bms - engineering projectsengineeringprojects.com/tender/uploadfiles/2821_volume--4-drawings.pdf ·...
TRANSCRIPT
HAL - NASIKPACKAGE-II
IO SUMMARY
Sr.No. Point Description AI AO DI DO S/W Connection Scope
A Airconditioning Chiller Plant
I) Chillers : 2 nos.
1 CHW Supply Temperature 4 Immersion Temperature Sensor IBMS Vendor
2 CHW Return Temperature 4 Immersion Temperature Sensor IBMS Vendor
3 Outside Air Ambient Temeprature &
Humidity Sensor
2 Outside Air Temperature + RH
Sensor
IBMS Vendor
4 Chilled Water Flow 4 Flow Meter IBMS Vendor
5 Chiller On / Off Status 4 Chillers Panel Chiller Manufacturer /Vendor to provide
potential free contact ( 1 NO for each chiller )
for indicating Chiller running Status
6 Chiller Trip Status 2 Chillers Panel Chiller Manufacturer /Vendor to provide
potential free contact ( 1 NO for each chiller )
for indicating Chiller running Status
7 Chiller Auto/Manual Status 2 Chillers Panel Chiller Manufacturer /Vendor to provide
potential free contact ( 1 NO for each chiller )
for indicating Chiller running Status
8 Chiller Isolation Valves 2 Butterfly Valve HVAC Vendor
9 Chiller On / Off 2 MCC Panel - Chillers Panel Vendor to provide potential free contact
( 1 NO for each chiller ) to accept remote start
/ stop
10 HVAC Chiller Microprocessor
Monitoring of Various Parameters
through sw interface
50 25 points per Chiller Unit from
Chiller Vendor
MODBUS/BACnet/TCPIP/ N2 Bus Interface to be
provided from Each Chiller Panel and the 20
No. of Soft Points to be considered Per Chiller
unit.
Sub Total 10 0 12 4 0
II) Chilled Water Pumps : 2 nos.
10 CHW Pump Auto/Manual Status 2 MCC Panel - CHW Pumps Panel Vendor to provide potential free contact
( 1 NO for each Pump) for indicating position of
auto/manual switch.
11 CHW Pumps On/ Off Status 4 Differential Pressure Switch IBMS vendor
12 CHW Pump Trip Status 2 MCC Panel - CHW Pumps Panel Vendor to provide potential free contact
( 1 NO for each Pump) for indicating Pump Trip
Status.
13 CHW Pump On /Off 2 MCC Panel - CHW Pumps Panel Vendor to provide potential free contact
( 1 NO for each pump ) to accept remote start
/ stop.
BMS - HVAC SYSTEMS
SEMAC Consulting EngineersHyderabad
TENDERHVAC
HAL - NASIKPACKAGE-II
IO SUMMARY
Sr.No. Point Description AI AO DI DO S/W Connection Scope
III) Condenser Water Pumps : 2 nos.
14 CHW Pump Auto/Manual Status 2 MCC Panel - CHW Pumps Panel Vendor to provide potential free contact
( 1 NO for each Pump ) for indicating position
of auto/manual switch.
15 CHW Pumps On/ Off Status 4 Differential Pressure Switch IBMS vendor
16 CHW Pump Trip Status 2 MCC Panel - CHW Pumps Panel Vendor to provide potential free contact
( 1 NO for each Pump ) for indicating Pump Trip
Status.
17 CHW Pump On /Off 2 MCC Panel - CHW Pumps Panel Vendor to provide potential free contact
( 1 NO for each Pump ) to accept remote start
/ stop.
Sub Total 0 0 16 4 0
IV) Cooling Tower : 2 nos.
18 CHW Supply Temperature 2 Immersion type sensors IBMS vendor. HVAC vendor to provide sockets
for sensors
19 CHW Return Temperature 2 Immersion type sensors IBMS vendor. HVAC vendor to provide sockets
for sensors
19 Fan Auto / Manual Status 2 MCC Panel - AHU Panel Vendor to provide potential free contact
( 1 NO for each AHU) for indicating position of
auto/manual switch.
