Electrical Engineering Services Report for the proposed “Bloubos” mixed use Development on Remainder Portion 43 of the “Farm Gustrouw Number 918”, Somerset West, Cape Town
P14796
20 March 2018
Q:\P14796 (Bloubos Road Development)\A\Ehv\03_Project Management Plan Design\G_Document Management ‐ Reports\Services Report\Bloubos Services Report.docx
Electrical Engineering Services Report for the proposed “Bloubos” mixed use development on the Remainder Portion 43 of the “Farm Gustrouw Number 918”, Somerset West, Cape Town CONTENTS
Chapter Description Page
Revision Status 2
Distribution List 2
Appendices 2
1 Introduction 3
2 Development Proposal 3
3 Electrical Infrastructure Design Parameters 3
4 Electricity Supply Authority 3
5 Existing Electricity Supply Capacity 4
5.1 Existing Capacity 4
5.2 Proposed Supply 4
6 Existing Electrical Services and Servitudes 4
6.1 Introduction 4
6.2 Eskom 132 kV Servitude 4
6.3 Eskom 66 kV Services 4
6.4 Eskom 11 kV Services 5
6.5 City of Cape Town Electrical Services 7
7 Conclusion 7
Document Control and Disclaimer 14
Page 2
Q:\P14796 (Bloubos Road Development)\A\Ehv\03_Project Management Plan Design\G_Document Management ‐ Reports\Services Report\Bloubos Services Report.docx
Revision Status
Rev No. Issue Date Revision Description Prepared
By Reviewed
By Approved By
0 20/03/2018 Original M Batt S Harcus A van der Walt
Distribution List
Copies to:
Copy No. Name Company Email
Copy 1 of 2 Mr Geoff Chait Newport Properties [email protected]
Copy 2 of 2 Mr Gary Stevens Multi Quantity Surveyors [email protected]
Appendices
Appendix A: Locality Plan ........................................................................................................................ 8
Appendix B: Development Proposal ........................................................................................................ 9
Appendix C: Eskom Capacity Letter ....................................................................................................... 10
Appendix D: Wayleave Agreement ....................................................................................................... 11
Appendix E: Existing Eskom Services ..................................................................................................... 12
Appendix F: City of Cape Town Electrical Services ................................................................................ 13
Page 3
Q:\P14796 (Bloubos Road Development)\A\Ehv\03_Project Management Plan Design\G_Document Management ‐ Reports\Services Report\Bloubos Services Report.docx
1 Introduction
GIBB (Pty) Ltd was requested by Newport Properties to compile an Electrical Engineering Services Report for the proposed “Bloubos” mixed use development in Somerset West, Cape Town.
This report describes the proposal for Electrical Engineering Services to supply the
development and also addresses the availability of electrical capacity on the existing Eskom
electrical network.
2 Development Proposal
The site is located on Remainder Portion 43 of the Farm Gustrouw Number 918, situated in the City of Cape Town, as shown on the locality plan attached hereto as Appendix A. The site is situated to the south of National Road N2 at the “Shell” Service Station at Firlands. The mixed use development proposal comprises the establishment of 1 000 sectional title units and 1 800 m2 of retail space as shown on the development proposal plan attached hereto as Appendix B. The sectional title units will consist of a number of residential “clusters” at varying densities of between 68 and 120 units per hectare. A single retail site is proposed which is located adjacent the existing service station site.
3 Electrical Infrastructure Design Parameters
Energy efficient measures will be applied to reduce the ADMD of the sectional title units which will include the installation of LED lighting and other measures to be finalised during the design stage of the development. Taking the above energy efficient measures into consideration the notified maximum demand (maximum load) of the development is estimated as follows:
Description Quantity Estimated after diversity maximum demand (ADMD)
Estimated demand
Retail 1 800 m2 85 VA/m2 153 kVA
Sectional Title 1 000 units 3 kVA/unit 3 000 kVA
General Services Provision
1 100 kVA 100 kVA
Diversity Factor 0.8
Estimated Demand 2 600 kVA
The electricity distribution systems will be designed for the anticipated maximum load to avoid the need for future upgrading of the electricity distribution systems.
4 Electricity Supply Authority
The area of the proposed development falls within Eskom’s area of supply.
Page 4
Q:\P14796 (Bloubos Road Development)\A\Ehv\03_Project Management Plan Design\G_Document Management ‐ Reports\Services Report\Bloubos Services Report.docx
5 Existing Electricity Supply Capacity
5.1 Existing Capacity
It is envisaged that the proposed development will be supplied from Eskom’s “Sir Lowry’s
Pass” Substation.
