HAL - NASIK PACKAGE-II IO SUMMARY Sr.No. Point Description AI AO DI DO S/W Connection Scope A Airconditioning Chiller Plant I) Chillers : 2 nos. 1 CHW Supply Temperature 4 Immersion Temperature Sensor IBMS Vendor 2 CHW Return Temperature 4 Immersion Temperature Sensor IBMS Vendor 3 Outside Air Ambient Temeprature & Humidity Sensor 2 Outside Air Temperature + RH Sensor IBMS Vendor 4 Chilled Water Flow 4 Flow Meter IBMS Vendor 5 Chiller On / Off Status 4 Chillers Panel Chiller Manufacturer /Vendor to provide potential free contact ( 1 NO for each chiller ) for indicating Chiller running Status 6 Chiller Trip Status 2 Chillers Panel Chiller Manufacturer /Vendor to provide potential free contact ( 1 NO for each chiller ) for indicating Chiller running Status 7 Chiller Auto/Manual Status 2 Chillers Panel Chiller Manufacturer /Vendor to provide potential free contact ( 1 NO for each chiller ) for indicating Chiller running Status 8 Chiller Isolation Valves 2 Butterfly Valve HVAC Vendor 9 Chiller On / Off 2 MCC Panel - Chillers Panel Vendor to provide potential free contact ( 1 NO for each chiller ) to accept remote start / stop 10 HVAC Chiller Microprocessor Monitoring of Various Parameters through sw interface 50 25 points per Chiller Unit from Chiller Vendor MODBUS/BACnet/TCPIP/ N2 Bus Interface to be provided from Each Chiller Panel and the 20 No. of Soft Points to be considered Per Chiller unit. Sub Total 10 0 12 4 0 II) Chilled Water Pumps : 2 nos. 10 CHW Pump Auto/Manual Status 2 MCC Panel - CHW Pumps Panel Vendor to provide potential free contact ( 1 NO for each Pump) for indicating position of auto/manual switch. 11 CHW Pumps On/ Off Status 4 Differential Pressure Switch IBMS vendor 12 CHW Pump Trip Status 2 MCC Panel - CHW Pumps Panel Vendor to provide potential free contact ( 1 NO for each Pump) for indicating Pump Trip Status. 13 CHW Pump On /Off 2 MCC Panel - CHW Pumps Panel Vendor to provide potential free contact ( 1 NO for each pump ) to accept remote start / stop. BMS - HVAC SYSTEMS SEMAC Consulting Engineers Hyderabad TENDER HVAC

Upload: others

Post on 27-Jan-2020

25 views

Category:

Documents


7 download

TRANSCRIPT

Page 1: BMS - Engineering Projectsengineeringprojects.com/Tender/UploadFiles/2821_VOLUME--4-DRAWINGS.pdf · HAL - NASIK PACKAGE-II IO SUMMARY Sr.No. Point Description AI AO DI DO S/W Connection

HAL - NASIKPACKAGE-II

IO SUMMARY

Sr.No. Point Description AI AO DI DO S/W Connection Scope

A Airconditioning Chiller Plant

I) Chillers : 2 nos.

1 CHW Supply Temperature 4 Immersion Temperature Sensor IBMS Vendor

2 CHW Return Temperature 4 Immersion Temperature Sensor IBMS Vendor

3 Outside Air Ambient Temeprature &

Humidity Sensor

2 Outside Air Temperature + RH

Sensor

IBMS Vendor

4 Chilled Water Flow 4 Flow Meter IBMS Vendor

5 Chiller On / Off Status 4 Chillers Panel Chiller Manufacturer /Vendor to provide

potential free contact ( 1 NO for each chiller )

for indicating Chiller running Status

6 Chiller Trip Status 2 Chillers Panel Chiller Manufacturer /Vendor to provide

potential free contact ( 1 NO for each chiller )

for indicating Chiller running Status

7 Chiller Auto/Manual Status 2 Chillers Panel Chiller Manufacturer /Vendor to provide

potential free contact ( 1 NO for each chiller )