20 Fan On/Off Status 4 Differential Pressure Switch IBMS vendor
20 Fan Trip Status 2 MCC Panel - AHU Panel Vendor to provide potential free contact
( 1 NO for each AHU) for indicating Trip Status.
21 Fan On /Off Command 2 MCC Panel - AHU Panel Vendor to provide potential free contact
( 1 NO for each AHU) to accept remote start /
stop.
Sub Total 4 0 8 2 0
AC Chiller Plant Sub Total 14 0 36 10 0
IV) Floor Mounted Air Handling Units - 4 nos
1 RA Temperature & RH Sensors 2 Duct Mounted Temperature &
RH Sensor
IBMS vendor
2 SA Temperature & RH Sensors 2 Duct Mounted Temperature &
RH Sensor
IBMS vendor
3 3-Way Modulating Valve Actuation 1 1 2-Way Modulating Valve with
feedback-Acutator shall be with
0-10VDC
HVAC Vendor
4 Filter Dirty Status 2 DP switch IBMS vendor
5 Fresh Air / Return Damper Control 2 Damper Actuator IBMS vendor
6 Duct Static Pressure 1 Duct Static Pressure Sensor IBMS vendor
SEMAC Consulting EngineersHyderabad
TENDERHVAC
HAL - NASIKPACKAGE-II
IO SUMMARY
Sr.No. Point Description AI AO DI DO S/W Connection Scope
7 AHU Auto / Manual Status 1 MCC Panel - AHU Panel Vendor to provide potential free contact
( 1 NO for each AHU) for indicating position of
auto/manual switch.
8 AHU On/Off Status 2 Differential Pressure Switch IBMS vendor
9 AHU Trip Status 1 MCC Panel - AHU Panel Vendor to provide potential free contact
( 1 NO for each AHU) for indicating Trip Status.
10 Smoke & Fire Sensor 1 MCC Panel - AHU Fire Alarm Control Module to provide potential
free contact at the panel and IBMS Vendor to
inteface the same.
11 AHU On /Off Command 1 MCC Panel - AHU Panel Vendor to provide potential free contact
( 1 NO for each AHU) to accept remote start /
stop.
12 CHW Supply Temperature 1 Immersion type sensors IBMS vendor. HVAC vendor to provide sockets
for sensors
13 CHW Return Temperature 1 Immersion type sensors IBMS vendor. HVAC vendor to provide sockets
for sensors
For Each AHU 8 3 7 1 0
Total for 4 AHUs 32 12 28 4 0
SEMAC Consulting EngineersHyderabad
TENDERHVAC
HAL - NASIKPACKAGE-II
IO SUMMARY
Sr.No. Point Description AI AO DI DO S/W Connection Scope
V) Floor Mounted Air Handling Units - 3 nos
1 RA Temperature & RH Sensors 2 Duct Mounted Temperature &
RH Sensor
IBMS vendor
2 SA Temperature & RH Sensors 2 Duct Mounted Temperature &
RH Sensor
IBMS vendor
3 3-Way Modulating Valve Actuation 1 1 2-Way Modulating Valve with
feedback-Acutator shall be with
0-10VDC
HVAC Vendor
4 Filter Dirty Status 4 DP switch IBMS vendor
5 Fresh Air / Return Damper Control 2 Damper Actuator IBMS vendor
6 Duct Static Pressure 1 Duct Static Pressure Sensor IBMS vendor
7 AHU Auto / Manual Status 1 MCC Panel - AHU Panel Vendor to provide potential free contact
( 1 NO for each AHU) for indicating position of
auto/manual switch.
8 AHU On/Off Status 2 Differential Pressure Switch IBMS vendor
9 AHU Trip Status 1 MCC Panel - AHU Panel Vendor to provide potential free contact
( 1 NO for each AHU) for indicating Trip Status.