Eskom has confirmed that Sir Lowry’s Pass Substation has sufficient capacity to supply the full
load of the development (refer to the attached Eskom confirmation of capacity letter
attached hereto as Appendix C).
5.2 Proposed Supply
Sir Lowry’s Pass Substation is situated some 800 m south east of the development. A new
11 kV supply will be established from the substation to the development. The final cable
routing will be negotiated with Eskom. We have proposed to make use of the existing
servitude area, but this is yet to be formally accepted by Eskom.
6 Existing Electrical Services and Servitudes
6.1 Introduction
Appendix E shows the extent of the existing Eskom services affected by the proposed development. These services are summarised as follows: 1. Gala/Lourensrivier 132 kV O/H line
2. Sir Lowry’s Pass/Waterkloof 66 kV O/H line (decommissioned)
3. Sir Lowry’s Pass/Revan 1 11 kV UG feeder
4. Sir Lowry’s Pass F3 11 kV O/H feeder
5. Sir Lowry’s Pass F2 11 kV O/H feeder
6.2 Eskom 132 kV Servitude
The Gala/Lourensrivier 132 kV overhead line is currently installed within a 39,938 m wide power transmission and telecommunication servitude across the property. No permanent structures are allowed within the servitude area.
6.3 Eskom 66 kV Services
The Sir Lowry’s Pass/Waterkloof 66 kV overhead line has been decommissioned and removed. A number of abandoned support structures have remained and will have to be removed prior to commencement of the civil works. These structures and associated suspension parts will have to be disposed of in accordance with the Eskom Guidelines for the disposal of such equipment. See Figure 6.1 below.
Page 5
Q:\P14796 (Bloubos Road Development)\A\Ehv\03_Project Management Plan Design\G_Document Management ‐ Reports\Services Report\Bloubos Services Report.docx
Figure 6.1: 66 kV Structures
6.4 Eskom 11 kV Services
The “Sir Lowry’s Pass/Revan 1” 11 kV underground cable, that follows the route of the decommissioned overhead infrastructure was identified by Eskom’s Western Cape office. According to their records, this cable is subject to a “wayleave agreement” in favour of Eskom. This information is yet to be verified by Eskom’s National office. Should the agreement still be valid, it notes that the wayleave agreement will be cancelled upon the successful relocation of the underground cable. Refer Clause 5 of the wayleave agreement as attached to Appendix D. The costs for this relocation will be for the developments account. “Sir Lowry’s Pass F2” overhead feeder cuts across the south western property boundary. This portion of line will have to be decommissioned or rerouted by Eskom, depending on the current users connected to it. Refer to Figure 6.2 below.
Page 6
Q:\P14796 (Bloubos Road Development)\A\Ehv\03_Project Management Plan Design\G_Document Management ‐ Reports\Services Report\Bloubos Services Report.docx
Figure 6.2: F2 ‐ 11 kV Line
The “Sir Lowry’s Pass F3” overhead feeder runs parallel to the northern properties boundary. A photo of this line is included below.
Figure 6.3: F3 ‐ 11 kV Line
The exact position of this line will have to be determined by a site survey. The survey will confirm whether this line is currently within the road reserve or within the property boundary. Further negotiations with Eskom may be required regarding the relocation of this line should it be repaired. The existing service station is currently supplied from this overhead line. Figure 6.4 below shows the position of the existing minisub.
Figure 6.4: Existing Minisub
Page 7
Q:\P14796 (Bloubos Road Development)\A\Ehv\03_Project Management Plan Design\G_Document Management ‐ Reports\Services Report\Bloubos Services Report.docx
6.5 City of Cape Town Electrical Services
The electrical services maintained by the City of Cape Town are limited to the existing streetlighting along the N2. The lighting extends to the East and the West of the development, to well beyond the property boundary. Any alterations to the existing configuration may require a re‐design of the affected portion. The extent of the services are included in Appendix F of this report.
7 Conclusion
GIBB has investigated the proposed development layout and engineering constraints of the
proposed development and is satisfied that the site is suitable for the intended development
from an electrical engineering point of view.
