boiler feed and pump sizing c-b and grundfos july 2016(1)

63
BOILER FEED & PUMP SIZING Presented by Cleaver-Brooks Steve Connor and Grundfos’ Jim Swetye

Upload: lorenzo-monasca

Post on 26-Jan-2017

372 views

Category:

Education


8 download

TRANSCRIPT

Page 1: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

BOILER FEED amp PUMP SIZINGPresented by Cleaver-Brooks Steve Connorand Grundfosrsquo Jim Swetye

TODAYrsquoS AGENDAbull Brief review of a typical steam systembull The boiler size range pressures and types we will be

addressing todaybull Methods and importance of capturing condensate for boiler feedbull Typical pumps used for boiler feed water dischargebull Typical piping methods usedbull Pump sizing criteriabull Criteria for calculating the base flow for the pumpbull Understanding TDH and NPSHbull Sizing a pump for a specific application (example)bull Reading the pump curve for final selectionbull Summary and QampA

2

T

T

T

T

T

LegendSteamCond

Vapor

H P Cond ReturnVent

D A TankD A Tank

Feed PumpBoiler

Strainer

Trap Trap

Trap TrapTT

TT

DA Tank

TT

TT

TTT

Legend

HP SteamPRV

LP Steam

Trap

LP Condensate Return

Cond Rcvramp Pump

MotiveForce

Flash

TYPICAL STEAM SYSTEM

33

BOILER SIZES AND FEED PUMP SIZES

Boiler HP Range

Boiler Pressure

Range

Typical Feed Pump Type

Typical Max Feed

Pump Flow

Range

Typical Max Feed

Pump Head

Where Used

100 to 1200

150 to 500 psi

Vertical inline

multistage regenerative

turbines

10 to 125 gpm 1250 feet

General industry

institutional universities

some commercial

buildings

4

Sheet1

FIRETUBE

Watertube (IWT)

Integral burner

Gun burner5

HORIZONTAL FIRETUBE BOILERSThe Dryback

Refractory Filled Door 1 2

3

4

Baffles

Tubesheet

Two (2) Tubesheets6

WATERTUBE OR IWT

7

THE WATERTUBE BOILER

bull Opposite of Firetubebull Water in the Tubesbull Natural and Forced Circulationbull Large Furnacebull Upper amp Lower Drums orbull Headers

Upper Steam Drum

Lower Mud Drum

Furnace

Outlet nozzle location

8

FLUE GAS SEALING

100 Membrane Construction

Tangent Tube Furnace Design Also Available

9

CONDENSATE IS LIQUID GOLD

A finite resource

10

TYPICAL STEAM SYSTEM

T

T

T

T

T

LegendSteamCond

Vapor

H P Cond Return

D A TankD A Tank

Feed PumpBoiler

Strainer

Trap Trap

TrapTT

TT

DA Tank

TT

TT

TTT

Legend

Trap

HP SteamPRV

LP Steam

Trap

LP Condensate Return

MotiveForce

FlashCondensate tank amp Pump system

11

CONDENSATE RETURN PUMPS

12

FLASH STEAM

T

T

T

T

T

H P Condensate Return

Cond Pump

D A TankD A Tank

Feed PumpBoiler

Strainer

Trap Trap

Trap TrapTT

TT

TT

TT

TTT

HP SteamPRV 15 psig

250 FLP Steam

150 psig366 F

TrapMotiveForce

Feed Tank or DA

13

Flash Tank

Low pressure condensate line

Flash Tank Flash Tank wEconomizer

Use flash steam for heating or deaerating Why not recover the heat from the hot condensate

14

HOT CONDENSATE RETURNED

DeaeratorBoiler Feed System

A vented receiver wastes energy

Pressurized receiver saves energy

Steam diffusing tube

15

Steam

HP Return

Vent

Exhaust OrFlash Steam

ToBoiler

Boiler FeedWater Pump(s)

OverflowDrainer

Cold Make-UpWater

LP Condensate

Make-Up Valve

Check Valve

PRV

Level control

16

SPRAY DEAERATOR

Spray cone

17

TRAY DEAERATOR

steam

Trays

18

PACKED COLUMN DA

19

BOILER FEED WATER TANKSSpray DA Tray DA Column DA

Vented Receiver

20

T

T

T

T

TH P Condensate Return

Cond Pump D A TankD A Tank

Feed PumpBoiler

Strainer

Trap Trap

TrapTrapTT

TT

TT

TT

TTT

HP SteamPRV 15 psig

250 F

LP Steam150 psig366 F

TrapMotiveForce

Feed Tank or DA

HP CONDENSATE RECOVERY

21

HIGH PRESSURE CONDENSATE RECEIVER

bull Takes high pressure condensate directly from the user

bull No need to deaeratebull Pump directly into boilerbull Feed the HPR from the DA

22

BOILER FEED WATER TANK OPTIONSSpray DA Tray DA Column DA

Vented Receiver

HPCR

23

FEED WATER SYSTEMSFor multiple boiler Installations

24

METHOD 1 ndashDirect feed for multiple boilers

Deaerator

Boiler A

Boiler AControlle

r4-20mA signal directly to

Grundfos E-pump instead of

control valve

Boiler BBoiler BControlle

r4-20mA signal directly to

Grundfos E-pump instead of

control valve

25

METHOD 2 ndashBooster sets for multiple boilers

Deaerator Pressure sensor

Bypass

Multiple pump

controller

26

STEAM BOILER PUMP APPLICATIONS AND TYPESBoiler feed pumpsCollection tank pumpsWater treatment pumpsCondensate return pumpsDeaerator tank recycle pumpsDeaerator vacuum pumps (vacuum deaerator tanks only)Economizer pumps

27

SIZING COMPLEXITY FOR BOILER FEED PUMPS

28

BASE FLOW RATE CALCULATION

Base flow = Boiler maximum capacity horsepower X 0069 X C

bull C = 15 for OnOff intermittent operation

bull C = 115 for continuous feed operation

29

ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW

To the Base flow we MIGHT add if specified

For Continuous Boiler Blowdown flowbull Approximately 5 to10 of the pumprsquos flow

rate at the Best Efficiency Point

30

ADD FOR BYPASS RECIRCULATION FLOWCertain feed system control modes require the use of a bypass line back to the source tank ndash such as back to the deaerator tank

Method

NamePump Speed

TypeDuty

Is orifice flow by-pass line

required1 OnOff control and fixed speed pumps Fixed Intermittent No2 Feed control valve and fixed speed pumps Fixed Continuous Yes3 Feed control valve and variable speed pumps Variable Continuous Yes4 Variable speed pumps only (no control valve) Variable Continuous No

31

Sheet1

RECIRCULATION FLOW

bull The solid curve below shows the minimum flow rate as a percentage of the nominal flow rate in relation to the liquid temperature

bull Ignore the dotted line which indicates a pump with special high-temperature construction

32

CALCULATING REQUIRED FEED PUMP HEAD

+ Suction side head+ Discharge side head= Total Dynamic Head

Elevation of DA tank

Elevation of boiler

33

FEED VALVE IMPACTS PUMPING HEAD CALCULATION

34

CALCULATING THE HEADFOR THE FEED PUMP1) At the duty point flow rateHead in feet = Boiler operating pressure X 231 X 103 divide Liquid Specific Gravity

Example Head = 130 psi X 231 X 103 divide 0953 = 324 feet

2) At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific Gravity

Example Head = 160 psi X 231 X 103 divide 0953 = 400 feet

35

NPSH ndashFORMULA FOR CALCULATION

NPSHr is obtained from the pump curve

Add two to four feet of safety factor to the NPSHr stated on the curve

NPSHa is calculated

+ Absolute pressure in deaerator tank

plusmn Elevation of minimum water level in tank above feed pump

- Vapor pressure of water in deaerator tank

- Suction line friction loss

= Net Positive Suction Head Available

To avoid cavitation NPSHa must be greater than NPSHr

36

NPSH AND ELEVATIONDeaerator

tank

Boiler feed

pumps

Minimum water level in DA tank

Location of eye of lowest impeller

Difference in elevation

37

NPSH AND SUCTION LINE CONSIDERATIONS

Critical suction line considerations here

38

Check list for boiler feed pump selection

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

39

Sheet2

BOILER FEED PUMPS USEFUL FORMULAS

40

Sheet1

SPECIFICATION FOR EXERCISEa) Control Method Continuous duty fixed speed pump with bypass line and feed valveb) Boiler maximum capacity = 250 HPc) Boiler safety valve setting = 125 psigd) Pressure safety factor = 3 above boilerrsquos safety valve settinge) Boiler operating pressure = 100 psigf) Continuous Boiler Blowdown flow - Requiredg) Bypass recirculation flow ndash Requiredh) Altitude ndash Sea leveli) Pressure in deaerator tank above atmospheric pressure = 5 psi (147 + 5 = 197 psi absolute)j) Height of deaerator tank minimum water level above pumprsquos first impeller = 10 feetk) Friction line loss through suction piping = 5 footl) Friction loss through suction side fittings = 5 footm) Friction loss through suction side valves = Nonen) Friction loss through suction side strainer = 1 feeto) Friction loss through discharge piping = 1 footp) Friction loss through discharge side fittings = 1 footq) Pressure drop across feed valve ndash 15 psir) Elevation of boiler maximum water level above pumprsquos discharge port = 5 feets) Liquid Specific Gravity = 0953t) Temperature of water in deaerator tank = 227 degrees Fu) Vapor pressure in deaerator tank = 197 psiv) Pump materials all 316 stainless steel to resist treatment chemicalsw) Mechanical seal to be silicon carbidesilicon carbideEPDM to withstand liquid temperature

41

Feed pumps

CONTROL METHOD

Fixed speed pumps with feed valve and recirculation line

Recirc line

Feed valve

42

STEP 1 ndashDetermine control methodFeed valve controlled system with a continuous duty fixed speed pump has been specified

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

43

Sheet2

STEP 2 ndashCalculate the BASE feed pump flow rate

The formula for this calculation is

bull Boiler maximum capacity in horsepower X 0069 X C

bull The maximum capacity in boiler horsepower is 250

bull The C factor is 115 for continuous duty

Therefore

250 X 0069 X 115 = 20 gpm = BASE flow rate

44

STEP 3 ndashContinuous Boiler Blowdown Flow

Determination

1 The BASE flow rate has been established at 20 gpm

2 We will on next slide need to add for bypass flow which can add 10 to 20 percent to the BASE flow rate

3 Blowdown flow is to be approximately 10 percent of flow at pumprsquos Best Efficiency Point

4 So the total boiler blowdown flow required is approximately 3 gpm

45

STEP 4 ndashAdd for by-pass flow

bull Control is via feed valve with fixed speed pump and for continuous dutybull A bypass will be required

bull Solid curve to right shows minimum flow rate as a percentage of nominal flow rate in relation to liquid temperature

bull Ignore dotted line which indicates a pump with special high-temperature construction

bull At 227degF we require a bypass flow that is about 20 of BEP flow

bull Presuming we can find a pump with BEP at about 25 or so gpm the bypass flow must be about 5 gpm

46

STEP 5 ndashCalculate total flow requiredbull BASE flow = 20 gpmbull Blowdown flow = 3 gpmbull Recirculation flow = 5 gpmbull Total flow required = 28 gpm

XXXX

X

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

47

Sheet2

STEP 6 ndashCalculate BASE pumping head

Boiler operating pressure setting + 3

Formula BASE head in feet = Boiler operating pressure X 231 X 103 divide Specific Gravity

BASE head = 100 psi X 231 X 103 divide 0953 = 250 feet

48

STEP 7 ndashAdd for suction piping system head components

From specificationAbsolute pressure on deaerator tank = 197 psi X 231 = - 46 feetWater elevation above first impeller = - 10 feetFriction loss through suction piping = + 5 feetFriction loss through suction fittings = + 5 feetFriction loss through suction side valves and strainer = + 1 feet

Total = - 54 feet

49

STEP 8 ndashAdd for discharge piping system head components

From specificationFriction loss through discharge piping = + 1 footFriction loss through discharge fittings = + 1 footFriction loss through feed valve is 15 psi X 231 = + 35 feetElevation of boiler maximum water level above pump = + 5 feet

Total = + 42 feet

50

STEP 9 ndashSum of all head components

BASE head with safety factor = + 250 feetSuction side piping system head = - 54 feetDischarge side piping system head = + 42 feet

Total = + 238 feet

51

STEP 10 ndashPressure safety valve considerations At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific GravityExample Head = 125 psi X 231 X 103 divide 0953 = 312 feet

XXXXXXXXX

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

52

Sheet2

STEP 11 ndashDetermine deaerator tank water temperature

From specification 227degF

53

STEP 12 ndashNPSHa calculation

NPSHa equation

plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa

10 feet + (197 psi X 231) - (197 psi X 231) - 2 feet = NPSHa10 feet + 46 feet - 46 feet - 2 feet = 8 feet NPSHa

54

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
1 Base flow calculation equation
Boiler maximum capacity horsepower X 0069 X C = Base flow rate
C = 150 for OnOff intermittent operation
C = 115 for continuous feed operation
2 Determine BASE head for feed pump
Formula based on Safety Valve setting
Pump head in feet = Maximum pressure X 231 X 103 divide Liquid Specific Gravity
3 Head components on suction side of piping system
Pressure above atmospheric on deaerator converted to feet of head = feet
Elevation difference between minimum deaerator water level and pump inlet = feet
Suction pipe friction loss = feet
Suction fitting friction loss = feet
Suction line valves and strainer friction loss = feet
Total = feet
4 Head components on discharge side of piping system
Friction loss through discharge piping = feet
Friction loss through discharge fittings = feet
Friction loss through feed valve = feet
Elevation of boiler maximum water level above pump = feet
Total = feet
5 NPSHa equation
plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa
(Feet) (psi X 231 = Feet) (psi X 231 = Feet) (Feet) (Feet)
Elevation of deaerator tank minimum water level above pumprsquos first impeller
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Method Name Is there head loss across feed valve Typical psi loss across feed valve Typical feed water temperature Typical Specific Gravity Conversion formula Typical feet of head loss across feed valve Pump Speed Type Duty Is orifce flow by-pass line required Orifice flow rate
1 On Off control and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Intermittent No Not applicable
2 Feed control valve and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Continuous Yes 20 of nominal
3 Feed control valve and variable speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Variable Continuous Yes 20 of nominal
4 Variable speed pumps only (no control valve) No None 225degF 0954 Not applicable Not applicable Variable Continuous No Not applicable
Orifice flow rate varies by manufacturers Will use 20 for these exercises
Must add for all head factors on suction and discharge sides of pump
Method Name Pump Speed Type Duty Is orifice flow by-pass line required
1 OnOff control and fixed speed pumps Fixed Intermittent No
2 Feed control valve and fixed speed pumps Fixed Continuous Yes
3 Feed control valve and variable speed pumps Variable Continuous Yes
4 Variable speed pumps only (no control valve) Variable Continuous No
Boiler HP Range Boiler Pressure Range Typical Feed Pump Type Typical Max Feed Pump Flow Range Typical Max Feed Pump Head Where Used
100 to 1200 150 to 500 psi Vertical inline multistage regenerative turbines 10 to 125 gpm 1250 feet General industry institutional universities some commercial buildings
Page 2: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