for indicating Chiller running Status

8 Chiller Isolation Valves 2 Butterfly Valve HVAC Vendor

9 Chiller On / Off 2 MCC Panel - Chillers Panel Vendor to provide potential free contact

( 1 NO for each chiller ) to accept remote start

/ stop

10 HVAC Chiller Microprocessor

Monitoring of Various Parameters

through sw interface

50 25 points per Chiller Unit from

Chiller Vendor

MODBUS/BACnet/TCPIP/ N2 Bus Interface to be

provided from Each Chiller Panel and the 20

No. of Soft Points to be considered Per Chiller

unit.

Sub Total 10 0 12 4 0

II) Chilled Water Pumps : 2 nos.

10 CHW Pump Auto/Manual Status 2 MCC Panel - CHW Pumps Panel Vendor to provide potential free contact

( 1 NO for each Pump) for indicating position of

auto/manual switch.

11 CHW Pumps On/ Off Status 4 Differential Pressure Switch IBMS vendor

12 CHW Pump Trip Status 2 MCC Panel - CHW Pumps Panel Vendor to provide potential free contact

( 1 NO for each Pump) for indicating Pump Trip

Status.

13 CHW Pump On /Off 2 MCC Panel - CHW Pumps Panel Vendor to provide potential free contact

( 1 NO for each pump ) to accept remote start

/ stop.

BMS - HVAC SYSTEMS

SEMAC Consulting EngineersHyderabad

TENDERHVAC

Page 2: BMS - Engineering Projectsengineeringprojects.com/Tender/UploadFiles/2821_VOLUME--4-DRAWINGS.pdf · HAL - NASIK PACKAGE-II IO SUMMARY Sr.No. Point Description AI AO DI DO S/W Connection

HAL - NASIKPACKAGE-II

IO SUMMARY

Sr.No. Point Description AI AO DI DO S/W Connection Scope

III) Condenser Water Pumps : 2 nos.

14 CHW Pump Auto/Manual Status 2 MCC Panel - CHW Pumps Panel Vendor to provide potential free contact

( 1 NO for each Pump ) for indicating position

of auto/manual switch.

15 CHW Pumps On/ Off Status 4 Differential Pressure Switch IBMS vendor

16 CHW Pump Trip Status 2 MCC Panel - CHW Pumps Panel Vendor to provide potential free contact

( 1 NO for each Pump ) for indicating Pump Trip

Status.

17 CHW Pump On /Off 2 MCC Panel - CHW Pumps Panel Vendor to provide potential free contact

( 1 NO for each Pump ) to accept remote start

/ stop.

Sub Total 0 0 16 4 0

IV) Cooling Tower : 2 nos.

18 CHW Supply Temperature 2 Immersion type sensors IBMS vendor. HVAC vendor to provide sockets

for sensors

19 CHW Return Temperature 2 Immersion type sensors IBMS vendor. HVAC vendor to provide sockets

for sensors

19 Fan Auto / Manual Status 2 MCC Panel - AHU Panel Vendor to provide potential free contact

( 1 NO for each AHU) for indicating position of

auto/manual switch.

20 Fan On/Off Status 4 Differential Pressure Switch IBMS vendor

20 Fan Trip Status 2 MCC Panel - AHU Panel Vendor to provide potential free contact

( 1 NO for each AHU) for indicating Trip Status.

21 Fan On /Off Command 2 MCC Panel - AHU Panel Vendor to provide potential free contact

( 1 NO for each AHU) to accept remote start /

stop.

