Page 1: Bmt Check List_xlsx

A

SITE ENGR QC ENGRI HVACA PLANT ROOM - SECONDARY CHW PUMP

1 On/Off Command

2 Run Status

3 High current Alarm

4 Chilled water common supply temp

5 Chilled water common return temp

6 Outside Air Temperature Monitoring

7 Outside Air RH Monitoring

8 Sec Pump Controller Common fault monitoring

9 Sec Pump Controller Common On/Off Command

10 VFD Integration

11 Secondary Pump's VFD Speed Feedback

12 Secondary Pump's VFD Frequency

13 Secondary Pump's VFD Current

14 Secondary Pump's VFD Voltage

15 Secondary Pump's VFD Power

16 Secondary Pump's VFD Run Time

Floor :

RESULT (OK/NA)

SIGNATURE REMARKS

INTEGRATED COMMISSIONING REPORT - (FLOOR LEVEL) -BASEMENT FLOORDate :

ANC CONTRACTING INDIA LTDFORMAT NO.

16 Secondary Pump's VFD Run Time

B AHU

1 On/Off Command

2 Run Status

3 Auto Manual status

4 Trip Status5 Filter status

6 Supply Air Temperature Monitoring

7 Return Air Temperature Monitoring8 Valve Modulation

9 VFD control Signal10 VFD modulation using diff press transmitter

(Location of Diff. pressure sensor to be in SA Duct within AHU room itself)

11 VFD soft integration

12 AHU's VFD Speed Feedback

13 AHU's VFD Frequency

14 AHU's VFD Current

15 AHU's VFD Voltage

16 AHU's VFD Power

17 AHU's VFD Run Time

C FAHU

1 of 6

Page 2: Bmt Check List_xlsx

A

SITE ENGR QC ENGR

Floor :

RESULT (OK/NA)

SIGNATURE REMARKS

INTEGRATED COMMISSIONING REPORT - (FLOOR LEVEL) -BASEMENT FLOORDate :

ANC CONTRACTING INDIA LTDFORMAT NO.

1 Supply Air Temperature Monitoring

2 Temperature After Heat Recovery

3 Exhaust Temperature before heat recovery

4 Ambient temperature Monitoring

5 Temperature After Heat wheel

6 Supply Fan Run Status

7 Supply Fan Trip Status

8 Exhaust Fan Run Status

9 Exhaust Fan Trip Status

10 HW Motor Run Status

11 HW Motor Trip Status

12 Filter before HW on Exhaust

13 Pre Filter Fresh Air

14 Bag Filter Fresh Air

15 FAHU Start/Stop

16 HOA Switch

17 Valve Modulation

18 VFD control Signal

19 VFD modulation using diff press transmitter

20 VFD soft integration

21 AHU's VFD Speed Feedback

22 AHU's VFD Frequency

23 AHU's VFD Current

24 AHU's VFD Voltage

25 AHU's VFD Power

26 AHU's VFD Run Time

E FCU FOR COMMON AREAS

1 Space Temperature

2 Space Temperature Setpoint

3 FCU Valve Modulation

4 FCU On/Off Command

5 FCU Fan High Speed Command

6 FCU Fan Medium Speed Command

7 FCU Fan Low Speed Command

II FANS

A SMOKE EXTRACT FAN

1 `Auto' position of H/O/A switch

2 Fan trip alarm

2 of 6

Page 3: Bmt Check List_xlsx

A

SITE ENGR QC ENGR

Floor :

RESULT (OK/NA)

SIGNATURE REMARKS

INTEGRATED COMMISSIONING REPORT - (FLOOR LEVEL) -BASEMENT FLOORDate :

ANC CONTRACTING INDIA LTDFORMAT NO.

3 Fan Start/Stop Command

4 Fan run status

5 FA signal

D CAR PARK JET FANS

1 `Auto' position of H/O/A switch

2 Fan trip alarm

3 Fan run status

E EXTRACT FAN (DUAL SPEED)

1 `Auto' position of H/O/A switchfor Fire + Normal Starters

2 Fan trip alarmFire Mode + Normal Mode

3 Fan run statusFire Mode + Normal Mode

F EXTRACT FAN (SINGLE SPEED)

1 `Auto' position of H/O/A switch

2 Fan trip alarm2 Fan trip alarm

3 Fan run status

IV PUBLIC HEALTH ENGINEERING

A TRANSFER PUMP

1 H/O/A Switch in auto position

2 Run Status

3 Trip Status

4 On/Off Command

B SUMP PUMP

1 Unit Fault status

2 Run Status

3 Auto Manual Status

D FIRE WATER TANK (3 Bsmt + 3 Terrace)

1 Tank Level

2 High/Low Level Alarm

3 Water Flow Meter

V FIRE FIGHTING SYSTEM

A FIRE FIGHTING PUMP

3 of 6

Page 4: Bmt Check List_xlsx

A

SITE ENGR QC ENGR

Floor :

RESULT (OK/NA)

SIGNATURE REMARKS

INTEGRATED COMMISSIONING REPORT - (FLOOR LEVEL) -BASEMENT FLOORDate :

ANC CONTRACTING INDIA LTDFORMAT NO.