TODAYrsquoS AGENDAbull Brief review of a typical steam systembull The boiler size range pressures and types we will be

addressing todaybull Methods and importance of capturing condensate for boiler feedbull Typical pumps used for boiler feed water dischargebull Typical piping methods usedbull Pump sizing criteriabull Criteria for calculating the base flow for the pumpbull Understanding TDH and NPSHbull Sizing a pump for a specific application (example)bull Reading the pump curve for final selectionbull Summary and QampA

2

T

T

T

T

T

LegendSteamCond

Vapor

H P Cond ReturnVent

D A TankD A Tank

Feed PumpBoiler

Strainer

Trap Trap

Trap TrapTT

TT

DA Tank

TT

TT

TTT

Legend

HP SteamPRV

LP Steam

Trap

LP Condensate Return

Cond Rcvramp Pump

MotiveForce

Flash

TYPICAL STEAM SYSTEM

33

BOILER SIZES AND FEED PUMP SIZES

Boiler HP Range

Boiler Pressure

Range

Typical Feed Pump Type

Typical Max Feed

Pump Flow

Range

Typical Max Feed

Pump Head

Where Used

100 to 1200

150 to 500 psi

Vertical inline

multistage regenerative

turbines

10 to 125 gpm 1250 feet

General industry

institutional universities

some commercial

buildings

4

Sheet1

FIRETUBE

Watertube (IWT)

Integral burner

Gun burner5

HORIZONTAL FIRETUBE BOILERSThe Dryback

Refractory Filled Door 1 2

3

4

Baffles

Tubesheet

Two (2) Tubesheets6

WATERTUBE OR IWT

7

THE WATERTUBE BOILER

bull Opposite of Firetubebull Water in the Tubesbull Natural and Forced Circulationbull Large Furnacebull Upper amp Lower Drums orbull Headers

Upper Steam Drum

Lower Mud Drum

Furnace

Outlet nozzle location

8

FLUE GAS SEALING

100 Membrane Construction

Tangent Tube Furnace Design Also Available

9

CONDENSATE IS LIQUID GOLD

A finite resource

10

TYPICAL STEAM SYSTEM

T

T

T

T

T

LegendSteamCond

Vapor

H P Cond Return

D A TankD A Tank

Feed PumpBoiler

Strainer

Trap Trap

TrapTT

TT

DA Tank

TT

TT

TTT

Legend

Trap

HP SteamPRV

LP Steam

Trap

LP Condensate Return

MotiveForce

FlashCondensate tank amp Pump system

11

CONDENSATE RETURN PUMPS

12

FLASH STEAM

T

T

T

T

T

H P Condensate Return

Cond Pump

D A TankD A Tank

Feed PumpBoiler

Strainer

Trap Trap

Trap TrapTT

TT

TT

TT

TTT

HP SteamPRV 15 psig

250 FLP Steam

150 psig366 F

TrapMotiveForce

Feed Tank or DA

13

Flash Tank

Low pressure condensate line

Flash Tank Flash Tank wEconomizer

Use flash steam for heating or deaerating Why not recover the heat from the hot condensate

14

HOT CONDENSATE RETURNED

DeaeratorBoiler Feed System

A vented receiver wastes energy

Pressurized receiver saves energy

Steam diffusing tube

15

Steam

HP Return

Vent

Exhaust OrFlash Steam

ToBoiler

Boiler FeedWater Pump(s)

OverflowDrainer

Cold Make-UpWater

LP Condensate

Make-Up Valve

Check Valve

PRV

Level control

16

SPRAY DEAERATOR

Spray cone

17

TRAY DEAERATOR

steam

Trays

18

PACKED COLUMN DA

19

BOILER FEED WATER TANKSSpray DA Tray DA Column DA

Vented Receiver

20

T

T

T

T

TH P Condensate Return

Cond Pump D A TankD A Tank

Feed PumpBoiler

Strainer

Trap Trap

TrapTrapTT

TT

TT

TT

TTT

HP SteamPRV 15 psig

250 F

LP Steam150 psig366 F

TrapMotiveForce

Feed Tank or DA

HP CONDENSATE RECOVERY

21

HIGH PRESSURE CONDENSATE RECEIVER

bull Takes high pressure condensate directly from the user

bull No need to deaeratebull Pump directly into boilerbull Feed the HPR from the DA

22

BOILER FEED WATER TANK OPTIONSSpray DA Tray DA Column DA

Vented Receiver

HPCR

23

FEED WATER SYSTEMSFor multiple boiler Installations

24

METHOD 1 ndashDirect feed for multiple boilers

Deaerator

Boiler A

Boiler AControlle

r4-20mA signal directly to

Grundfos E-pump instead of

control valve

Boiler BBoiler BControlle

r4-20mA signal directly to

Grundfos E-pump instead of

control valve

25

METHOD 2 ndashBooster sets for multiple boilers

Deaerator Pressure sensor

Bypass

Multiple pump

controller

26

STEAM BOILER PUMP APPLICATIONS AND TYPESBoiler feed pumpsCollection tank pumpsWater treatment pumpsCondensate return pumpsDeaerator tank recycle pumpsDeaerator vacuum pumps (vacuum deaerator tanks only)Economizer pumps

27

SIZING COMPLEXITY FOR BOILER FEED PUMPS

28

BASE FLOW RATE CALCULATION

Base flow = Boiler maximum capacity horsepower X 0069 X C

bull C = 15 for OnOff intermittent operation

bull C = 115 for continuous feed operation

29

ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW

To the Base flow we MIGHT add if specified

For Continuous Boiler Blowdown flowbull Approximately 5 to10 of the pumprsquos flow

rate at the Best Efficiency Point

30

ADD FOR BYPASS RECIRCULATION FLOWCertain feed system control modes require the use of a bypass line back to the source tank ndash such as back to the deaerator tank

Method

NamePump Speed

TypeDuty

Is orifice flow by-pass line

required1 OnOff control and fixed speed pumps Fixed Intermittent No2 Feed control valve and fixed speed pumps Fixed Continuous Yes3 Feed control valve and variable speed pumps Variable Continuous Yes4 Variable speed pumps only (no control valve) Variable Continuous No

31

Sheet1

RECIRCULATION FLOW

bull The solid curve below shows the minimum flow rate as a percentage of the nominal flow rate in relation to the liquid temperature

bull Ignore the dotted line which indicates a pump with special high-temperature construction

32

CALCULATING REQUIRED FEED PUMP HEAD

+ Suction side head+ Discharge side head= Total Dynamic Head

Elevation of DA tank

Elevation of boiler

33

FEED VALVE IMPACTS PUMPING HEAD CALCULATION

34

CALCULATING THE HEADFOR THE FEED PUMP1) At the duty point flow rateHead in feet = Boiler operating pressure X 231 X 103 divide Liquid Specific Gravity

Example Head = 130 psi X 231 X 103 divide 0953 = 324 feet

2) At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific Gravity

Example Head = 160 psi X 231 X 103 divide 0953 = 400 feet

35

NPSH ndashFORMULA FOR CALCULATION

NPSHr is obtained from the pump curve

Add two to four feet of safety factor to the NPSHr stated on the curve

NPSHa is calculated

+ Absolute pressure in deaerator tank

plusmn Elevation of minimum water level in tank above feed pump

- Vapor pressure of water in deaerator tank

- Suction line friction loss

= Net Positive Suction Head Available

To avoid cavitation NPSHa must be greater than NPSHr

36

NPSH AND ELEVATIONDeaerator

tank

Boiler feed

pumps

Minimum water level in DA tank

Location of eye of lowest impeller

Difference in elevation

37

NPSH AND SUCTION LINE CONSIDERATIONS

Critical suction line considerations here

38

Check list for boiler feed pump selection

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

39

Sheet2

BOILER FEED PUMPS USEFUL FORMULAS

40

Sheet1

SPECIFICATION FOR EXERCISEa) Control Method Continuous duty fixed speed pump with bypass line and feed valveb) Boiler maximum capacity = 250 HPc) Boiler safety valve setting = 125 psigd) Pressure safety factor = 3 above boilerrsquos safety valve settinge) Boiler operating pressure = 100 psigf) Continuous Boiler Blowdown flow - Requiredg) Bypass recirculation flow ndash Requiredh) Altitude ndash Sea leveli) Pressure in deaerator tank above atmospheric pressure = 5 psi (147 + 5 = 197 psi absolute)j) Height of deaerator tank minimum water level above pumprsquos first impeller = 10 feetk) Friction line loss through suction piping = 5 footl) Friction loss through suction side fittings = 5 footm) Friction loss through suction side valves = Nonen) Friction loss through suction side strainer = 1 feeto) Friction loss through discharge piping = 1 footp) Friction loss through discharge side fittings = 1 footq) Pressure drop across feed valve ndash 15 psir) Elevation of boiler maximum water level above pumprsquos discharge port = 5 feets) Liquid Specific Gravity = 0953t) Temperature of water in deaerator tank = 227 degrees Fu) Vapor pressure in deaerator tank = 197 psiv) Pump materials all 316 stainless steel to resist treatment chemicalsw) Mechanical seal to be silicon carbidesilicon carbideEPDM to withstand liquid temperature

41

Feed pumps

CONTROL METHOD

Fixed speed pumps with feed valve and recirculation line

Recirc line

Feed valve

42

STEP 1 ndashDetermine control methodFeed valve controlled system with a continuous duty fixed speed pump has been specified

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

43

Sheet2

STEP 2 ndashCalculate the BASE feed pump flow rate

The formula for this calculation is

bull Boiler maximum capacity in horsepower X 0069 X C

bull The maximum capacity in boiler horsepower is 250

bull The C factor is 115 for continuous duty

Therefore

250 X 0069 X 115 = 20 gpm = BASE flow rate

44

STEP 3 ndashContinuous Boiler Blowdown Flow

Determination

1 The BASE flow rate has been established at 20 gpm

2 We will on next slide need to add for bypass flow which can add 10 to 20 percent to the BASE flow rate

3 Blowdown flow is to be approximately 10 percent of flow at pumprsquos Best Efficiency Point

4 So the total boiler blowdown flow required is approximately 3 gpm

45

STEP 4 ndashAdd for by-pass flow

bull Control is via feed valve with fixed speed pump and for continuous dutybull A bypass will be required

bull Solid curve to right shows minimum flow rate as a percentage of nominal flow rate in relation to liquid temperature

bull Ignore dotted line which indicates a pump with special high-temperature construction

bull At 227degF we require a bypass flow that is about 20 of BEP flow

bull Presuming we can find a pump with BEP at about 25 or so gpm the bypass flow must be about 5 gpm

46

STEP 5 ndashCalculate total flow requiredbull BASE flow = 20 gpmbull Blowdown flow = 3 gpmbull Recirculation flow = 5 gpmbull Total flow required = 28 gpm

XXXX

X

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

47

Sheet2

STEP 6 ndashCalculate BASE pumping head

Boiler operating pressure setting + 3

Formula BASE head in feet = Boiler operating pressure X 231 X 103 divide Specific Gravity

BASE head = 100 psi X 231 X 103 divide 0953 = 250 feet

48

STEP 7 ndashAdd for suction piping system head components

From specificationAbsolute pressure on deaerator tank = 197 psi X 231 = - 46 feetWater elevation above first impeller = - 10 feetFriction loss through suction piping = + 5 feetFriction loss through suction fittings = + 5 feetFriction loss through suction side valves and strainer = + 1 feet

Total = - 54 feet

49

STEP 8 ndashAdd for discharge piping system head components

From specificationFriction loss through discharge piping = + 1 footFriction loss through discharge fittings = + 1 footFriction loss through feed valve is 15 psi X 231 = + 35 feetElevation of boiler maximum water level above pump = + 5 feet

Total = + 42 feet

50

STEP 9 ndashSum of all head components

BASE head with safety factor = + 250 feetSuction side piping system head = - 54 feetDischarge side piping system head = + 42 feet

Total = + 238 feet

51

STEP 10 ndashPressure safety valve considerations At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific GravityExample Head = 125 psi X 231 X 103 divide 0953 = 312 feet

XXXXXXXXX

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

52

Sheet2

STEP 11 ndashDetermine deaerator tank water temperature

From specification 227degF

53

STEP 12 ndashNPSHa calculation

NPSHa equation

plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa

10 feet + (197 psi X 231) - (197 psi X 231) - 2 feet = NPSHa10 feet + 46 feet - 46 feet - 2 feet = 8 feet NPSHa