Sub Total 4 0 8 2 0

AC Chiller Plant Sub Total 14 0 36 10 0

IV) Floor Mounted Air Handling Units - 4 nos

1 RA Temperature & RH Sensors 2 Duct Mounted Temperature &

RH Sensor

IBMS vendor

2 SA Temperature & RH Sensors 2 Duct Mounted Temperature &

RH Sensor

IBMS vendor

3 3-Way Modulating Valve Actuation 1 1 2-Way Modulating Valve with

feedback-Acutator shall be with

0-10VDC

HVAC Vendor

4 Filter Dirty Status 2 DP switch IBMS vendor

5 Fresh Air / Return Damper Control 2 Damper Actuator IBMS vendor

6 Duct Static Pressure 1 Duct Static Pressure Sensor IBMS vendor

SEMAC Consulting EngineersHyderabad

TENDERHVAC

Page 3: BMS - Engineering Projectsengineeringprojects.com/Tender/UploadFiles/2821_VOLUME--4-DRAWINGS.pdf · HAL - NASIK PACKAGE-II IO SUMMARY Sr.No. Point Description AI AO DI DO S/W Connection

HAL - NASIKPACKAGE-II

IO SUMMARY

Sr.No. Point Description AI AO DI DO S/W Connection Scope

7 AHU Auto / Manual Status 1 MCC Panel - AHU Panel Vendor to provide potential free contact

( 1 NO for each AHU) for indicating position of

auto/manual switch.

8 AHU On/Off Status 2 Differential Pressure Switch IBMS vendor

9 AHU Trip Status 1 MCC Panel - AHU Panel Vendor to provide potential free contact

( 1 NO for each AHU) for indicating Trip Status.

10 Smoke & Fire Sensor 1 MCC Panel - AHU Fire Alarm Control Module to provide potential

free contact at the panel and IBMS Vendor to

inteface the same.

11 AHU On /Off Command 1 MCC Panel - AHU Panel Vendor to provide potential free contact

( 1 NO for each AHU) to accept remote start /

stop.

12 CHW Supply Temperature 1 Immersion type sensors IBMS vendor. HVAC vendor to provide sockets

for sensors

13 CHW Return Temperature 1 Immersion type sensors IBMS vendor. HVAC vendor to provide sockets

for sensors

For Each AHU 8 3 7 1 0

Total for 4 AHUs 32 12 28 4 0

SEMAC Consulting EngineersHyderabad

TENDERHVAC

Page 4: BMS - Engineering Projectsengineeringprojects.com/Tender/UploadFiles/2821_VOLUME--4-DRAWINGS.pdf · HAL - NASIK PACKAGE-II IO SUMMARY Sr.No. Point Description AI AO DI DO S/W Connection

HAL - NASIKPACKAGE-II

IO SUMMARY

Sr.No. Point Description AI AO DI DO S/W Connection Scope

V) Floor Mounted Air Handling Units - 3 nos

1 RA Temperature & RH Sensors 2 Duct Mounted Temperature &

RH Sensor

IBMS vendor

2 SA Temperature & RH Sensors 2 Duct Mounted Temperature &

RH Sensor

IBMS vendor

3 3-Way Modulating Valve Actuation 1 1 2-Way Modulating Valve with

feedback-Acutator shall be with

0-10VDC

HVAC Vendor

4 Filter Dirty Status 4 DP switch IBMS vendor

5 Fresh Air / Return Damper Control 2 Damper Actuator IBMS vendor

6 Duct Static Pressure 1 Duct Static Pressure Sensor IBMS vendor

7 AHU Auto / Manual Status 1 MCC Panel - AHU Panel Vendor to provide potential free contact

( 1 NO for each AHU) for indicating position of

auto/manual switch.

8 AHU On/Off Status 2 Differential Pressure Switch IBMS vendor

9 AHU Trip Status 1 MCC Panel - AHU Panel Vendor to provide potential free contact

( 1 NO for each AHU) for indicating Trip Status.

10 Smoke & Fire Sensor 1 MCC Panel - AHU Fire Alarm Control Module to provide potential

free contact at the panel and IBMS Vendor to

inteface the same.

11 AHU On /Off Command 1 MCC Panel - AHU Panel Vendor to provide potential free contact

( 1 NO for each AHU) to accept remote start /

stop.