1 Pump auto-manual status

2 Pump run status

3 Trip Status

B JOCKEY PUMP

1 Pump auto-manual status

2 Pump run status

3 Trip Status

C DIESEL ENGINE PUMP

1 Pump auto-manual status

2 Pump run status

3 Trip Status

VI ELECTRICAL SYSTEM

A LV PANEL 1

Incoming breaker

1 ON/OFF Status of each main incoming breaker

2 Trip alarm indication of main incoming breaker

3 Breaker Trip Command

Outgoing breaker

1 ON/OFF Status of each main outgoing breaker

2 Trip alarm indication of main outgoing breaker

3 Breaker Trip Command

B LV PANEL 2

Incoming breaker

1 ON/OFF Status of each main incoming breaker

2 Trip alarm indication of main incoming breaker

3 Breaker Trip Command

Outgoing breaker

1 ON/OFF Status of each main outgoing breaker

2 Trip alarm indication of main outgoing breaker

3 Breaker Trip Command

C LV PANEL 3

Incoming breaker

1 ON/OFF Status of each main incoming breaker

2 Trip alarm indication of main incoming breaker

3 Breaker Trip Command

Outgoing breaker

1 ON/OFF Status of each main outgoing breaker

4 of 6

Page 5: Bmt Check List_xlsx

A

SITE ENGR QC ENGR

Floor :

RESULT (OK/NA)

SIGNATURE REMARKS

INTEGRATED COMMISSIONING REPORT - (FLOOR LEVEL) -BASEMENT FLOORDate :

ANC CONTRACTING INDIA LTDFORMAT NO.

2 Trip alarm indication of main outgoing breaker

3 Breaker Trip Command

D ESMDB

Incoming breaker

1 ON/OFF Status of each main incoming breaker

Outgoing breaker

2 ON/OFF Status of each main incoming breaker

E MCC - B

Incoming breaker

1 ON/OFF Status of each main incoming breaker

F EMCC - B

Incoming breaker

1 ON/OFF Status of each main incoming breaker

G SMDB - B

Incoming breaker

1 ON/OFF Status of each main incoming breaker

H MCC - PUMP

Incoming breaker

1 ON/OFF Status of each main incoming breaker1 ON/OFF Status of each main incoming breaker

I MCC SUMP PUMP

Incoming breaker

1 ON/OFF Status of each main incoming breaker

J MCC ETS

Incoming breaker

1 ON/OFF Status of each main incoming breaker

K SMDB - G

Incoming breaker

1 ON/OFF Status of each main incoming breaker

Q SMDB UPS

Incoming breaker

1 ON/OFF Status of each main incoming breaker

V MCC FF

Incoming breaker

1 ON/OFF Status of each main incoming breaker

Y TRANSFORMERS

1 Signals for monitoring

2 Signals for monitoring

Z HT PANELS/BREAKERS

1 Signals for monitoring

2 Signals for monitoring

AD UPS

5 of 6

Page 6: Bmt Check List_xlsx

A

SITE ENGR QC ENGR

Floor :

RESULT (OK/NA)

SIGNATURE REMARKS

INTEGRATED COMMISSIONING REPORT - (FLOOR LEVEL) -BASEMENT FLOORDate :

ANC CONTRACTING INDIA LTDFORMAT NO.

1 O/P Voltage - R

2 O/P Voltage - Y

3 O/P Voltage - B

4 O/P Current - R

5 O/P Current - Y

6 O/P Current - Y

7 Battery Voltage

8 Battery Charge Remaining

9 Frequency

10 Alarm Status

VII PA/ACCESS/CCTV

1 Check of Door Access through Access Cards in Normal & Fire Mode

2 Check for Public Addressing system by Announcing in the console.

Check for Evacuation Message in Fire Mode.

Check for Views of Cameras as per Design requirement

Remarks (if any):

For Honeywell FOR ANC FOR PMC/DA

6 of 6