Page 8
Q:\P14796 (Bloubos Road Development)\A\Ehv\03_Project Management Plan Design\G_Document Management ‐ Reports\Services Report\Bloubos Services Report.docx
Appendix A: Locality Plan
Page 9
Q:\P14796 (Bloubos Road Development)\A\Ehv\03_Project Management Plan Design\G_Document Management ‐ Reports\Services Report\Bloubos Services Report.docx
Appendix B: Development Proposal
Gate
House 2A
in
out
1800m² Retail Component
Community
Centre
Gate
House 2B
Gate
House 1A
Mixed Use/
Education Facility
Gate
House 1B
Recreational
Facilities
Gate
House 1C
Visitor/ Public Parking
Visitor Parking
SLEAD BUILD DESIGNVA
Rev : 7
Spatial Development Framework - Phase 1 & 2
UD.2002
Bloubos Residential Precinct:
N
010 20 5010 100
70% 2 bed units30% 1 bed units
100 yr Flood Line
Servitude
Power line
Building Setback
Pocket Boundary
530 Units in Phase 2
1000 : Total Units [Phase 1 & 2 ]
[2 bays/ unit]
[1,25 bays/ unit] } 1,775 bays/unit
Phase 2 - Parking Schedule
Bay Allocation Count Parking Ratio Maximum Units
Phase 1Community 78 168Phase 1A 96 @1.775 bays/unit 55Phase 1B 437 @1.775 bays/unit 247Phase 1C 306 @1.775 bays/unit 168
917
Phase 2Phase 2A 375 @1.775 bays/unit 212Phase 2B 560 @1.775 bays/unit 318
935Grand total: 1852 1852
470 : Units [Phase 1] }
}
Area Schedule (Property Division - Phase 1 & 2)
Number Name Area Unit Count Density/ Ha
Phase 11 Parcel 1- GB1 0.8 hectare N/A N/A2 Parcel 2- C01 0.2 hectare N/A N/A3 Parcel 3 - GR2 0.8 hectare 55 68 du/Ha4 Parcel 4 - GR2 2.6 hectare 247 95 du/Ha5 Parcel 5 - GR2 1.4 hectare 168 120 du/HaPhase 26 Parcel 6 - LB1 0.8 hectare N/A N/A7 Parcel 7 - GR2 2.4 hectare 212 88 du/Ha8 Parcel 8 - GR2 3.3 hectare 318 93 du/Ha
Page 10
Q:\P14796 (Bloubos Road Development)\A\Ehv\03_Project Management Plan Design\G_Document Management ‐ Reports\Services Report\Bloubos Services Report.docx
Appendix C: Eskom Capacity Letter
Eskom Holdings SOC Limited Reg No 2002/015527/30
Dear Mr. Batt,
SERVICE CERTIFICATE: FIRLANDS MIXED-USE DEVELOPMENT
With reference to your enquiry at Eskom, I advise that Eskom is the licensed Distributor to the
abovementioned development.
The network feeder is Sir Lowrys Pass S/S.
The method of supplying the electricity will be determined once details are made available. The
formal quotation process will confirm spare capacity available and a proposal to supply such
property. Execution of making supply available will only be initiated on acceptance of a formal
budget quote.
The date to make a point of supply available will be confirmed during this process.
Please direct a formal application to our Group Customer Services for a quote at:
Group Customer Services
Eskom
Po Box 2100
Bellville
7535
Should you require any further information please contact Pieter Du Preez on the numbers
mentioned above, and be assured of Eskom’s best service at all times.