12 CHW Supply Temperature 1 Immersion type sensors IBMS vendor. HVAC vendor to provide sockets

for sensors

13 CHW Return Temperature 1 Immersion type sensors IBMS vendor. HVAC vendor to provide sockets

for sensors

For Each AHU 8 3 9 1 0

Total for 3 AHUs 24 9 27 3 0

SEMAC Consulting EngineersHyderabad

TENDERHVAC

Page 5: BMS - Engineering Projectsengineeringprojects.com/Tender/UploadFiles/2821_VOLUME--4-DRAWINGS.pdf · HAL - NASIK PACKAGE-II IO SUMMARY Sr.No. Point Description AI AO DI DO S/W Connection

HAL - NASIKPACKAGE-II

IO SUMMARY

Sr.No. Point Description AI AO DI DO S/W Connection Scope

VI) Vertical Air Handling Units - 1 nos

1 RA Temperature & RH Sensors 2 Duct Mounted Temperature &

RH Sensor

IBMS vendor

2 SA Temperature & RH Sensors 2 Duct Mounted Temperature &

RH Sensor

IBMS vendor

3 3-Way Modulating Valve Actuation 1 1 2-Way Modulating Valve with

feedback-Acutator shall be with

0-10VDC

HVAC Vendor

4 Filter Dirty Status 4 DP switch IBMS vendor

5 Fresh Air / Return Damper Control 2 Damper Actuator IBMS vendor

6 Duct Static Pressure 1 Duct Static Pressure Sensor IBMS vendor

7 AHU Auto / Manual Status 1 MCC Panel - AHU Panel Vendor to provide potential free contact

( 1 NO for each AHU) for indicating position of

auto/manual switch.

8 AHU On/Off Status 2 Differential Pressure Switch IBMS vendor

9 AHU Trip Status 1 MCC Panel - AHU Panel Vendor to provide potential free contact

( 1 NO for each AHU) for indicating Trip Status.

10 Smoke & Fire Sensor 1 MCC Panel - AHU Fire Alarm Control Module to provide potential

free contact at the panel and IBMS Vendor to

inteface the same.

11 AHU On /Off Command 1 MCC Panel - AHU Panel Vendor to provide potential free contact

( 1 NO for each AHU) to accept remote start /

stop.

12 CHW Supply Temperature 1 Immersion type sensors IBMS vendor. HVAC vendor to provide sockets

for sensors

13 CHW Return Temperature 1 Immersion type sensors IBMS vendor. HVAC vendor to provide sockets

for sensors

For Each AHU 8 3 9 1 0

Total for 1 AHUs 8 3 9 1 0

GRAND TOTAL 78 24 100 18 0

SEMAC Consulting EngineersHyderabad

TENDERHVAC

Page 6: BMS - Engineering Projectsengineeringprojects.com/Tender/UploadFiles/2821_VOLUME--4-DRAWINGS.pdf · HAL - NASIK PACKAGE-II IO SUMMARY Sr.No. Point Description AI AO DI DO S/W Connection

Architects & Consulting Engineers

'' Conjeevaram House'' 2nd Floor6-1-276, Padmaraonagar..

S e c u n d e r a b a d - 500 025Ph:27508968,Fax:040-27507733

Email: [email protected]

Page 7: BMS - Engineering Projectsengineeringprojects.com/Tender/UploadFiles/2821_VOLUME--4-DRAWINGS.pdf · HAL - NASIK PACKAGE-II IO SUMMARY Sr.No. Point Description AI AO DI DO S/W Connection

Architects & Consulting Engineers

'' Conjeevaram House'' 2nd Floor6-1-276, Padmaraonagar..

S e c u n d e r a b a d - 500 025Ph:27508968,Fax:040-27507733

Email: [email protected]

Page 8: BMS - Engineering Projectsengineeringprojects.com/Tender/UploadFiles/2821_VOLUME--4-DRAWINGS.pdf · HAL - NASIK PACKAGE-II IO SUMMARY Sr.No. Point Description AI AO DI DO S/W Connection

Architects & Consulting Engineers

'' Conjeevaram House'' 2nd Floor6-1-276, Padmaraonagar..