54

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
1 Base flow calculation equation
Boiler maximum capacity horsepower X 0069 X C = Base flow rate
C = 150 for OnOff intermittent operation
C = 115 for continuous feed operation
2 Determine BASE head for feed pump
Formula based on Safety Valve setting
Pump head in feet = Maximum pressure X 231 X 103 divide Liquid Specific Gravity
3 Head components on suction side of piping system
Pressure above atmospheric on deaerator converted to feet of head = feet
Elevation difference between minimum deaerator water level and pump inlet = feet
Suction pipe friction loss = feet
Suction fitting friction loss = feet
Suction line valves and strainer friction loss = feet
Total = feet
4 Head components on discharge side of piping system
Friction loss through discharge piping = feet
Friction loss through discharge fittings = feet
Friction loss through feed valve = feet
Elevation of boiler maximum water level above pump = feet
Total = feet
5 NPSHa equation
plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa
(Feet) (psi X 231 = Feet) (psi X 231 = Feet) (Feet) (Feet)
Elevation of deaerator tank minimum water level above pumprsquos first impeller
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Method Name Is there head loss across feed valve Typical psi loss across feed valve Typical feed water temperature Typical Specific Gravity Conversion formula Typical feet of head loss across feed valve Pump Speed Type Duty Is orifce flow by-pass line required Orifice flow rate
1 On Off control and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Intermittent No Not applicable
2 Feed control valve and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Continuous Yes 20 of nominal
3 Feed control valve and variable speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Variable Continuous Yes 20 of nominal
4 Variable speed pumps only (no control valve) No None 225degF 0954 Not applicable Not applicable Variable Continuous No Not applicable
Orifice flow rate varies by manufacturers Will use 20 for these exercises
Must add for all head factors on suction and discharge sides of pump
Method Name Pump Speed Type Duty Is orifice flow by-pass line required
1 OnOff control and fixed speed pumps Fixed Intermittent No
2 Feed control valve and fixed speed pumps Fixed Continuous Yes
3 Feed control valve and variable speed pumps Variable Continuous Yes
4 Variable speed pumps only (no control valve) Variable Continuous No
Boiler HP Range Boiler Pressure Range Typical Feed Pump Type Typical Max Feed Pump Flow Range Typical Max Feed Pump Head Where Used
100 to 1200 150 to 500 psi Vertical inline multistage regenerative turbines 10 to 125 gpm 1250 feet General industry institutional universities some commercial buildings
Page 3: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

T

T

T

T

T

LegendSteamCond

Vapor

H P Cond ReturnVent

D A TankD A Tank

Feed PumpBoiler

Strainer

Trap Trap

Trap TrapTT

TT

DA Tank

TT

TT

TTT

Legend

HP SteamPRV

LP Steam

Trap

LP Condensate Return

Cond Rcvramp Pump

MotiveForce

Flash

TYPICAL STEAM SYSTEM

33

BOILER SIZES AND FEED PUMP SIZES

Boiler HP Range

Boiler Pressure

Range

Typical Feed Pump Type

Typical Max Feed

Pump Flow

Range

Typical Max Feed

Pump Head

Where Used

100 to 1200

150 to 500 psi

Vertical inline

multistage regenerative

turbines

10 to 125 gpm 1250 feet

General industry

institutional universities

some commercial

buildings

4

Sheet1

FIRETUBE

Watertube (IWT)

Integral burner

Gun burner5

HORIZONTAL FIRETUBE BOILERSThe Dryback

Refractory Filled Door 1 2

3

4

Baffles

Tubesheet

Two (2) Tubesheets6

WATERTUBE OR IWT

7

THE WATERTUBE BOILER

bull Opposite of Firetubebull Water in the Tubesbull Natural and Forced Circulationbull Large Furnacebull Upper amp Lower Drums orbull Headers

Upper Steam Drum

Lower Mud Drum

Furnace

Outlet nozzle location

8

FLUE GAS SEALING

100 Membrane Construction

Tangent Tube Furnace Design Also Available

9

CONDENSATE IS LIQUID GOLD

A finite resource

10

TYPICAL STEAM SYSTEM

T

T

T

T

T

LegendSteamCond

Vapor

H P Cond Return

D A TankD A Tank

Feed PumpBoiler

Strainer

Trap Trap

TrapTT

TT

DA Tank

TT

TT

TTT

Legend

Trap

HP SteamPRV

LP Steam

Trap

LP Condensate Return

MotiveForce

FlashCondensate tank amp Pump system

11

CONDENSATE RETURN PUMPS

12

FLASH STEAM

T

T

T

T

T

H P Condensate Return

Cond Pump

D A TankD A Tank

Feed PumpBoiler

Strainer

Trap Trap

Trap TrapTT

TT

TT

TT

TTT

HP SteamPRV 15 psig

250 FLP Steam

150 psig366 F

TrapMotiveForce

Feed Tank or DA

13

Flash Tank

Low pressure condensate line

Flash Tank Flash Tank wEconomizer

Use flash steam for heating or deaerating Why not recover the heat from the hot condensate

14

HOT CONDENSATE RETURNED

DeaeratorBoiler Feed System

A vented receiver wastes energy

Pressurized receiver saves energy

Steam diffusing tube

15

Steam

HP Return

Vent

Exhaust OrFlash Steam

ToBoiler

Boiler FeedWater Pump(s)

OverflowDrainer

Cold Make-UpWater

LP Condensate

Make-Up Valve

Check Valve

PRV

Level control

16

SPRAY DEAERATOR

Spray cone

17

TRAY DEAERATOR

steam

Trays

18

PACKED COLUMN DA

19

BOILER FEED WATER TANKSSpray DA Tray DA Column DA

Vented Receiver

20

T

T

T

T

TH P Condensate Return

Cond Pump D A TankD A Tank

Feed PumpBoiler

Strainer

Trap Trap

TrapTrapTT

TT

TT

TT

TTT

HP SteamPRV 15 psig

250 F

LP Steam150 psig366 F

TrapMotiveForce

Feed Tank or DA

HP CONDENSATE RECOVERY

21

HIGH PRESSURE CONDENSATE RECEIVER

bull Takes high pressure condensate directly from the user

bull No need to deaeratebull Pump directly into boilerbull Feed the HPR from the DA

22

BOILER FEED WATER TANK OPTIONSSpray DA Tray DA Column DA

Vented Receiver

HPCR

23

FEED WATER SYSTEMSFor multiple boiler Installations

24

METHOD 1 ndashDirect feed for multiple boilers

Deaerator

Boiler A

Boiler AControlle

r4-20mA signal directly to

Grundfos E-pump instead of

control valve

Boiler BBoiler BControlle

r4-20mA signal directly to

Grundfos E-pump instead of

control valve

25

METHOD 2 ndashBooster sets for multiple boilers

Deaerator Pressure sensor

Bypass

Multiple pump

controller

26

STEAM BOILER PUMP APPLICATIONS AND TYPESBoiler feed pumpsCollection tank pumpsWater treatment pumpsCondensate return pumpsDeaerator tank recycle pumpsDeaerator vacuum pumps (vacuum deaerator tanks only)Economizer pumps

27

SIZING COMPLEXITY FOR BOILER FEED PUMPS

28

BASE FLOW RATE CALCULATION

Base flow = Boiler maximum capacity horsepower X 0069 X C

bull C = 15 for OnOff intermittent operation

bull C = 115 for continuous feed operation

29

ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW

To the Base flow we MIGHT add if specified

For Continuous Boiler Blowdown flowbull Approximately 5 to10 of the pumprsquos flow

rate at the Best Efficiency Point

30

ADD FOR BYPASS RECIRCULATION FLOWCertain feed system control modes require the use of a bypass line back to the source tank ndash such as back to the deaerator tank

Method

NamePump Speed

TypeDuty

Is orifice flow by-pass line

required1 OnOff control and fixed speed pumps Fixed Intermittent No2 Feed control valve and fixed speed pumps Fixed Continuous Yes3 Feed control valve and variable speed pumps Variable Continuous Yes4 Variable speed pumps only (no control valve) Variable Continuous No

31

Sheet1

RECIRCULATION FLOW

bull The solid curve below shows the minimum flow rate as a percentage of the nominal flow rate in relation to the liquid temperature

bull Ignore the dotted line which indicates a pump with special high-temperature construction

32

CALCULATING REQUIRED FEED PUMP HEAD

+ Suction side head+ Discharge side head= Total Dynamic Head

Elevation of DA tank

Elevation of boiler

33

FEED VALVE IMPACTS PUMPING HEAD CALCULATION

34

CALCULATING THE HEADFOR THE FEED PUMP1) At the duty point flow rateHead in feet = Boiler operating pressure X 231 X 103 divide Liquid Specific Gravity

Example Head = 130 psi X 231 X 103 divide 0953 = 324 feet

2) At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific Gravity

Example Head = 160 psi X 231 X 103 divide 0953 = 400 feet

35

NPSH ndashFORMULA FOR CALCULATION

NPSHr is obtained from the pump curve

Add two to four feet of safety factor to the NPSHr stated on the curve

NPSHa is calculated

+ Absolute pressure in deaerator tank

plusmn Elevation of minimum water level in tank above feed pump

- Vapor pressure of water in deaerator tank

- Suction line friction loss

= Net Positive Suction Head Available

To avoid cavitation NPSHa must be greater than NPSHr

36

NPSH AND ELEVATIONDeaerator

tank

Boiler feed

pumps

Minimum water level in DA tank

Location of eye of lowest impeller

Difference in elevation

37

NPSH AND SUCTION LINE CONSIDERATIONS

Critical suction line considerations here

38

Check list for boiler feed pump selection

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

39

Sheet2

BOILER FEED PUMPS USEFUL FORMULAS

40

Sheet1

SPECIFICATION FOR EXERCISEa) Control Method Continuous duty fixed speed pump with bypass line and feed valveb) Boiler maximum capacity = 250 HPc) Boiler safety valve setting = 125 psigd) Pressure safety factor = 3 above boilerrsquos safety valve settinge) Boiler operating pressure = 100 psigf) Continuous Boiler Blowdown flow - Requiredg) Bypass recirculation flow ndash Requiredh) Altitude ndash Sea leveli) Pressure in deaerator tank above atmospheric pressure = 5 psi (147 + 5 = 197 psi absolute)j) Height of deaerator tank minimum water level above pumprsquos first impeller = 10 feetk) Friction line loss through suction piping = 5 footl) Friction loss through suction side fittings = 5 footm) Friction loss through suction side valves = Nonen) Friction loss through suction side strainer = 1 feeto) Friction loss through discharge piping = 1 footp) Friction loss through discharge side fittings = 1 footq) Pressure drop across feed valve ndash 15 psir) Elevation of boiler maximum water level above pumprsquos discharge port = 5 feets) Liquid Specific Gravity = 0953t) Temperature of water in deaerator tank = 227 degrees Fu) Vapor pressure in deaerator tank = 197 psiv) Pump materials all 316 stainless steel to resist treatment chemicalsw) Mechanical seal to be silicon carbidesilicon carbideEPDM to withstand liquid temperature

41

Feed pumps

CONTROL METHOD

Fixed speed pumps with feed valve and recirculation line

Recirc line

Feed valve

42

STEP 1 ndashDetermine control methodFeed valve controlled system with a continuous duty fixed speed pump has been specified

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

43

Sheet2

STEP 2 ndashCalculate the BASE feed pump flow rate

The formula for this calculation is

bull Boiler maximum capacity in horsepower X 0069 X C

bull The maximum capacity in boiler horsepower is 250

bull The C factor is 115 for continuous duty

Therefore

250 X 0069 X 115 = 20 gpm = BASE flow rate

44

STEP 3 ndashContinuous Boiler Blowdown Flow

Determination

1 The BASE flow rate has been established at 20 gpm

2 We will on next slide need to add for bypass flow which can add 10 to 20 percent to the BASE flow rate

3 Blowdown flow is to be approximately 10 percent of flow at pumprsquos Best Efficiency Point

4 So the total boiler blowdown flow required is approximately 3 gpm

45

STEP 4 ndashAdd for by-pass flow

bull Control is via feed valve with fixed speed pump and for continuous dutybull A bypass will be required

bull Solid curve to right shows minimum flow rate as a percentage of nominal flow rate in relation to liquid temperature

bull Ignore dotted line which indicates a pump with special high-temperature construction

bull At 227degF we require a bypass flow that is about 20 of BEP flow

bull Presuming we can find a pump with BEP at about 25 or so gpm the bypass flow must be about 5 gpm

46

STEP 5 ndashCalculate total flow requiredbull BASE flow = 20 gpmbull Blowdown flow = 3 gpmbull Recirculation flow = 5 gpmbull Total flow required = 28 gpm

XXXX

X

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

47

Sheet2

STEP 6 ndashCalculate BASE pumping head

Boiler operating pressure setting + 3

Formula BASE head in feet = Boiler operating pressure X 231 X 103 divide Specific Gravity

BASE head = 100 psi X 231 X 103 divide 0953 = 250 feet

48

STEP 7 ndashAdd for suction piping system head components

From specificationAbsolute pressure on deaerator tank = 197 psi X 231 = - 46 feetWater elevation above first impeller = - 10 feetFriction loss through suction piping = + 5 feetFriction loss through suction fittings = + 5 feetFriction loss through suction side valves and strainer = + 1 feet

Total = - 54 feet

49

STEP 8 ndashAdd for discharge piping system head components

From specificationFriction loss through discharge piping = + 1 footFriction loss through discharge fittings = + 1 footFriction loss through feed valve is 15 psi X 231 = + 35 feetElevation of boiler maximum water level above pump = + 5 feet

Total = + 42 feet

50

STEP 9 ndashSum of all head components

BASE head with safety factor = + 250 feetSuction side piping system head = - 54 feetDischarge side piping system head = + 42 feet

Total = + 238 feet

51

STEP 10 ndashPressure safety valve considerations At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific GravityExample Head = 125 psi X 231 X 103 divide 0953 = 312 feet

XXXXXXXXX

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

52

Sheet2

STEP 11 ndashDetermine deaerator tank water temperature

From specification 227degF

53

STEP 12 ndashNPSHa calculation

NPSHa equation

plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa

10 feet + (197 psi X 231) - (197 psi X 231) - 2 feet = NPSHa10 feet + 46 feet - 46 feet - 2 feet = 8 feet NPSHa