10 Smoke & Fire Sensor 1 MCC Panel - AHU Fire Alarm Control Module to provide potential
free contact at the panel and IBMS Vendor to
inteface the same.
11 AHU On /Off Command 1 MCC Panel - AHU Panel Vendor to provide potential free contact
( 1 NO for each AHU) to accept remote start /
stop.
12 CHW Supply Temperature 1 Immersion type sensors IBMS vendor. HVAC vendor to provide sockets
for sensors
13 CHW Return Temperature 1 Immersion type sensors IBMS vendor. HVAC vendor to provide sockets
for sensors
For Each AHU 8 3 9 1 0
Total for 3 AHUs 24 9 27 3 0
SEMAC Consulting EngineersHyderabad
TENDERHVAC
HAL - NASIKPACKAGE-II
IO SUMMARY
Sr.No. Point Description AI AO DI DO S/W Connection Scope
VI) Vertical Air Handling Units - 1 nos
1 RA Temperature & RH Sensors 2 Duct Mounted Temperature &
RH Sensor
IBMS vendor
2 SA Temperature & RH Sensors 2 Duct Mounted Temperature &
RH Sensor
IBMS vendor
3 3-Way Modulating Valve Actuation 1 1 2-Way Modulating Valve with
feedback-Acutator shall be with
0-10VDC
HVAC Vendor
4 Filter Dirty Status 4 DP switch IBMS vendor
5 Fresh Air / Return Damper Control 2 Damper Actuator IBMS vendor
6 Duct Static Pressure 1 Duct Static Pressure Sensor IBMS vendor
7 AHU Auto / Manual Status 1 MCC Panel - AHU Panel Vendor to provide potential free contact
( 1 NO for each AHU) for indicating position of
auto/manual switch.
8 AHU On/Off Status 2 Differential Pressure Switch IBMS vendor
9 AHU Trip Status 1 MCC Panel - AHU Panel Vendor to provide potential free contact
( 1 NO for each AHU) for indicating Trip Status.
10 Smoke & Fire Sensor 1 MCC Panel - AHU Fire Alarm Control Module to provide potential
free contact at the panel and IBMS Vendor to
inteface the same.
11 AHU On /Off Command 1 MCC Panel - AHU Panel Vendor to provide potential free contact
( 1 NO for each AHU) to accept remote start /
stop.
12 CHW Supply Temperature 1 Immersion type sensors IBMS vendor. HVAC vendor to provide sockets
for sensors
13 CHW Return Temperature 1 Immersion type sensors IBMS vendor. HVAC vendor to provide sockets
for sensors
For Each AHU 8 3 9 1 0
Total for 1 AHUs 8 3 9 1 0
GRAND TOTAL 78 24 100 18 0
SEMAC Consulting EngineersHyderabad
TENDERHVAC
Architects & Consulting Engineers
'' Conjeevaram House'' 2nd Floor6-1-276, Padmaraonagar..
S e c u n d e r a b a d - 500 025Ph:27508968,Fax:040-27507733
Email: [email protected]
Architects & Consulting Engineers
'' Conjeevaram House'' 2nd Floor6-1-276, Padmaraonagar..
S e c u n d e r a b a d - 500 025Ph:27508968,Fax:040-27507733
Email: [email protected]
Architects & Consulting Engineers
'' Conjeevaram House'' 2nd Floor6-1-276, Padmaraonagar..
S e c u n d e r a b a d - 500 025Ph:27508968,Fax:040-27507733
Email: [email protected]
TEST STATION FOR HYDRO PNEUMATIC FUEL AGGREGATESWORKS & SERVICES DEPARTMENT BUILDING(21/1)
PLANT ROOM , CT LOCATION LAYOUT
Architects & Consulting Engineers
'' Conjeevaram House'' 2nd Floor6-1-276, Padmaraonagar..