S e c u n d e r a b a d - 500 025Ph:27508968,Fax:040-27507733

Email: [email protected]

TEST STATION FOR HYDRO PNEUMATIC FUEL AGGREGATESWORKS & SERVICES DEPARTMENT BUILDING(21/1)

PLANT ROOM , CT LOCATION LAYOUT

Page 9: BMS - Engineering Projectsengineeringprojects.com/Tender/UploadFiles/2821_VOLUME--4-DRAWINGS.pdf · HAL - NASIK PACKAGE-II IO SUMMARY Sr.No. Point Description AI AO DI DO S/W Connection

Architects & Consulting Engineers

'' Conjeevaram House'' 2nd Floor6-1-276, Padmaraonagar..

S e c u n d e r a b a d - 500 025Ph:27508968,Fax:040-27507733

Email: [email protected]

TEST STATION FOR HYDRO PNEUMATIC FUEL AGGREGATESWORKS & SERVICES DEPARTMENT BUILDING(21/1)

TERRACE FLOOR PLAN CT LOCATION LAYOUT

Page 10: BMS - Engineering Projectsengineeringprojects.com/Tender/UploadFiles/2821_VOLUME--4-DRAWINGS.pdf · HAL - NASIK PACKAGE-II IO SUMMARY Sr.No. Point Description AI AO DI DO S/W Connection

CHILLER

200TR

CHILLER

200TR

205/204

44.1 gpm

201/204

44.1 gpm

200/204

44.1 gpm

182/204

22 gpm

184/204

15.9 gpm

190/204

7.9 gpm

183/204

7.9 gpm

186/204

15.9 gpm8.8 gpm

256/204

158 gpm

250/204

21.16 gpm

254/204

7.9 gpm

242/204

8.8 gpm

239/204

13.2 gpm

238/204

14.1 gpm

CDS PUMPS

20HPX3NOS

200MM

COOLING TOWER

250TRX2NOS (2W)

200MM

250MM

250MM

200MM

CHW PUMPS

10HPX3NOS

(2W+1SB)

(2W+1SB)

317.5 GPM @95 DEGF

185/204

237/204

3.5 gpm

220/204

0.88 gpm

243/204

14.1 gpm

250MM

50MM50MM50MM

40MM

32MM25MM

25MM

32MM

25MM100 MM

40MM

25MM

25MM32MM

18.75MM9.37MM

32MM32MM

452.3 GPM

408.24 GPM

364.14 GPM

274.24 GPM 320.04 GPM

182.7G

PM

158G

PM

166.8G

PM

100M

M

190.6GPM

100M

M

100M

M

100MM

7.9G

PM

25M

M

23.8G

PM

40M

M

45.8 GPM

50MM

83.64 GPM

29.06GPM 7.9GPM

45.78 G

PM

32.58 G

PM

50M

M

18.48 G

PM

32M

M

4.38 G

PM

18.75M

M

0.88 G

PM

9.37M

M

54.58 GPM

50MM

50M

M

25MM

40MM

65MM

100MM

125MM

125MM 150MM150MM

BUILDING 21/1 PROCESS PIPING SCHEMATIC

DIA

DIA

DIA

DIA

DIADIA

DIA

DIADIADIA

DIA

DIA

DIA

DIA

DIA

DIA

DIA

DIA

DIADIA

DIADIA

DIA

DIA

DIA

DIA

DIADIA

DIADIADIA

DIA

DIA

DIA

DIA

DIA

DIA

DIA

2-5P 2-5P 2-5P

2-5P2-5P2-5P

2-5P

2-5P2-5P

2-5P

2-5P2-5P

2-5P

2-5P

2-5P

2-5P

2-5P

2-5P

MAKEUP MAKEUP

TT

TT

TT

TT

P1

P2

P1

P2

P1

P1

P1

P1

P1

P1

TT

P1

P1

P1

4.87M

5.182M

200MM

4.87M

5.182M

65 MM/79GPM

DIA

65 MM/79GPM

DIA

39 gpm

DIA 50 M

M

39 gpm

DIA 50 M

M

39 gpm

DIA 50 M

M

39 gpm

DIA 50 M

M

256/204

256/204

256/204

256/204

NOTES:

NORTH :

Architects & Consulting Engineers

'' Conjeevaram House'' 2nd Floor6-1-276, Padmaraonagar..

S e c u n d e r a b a d - 500 025Ph:27508968,Fax:040-27507733

Email: [email protected]

PROCESS PIPING SCHEMATIC LAYOUT OF TEST STATION FOR HYDRO

PNEUMATIC FUEL AGGREGATES (21/1)

LEGEND:

GV'S

Y STRAINER

NRV

CHILLED CHW

WATER

CONDENSER CDS

WATER

WORKING

W

STANDBY

SB

PRESSURE

P

LOSS M.WC

PRESSURE

PG

GAUGE

TEMPERATURE

TG

GAUGE

P1COOLER

PRESSURE DROP

P2CONDENSER

PRESSURE DROP

T0 SMM

05.06.10

R0 SMM

12.04.12

Page 11: BMS - Engineering Projectsengineeringprojects.com/Tender/UploadFiles/2821_VOLUME--4-DRAWINGS.pdf · HAL - NASIK PACKAGE-II IO SUMMARY Sr.No. Point Description AI AO DI DO S/W Connection

Architects & Consulting Engineers

'' Conjeevaram House'' 2nd Floor6-1-276, Padmaraonagar..

S e c u n d e r a b a d - 500 025Ph:27508968,Fax:040-27507733

Email: [email protected]

Page 12: BMS - Engineering Projectsengineeringprojects.com/Tender/UploadFiles/2821_VOLUME--4-DRAWINGS.pdf · HAL - NASIK PACKAGE-II IO SUMMARY Sr.No. Point Description AI AO DI DO S/W Connection

Architects & Consulting Engineers

'' Conjeevaram House'' 2nd Floor6-1-276, Padmaraonagar..

S e c u n d e r a b a d - 500 025Ph:27508968,Fax:040-27507733

Email: [email protected]

Page 13: BMS - Engineering Projectsengineeringprojects.com/Tender/UploadFiles/2821_VOLUME--4-DRAWINGS.pdf · HAL - NASIK PACKAGE-II IO SUMMARY Sr.No. Point Description AI AO DI DO S/W Connection

Architects & Consulting Engineers

'' Conjeevaram House'' 2nd Floor6-1-276, Padmaraonagar..

S e c u n d e r a b a d - 500 025Ph:27508968,Fax:040-27507733

Email: [email protected]

Page 14: BMS - Engineering Projectsengineeringprojects.com/Tender/UploadFiles/2821_VOLUME--4-DRAWINGS.pdf · HAL - NASIK PACKAGE-II IO SUMMARY Sr.No. Point Description AI AO DI DO S/W Connection

CHILLER

25TR

CHW PUMPS

3/4HPX2NOS

(1W+1SB)

BUILDING 22/1 PROCESS PIPING SCHEMATIC

73/205

7.92 gpm

25MM

77/205

7.92 gpm

25MM

76/205

7.92 gpm

25MM

21/205

3.9625 gpm

18.75MM

3.9625GPM

18.75MM

11.882GPM

32MM

19.80GPM

40MM

27.72GPM

40MM

WATER COOLED

40MM

27.72GPM

65MM

CDS PUMPS

90 GPM

COOLING TOWER

30TRX1NOS

80MM

3HPX2NOS

(1W+1SB)

80MM

DIA

DIA

DIA

80MMDIA

80MMDIA

80MMDIA

DIA

DIA

DIA

DIA

DIA

DIADIA

DIA

DIA

P1

P2

5M

7M

P1 P1

P1 P1

MAKEUP

T

T

T

TT

P1 P1

P1 P1

2-5P

2-5P2-5P2-5P

NOTES:

NORTH :

Architects & Consulting Engineers

'' Conjeevaram House'' 2nd Floor6-1-276, Padmaraonagar..