54

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
1 Base flow calculation equation
Boiler maximum capacity horsepower X 0069 X C = Base flow rate
C = 150 for OnOff intermittent operation
C = 115 for continuous feed operation
2 Determine BASE head for feed pump
Formula based on Safety Valve setting
Pump head in feet = Maximum pressure X 231 X 103 divide Liquid Specific Gravity
3 Head components on suction side of piping system
Pressure above atmospheric on deaerator converted to feet of head = feet
Elevation difference between minimum deaerator water level and pump inlet = feet
Suction pipe friction loss = feet
Suction fitting friction loss = feet
Suction line valves and strainer friction loss = feet
Total = feet
4 Head components on discharge side of piping system
Friction loss through discharge piping = feet
Friction loss through discharge fittings = feet
Friction loss through feed valve = feet
Elevation of boiler maximum water level above pump = feet
Total = feet
5 NPSHa equation
plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa
(Feet) (psi X 231 = Feet) (psi X 231 = Feet) (Feet) (Feet)
Elevation of deaerator tank minimum water level above pumprsquos first impeller
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Method Name Is there head loss across feed valve Typical psi loss across feed valve Typical feed water temperature Typical Specific Gravity Conversion formula Typical feet of head loss across feed valve Pump Speed Type Duty Is orifce flow by-pass line required Orifice flow rate
1 On Off control and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Intermittent No Not applicable
2 Feed control valve and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Continuous Yes 20 of nominal
3 Feed control valve and variable speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Variable Continuous Yes 20 of nominal
4 Variable speed pumps only (no control valve) No None 225degF 0954 Not applicable Not applicable Variable Continuous No Not applicable
Orifice flow rate varies by manufacturers Will use 20 for these exercises
Must add for all head factors on suction and discharge sides of pump
Method Name Pump Speed Type Duty Is orifice flow by-pass line required
1 OnOff control and fixed speed pumps Fixed Intermittent No
2 Feed control valve and fixed speed pumps Fixed Continuous Yes
3 Feed control valve and variable speed pumps Variable Continuous Yes
4 Variable speed pumps only (no control valve) Variable Continuous No
Boiler HP Range Boiler Pressure Range Typical Feed Pump Type Typical Max Feed Pump Flow Range Typical Max Feed Pump Head Where Used
100 to 1200 150 to 500 psi Vertical inline multistage regenerative turbines 10 to 125 gpm 1250 feet General industry institutional universities some commercial buildings
Page 4: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

BOILER SIZES AND FEED PUMP SIZES

Boiler HP Range

Boiler Pressure

Range

Typical Feed Pump Type

Typical Max Feed

Pump Flow

Range

Typical Max Feed

Pump Head

Where Used

100 to 1200

150 to 500 psi

Vertical inline

multistage regenerative

turbines

10 to 125 gpm 1250 feet

General industry

institutional universities

some commercial

buildings

4

Sheet1

FIRETUBE

Watertube (IWT)

Integral burner

Gun burner5

HORIZONTAL FIRETUBE BOILERSThe Dryback

Refractory Filled Door 1 2

3

4

Baffles

Tubesheet

Two (2) Tubesheets6

WATERTUBE OR IWT

7

THE WATERTUBE BOILER

bull Opposite of Firetubebull Water in the Tubesbull Natural and Forced Circulationbull Large Furnacebull Upper amp Lower Drums orbull Headers

Upper Steam Drum

Lower Mud Drum

Furnace

Outlet nozzle location

8

FLUE GAS SEALING

100 Membrane Construction

Tangent Tube Furnace Design Also Available

9

CONDENSATE IS LIQUID GOLD

A finite resource

10

TYPICAL STEAM SYSTEM

T

T

T

T

T

LegendSteamCond

Vapor

H P Cond Return

D A TankD A Tank

Feed PumpBoiler

Strainer

Trap Trap

TrapTT

TT

DA Tank

TT

TT

TTT

Legend

Trap

HP SteamPRV

LP Steam

Trap

LP Condensate Return

MotiveForce

FlashCondensate tank amp Pump system

11

CONDENSATE RETURN PUMPS

12

FLASH STEAM

T

T

T

T

T

H P Condensate Return

Cond Pump

D A TankD A Tank

Feed PumpBoiler

Strainer

Trap Trap

Trap TrapTT

TT

TT

TT

TTT

HP SteamPRV 15 psig

250 FLP Steam

150 psig366 F

TrapMotiveForce

Feed Tank or DA

13

Flash Tank

Low pressure condensate line

Flash Tank Flash Tank wEconomizer

Use flash steam for heating or deaerating Why not recover the heat from the hot condensate

14

HOT CONDENSATE RETURNED

DeaeratorBoiler Feed System

A vented receiver wastes energy

Pressurized receiver saves energy

Steam diffusing tube

15

Steam

HP Return

Vent

Exhaust OrFlash Steam

ToBoiler

Boiler FeedWater Pump(s)

OverflowDrainer

Cold Make-UpWater

LP Condensate

Make-Up Valve

Check Valve

PRV

Level control

16

SPRAY DEAERATOR

Spray cone

17

TRAY DEAERATOR

steam

Trays

18

PACKED COLUMN DA

19

BOILER FEED WATER TANKSSpray DA Tray DA Column DA

Vented Receiver

20

T

T

T

T

TH P Condensate Return

Cond Pump D A TankD A Tank

Feed PumpBoiler

Strainer

Trap Trap

TrapTrapTT

TT

TT

TT

TTT

HP SteamPRV 15 psig

250 F

LP Steam150 psig366 F

TrapMotiveForce

Feed Tank or DA

HP CONDENSATE RECOVERY

21

HIGH PRESSURE CONDENSATE RECEIVER

bull Takes high pressure condensate directly from the user

bull No need to deaeratebull Pump directly into boilerbull Feed the HPR from the DA

22

BOILER FEED WATER TANK OPTIONSSpray DA Tray DA Column DA

Vented Receiver

HPCR

23

FEED WATER SYSTEMSFor multiple boiler Installations

24

METHOD 1 ndashDirect feed for multiple boilers

Deaerator

Boiler A

Boiler AControlle

r4-20mA signal directly to

Grundfos E-pump instead of

control valve

Boiler BBoiler BControlle

r4-20mA signal directly to

Grundfos E-pump instead of

control valve

25

METHOD 2 ndashBooster sets for multiple boilers

Deaerator Pressure sensor

Bypass

Multiple pump

controller

26

STEAM BOILER PUMP APPLICATIONS AND TYPESBoiler feed pumpsCollection tank pumpsWater treatment pumpsCondensate return pumpsDeaerator tank recycle pumpsDeaerator vacuum pumps (vacuum deaerator tanks only)Economizer pumps

27

SIZING COMPLEXITY FOR BOILER FEED PUMPS

28

BASE FLOW RATE CALCULATION

Base flow = Boiler maximum capacity horsepower X 0069 X C

bull C = 15 for OnOff intermittent operation

bull C = 115 for continuous feed operation

29

ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW

To the Base flow we MIGHT add if specified

For Continuous Boiler Blowdown flowbull Approximately 5 to10 of the pumprsquos flow

rate at the Best Efficiency Point

30

ADD FOR BYPASS RECIRCULATION FLOWCertain feed system control modes require the use of a bypass line back to the source tank ndash such as back to the deaerator tank

Method

NamePump Speed

TypeDuty

Is orifice flow by-pass line

required1 OnOff control and fixed speed pumps Fixed Intermittent No2 Feed control valve and fixed speed pumps Fixed Continuous Yes3 Feed control valve and variable speed pumps Variable Continuous Yes4 Variable speed pumps only (no control valve) Variable Continuous No

31

Sheet1

RECIRCULATION FLOW

bull The solid curve below shows the minimum flow rate as a percentage of the nominal flow rate in relation to the liquid temperature

bull Ignore the dotted line which indicates a pump with special high-temperature construction

32

CALCULATING REQUIRED FEED PUMP HEAD

+ Suction side head+ Discharge side head= Total Dynamic Head

Elevation of DA tank

Elevation of boiler

33

FEED VALVE IMPACTS PUMPING HEAD CALCULATION

34

CALCULATING THE HEADFOR THE FEED PUMP1) At the duty point flow rateHead in feet = Boiler operating pressure X 231 X 103 divide Liquid Specific Gravity

Example Head = 130 psi X 231 X 103 divide 0953 = 324 feet

2) At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific Gravity

Example Head = 160 psi X 231 X 103 divide 0953 = 400 feet

35

NPSH ndashFORMULA FOR CALCULATION

NPSHr is obtained from the pump curve

Add two to four feet of safety factor to the NPSHr stated on the curve

NPSHa is calculated

+ Absolute pressure in deaerator tank

plusmn Elevation of minimum water level in tank above feed pump

- Vapor pressure of water in deaerator tank

- Suction line friction loss

= Net Positive Suction Head Available

To avoid cavitation NPSHa must be greater than NPSHr

36

NPSH AND ELEVATIONDeaerator

tank

Boiler feed

pumps

Minimum water level in DA tank

Location of eye of lowest impeller

Difference in elevation

37

NPSH AND SUCTION LINE CONSIDERATIONS

Critical suction line considerations here

38

Check list for boiler feed pump selection

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

39

Sheet2

BOILER FEED PUMPS USEFUL FORMULAS

40

Sheet1

SPECIFICATION FOR EXERCISEa) Control Method Continuous duty fixed speed pump with bypass line and feed valveb) Boiler maximum capacity = 250 HPc) Boiler safety valve setting = 125 psigd) Pressure safety factor = 3 above boilerrsquos safety valve settinge) Boiler operating pressure = 100 psigf) Continuous Boiler Blowdown flow - Requiredg) Bypass recirculation flow ndash Requiredh) Altitude ndash Sea leveli) Pressure in deaerator tank above atmospheric pressure = 5 psi (147 + 5 = 197 psi absolute)j) Height of deaerator tank minimum water level above pumprsquos first impeller = 10 feetk) Friction line loss through suction piping = 5 footl) Friction loss through suction side fittings = 5 footm) Friction loss through suction side valves = Nonen) Friction loss through suction side strainer = 1 feeto) Friction loss through discharge piping = 1 footp) Friction loss through discharge side fittings = 1 footq) Pressure drop across feed valve ndash 15 psir) Elevation of boiler maximum water level above pumprsquos discharge port = 5 feets) Liquid Specific Gravity = 0953t) Temperature of water in deaerator tank = 227 degrees Fu) Vapor pressure in deaerator tank = 197 psiv) Pump materials all 316 stainless steel to resist treatment chemicalsw) Mechanical seal to be silicon carbidesilicon carbideEPDM to withstand liquid temperature

41

Feed pumps

CONTROL METHOD

Fixed speed pumps with feed valve and recirculation line

Recirc line

Feed valve

42

STEP 1 ndashDetermine control methodFeed valve controlled system with a continuous duty fixed speed pump has been specified

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

43

Sheet2

STEP 2 ndashCalculate the BASE feed pump flow rate

The formula for this calculation is

bull Boiler maximum capacity in horsepower X 0069 X C

bull The maximum capacity in boiler horsepower is 250

bull The C factor is 115 for continuous duty

Therefore

250 X 0069 X 115 = 20 gpm = BASE flow rate

44

STEP 3 ndashContinuous Boiler Blowdown Flow

Determination

1 The BASE flow rate has been established at 20 gpm

2 We will on next slide need to add for bypass flow which can add 10 to 20 percent to the BASE flow rate

3 Blowdown flow is to be approximately 10 percent of flow at pumprsquos Best Efficiency Point

4 So the total boiler blowdown flow required is approximately 3 gpm

45

STEP 4 ndashAdd for by-pass flow

bull Control is via feed valve with fixed speed pump and for continuous dutybull A bypass will be required

bull Solid curve to right shows minimum flow rate as a percentage of nominal flow rate in relation to liquid temperature

bull Ignore dotted line which indicates a pump with special high-temperature construction

bull At 227degF we require a bypass flow that is about 20 of BEP flow

bull Presuming we can find a pump with BEP at about 25 or so gpm the bypass flow must be about 5 gpm

46

STEP 5 ndashCalculate total flow requiredbull BASE flow = 20 gpmbull Blowdown flow = 3 gpmbull Recirculation flow = 5 gpmbull Total flow required = 28 gpm

XXXX

X

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

47

Sheet2

STEP 6 ndashCalculate BASE pumping head

Boiler operating pressure setting + 3

Formula BASE head in feet = Boiler operating pressure X 231 X 103 divide Specific Gravity

BASE head = 100 psi X 231 X 103 divide 0953 = 250 feet

48

STEP 7 ndashAdd for suction piping system head components

From specificationAbsolute pressure on deaerator tank = 197 psi X 231 = - 46 feetWater elevation above first impeller = - 10 feetFriction loss through suction piping = + 5 feetFriction loss through suction fittings = + 5 feetFriction loss through suction side valves and strainer = + 1 feet

Total = - 54 feet

49

STEP 8 ndashAdd for discharge piping system head components

From specificationFriction loss through discharge piping = + 1 footFriction loss through discharge fittings = + 1 footFriction loss through feed valve is 15 psi X 231 = + 35 feetElevation of boiler maximum water level above pump = + 5 feet

Total = + 42 feet

50

STEP 9 ndashSum of all head components

BASE head with safety factor = + 250 feetSuction side piping system head = - 54 feetDischarge side piping system head = + 42 feet

Total = + 238 feet

51

STEP 10 ndashPressure safety valve considerations At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific GravityExample Head = 125 psi X 231 X 103 divide 0953 = 312 feet

XXXXXXXXX

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

52

Sheet2

STEP 11 ndashDetermine deaerator tank water temperature

From specification 227degF

53

STEP 12 ndashNPSHa calculation

NPSHa equation

plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa

10 feet + (197 psi X 231) - (197 psi X 231) - 2 feet = NPSHa10 feet + 46 feet - 46 feet - 2 feet = 8 feet NPSHa