S e c u n d e r a b a d - 500 025Ph:27508968,Fax:040-27507733
Email: [email protected]
TEST STATION FOR HYDRO PNEUMATIC FUEL AGGREGATESWORKS & SERVICES DEPARTMENT BUILDING(21/1)
TERRACE FLOOR PLAN CT LOCATION LAYOUT
CHILLER
200TR
CHILLER
200TR
205/204
44.1 gpm
201/204
44.1 gpm
200/204
44.1 gpm
182/204
22 gpm
184/204
15.9 gpm
190/204
7.9 gpm
183/204
7.9 gpm
186/204
15.9 gpm8.8 gpm
256/204
158 gpm
250/204
21.16 gpm
254/204
7.9 gpm
242/204
8.8 gpm
239/204
13.2 gpm
238/204
14.1 gpm
CDS PUMPS
20HPX3NOS
200MM
COOLING TOWER
250TRX2NOS (2W)
200MM
250MM
250MM
200MM
CHW PUMPS
10HPX3NOS
(2W+1SB)
(2W+1SB)
317.5 GPM @95 DEGF
185/204
237/204
3.5 gpm
220/204
0.88 gpm
243/204
14.1 gpm
250MM
50MM50MM50MM
40MM
32MM25MM
25MM
32MM
25MM100 MM
40MM
25MM
25MM32MM
18.75MM9.37MM
32MM32MM
452.3 GPM
408.24 GPM
364.14 GPM
274.24 GPM 320.04 GPM
182.7G
PM
158G
PM
166.8G
PM
100M
M
190.6GPM
100M
M
100M
M
100MM
7.9G
PM
25M
M
23.8G
PM
40M
M
45.8 GPM
50MM
83.64 GPM
29.06GPM 7.9GPM
45.78 G
PM
32.58 G
PM
50M
M
18.48 G
PM
32M
M
4.38 G
PM
18.75M
M
0.88 G
PM
9.37M
M
54.58 GPM
50MM
50M
M
25MM
40MM
65MM
100MM
125MM
125MM 150MM150MM
BUILDING 21/1 PROCESS PIPING SCHEMATIC
DIA
DIA
DIA
DIA
DIADIA
DIA
DIADIADIA
DIA
DIA
DIA
DIA
DIA
DIA
DIA
DIA
DIADIA
DIADIA
DIA
DIA
DIA
DIA
DIADIA
DIADIADIA
DIA
DIA
DIA
DIA
DIA
DIA
DIA
2-5P 2-5P 2-5P
2-5P2-5P2-5P
2-5P
2-5P2-5P
2-5P
2-5P2-5P
2-5P
2-5P
2-5P
2-5P
2-5P
2-5P
MAKEUP MAKEUP
TT
TT
TT
TT
P1
P2
P1
P2
P1
P1
P1
P1
P1
P1
TT
P1
P1
P1
4.87M
5.182M
200MM
4.87M
5.182M
65 MM/79GPM
DIA
65 MM/79GPM
DIA
39 gpm
DIA 50 M
M
39 gpm
DIA 50 M
M
39 gpm
DIA 50 M
M
39 gpm
DIA 50 M
M
256/204
256/204
256/204
256/204
NOTES:
NORTH :
Architects & Consulting Engineers
'' Conjeevaram House'' 2nd Floor6-1-276, Padmaraonagar..
S e c u n d e r a b a d - 500 025Ph:27508968,Fax:040-27507733
Email: [email protected]
PROCESS PIPING SCHEMATIC LAYOUT OF TEST STATION FOR HYDRO
PNEUMATIC FUEL AGGREGATES (21/1)
LEGEND:
GV'S
Y STRAINER
NRV
CHILLED CHW
WATER
CONDENSER CDS
WATER
WORKING
W
STANDBY
SB
PRESSURE
P
LOSS M.WC
PRESSURE
PG
GAUGE
TEMPERATURE
TG
GAUGE
P1COOLER
PRESSURE DROP
P2CONDENSER
PRESSURE DROP
T0 SMM
05.06.10
R0 SMM
12.04.12
Architects & Consulting Engineers
'' Conjeevaram House'' 2nd Floor6-1-276, Padmaraonagar..