Yours faithfully
________________________________
JP Du Preez
Key Customer Relations Officer
Group Customer Service 60 Voortrekker Road, Bellville, 7530 P.O. Box 2100, Bellville, 7535 SA Tel +27 86 003 7566 www.eskom.co.za
Mr. Mario Batt Date: The Developer 08 February 2018 Gibb Engineering & Architecture PO Box 3965
Enquiries: JP Du Preez
CAPE TOWN
Tel +27 21 915 2076 8000
Page 11
Q:\P14796 (Bloubos Road Development)\A\Ehv\03_Project Management Plan Design\G_Document Management ‐ Reports\Services Report\Bloubos Services Report.docx
Appendix D: Wayleave Agreement
Page 12
Q:\P14796 (Bloubos Road Development)\A\Ehv\03_Project Management Plan Design\G_Document Management ‐ Reports\Services Report\Bloubos Services Report.docx
Appendix E: Existing Eskom Services
Page 13
Q:\P14796 (Bloubos Road Development)\A\Ehv\03_Project Management Plan Design\G_Document Management ‐ Reports\Services Report\Bloubos Services Report.docx
Appendix F: City of Cape Town Electrical Services
N2
ESKOM
ST918-183ST918-185
ST959-198
ST959-RE
ST918-43-RE
ST959-282
ST959-9ST959-8
ST959-6-RE
ST959-5-RE
ST959-285
ST959-7-RE
ST959-296
ST959-10-RE
ST959-281
ST959-279
ST918-146
ST918-24-RE
ST959-97
ST1154-4
ST959-146
ST959-96
ST959-280
ST959-297
ST1154-RE
ST918-60-RE
ST959-273-RE
32001
ST1154-27
ST959-287
ST959-274
ST959-144
ST959-298
ST959-176
ST959-307
ST959-309
ST1154-26
ST959-316
ST959-300
ST959-299
ST959-308
ST959-306
ST959-305
ST959-310
ST959-311
ST918-149
ST959-304
ST959-272
ST959-284
ST959-140
ST959-RE
32002
ST959-317
ST959-12
ST959-117-REST959-315
ST959-312
ST959-177-RE
ST959-314
ST959-319
ST959-173
ST1154-28
ST918-184
ST959-174
ST959-318
ST959-286ST959-95
32003
ST959-301
ST1154-5
ST959-313
ST959-270 ST959-271
Firlands
NOTES OUR REFERENCE: YOUR REFERENCEFirlands Mixed-Use developmentWayleave for Planning Purposes
E.CAPES
A van Zyl 16/3/3/1ELECTRICITY GENERATION & DISTRIBUTION
CITY OF CAPE TOWNCHECKED:
SCALEDATEENGINEER:
PROCESSED:
2017/05/04
MC Louw
1:2,500·
LegendStreetlight
Pole
EXTENT OF PROPOSED PLANNING
CITY OF CAPE TOWNELE C TR ICITY G E NE RAT IO N
& D IS TR IBU TION
DR AW IN G & RE CO RD C EN TR EEA ST
4 MAY 2017
Page 14
Q:\P14796 (Bloubos Road Development)\A\Ehv\03_Project Management Plan Design\G_Document Management ‐ Reports\Services Report\Bloubos Services Report.docx
Document Control and Disclaimer
FORM IP180_B
CLIENT : Newport Properties
PROJECT NAME : Bloubos PROJECT No.: P14796
TITLE OF DOCUMENT : Electrical Engineering Services Report for the proposed Bloubos mixed use development, Somerset West, Cape Town
ELECTRONIC LOCATION : Q:\P14796 (Bloubos Road Development)\A\Ehv\03_Project Management Plan Design\G_Document Management ‐ Reports\Services Report\Bloubos Services Report.docx
Approved By Reviewed By Prepared By
ORIGINAL NAME Andre van der Walt
NAME Sinclair Harcus
NAME Mario Batt
DATE 20 March 2018
SIGNATURE
SIGNATURE SIGNATURE
Approved By Reviewed By Prepared By
REVISION NAME
NAME
NAME
DATE
SIGNATURE
SIGNATURE
SIGNATURE
This report, and information or advice, which it contains, is provided by GIBB (or any of its related entities) solely for internal use and reliance by its Client in performance of GIBB’s duties and liabilities under its contract with the Client. Any advice, opinions, or recommendations within this report should be read and relied upon only in the context of the report as a whole. The advice and opinions in this report are based upon the information made available to GIBB at the date of this report and on current South African standards, codes, technology and construction practices as at the date of this report. Following final delivery of this report to the Client, GIBB will have no further obligations or duty to advise the Client on any matters, including development affecting the information or advice provided in this report. This report has been prepared by GIBB in their professional capacity as Consulting Engineers. The contents of the report do not, in any way, purport to include any manner of legal advice or opinion. This report is prepared in accordance with the terms and conditions of the GIBB contract with the Client. Regard should be had to those terms and conditions when considering and/or placing any reliance on this report. Should the Client wish to release this report to a Third Party for that party's reliance, GIBB may, at its discretion, agree to such release provided that: (a) GIBB’s written agreement is obtained prior to such release, and (b) By release of the report to the Third Party, that Third Party does not acquire any rights, contractual or otherwise, whatsoever against
GIBB and GIBB, accordingly, assume no duties, liabilities or obligations to that Third Party, and (c) GIBB accepts no responsibility for any loss or damage incurred by the Client or for any conflict of GIBB interests arising out of the Client's
release of this report to the Third Party.
GIBB (Pty) Ltd Website : www.gibb.co.za
Postal Address : PO Box 3965, Cape Town Physical Address : 14 Kloof Street, Cape Town
Contact Person : Mario Batt Email Address : [email protected]