54

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
1 Base flow calculation equation
Boiler maximum capacity horsepower X 0069 X C = Base flow rate
C = 150 for OnOff intermittent operation
C = 115 for continuous feed operation
2 Determine BASE head for feed pump
Formula based on Safety Valve setting
Pump head in feet = Maximum pressure X 231 X 103 divide Liquid Specific Gravity
3 Head components on suction side of piping system
Pressure above atmospheric on deaerator converted to feet of head = feet
Elevation difference between minimum deaerator water level and pump inlet = feet
Suction pipe friction loss = feet
Suction fitting friction loss = feet
Suction line valves and strainer friction loss = feet
Total = feet
4 Head components on discharge side of piping system
Friction loss through discharge piping = feet
Friction loss through discharge fittings = feet
Friction loss through feed valve = feet
Elevation of boiler maximum water level above pump = feet
Total = feet
5 NPSHa equation
plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa
(Feet) (psi X 231 = Feet) (psi X 231 = Feet) (Feet) (Feet)
Elevation of deaerator tank minimum water level above pumprsquos first impeller
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Method Name Is there head loss across feed valve Typical psi loss across feed valve Typical feed water temperature Typical Specific Gravity Conversion formula Typical feet of head loss across feed valve Pump Speed Type Duty Is orifce flow by-pass line required Orifice flow rate
1 On Off control and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Intermittent No Not applicable
2 Feed control valve and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Continuous Yes 20 of nominal
3 Feed control valve and variable speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Variable Continuous Yes 20 of nominal
4 Variable speed pumps only (no control valve) No None 225degF 0954 Not applicable Not applicable Variable Continuous No Not applicable
Orifice flow rate varies by manufacturers Will use 20 for these exercises
Must add for all head factors on suction and discharge sides of pump
Method Name Pump Speed Type Duty Is orifice flow by-pass line required
1 OnOff control and fixed speed pumps Fixed Intermittent No
2 Feed control valve and fixed speed pumps Fixed Continuous Yes
3 Feed control valve and variable speed pumps Variable Continuous Yes
4 Variable speed pumps only (no control valve) Variable Continuous No
Boiler HP Range Boiler Pressure Range Typical Feed Pump Type Typical Max Feed Pump Flow Range Typical Max Feed Pump Head Where Used
100 to 1200 150 to 500 psi Vertical inline multistage regenerative turbines 10 to 125 gpm 1250 feet General industry institutional universities some commercial buildings
Page 5: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

FIRETUBE

Watertube (IWT)

Integral burner

Gun burner5

HORIZONTAL FIRETUBE BOILERSThe Dryback

Refractory Filled Door 1 2

3

4

Baffles

Tubesheet

Two (2) Tubesheets6

WATERTUBE OR IWT

7

THE WATERTUBE BOILER

bull Opposite of Firetubebull Water in the Tubesbull Natural and Forced Circulationbull Large Furnacebull Upper amp Lower Drums orbull Headers

Upper Steam Drum

Lower Mud Drum

Furnace

Outlet nozzle location

8

FLUE GAS SEALING

100 Membrane Construction

Tangent Tube Furnace Design Also Available

9

CONDENSATE IS LIQUID GOLD

A finite resource

10

TYPICAL STEAM SYSTEM

T

T

T

T

T

LegendSteamCond

Vapor

H P Cond Return

D A TankD A Tank

Feed PumpBoiler

Strainer

Trap Trap

TrapTT

TT

DA Tank

TT

TT

TTT

Legend

Trap

HP SteamPRV

LP Steam

Trap

LP Condensate Return

MotiveForce

FlashCondensate tank amp Pump system

11

CONDENSATE RETURN PUMPS

12

FLASH STEAM

T

T

T

T

T

H P Condensate Return

Cond Pump

D A TankD A Tank

Feed PumpBoiler

Strainer

Trap Trap

Trap TrapTT

TT

TT

TT

TTT

HP SteamPRV 15 psig

250 FLP Steam

150 psig366 F

TrapMotiveForce

Feed Tank or DA

13

Flash Tank

Low pressure condensate line

Flash Tank Flash Tank wEconomizer

Use flash steam for heating or deaerating Why not recover the heat from the hot condensate

14

HOT CONDENSATE RETURNED

DeaeratorBoiler Feed System

A vented receiver wastes energy

Pressurized receiver saves energy

Steam diffusing tube

15

Steam

HP Return

Vent

Exhaust OrFlash Steam

ToBoiler

Boiler FeedWater Pump(s)

OverflowDrainer

Cold Make-UpWater

LP Condensate

Make-Up Valve

Check Valve

PRV

Level control

16

SPRAY DEAERATOR

Spray cone

17

TRAY DEAERATOR

steam

Trays

18

PACKED COLUMN DA

19

BOILER FEED WATER TANKSSpray DA Tray DA Column DA

Vented Receiver

20

T

T

T

T

TH P Condensate Return

Cond Pump D A TankD A Tank

Feed PumpBoiler

Strainer

Trap Trap

TrapTrapTT

TT

TT

TT

TTT

HP SteamPRV 15 psig

250 F

LP Steam150 psig366 F

TrapMotiveForce

Feed Tank or DA

HP CONDENSATE RECOVERY

21

HIGH PRESSURE CONDENSATE RECEIVER

bull Takes high pressure condensate directly from the user

bull No need to deaeratebull Pump directly into boilerbull Feed the HPR from the DA

22

BOILER FEED WATER TANK OPTIONSSpray DA Tray DA Column DA

Vented Receiver

HPCR

23

FEED WATER SYSTEMSFor multiple boiler Installations

24

METHOD 1 ndashDirect feed for multiple boilers

Deaerator

Boiler A

Boiler AControlle

r4-20mA signal directly to

Grundfos E-pump instead of

control valve

Boiler BBoiler BControlle

r4-20mA signal directly to

Grundfos E-pump instead of

control valve

25

METHOD 2 ndashBooster sets for multiple boilers

Deaerator Pressure sensor

Bypass

Multiple pump

controller

26

STEAM BOILER PUMP APPLICATIONS AND TYPESBoiler feed pumpsCollection tank pumpsWater treatment pumpsCondensate return pumpsDeaerator tank recycle pumpsDeaerator vacuum pumps (vacuum deaerator tanks only)Economizer pumps

27

SIZING COMPLEXITY FOR BOILER FEED PUMPS

28

BASE FLOW RATE CALCULATION

Base flow = Boiler maximum capacity horsepower X 0069 X C

bull C = 15 for OnOff intermittent operation

bull C = 115 for continuous feed operation

29

ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW

To the Base flow we MIGHT add if specified

For Continuous Boiler Blowdown flowbull Approximately 5 to10 of the pumprsquos flow

rate at the Best Efficiency Point

30

ADD FOR BYPASS RECIRCULATION FLOWCertain feed system control modes require the use of a bypass line back to the source tank ndash such as back to the deaerator tank

Method

NamePump Speed

TypeDuty

Is orifice flow by-pass line

required1 OnOff control and fixed speed pumps Fixed Intermittent No2 Feed control valve and fixed speed pumps Fixed Continuous Yes3 Feed control valve and variable speed pumps Variable Continuous Yes4 Variable speed pumps only (no control valve) Variable Continuous No

31

Sheet1

RECIRCULATION FLOW

bull The solid curve below shows the minimum flow rate as a percentage of the nominal flow rate in relation to the liquid temperature

bull Ignore the dotted line which indicates a pump with special high-temperature construction

32

CALCULATING REQUIRED FEED PUMP HEAD

+ Suction side head+ Discharge side head= Total Dynamic Head

Elevation of DA tank

Elevation of boiler

33

FEED VALVE IMPACTS PUMPING HEAD CALCULATION

34

CALCULATING THE HEADFOR THE FEED PUMP1) At the duty point flow rateHead in feet = Boiler operating pressure X 231 X 103 divide Liquid Specific Gravity

Example Head = 130 psi X 231 X 103 divide 0953 = 324 feet

2) At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific Gravity

Example Head = 160 psi X 231 X 103 divide 0953 = 400 feet

35

NPSH ndashFORMULA FOR CALCULATION

NPSHr is obtained from the pump curve

Add two to four feet of safety factor to the NPSHr stated on the curve

NPSHa is calculated

+ Absolute pressure in deaerator tank

plusmn Elevation of minimum water level in tank above feed pump

- Vapor pressure of water in deaerator tank

- Suction line friction loss

= Net Positive Suction Head Available

To avoid cavitation NPSHa must be greater than NPSHr

36

NPSH AND ELEVATIONDeaerator

tank

Boiler feed

pumps

Minimum water level in DA tank

Location of eye of lowest impeller

Difference in elevation

37

NPSH AND SUCTION LINE CONSIDERATIONS

Critical suction line considerations here

38

Check list for boiler feed pump selection

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

39

Sheet2

BOILER FEED PUMPS USEFUL FORMULAS

40

Sheet1

SPECIFICATION FOR EXERCISEa) Control Method Continuous duty fixed speed pump with bypass line and feed valveb) Boiler maximum capacity = 250 HPc) Boiler safety valve setting = 125 psigd) Pressure safety factor = 3 above boilerrsquos safety valve settinge) Boiler operating pressure = 100 psigf) Continuous Boiler Blowdown flow - Requiredg) Bypass recirculation flow ndash Requiredh) Altitude ndash Sea leveli) Pressure in deaerator tank above atmospheric pressure = 5 psi (147 + 5 = 197 psi absolute)j) Height of deaerator tank minimum water level above pumprsquos first impeller = 10 feetk) Friction line loss through suction piping = 5 footl) Friction loss through suction side fittings = 5 footm) Friction loss through suction side valves = Nonen) Friction loss through suction side strainer = 1 feeto) Friction loss through discharge piping = 1 footp) Friction loss through discharge side fittings = 1 footq) Pressure drop across feed valve ndash 15 psir) Elevation of boiler maximum water level above pumprsquos discharge port = 5 feets) Liquid Specific Gravity = 0953t) Temperature of water in deaerator tank = 227 degrees Fu) Vapor pressure in deaerator tank = 197 psiv) Pump materials all 316 stainless steel to resist treatment chemicalsw) Mechanical seal to be silicon carbidesilicon carbideEPDM to withstand liquid temperature

41

Feed pumps

CONTROL METHOD

Fixed speed pumps with feed valve and recirculation line

Recirc line

Feed valve

42

STEP 1 ndashDetermine control methodFeed valve controlled system with a continuous duty fixed speed pump has been specified

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

43

Sheet2

STEP 2 ndashCalculate the BASE feed pump flow rate

The formula for this calculation is

bull Boiler maximum capacity in horsepower X 0069 X C

bull The maximum capacity in boiler horsepower is 250

bull The C factor is 115 for continuous duty

Therefore

250 X 0069 X 115 = 20 gpm = BASE flow rate

44

STEP 3 ndashContinuous Boiler Blowdown Flow

Determination

1 The BASE flow rate has been established at 20 gpm

2 We will on next slide need to add for bypass flow which can add 10 to 20 percent to the BASE flow rate

3 Blowdown flow is to be approximately 10 percent of flow at pumprsquos Best Efficiency Point

4 So the total boiler blowdown flow required is approximately 3 gpm

45

STEP 4 ndashAdd for by-pass flow

bull Control is via feed valve with fixed speed pump and for continuous dutybull A bypass will be required

bull Solid curve to right shows minimum flow rate as a percentage of nominal flow rate in relation to liquid temperature

bull Ignore dotted line which indicates a pump with special high-temperature construction

bull At 227degF we require a bypass flow that is about 20 of BEP flow

bull Presuming we can find a pump with BEP at about 25 or so gpm the bypass flow must be about 5 gpm

46

STEP 5 ndashCalculate total flow requiredbull BASE flow = 20 gpmbull Blowdown flow = 3 gpmbull Recirculation flow = 5 gpmbull Total flow required = 28 gpm

XXXX

X

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

47

Sheet2

STEP 6 ndashCalculate BASE pumping head

Boiler operating pressure setting + 3

Formula BASE head in feet = Boiler operating pressure X 231 X 103 divide Specific Gravity

BASE head = 100 psi X 231 X 103 divide 0953 = 250 feet

48

STEP 7 ndashAdd for suction piping system head components

From specificationAbsolute pressure on deaerator tank = 197 psi X 231 = - 46 feetWater elevation above first impeller = - 10 feetFriction loss through suction piping = + 5 feetFriction loss through suction fittings = + 5 feetFriction loss through suction side valves and strainer = + 1 feet

Total = - 54 feet

49

STEP 8 ndashAdd for discharge piping system head components

From specificationFriction loss through discharge piping = + 1 footFriction loss through discharge fittings = + 1 footFriction loss through feed valve is 15 psi X 231 = + 35 feetElevation of boiler maximum water level above pump = + 5 feet

Total = + 42 feet

50

STEP 9 ndashSum of all head components

BASE head with safety factor = + 250 feetSuction side piping system head = - 54 feetDischarge side piping system head = + 42 feet

Total = + 238 feet

51

STEP 10 ndashPressure safety valve considerations At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific GravityExample Head = 125 psi X 231 X 103 divide 0953 = 312 feet

XXXXXXXXX

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

52

Sheet2

STEP 11 ndashDetermine deaerator tank water temperature

From specification 227degF

53

STEP 12 ndashNPSHa calculation

NPSHa equation

plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa

10 feet + (197 psi X 231) - (197 psi X 231) - 2 feet = NPSHa10 feet + 46 feet - 46 feet - 2 feet = 8 feet NPSHa

54

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
1 Base flow calculation equation
Boiler maximum capacity horsepower X 0069 X C = Base flow rate
C = 150 for OnOff intermittent operation
C = 115 for continuous feed operation
2 Determine BASE head for feed pump
Formula based on Safety Valve setting
Pump head in feet = Maximum pressure X 231 X 103 divide Liquid Specific Gravity
3 Head components on suction side of piping system
Pressure above atmospheric on deaerator converted to feet of head = feet
Elevation difference between minimum deaerator water level and pump inlet = feet
Suction pipe friction loss = feet
Suction fitting friction loss = feet
Suction line valves and strainer friction loss = feet
Total = feet
4 Head components on discharge side of piping system
Friction loss through discharge piping = feet
Friction loss through discharge fittings = feet
Friction loss through feed valve = feet
Elevation of boiler maximum water level above pump = feet
Total = feet
5 NPSHa equation
plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa
(Feet) (psi X 231 = Feet) (psi X 231 = Feet) (Feet) (Feet)
Elevation of deaerator tank minimum water level above pumprsquos first impeller
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Method Name Is there head loss across feed valve Typical psi loss across feed valve Typical feed water temperature Typical Specific Gravity Conversion formula Typical feet of head loss across feed valve Pump Speed Type Duty Is orifce flow by-pass line required Orifice flow rate
1 On Off control and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Intermittent No Not applicable
2 Feed control valve and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Continuous Yes 20 of nominal
3 Feed control valve and variable speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Variable Continuous Yes 20 of nominal
4 Variable speed pumps only (no control valve) No None 225degF 0954 Not applicable Not applicable Variable Continuous No Not applicable
Orifice flow rate varies by manufacturers Will use 20 for these exercises
Must add for all head factors on suction and discharge sides of pump
Method Name Pump Speed Type Duty Is orifice flow by-pass line required
1 OnOff control and fixed speed pumps Fixed Intermittent No
2 Feed control valve and fixed speed pumps Fixed Continuous Yes
3 Feed control valve and variable speed pumps Variable Continuous Yes
4 Variable speed pumps only (no control valve) Variable Continuous No
Page 6: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