S e c u n d e r a b a d - 500 025Ph:27508968,Fax:040-27507733

Email: [email protected] PIPING SCHEMATIC LAYOUT OF LANDING

GEAR O/H SHOP (22/1)

LEGEND:

GV'S

Y STRAINER

NRV

CHILLED CHW

WATER

CONDENSER CDS

WATER

WORKING

W

STANDBY

SB

PRESSURE

P

LOSS M.WC

PRESSURE

PG

GAUGE

TEMPERATURE

TG

GAUGE

P1COOLER

PRESSURE DROP

P2CONDENSER

PRESSURE DROP

T0 SMM

05.06.10

R0 SMM

12.04.12

Page 15: BMS - Engineering Projectsengineeringprojects.com/Tender/UploadFiles/2821_VOLUME--4-DRAWINGS.pdf · HAL - NASIK PACKAGE-II IO SUMMARY Sr.No. Point Description AI AO DI DO S/W Connection

CHILLER

25TR

CHW PUMPS

3/4HPX2NOS

(1W+1SB)

BUILDING 22/1 PROCESS PIPING SCHEMATIC

73/205

7.92 gpm

25MM

77/205

7.92 gpm

25MM

76/205

7.92 gpm

25MM

21/205

3.9625 gpm

18.75MM

3.9625GPM

18.75MM

11.882GPM

32MM

19.80GPM

40MM

27.72GPM

40MM

WATER COOLED

40MM

27.72GPM

65MM

CDS PUMPS

90 GPM

COOLING TOWER

30TRX1NOS

80MM

3HPX2NOS

(1W+1SB)

80MM

DIA

DIA

DIA

80MMDIA

80MMDIA

80MMDIA

DIA

DIA

DIA

DIA

DIA

DIADIA

DIA

DIA

P1

P2

5M

7M

P1 P1

P1 P1

MAKEUP

T

T

T

TT

P1 P1

P1 P1

2-5P

2-5P2-5P2-5P

NOTES:

NORTH :

Architects & Consulting Engineers

'' Conjeevaram House'' 2nd Floor6-1-276, Padmaraonagar..

S e c u n d e r a b a d - 500 025Ph:27508968,Fax:040-27507733

Email: [email protected] PIPING SCHEMATIC LAYOUT OF LANDING

GEAR O/H SHOP (22/1)

LEGEND:

GV'S

Y STRAINER

NRV

CHILLED CHW

WATER

CONDENSER CDS

WATER

WORKING

W

STANDBY

SB

PRESSURE

P

LOSS M.WC

PRESSURE

PG

GAUGE

TEMPERATURE

TG

GAUGE

P1COOLER

PRESSURE DROP

P2CONDENSER

PRESSURE DROP

T0 SMM

05.06.10

R0 SMM

12.04.12

Page 16: BMS - Engineering Projectsengineeringprojects.com/Tender/UploadFiles/2821_VOLUME--4-DRAWINGS.pdf · HAL - NASIK PACKAGE-II IO SUMMARY Sr.No. Point Description AI AO DI DO S/W Connection

VP VP VP VP VP VP

VP

VPVPVPVP

AIR SHOWER

VP

VPVPVP VP VP VPVPVPVP

GF-LVAU-03

GF-

LVA

U-0

4

150MM DEPTHCONCRETE PEDESTAL

150MM DEPTHCONCRETE PEDESTAL

Architects & Consulting Engineers

'' Conjeevaram House'' 2nd Floor6-1-276, Padmaraonagar..

