USACE - Orleans Canal New Orleans, Louisiana Blue Iron Foundations and Shoring, LLC Florida 467 Lake Howell Rd #104 Maitland, FL 32751 Louisiana 125 Teal Street St Rose, LA 70087 info@blueironllc.com www.blueironllc.com Type of Project Canal Upgrades Purpose of Piling Permanent Cutoff Wall Site Location New Orleans, Louisiana Duration of Work April 2011 - June 2011 Owner USACE Main Contractor Integrated Pro Services, LLC (IPS) Piling Contractor Blue Iron Foundations and Shoring, LLC Equipment Used ECO 900 Silent Piler & ECO1400 S Silent Piler Sheet Pile Material PZ27 & PZC18 L=65ft N=278pr Sheet Pile Supplier Skyline Steel & LB Foster Description The Press-In Method for sheeting installation was specified into the project plans due to the close proximity of the adjacent canal wall. The permanent steel sheet pile cutoff wall was installed alongside the existing wall as well as under an existing in-use highway bridge with headroom limitations which required the sheeting to be spliced a minimum of five times. Blue Iron, Inc. California PO Box 1679 W. Sacramento, CA 95691 (916)441-3538 Borehole Data Clay PZ27 & PZC18 L=65ft Blue Iron , LLC MAILING ADDRESS PO BOX 6 W. SACRAMENTO, CA 95691

Upload: others

Post on 23-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Blue%Iron LLC New Orleans · 2019. 11. 21. · Site Location New Orleans, Louisiana Duration of Work April 2011 - June 2011 Owner USACE Main Contractor Integrated Pro Services, LLC

USACE - Orleans Canal New Orleans, Louisiana

Blue Iron Foundations and Shoring, LLCFlorida467 Lake Howell Rd #104Maitland, FL 32751

Louisiana125 Teal StreetSt Rose, LA 70087

[email protected]

Type of Project Canal Upgrades

Purpose of Piling Permanent Cutoff Wall

Site Location New Orleans, Louisiana

Duration of Work April 2011 - June 2011

Owner USACE

Main Contractor Integrated Pro Services, LLC (IPS)

Piling Contractor Blue Iron Foundations and Shoring, LLC

Equipment Used ECO 900 Silent Piler & ECO1400 S Silent Piler

Sheet Pile Material PZ27 & PZC18 L=65ft N=278pr

Sheet Pile Supplier Skyline Steel & LB Foster

Description The Press-In Method for sheeting installation was specified into the project plans due to the close proximity of the adjacent canal wall. The permanent steel sheet pile cutoff wall was installed alongside the existing wall as well as under an existing in-use highway bridge with headroom limitations which required the sheeting to be spliced a minimum of five times.

Blue Iron, Inc.CaliforniaPO Box 1679W. Sacramento, CA 95691

(916)441-3538

Borehole Data

Clay

PZ2

7 &

PZC

18

L=65

ft

Blue Iron, LLC

MAILING ADDRESSPO BOX 6W. SACRAMENTO, CA 95691