HORIZONTAL FIRETUBE BOILERSThe Dryback

Refractory Filled Door 1 2

3

4

Baffles

Tubesheet

Two (2) Tubesheets6

WATERTUBE OR IWT

7

THE WATERTUBE BOILER

bull Opposite of Firetubebull Water in the Tubesbull Natural and Forced Circulationbull Large Furnacebull Upper amp Lower Drums orbull Headers

Upper Steam Drum

Lower Mud Drum

Furnace

Outlet nozzle location

8

FLUE GAS SEALING

100 Membrane Construction

Tangent Tube Furnace Design Also Available

9

CONDENSATE IS LIQUID GOLD

A finite resource

10

TYPICAL STEAM SYSTEM

T

T

T

T

T

LegendSteamCond

Vapor

H P Cond Return

D A TankD A Tank

Feed PumpBoiler

Strainer

Trap Trap

TrapTT

TT

DA Tank

TT

TT

TTT

Legend

Trap

HP SteamPRV

LP Steam

Trap

LP Condensate Return

MotiveForce

FlashCondensate tank amp Pump system

11

CONDENSATE RETURN PUMPS

12

FLASH STEAM

T

T

T

T

T

H P Condensate Return

Cond Pump

D A TankD A Tank

Feed PumpBoiler

Strainer

Trap Trap

Trap TrapTT

TT

TT

TT

TTT

HP SteamPRV 15 psig

250 FLP Steam

150 psig366 F

TrapMotiveForce

Feed Tank or DA

13

Flash Tank

Low pressure condensate line

Flash Tank Flash Tank wEconomizer

Use flash steam for heating or deaerating Why not recover the heat from the hot condensate

14

HOT CONDENSATE RETURNED

DeaeratorBoiler Feed System

A vented receiver wastes energy

Pressurized receiver saves energy

Steam diffusing tube

15

Steam

HP Return

Vent

Exhaust OrFlash Steam

ToBoiler

Boiler FeedWater Pump(s)

OverflowDrainer

Cold Make-UpWater

LP Condensate

Make-Up Valve

Check Valve

PRV

Level control

16

SPRAY DEAERATOR

Spray cone

17

TRAY DEAERATOR

steam

Trays

18

PACKED COLUMN DA

19

BOILER FEED WATER TANKSSpray DA Tray DA Column DA

Vented Receiver

20

T

T

T

T

TH P Condensate Return

Cond Pump D A TankD A Tank

Feed PumpBoiler

Strainer

Trap Trap

TrapTrapTT

TT

TT

TT

TTT

HP SteamPRV 15 psig

250 F

LP Steam150 psig366 F

TrapMotiveForce

Feed Tank or DA

HP CONDENSATE RECOVERY

21

HIGH PRESSURE CONDENSATE RECEIVER

bull Takes high pressure condensate directly from the user

bull No need to deaeratebull Pump directly into boilerbull Feed the HPR from the DA

22

BOILER FEED WATER TANK OPTIONSSpray DA Tray DA Column DA

Vented Receiver

HPCR

23

FEED WATER SYSTEMSFor multiple boiler Installations

24

METHOD 1 ndashDirect feed for multiple boilers

Deaerator

Boiler A

Boiler AControlle

r4-20mA signal directly to

Grundfos E-pump instead of

control valve

Boiler BBoiler BControlle

r4-20mA signal directly to

Grundfos E-pump instead of

control valve

25

METHOD 2 ndashBooster sets for multiple boilers

Deaerator Pressure sensor

Bypass

Multiple pump

controller

26

STEAM BOILER PUMP APPLICATIONS AND TYPESBoiler feed pumpsCollection tank pumpsWater treatment pumpsCondensate return pumpsDeaerator tank recycle pumpsDeaerator vacuum pumps (vacuum deaerator tanks only)Economizer pumps

27

SIZING COMPLEXITY FOR BOILER FEED PUMPS

28

BASE FLOW RATE CALCULATION

Base flow = Boiler maximum capacity horsepower X 0069 X C

bull C = 15 for OnOff intermittent operation

bull C = 115 for continuous feed operation

29

ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW

To the Base flow we MIGHT add if specified

For Continuous Boiler Blowdown flowbull Approximately 5 to10 of the pumprsquos flow

rate at the Best Efficiency Point

30

ADD FOR BYPASS RECIRCULATION FLOWCertain feed system control modes require the use of a bypass line back to the source tank ndash such as back to the deaerator tank

Method

NamePump Speed

TypeDuty

Is orifice flow by-pass line

required1 OnOff control and fixed speed pumps Fixed Intermittent No2 Feed control valve and fixed speed pumps Fixed Continuous Yes3 Feed control valve and variable speed pumps Variable Continuous Yes4 Variable speed pumps only (no control valve) Variable Continuous No

31

Sheet1

RECIRCULATION FLOW

bull The solid curve below shows the minimum flow rate as a percentage of the nominal flow rate in relation to the liquid temperature

bull Ignore the dotted line which indicates a pump with special high-temperature construction

32

CALCULATING REQUIRED FEED PUMP HEAD

+ Suction side head+ Discharge side head= Total Dynamic Head

Elevation of DA tank

Elevation of boiler

33

FEED VALVE IMPACTS PUMPING HEAD CALCULATION

34

CALCULATING THE HEADFOR THE FEED PUMP1) At the duty point flow rateHead in feet = Boiler operating pressure X 231 X 103 divide Liquid Specific Gravity

Example Head = 130 psi X 231 X 103 divide 0953 = 324 feet

2) At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific Gravity

Example Head = 160 psi X 231 X 103 divide 0953 = 400 feet

35

NPSH ndashFORMULA FOR CALCULATION

NPSHr is obtained from the pump curve

Add two to four feet of safety factor to the NPSHr stated on the curve

NPSHa is calculated

+ Absolute pressure in deaerator tank

plusmn Elevation of minimum water level in tank above feed pump

- Vapor pressure of water in deaerator tank

- Suction line friction loss

= Net Positive Suction Head Available

To avoid cavitation NPSHa must be greater than NPSHr

36

NPSH AND ELEVATIONDeaerator

tank

Boiler feed

pumps

Minimum water level in DA tank

Location of eye of lowest impeller

Difference in elevation

37

NPSH AND SUCTION LINE CONSIDERATIONS

Critical suction line considerations here

38

Check list for boiler feed pump selection

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

39

Sheet2

BOILER FEED PUMPS USEFUL FORMULAS

40

Sheet1

SPECIFICATION FOR EXERCISEa) Control Method Continuous duty fixed speed pump with bypass line and feed valveb) Boiler maximum capacity = 250 HPc) Boiler safety valve setting = 125 psigd) Pressure safety factor = 3 above boilerrsquos safety valve settinge) Boiler operating pressure = 100 psigf) Continuous Boiler Blowdown flow - Requiredg) Bypass recirculation flow ndash Requiredh) Altitude ndash Sea leveli) Pressure in deaerator tank above atmospheric pressure = 5 psi (147 + 5 = 197 psi absolute)j) Height of deaerator tank minimum water level above pumprsquos first impeller = 10 feetk) Friction line loss through suction piping = 5 footl) Friction loss through suction side fittings = 5 footm) Friction loss through suction side valves = Nonen) Friction loss through suction side strainer = 1 feeto) Friction loss through discharge piping = 1 footp) Friction loss through discharge side fittings = 1 footq) Pressure drop across feed valve ndash 15 psir) Elevation of boiler maximum water level above pumprsquos discharge port = 5 feets) Liquid Specific Gravity = 0953t) Temperature of water in deaerator tank = 227 degrees Fu) Vapor pressure in deaerator tank = 197 psiv) Pump materials all 316 stainless steel to resist treatment chemicalsw) Mechanical seal to be silicon carbidesilicon carbideEPDM to withstand liquid temperature

41

Feed pumps

CONTROL METHOD

Fixed speed pumps with feed valve and recirculation line

Recirc line

Feed valve

42

STEP 1 ndashDetermine control methodFeed valve controlled system with a continuous duty fixed speed pump has been specified

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

43

Sheet2

STEP 2 ndashCalculate the BASE feed pump flow rate

The formula for this calculation is

bull Boiler maximum capacity in horsepower X 0069 X C

bull The maximum capacity in boiler horsepower is 250

bull The C factor is 115 for continuous duty

Therefore

250 X 0069 X 115 = 20 gpm = BASE flow rate

44

STEP 3 ndashContinuous Boiler Blowdown Flow

Determination

1 The BASE flow rate has been established at 20 gpm

2 We will on next slide need to add for bypass flow which can add 10 to 20 percent to the BASE flow rate

3 Blowdown flow is to be approximately 10 percent of flow at pumprsquos Best Efficiency Point

4 So the total boiler blowdown flow required is approximately 3 gpm

45

STEP 4 ndashAdd for by-pass flow

bull Control is via feed valve with fixed speed pump and for continuous dutybull A bypass will be required

bull Solid curve to right shows minimum flow rate as a percentage of nominal flow rate in relation to liquid temperature

bull Ignore dotted line which indicates a pump with special high-temperature construction

bull At 227degF we require a bypass flow that is about 20 of BEP flow

bull Presuming we can find a pump with BEP at about 25 or so gpm the bypass flow must be about 5 gpm

46

STEP 5 ndashCalculate total flow requiredbull BASE flow = 20 gpmbull Blowdown flow = 3 gpmbull Recirculation flow = 5 gpmbull Total flow required = 28 gpm

XXXX

X

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

47

Sheet2

STEP 6 ndashCalculate BASE pumping head

Boiler operating pressure setting + 3

Formula BASE head in feet = Boiler operating pressure X 231 X 103 divide Specific Gravity

BASE head = 100 psi X 231 X 103 divide 0953 = 250 feet

48

STEP 7 ndashAdd for suction piping system head components

From specificationAbsolute pressure on deaerator tank = 197 psi X 231 = - 46 feetWater elevation above first impeller = - 10 feetFriction loss through suction piping = + 5 feetFriction loss through suction fittings = + 5 feetFriction loss through suction side valves and strainer = + 1 feet

Total = - 54 feet

49

STEP 8 ndashAdd for discharge piping system head components

From specificationFriction loss through discharge piping = + 1 footFriction loss through discharge fittings = + 1 footFriction loss through feed valve is 15 psi X 231 = + 35 feetElevation of boiler maximum water level above pump = + 5 feet

Total = + 42 feet

50

STEP 9 ndashSum of all head components

BASE head with safety factor = + 250 feetSuction side piping system head = - 54 feetDischarge side piping system head = + 42 feet

Total = + 238 feet

51

STEP 10 ndashPressure safety valve considerations At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific GravityExample Head = 125 psi X 231 X 103 divide 0953 = 312 feet

XXXXXXXXX

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

52

Sheet2

STEP 11 ndashDetermine deaerator tank water temperature

From specification 227degF

53

STEP 12 ndashNPSHa calculation

NPSHa equation

plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa

10 feet + (197 psi X 231) - (197 psi X 231) - 2 feet = NPSHa10 feet + 46 feet - 46 feet - 2 feet = 8 feet NPSHa

54

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
1 Base flow calculation equation
Boiler maximum capacity horsepower X 0069 X C = Base flow rate
C = 150 for OnOff intermittent operation
C = 115 for continuous feed operation
2 Determine BASE head for feed pump
Formula based on Safety Valve setting
Pump head in feet = Maximum pressure X 231 X 103 divide Liquid Specific Gravity
3 Head components on suction side of piping system
Pressure above atmospheric on deaerator converted to feet of head = feet
Elevation difference between minimum deaerator water level and pump inlet = feet
Suction pipe friction loss = feet
Suction fitting friction loss = feet
Suction line valves and strainer friction loss = feet
Total = feet
4 Head components on discharge side of piping system
Friction loss through discharge piping = feet
Friction loss through discharge fittings = feet
Friction loss through feed valve = feet
Elevation of boiler maximum water level above pump = feet
Total = feet
5 NPSHa equation
plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa
(Feet) (psi X 231 = Feet) (psi X 231 = Feet) (Feet) (Feet)
Elevation of deaerator tank minimum water level above pumprsquos first impeller
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Method Name Is there head loss across feed valve Typical psi loss across feed valve Typical feed water temperature Typical Specific Gravity Conversion formula Typical feet of head loss across feed valve Pump Speed Type Duty Is orifce flow by-pass line required Orifice flow rate
1 On Off control and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Intermittent No Not applicable
2 Feed control valve and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Continuous Yes 20 of nominal
3 Feed control valve and variable speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Variable Continuous Yes 20 of nominal
4 Variable speed pumps only (no control valve) No None 225degF 0954 Not applicable Not applicable Variable Continuous No Not applicable
Orifice flow rate varies by manufacturers Will use 20 for these exercises
Must add for all head factors on suction and discharge sides of pump
Method Name Pump Speed Type Duty Is orifice flow by-pass line required
1 OnOff control and fixed speed pumps Fixed Intermittent No
2 Feed control valve and fixed speed pumps Fixed Continuous Yes
3 Feed control valve and variable speed pumps Variable Continuous Yes
4 Variable speed pumps only (no control valve) Variable Continuous No
Page 7: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

WATERTUBE OR IWT

7

THE WATERTUBE BOILER

bull Opposite of Firetubebull Water in the Tubesbull Natural and Forced Circulationbull Large Furnacebull Upper amp Lower Drums orbull Headers

Upper Steam Drum

Lower Mud Drum

Furnace

Outlet nozzle location

8

FLUE GAS SEALING

100 Membrane Construction

Tangent Tube Furnace Design Also Available

9

CONDENSATE IS LIQUID GOLD

A finite resource

10

TYPICAL STEAM SYSTEM

T

T

T

T

T

LegendSteamCond

Vapor

H P Cond Return

D A TankD A Tank

Feed PumpBoiler

Strainer

Trap Trap

TrapTT

TT

DA Tank

TT

TT

TTT

Legend

Trap

HP SteamPRV

LP Steam

Trap

LP Condensate Return

MotiveForce

FlashCondensate tank amp Pump system

11

CONDENSATE RETURN PUMPS

12

FLASH STEAM

T

T

T

T

T

H P Condensate Return

Cond Pump

D A TankD A Tank

Feed PumpBoiler

Strainer

Trap Trap

Trap TrapTT

TT

TT

TT

TTT

HP SteamPRV 15 psig

250 FLP Steam

150 psig366 F

TrapMotiveForce

Feed Tank or DA

13

Flash Tank

Low pressure condensate line

Flash Tank Flash Tank wEconomizer

Use flash steam for heating or deaerating Why not recover the heat from the hot condensate