S e c u n d e r a b a d - 500 025Ph:27508968,Fax:040-27507733
Email: [email protected]
Architects & Consulting Engineers
'' Conjeevaram House'' 2nd Floor6-1-276, Padmaraonagar..
S e c u n d e r a b a d - 500 025Ph:27508968,Fax:040-27507733
Email: [email protected]
Architects & Consulting Engineers
'' Conjeevaram House'' 2nd Floor6-1-276, Padmaraonagar..
S e c u n d e r a b a d - 500 025Ph:27508968,Fax:040-27507733
Email: [email protected]
CHILLER
25TR
CHW PUMPS
3/4HPX2NOS
(1W+1SB)
BUILDING 22/1 PROCESS PIPING SCHEMATIC
73/205
7.92 gpm
25MM
77/205
7.92 gpm
25MM
76/205
7.92 gpm
25MM
21/205
3.9625 gpm
18.75MM
3.9625GPM
18.75MM
11.882GPM
32MM
19.80GPM
40MM
27.72GPM
40MM
WATER COOLED
40MM
27.72GPM
65MM
CDS PUMPS
90 GPM
COOLING TOWER
30TRX1NOS
80MM
3HPX2NOS
(1W+1SB)
80MM
DIA
DIA
DIA
80MMDIA
80MMDIA
80MMDIA
DIA
DIA
DIA
DIA
DIA
DIADIA
DIA
DIA
P1
P2
5M
7M
P1 P1
P1 P1
MAKEUP
T
T
T
TT
P1 P1
P1 P1
2-5P
2-5P2-5P2-5P
NOTES:
NORTH :
Architects & Consulting Engineers
'' Conjeevaram House'' 2nd Floor6-1-276, Padmaraonagar..
S e c u n d e r a b a d - 500 025Ph:27508968,Fax:040-27507733
Email: [email protected] PIPING SCHEMATIC LAYOUT OF LANDING
GEAR O/H SHOP (22/1)
LEGEND:
GV'S
Y STRAINER
NRV
CHILLED CHW
WATER
CONDENSER CDS
WATER
WORKING
W
STANDBY
SB
PRESSURE
P
LOSS M.WC
PRESSURE
PG
GAUGE
TEMPERATURE
TG
GAUGE
P1COOLER
PRESSURE DROP
P2CONDENSER
PRESSURE DROP
T0 SMM
05.06.10
R0 SMM
12.04.12
CHILLER
25TR
CHW PUMPS
3/4HPX2NOS
(1W+1SB)
BUILDING 22/1 PROCESS PIPING SCHEMATIC
73/205
7.92 gpm
25MM
77/205
7.92 gpm
25MM
76/205
7.92 gpm
25MM
21/205
3.9625 gpm
18.75MM
3.9625GPM
18.75MM
11.882GPM
32MM
19.80GPM
40MM
27.72GPM
40MM
WATER COOLED
40MM
27.72GPM
65MM
CDS PUMPS
90 GPM
COOLING TOWER
30TRX1NOS
80MM
3HPX2NOS
(1W+1SB)
80MM
DIA
DIA
DIA
80MMDIA
80MMDIA
80MMDIA
DIA
DIA
DIA
DIA
DIA
DIADIA
DIA
DIA
P1
P2
5M
7M
P1 P1
P1 P1
MAKEUP
T
T
T
TT
P1 P1
P1 P1
2-5P
2-5P2-5P2-5P
NOTES:
NORTH :
Architects & Consulting Engineers
'' Conjeevaram House'' 2nd Floor6-1-276, Padmaraonagar..