S e c u n d e r a b a d - 500 025Ph:27508968,Fax:040-27507733

Email: [email protected]

AIR CONDITIONING - RETURN DUCT LAYOUTFOR CLEAN ROOM AREAS

OF 11 TO 13 NUMBERS

Page 17: BMS - Engineering Projectsengineeringprojects.com/Tender/UploadFiles/2821_VOLUME--4-DRAWINGS.pdf · HAL - NASIK PACKAGE-II IO SUMMARY Sr.No. Point Description AI AO DI DO S/W Connection

VP VP VP VP VP VP

VP

VPVPVPVP

AIR SHOWER

VP

VPVPVP VP VP VPVPVPVP

GF-LVAU-03

GF-

LVA

U-0

4

150MM DEPTHCONCRETE PEDESTAL

150MM DEPTHCONCRETE PEDESTAL

Architects & Consulting Engineers

'' Conjeevaram House'' 2nd Floor6-1-276, Padmaraonagar..

S e c u n d e r a b a d - 500 025Ph:27508968,Fax:040-27507733

Email: [email protected]

AIR CONDITIONING - SUPPLY AND RETURNDUCT LAYOUT FOR CLEAN ROOM AREAS

OF 11 TO 13 NUMBERS

Page 18: BMS - Engineering Projectsengineeringprojects.com/Tender/UploadFiles/2821_VOLUME--4-DRAWINGS.pdf · HAL - NASIK PACKAGE-II IO SUMMARY Sr.No. Point Description AI AO DI DO S/W Connection

VP VP VP VP VP VP

VP

VPVPVPVP

AIR SHOWER

VP

VPVPVP VP VP VPVPVPVP

GF-LVAU-03

GF-

LVA

U-0

4

150MM DEPTHCONCRETE PEDESTAL

150MM DEPTHCONCRETE PEDESTAL

Architects & Consulting Engineers

'' Conjeevaram House'' 2nd Floor6-1-276, Padmaraonagar..

S e c u n d e r a b a d - 500 025Ph:27508968,Fax:040-27507733

Email: [email protected]

AIR CONDITIONING - SUPPLY DUCT LAYOUTFOR CLEAN ROOM AREAS

OF 11 TO 13 NUMBERS

Page 19: BMS - Engineering Projectsengineeringprojects.com/Tender/UploadFiles/2821_VOLUME--4-DRAWINGS.pdf · HAL - NASIK PACKAGE-II IO SUMMARY Sr.No. Point Description AI AO DI DO S/W Connection

VP VP VP VP VP VP

VP

VPVPVPVP

AIR SHOWER

VP

VPVPVP VP VP VPVPVPVP

GF-LVAU-03

GF-

LVA

U-0

4

150MM DEPTHCONCRETE PEDESTAL

150MM DEPTHCONCRETE PEDESTAL

Architects & Consulting Engineers

'' Conjeevaram House'' 2nd Floor6-1-276, Padmaraonagar..

S e c u n d e r a b a d - 500 025Ph:27508968,Fax:040-27507733

Email: [email protected]

AIR CONDITIONING - SUPPLY DUCT LAYOUTFOR CLEAN ROOM AREAS

OF 11 TO 13 NUMBERS

Page 20: BMS - Engineering Projectsengineeringprojects.com/Tender/UploadFiles/2821_VOLUME--4-DRAWINGS.pdf · HAL - NASIK PACKAGE-II IO SUMMARY Sr.No. Point Description AI AO DI DO S/W Connection

FF-LVAU-01

FF-L

VA

U-0

5

FF-EVAU-01

FF-LVAU-04

FF-LVAU-03

FF-LVAU-02

Plenum650(W)X650(D)X650(H)

Architects & Consulting Engineers

'' Conjeevaram House'' 2nd Floor6-1-276, Padmaraonagar..

S e c u n d e r a b a d - 500 025Ph:27508968,Fax:040-27507733

Email: [email protected]

HVAC LAYOUT FOR FIRST FLOOR OFMECHANICAL AND AVIONICS AGGREGATE

(20/1)