14

HOT CONDENSATE RETURNED

DeaeratorBoiler Feed System

A vented receiver wastes energy

Pressurized receiver saves energy

Steam diffusing tube

15

Steam

HP Return

Vent

Exhaust OrFlash Steam

ToBoiler

Boiler FeedWater Pump(s)

OverflowDrainer

Cold Make-UpWater

LP Condensate

Make-Up Valve

Check Valve

PRV

Level control

16

SPRAY DEAERATOR

Spray cone

17

TRAY DEAERATOR

steam

Trays

18

PACKED COLUMN DA

19

BOILER FEED WATER TANKSSpray DA Tray DA Column DA

Vented Receiver

20

T

T

T

T

TH P Condensate Return

Cond Pump D A TankD A Tank

Feed PumpBoiler

Strainer

Trap Trap

TrapTrapTT

TT

TT

TT

TTT

HP SteamPRV 15 psig

250 F

LP Steam150 psig366 F

TrapMotiveForce

Feed Tank or DA

HP CONDENSATE RECOVERY

21

HIGH PRESSURE CONDENSATE RECEIVER

bull Takes high pressure condensate directly from the user

bull No need to deaeratebull Pump directly into boilerbull Feed the HPR from the DA

22

BOILER FEED WATER TANK OPTIONSSpray DA Tray DA Column DA

Vented Receiver

HPCR

23

FEED WATER SYSTEMSFor multiple boiler Installations

24

METHOD 1 ndashDirect feed for multiple boilers

Deaerator

Boiler A

Boiler AControlle

r4-20mA signal directly to

Grundfos E-pump instead of

control valve

Boiler BBoiler BControlle

r4-20mA signal directly to

Grundfos E-pump instead of

control valve

25

METHOD 2 ndashBooster sets for multiple boilers

Deaerator Pressure sensor

Bypass

Multiple pump

controller

26

STEAM BOILER PUMP APPLICATIONS AND TYPESBoiler feed pumpsCollection tank pumpsWater treatment pumpsCondensate return pumpsDeaerator tank recycle pumpsDeaerator vacuum pumps (vacuum deaerator tanks only)Economizer pumps

27

SIZING COMPLEXITY FOR BOILER FEED PUMPS

28

BASE FLOW RATE CALCULATION

Base flow = Boiler maximum capacity horsepower X 0069 X C

bull C = 15 for OnOff intermittent operation

bull C = 115 for continuous feed operation

29

ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW

To the Base flow we MIGHT add if specified

For Continuous Boiler Blowdown flowbull Approximately 5 to10 of the pumprsquos flow

rate at the Best Efficiency Point

30

ADD FOR BYPASS RECIRCULATION FLOWCertain feed system control modes require the use of a bypass line back to the source tank ndash such as back to the deaerator tank

Method

NamePump Speed

TypeDuty

Is orifice flow by-pass line

required1 OnOff control and fixed speed pumps Fixed Intermittent No2 Feed control valve and fixed speed pumps Fixed Continuous Yes3 Feed control valve and variable speed pumps Variable Continuous Yes4 Variable speed pumps only (no control valve) Variable Continuous No

31

Sheet1

RECIRCULATION FLOW

bull The solid curve below shows the minimum flow rate as a percentage of the nominal flow rate in relation to the liquid temperature

bull Ignore the dotted line which indicates a pump with special high-temperature construction

32

CALCULATING REQUIRED FEED PUMP HEAD

+ Suction side head+ Discharge side head= Total Dynamic Head

Elevation of DA tank

Elevation of boiler

33

FEED VALVE IMPACTS PUMPING HEAD CALCULATION

34

CALCULATING THE HEADFOR THE FEED PUMP1) At the duty point flow rateHead in feet = Boiler operating pressure X 231 X 103 divide Liquid Specific Gravity

Example Head = 130 psi X 231 X 103 divide 0953 = 324 feet

2) At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific Gravity

Example Head = 160 psi X 231 X 103 divide 0953 = 400 feet

35

NPSH ndashFORMULA FOR CALCULATION

NPSHr is obtained from the pump curve

Add two to four feet of safety factor to the NPSHr stated on the curve

NPSHa is calculated

+ Absolute pressure in deaerator tank

plusmn Elevation of minimum water level in tank above feed pump

- Vapor pressure of water in deaerator tank

- Suction line friction loss

= Net Positive Suction Head Available

To avoid cavitation NPSHa must be greater than NPSHr

36

NPSH AND ELEVATIONDeaerator

tank

Boiler feed

pumps

Minimum water level in DA tank

Location of eye of lowest impeller

Difference in elevation

37

NPSH AND SUCTION LINE CONSIDERATIONS

Critical suction line considerations here

38

Check list for boiler feed pump selection

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

39

Sheet2

BOILER FEED PUMPS USEFUL FORMULAS

40

Sheet1

SPECIFICATION FOR EXERCISEa) Control Method Continuous duty fixed speed pump with bypass line and feed valveb) Boiler maximum capacity = 250 HPc) Boiler safety valve setting = 125 psigd) Pressure safety factor = 3 above boilerrsquos safety valve settinge) Boiler operating pressure = 100 psigf) Continuous Boiler Blowdown flow - Requiredg) Bypass recirculation flow ndash Requiredh) Altitude ndash Sea leveli) Pressure in deaerator tank above atmospheric pressure = 5 psi (147 + 5 = 197 psi absolute)j) Height of deaerator tank minimum water level above pumprsquos first impeller = 10 feetk) Friction line loss through suction piping = 5 footl) Friction loss through suction side fittings = 5 footm) Friction loss through suction side valves = Nonen) Friction loss through suction side strainer = 1 feeto) Friction loss through discharge piping = 1 footp) Friction loss through discharge side fittings = 1 footq) Pressure drop across feed valve ndash 15 psir) Elevation of boiler maximum water level above pumprsquos discharge port = 5 feets) Liquid Specific Gravity = 0953t) Temperature of water in deaerator tank = 227 degrees Fu) Vapor pressure in deaerator tank = 197 psiv) Pump materials all 316 stainless steel to resist treatment chemicalsw) Mechanical seal to be silicon carbidesilicon carbideEPDM to withstand liquid temperature

41

Feed pumps

CONTROL METHOD

Fixed speed pumps with feed valve and recirculation line

Recirc line

Feed valve

42

STEP 1 ndashDetermine control methodFeed valve controlled system with a continuous duty fixed speed pump has been specified

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

43

Sheet2

STEP 2 ndashCalculate the BASE feed pump flow rate

The formula for this calculation is

bull Boiler maximum capacity in horsepower X 0069 X C

bull The maximum capacity in boiler horsepower is 250

bull The C factor is 115 for continuous duty

Therefore

250 X 0069 X 115 = 20 gpm = BASE flow rate

44

STEP 3 ndashContinuous Boiler Blowdown Flow

Determination

1 The BASE flow rate has been established at 20 gpm

2 We will on next slide need to add for bypass flow which can add 10 to 20 percent to the BASE flow rate

3 Blowdown flow is to be approximately 10 percent of flow at pumprsquos Best Efficiency Point

4 So the total boiler blowdown flow required is approximately 3 gpm

45

STEP 4 ndashAdd for by-pass flow

bull Control is via feed valve with fixed speed pump and for continuous dutybull A bypass will be required

bull Solid curve to right shows minimum flow rate as a percentage of nominal flow rate in relation to liquid temperature

bull Ignore dotted line which indicates a pump with special high-temperature construction

bull At 227degF we require a bypass flow that is about 20 of BEP flow

bull Presuming we can find a pump with BEP at about 25 or so gpm the bypass flow must be about 5 gpm

46

STEP 5 ndashCalculate total flow requiredbull BASE flow = 20 gpmbull Blowdown flow = 3 gpmbull Recirculation flow = 5 gpmbull Total flow required = 28 gpm

XXXX

X

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

47

Sheet2

STEP 6 ndashCalculate BASE pumping head

Boiler operating pressure setting + 3

Formula BASE head in feet = Boiler operating pressure X 231 X 103 divide Specific Gravity

BASE head = 100 psi X 231 X 103 divide 0953 = 250 feet

48

STEP 7 ndashAdd for suction piping system head components

From specificationAbsolute pressure on deaerator tank = 197 psi X 231 = - 46 feetWater elevation above first impeller = - 10 feetFriction loss through suction piping = + 5 feetFriction loss through suction fittings = + 5 feetFriction loss through suction side valves and strainer = + 1 feet

Total = - 54 feet

49

STEP 8 ndashAdd for discharge piping system head components

From specificationFriction loss through discharge piping = + 1 footFriction loss through discharge fittings = + 1 footFriction loss through feed valve is 15 psi X 231 = + 35 feetElevation of boiler maximum water level above pump = + 5 feet

Total = + 42 feet

50

STEP 9 ndashSum of all head components

BASE head with safety factor = + 250 feetSuction side piping system head = - 54 feetDischarge side piping system head = + 42 feet

Total = + 238 feet

51

STEP 10 ndashPressure safety valve considerations At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific GravityExample Head = 125 psi X 231 X 103 divide 0953 = 312 feet

XXXXXXXXX

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

52

Sheet2

STEP 11 ndashDetermine deaerator tank water temperature

From specification 227degF

53

STEP 12 ndashNPSHa calculation

NPSHa equation

plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa

10 feet + (197 psi X 231) - (197 psi X 231) - 2 feet = NPSHa10 feet + 46 feet - 46 feet - 2 feet = 8 feet NPSHa

54

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
1 Base flow calculation equation
Boiler maximum capacity horsepower X 0069 X C = Base flow rate
C = 150 for OnOff intermittent operation
C = 115 for continuous feed operation
2 Determine BASE head for feed pump
Formula based on Safety Valve setting
Pump head in feet = Maximum pressure X 231 X 103 divide Liquid Specific Gravity
3 Head components on suction side of piping system
Pressure above atmospheric on deaerator converted to feet of head = feet
Elevation difference between minimum deaerator water level and pump inlet = feet
Suction pipe friction loss = feet
Suction fitting friction loss = feet
Suction line valves and strainer friction loss = feet
Total = feet
4 Head components on discharge side of piping system
Friction loss through discharge piping = feet
Friction loss through discharge fittings = feet
Friction loss through feed valve = feet
Elevation of boiler maximum water level above pump = feet
Total = feet
5 NPSHa equation
plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa
(Feet) (psi X 231 = Feet) (psi X 231 = Feet) (Feet) (Feet)
Elevation of deaerator tank minimum water level above pumprsquos first impeller
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Method Name Is there head loss across feed valve Typical psi loss across feed valve Typical feed water temperature Typical Specific Gravity Conversion formula Typical feet of head loss across feed valve Pump Speed Type Duty Is orifce flow by-pass line required Orifice flow rate
1 On Off control and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Intermittent No Not applicable
2 Feed control valve and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Continuous Yes 20 of nominal
3 Feed control valve and variable speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Variable Continuous Yes 20 of nominal
4 Variable speed pumps only (no control valve) No None 225degF 0954 Not applicable Not applicable Variable Continuous No Not applicable
Orifice flow rate varies by manufacturers Will use 20 for these exercises
Must add for all head factors on suction and discharge sides of pump
Method Name Pump Speed Type Duty Is orifice flow by-pass line required
1 OnOff control and fixed speed pumps Fixed Intermittent No
2 Feed control valve and fixed speed pumps Fixed Continuous Yes
3 Feed control valve and variable speed pumps Variable Continuous Yes
4 Variable speed pumps only (no control valve) Variable Continuous No
Page 8: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

THE WATERTUBE BOILER

bull Opposite of Firetubebull Water in the Tubesbull Natural and Forced Circulationbull Large Furnacebull Upper amp Lower Drums orbull Headers

Upper Steam Drum

Lower Mud Drum

Furnace

Outlet nozzle location

8

FLUE GAS SEALING

100 Membrane Construction

Tangent Tube Furnace Design Also Available

9

CONDENSATE IS LIQUID GOLD

A finite resource

10

TYPICAL STEAM SYSTEM

T

T

T

T

T

LegendSteamCond

Vapor

H P Cond Return

D A TankD A Tank

Feed PumpBoiler

Strainer

Trap Trap

TrapTT

TT

DA Tank

TT

TT

TTT

Legend

Trap

HP SteamPRV

LP Steam

Trap

LP Condensate Return

MotiveForce

FlashCondensate tank amp Pump system

11

CONDENSATE RETURN PUMPS

12

FLASH STEAM

T

T

T

T

T

H P Condensate Return

Cond Pump

D A TankD A Tank

Feed PumpBoiler

Strainer

Trap Trap

Trap TrapTT

TT

TT

TT

TTT

HP SteamPRV 15 psig

250 FLP Steam

150 psig366 F

TrapMotiveForce

Feed Tank or DA

13

Flash Tank

Low pressure condensate line

Flash Tank Flash Tank wEconomizer

Use flash steam for heating or deaerating Why not recover the heat from the hot condensate

14

HOT CONDENSATE RETURNED

DeaeratorBoiler Feed System

A vented receiver wastes energy

Pressurized receiver saves energy

Steam diffusing tube

15

Steam

HP Return

Vent

Exhaust OrFlash Steam

ToBoiler

Boiler FeedWater Pump(s)

OverflowDrainer

Cold Make-UpWater

LP Condensate

Make-Up Valve

Check Valve

PRV

Level control

16

SPRAY DEAERATOR

Spray cone

17

TRAY DEAERATOR

steam

Trays

18

PACKED COLUMN DA

19

BOILER FEED WATER TANKSSpray DA Tray DA Column DA

Vented Receiver

20

T

T

T

T

TH P Condensate Return

Cond Pump D A TankD A Tank

Feed PumpBoiler

Strainer

Trap Trap

TrapTrapTT

TT

TT

TT

TTT

HP SteamPRV 15 psig

250 F

LP Steam150 psig366 F

TrapMotiveForce

Feed Tank or DA

HP CONDENSATE RECOVERY

21

HIGH PRESSURE CONDENSATE RECEIVER

bull Takes high pressure condensate directly from the user

bull No need to deaeratebull Pump directly into boilerbull Feed the HPR from the DA