S e c u n d e r a b a d - 500 025Ph:27508968,Fax:040-27507733
Email: [email protected] PIPING SCHEMATIC LAYOUT OF LANDING
GEAR O/H SHOP (22/1)
LEGEND:
GV'S
Y STRAINER
NRV
CHILLED CHW
WATER
CONDENSER CDS
WATER
WORKING
W
STANDBY
SB
PRESSURE
P
LOSS M.WC
PRESSURE
PG
GAUGE
TEMPERATURE
TG
GAUGE
P1COOLER
PRESSURE DROP
P2CONDENSER
PRESSURE DROP
T0 SMM
05.06.10
R0 SMM
12.04.12
VP VP VP VP VP VP
VP
VPVPVPVP
AIR SHOWER
VP
VPVPVP VP VP VPVPVPVP
GF-LVAU-03
GF-
LVA
U-0
4
150MM DEPTHCONCRETE PEDESTAL
150MM DEPTHCONCRETE PEDESTAL
Architects & Consulting Engineers
'' Conjeevaram House'' 2nd Floor6-1-276, Padmaraonagar..
S e c u n d e r a b a d - 500 025Ph:27508968,Fax:040-27507733
Email: [email protected]
AIR CONDITIONING - RETURN DUCT LAYOUTFOR CLEAN ROOM AREAS
OF 11 TO 13 NUMBERS
VP VP VP VP VP VP
VP
VPVPVPVP
AIR SHOWER
VP
VPVPVP VP VP VPVPVPVP
GF-LVAU-03
GF-
LVA
U-0
4
150MM DEPTHCONCRETE PEDESTAL
150MM DEPTHCONCRETE PEDESTAL
Architects & Consulting Engineers
'' Conjeevaram House'' 2nd Floor6-1-276, Padmaraonagar..
S e c u n d e r a b a d - 500 025Ph:27508968,Fax:040-27507733
Email: [email protected]
AIR CONDITIONING - SUPPLY AND RETURNDUCT LAYOUT FOR CLEAN ROOM AREAS
OF 11 TO 13 NUMBERS
VP VP VP VP VP VP
VP
VPVPVPVP
AIR SHOWER
VP
VPVPVP VP VP VPVPVPVP
GF-LVAU-03
GF-
LVA
U-0
4
150MM DEPTHCONCRETE PEDESTAL
150MM DEPTHCONCRETE PEDESTAL
Architects & Consulting Engineers
'' Conjeevaram House'' 2nd Floor6-1-276, Padmaraonagar..
S e c u n d e r a b a d - 500 025Ph:27508968,Fax:040-27507733
Email: [email protected]
AIR CONDITIONING - SUPPLY DUCT LAYOUTFOR CLEAN ROOM AREAS
OF 11 TO 13 NUMBERS
VP VP VP VP VP VP
VP
VPVPVPVP
AIR SHOWER
VP
VPVPVP VP VP VPVPVPVP
GF-LVAU-03
GF-
LVA
U-0
4
150MM DEPTHCONCRETE PEDESTAL
150MM DEPTHCONCRETE PEDESTAL
Architects & Consulting Engineers
'' Conjeevaram House'' 2nd Floor6-1-276, Padmaraonagar..
S e c u n d e r a b a d - 500 025Ph:27508968,Fax:040-27507733
Email: [email protected]
AIR CONDITIONING - SUPPLY DUCT LAYOUTFOR CLEAN ROOM AREAS
OF 11 TO 13 NUMBERS
FF-LVAU-01
FF-L
VA
U-0
5
FF-EVAU-01
FF-LVAU-04
FF-LVAU-03
FF-LVAU-02
Plenum650(W)X650(D)X650(H)
Architects & Consulting Engineers
'' Conjeevaram House'' 2nd Floor6-1-276, Padmaraonagar..
S e c u n d e r a b a d - 500 025Ph:27508968,Fax:040-27507733
Email: [email protected]
HVAC LAYOUT FOR FIRST FLOOR OFMECHANICAL AND AVIONICS AGGREGATE
(20/1)