22

BOILER FEED WATER TANK OPTIONSSpray DA Tray DA Column DA

Vented Receiver

HPCR

23

FEED WATER SYSTEMSFor multiple boiler Installations

24

METHOD 1 ndashDirect feed for multiple boilers

Deaerator

Boiler A

Boiler AControlle

r4-20mA signal directly to

Grundfos E-pump instead of

control valve

Boiler BBoiler BControlle

r4-20mA signal directly to

Grundfos E-pump instead of

control valve

25

METHOD 2 ndashBooster sets for multiple boilers

Deaerator Pressure sensor

Bypass

Multiple pump

controller

26

STEAM BOILER PUMP APPLICATIONS AND TYPESBoiler feed pumpsCollection tank pumpsWater treatment pumpsCondensate return pumpsDeaerator tank recycle pumpsDeaerator vacuum pumps (vacuum deaerator tanks only)Economizer pumps

27

SIZING COMPLEXITY FOR BOILER FEED PUMPS

28

BASE FLOW RATE CALCULATION

Base flow = Boiler maximum capacity horsepower X 0069 X C

bull C = 15 for OnOff intermittent operation

bull C = 115 for continuous feed operation

29

ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW

To the Base flow we MIGHT add if specified

For Continuous Boiler Blowdown flowbull Approximately 5 to10 of the pumprsquos flow

rate at the Best Efficiency Point

30

ADD FOR BYPASS RECIRCULATION FLOWCertain feed system control modes require the use of a bypass line back to the source tank ndash such as back to the deaerator tank

Method

NamePump Speed

TypeDuty

Is orifice flow by-pass line

required1 OnOff control and fixed speed pumps Fixed Intermittent No2 Feed control valve and fixed speed pumps Fixed Continuous Yes3 Feed control valve and variable speed pumps Variable Continuous Yes4 Variable speed pumps only (no control valve) Variable Continuous No

31

Sheet1

RECIRCULATION FLOW

bull The solid curve below shows the minimum flow rate as a percentage of the nominal flow rate in relation to the liquid temperature

bull Ignore the dotted line which indicates a pump with special high-temperature construction

32

CALCULATING REQUIRED FEED PUMP HEAD

+ Suction side head+ Discharge side head= Total Dynamic Head

Elevation of DA tank

Elevation of boiler

33

FEED VALVE IMPACTS PUMPING HEAD CALCULATION

34

CALCULATING THE HEADFOR THE FEED PUMP1) At the duty point flow rateHead in feet = Boiler operating pressure X 231 X 103 divide Liquid Specific Gravity

Example Head = 130 psi X 231 X 103 divide 0953 = 324 feet

2) At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific Gravity

Example Head = 160 psi X 231 X 103 divide 0953 = 400 feet

35

NPSH ndashFORMULA FOR CALCULATION

NPSHr is obtained from the pump curve

Add two to four feet of safety factor to the NPSHr stated on the curve

NPSHa is calculated

+ Absolute pressure in deaerator tank

plusmn Elevation of minimum water level in tank above feed pump

- Vapor pressure of water in deaerator tank

- Suction line friction loss

= Net Positive Suction Head Available

To avoid cavitation NPSHa must be greater than NPSHr

36

NPSH AND ELEVATIONDeaerator

tank

Boiler feed

pumps

Minimum water level in DA tank

Location of eye of lowest impeller

Difference in elevation

37

NPSH AND SUCTION LINE CONSIDERATIONS

Critical suction line considerations here

38

Check list for boiler feed pump selection

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

39

Sheet2

BOILER FEED PUMPS USEFUL FORMULAS

40

Sheet1

SPECIFICATION FOR EXERCISEa) Control Method Continuous duty fixed speed pump with bypass line and feed valveb) Boiler maximum capacity = 250 HPc) Boiler safety valve setting = 125 psigd) Pressure safety factor = 3 above boilerrsquos safety valve settinge) Boiler operating pressure = 100 psigf) Continuous Boiler Blowdown flow - Requiredg) Bypass recirculation flow ndash Requiredh) Altitude ndash Sea leveli) Pressure in deaerator tank above atmospheric pressure = 5 psi (147 + 5 = 197 psi absolute)j) Height of deaerator tank minimum water level above pumprsquos first impeller = 10 feetk) Friction line loss through suction piping = 5 footl) Friction loss through suction side fittings = 5 footm) Friction loss through suction side valves = Nonen) Friction loss through suction side strainer = 1 feeto) Friction loss through discharge piping = 1 footp) Friction loss through discharge side fittings = 1 footq) Pressure drop across feed valve ndash 15 psir) Elevation of boiler maximum water level above pumprsquos discharge port = 5 feets) Liquid Specific Gravity = 0953t) Temperature of water in deaerator tank = 227 degrees Fu) Vapor pressure in deaerator tank = 197 psiv) Pump materials all 316 stainless steel to resist treatment chemicalsw) Mechanical seal to be silicon carbidesilicon carbideEPDM to withstand liquid temperature

41

Feed pumps

CONTROL METHOD

Fixed speed pumps with feed valve and recirculation line

Recirc line

Feed valve

42

STEP 1 ndashDetermine control methodFeed valve controlled system with a continuous duty fixed speed pump has been specified

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

43

Sheet2

STEP 2 ndashCalculate the BASE feed pump flow rate

The formula for this calculation is

bull Boiler maximum capacity in horsepower X 0069 X C

bull The maximum capacity in boiler horsepower is 250

bull The C factor is 115 for continuous duty

Therefore

250 X 0069 X 115 = 20 gpm = BASE flow rate

44

STEP 3 ndashContinuous Boiler Blowdown Flow

Determination

1 The BASE flow rate has been established at 20 gpm

2 We will on next slide need to add for bypass flow which can add 10 to 20 percent to the BASE flow rate

3 Blowdown flow is to be approximately 10 percent of flow at pumprsquos Best Efficiency Point

4 So the total boiler blowdown flow required is approximately 3 gpm

45

STEP 4 ndashAdd for by-pass flow

bull Control is via feed valve with fixed speed pump and for continuous dutybull A bypass will be required

bull Solid curve to right shows minimum flow rate as a percentage of nominal flow rate in relation to liquid temperature

bull Ignore dotted line which indicates a pump with special high-temperature construction

bull At 227degF we require a bypass flow that is about 20 of BEP flow

bull Presuming we can find a pump with BEP at about 25 or so gpm the bypass flow must be about 5 gpm

46

STEP 5 ndashCalculate total flow requiredbull BASE flow = 20 gpmbull Blowdown flow = 3 gpmbull Recirculation flow = 5 gpmbull Total flow required = 28 gpm

XXXX

X

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

47

Sheet2

STEP 6 ndashCalculate BASE pumping head

Boiler operating pressure setting + 3

Formula BASE head in feet = Boiler operating pressure X 231 X 103 divide Specific Gravity

BASE head = 100 psi X 231 X 103 divide 0953 = 250 feet

48

STEP 7 ndashAdd for suction piping system head components

From specificationAbsolute pressure on deaerator tank = 197 psi X 231 = - 46 feetWater elevation above first impeller = - 10 feetFriction loss through suction piping = + 5 feetFriction loss through suction fittings = + 5 feetFriction loss through suction side valves and strainer = + 1 feet

Total = - 54 feet

49

STEP 8 ndashAdd for discharge piping system head components

From specificationFriction loss through discharge piping = + 1 footFriction loss through discharge fittings = + 1 footFriction loss through feed valve is 15 psi X 231 = + 35 feetElevation of boiler maximum water level above pump = + 5 feet

Total = + 42 feet

50

STEP 9 ndashSum of all head components

BASE head with safety factor = + 250 feetSuction side piping system head = - 54 feetDischarge side piping system head = + 42 feet

Total = + 238 feet

51

STEP 10 ndashPressure safety valve considerations At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific GravityExample Head = 125 psi X 231 X 103 divide 0953 = 312 feet

XXXXXXXXX

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

52

Sheet2

STEP 11 ndashDetermine deaerator tank water temperature

From specification 227degF

53

STEP 12 ndashNPSHa calculation

NPSHa equation

plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa

10 feet + (197 psi X 231) - (197 psi X 231) - 2 feet = NPSHa10 feet + 46 feet - 46 feet - 2 feet = 8 feet NPSHa

54

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
1 Base flow calculation equation
Boiler maximum capacity horsepower X 0069 X C = Base flow rate
C = 150 for OnOff intermittent operation
C = 115 for continuous feed operation
2 Determine BASE head for feed pump
Formula based on Safety Valve setting
Pump head in feet = Maximum pressure X 231 X 103 divide Liquid Specific Gravity
3 Head components on suction side of piping system
Pressure above atmospheric on deaerator converted to feet of head = feet
Elevation difference between minimum deaerator water level and pump inlet = feet
Suction pipe friction loss = feet
Suction fitting friction loss = feet
Suction line valves and strainer friction loss = feet
Total = feet
4 Head components on discharge side of piping system
Friction loss through discharge piping = feet
Friction loss through discharge fittings = feet
Friction loss through feed valve = feet
Elevation of boiler maximum water level above pump = feet
Total = feet
5 NPSHa equation
plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa
(Feet) (psi X 231 = Feet) (psi X 231 = Feet) (Feet) (Feet)
Elevation of deaerator tank minimum water level above pumprsquos first impeller
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Method Name Is there head loss across feed valve Typical psi loss across feed valve Typical feed water temperature Typical Specific Gravity Conversion formula Typical feet of head loss across feed valve Pump Speed Type Duty Is orifce flow by-pass line required Orifice flow rate
1 On Off control and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Intermittent No Not applicable
2 Feed control valve and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Continuous Yes 20 of nominal
3 Feed control valve and variable speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Variable Continuous Yes 20 of nominal
4 Variable speed pumps only (no control valve) No None 225degF 0954 Not applicable Not applicable Variable Continuous No Not applicable
Orifice flow rate varies by manufacturers Will use 20 for these exercises
Must add for all head factors on suction and discharge sides of pump
Method Name Pump Speed Type Duty Is orifice flow by-pass line required
1 OnOff control and fixed speed pumps Fixed Intermittent No
2 Feed control valve and fixed speed pumps Fixed Continuous Yes
3 Feed control valve and variable speed pumps Variable Continuous Yes
4 Variable speed pumps only (no control valve) Variable Continuous No
Page 9: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

FLUE GAS SEALING

100 Membrane Construction

Tangent Tube Furnace Design Also Available

9

CONDENSATE IS LIQUID GOLD

A finite resource

10

TYPICAL STEAM SYSTEM

T

T

T

T

T

LegendSteamCond

Vapor

H P Cond Return

D A TankD A Tank

Feed PumpBoiler

Strainer

Trap Trap

TrapTT

TT

DA Tank

TT

TT

TTT

Legend

Trap

HP SteamPRV

LP Steam

Trap

LP Condensate Return

MotiveForce

FlashCondensate tank amp Pump system

11

CONDENSATE RETURN PUMPS

12

FLASH STEAM

T

T

T

T

T

H P Condensate Return

Cond Pump

D A TankD A Tank

Feed PumpBoiler

Strainer

Trap Trap

Trap TrapTT

TT

TT

TT

TTT

HP SteamPRV 15 psig

250 FLP Steam

150 psig366 F

TrapMotiveForce

Feed Tank or DA

13

Flash Tank

Low pressure condensate line

Flash Tank Flash Tank wEconomizer

Use flash steam for heating or deaerating Why not recover the heat from the hot condensate

14

HOT CONDENSATE RETURNED

DeaeratorBoiler Feed System

A vented receiver wastes energy

Pressurized receiver saves energy

Steam diffusing tube

15

Steam

HP Return

Vent

Exhaust OrFlash Steam

ToBoiler

Boiler FeedWater Pump(s)

OverflowDrainer

Cold Make-UpWater

LP Condensate

Make-Up Valve

Check Valve

PRV

Level control

16

SPRAY DEAERATOR

Spray cone

17

TRAY DEAERATOR

steam

Trays

18

PACKED COLUMN DA

19

BOILER FEED WATER TANKSSpray DA Tray DA Column DA

Vented Receiver

20

T

T

T

T

TH P Condensate Return

Cond Pump D A TankD A Tank

Feed PumpBoiler

Strainer

Trap Trap

TrapTrapTT

TT

TT

TT

TTT

HP SteamPRV 15 psig

250 F

LP Steam150 psig366 F

TrapMotiveForce

Feed Tank or DA

HP CONDENSATE RECOVERY

21

HIGH PRESSURE CONDENSATE RECEIVER

bull Takes high pressure condensate directly from the user

bull No need to deaeratebull Pump directly into boilerbull Feed the HPR from the DA

22

BOILER FEED WATER TANK OPTIONSSpray DA Tray DA Column DA

Vented Receiver

HPCR

23

FEED WATER SYSTEMSFor multiple boiler Installations

24

METHOD 1 ndashDirect feed for multiple boilers

Deaerator

Boiler A

Boiler AControlle

r4-20mA signal directly to

Grundfos E-pump instead of

control valve

Boiler BBoiler BControlle

r4-20mA signal directly to

Grundfos E-pump instead of

control valve

25

METHOD 2 ndashBooster sets for multiple boilers

Deaerator Pressure sensor

Bypass

Multiple pump

controller

26

STEAM BOILER PUMP APPLICATIONS AND TYPESBoiler feed pumpsCollection tank pumpsWater treatment pumpsCondensate return pumpsDeaerator tank recycle pumpsDeaerator vacuum pumps (vacuum deaerator tanks only)Economizer pumps

27

SIZING COMPLEXITY FOR BOILER FEED PUMPS

28

BASE FLOW RATE CALCULATION

Base flow = Boiler maximum capacity horsepower X 0069 X C

bull C = 15 for OnOff intermittent operation

bull C = 115 for continuous feed operation

29

ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW

To the Base flow we MIGHT add if specified

For Continuous Boiler Blowdown flowbull Approximately 5 to10 of the pumprsquos flow

rate at the Best Efficiency Point

30

ADD FOR BYPASS RECIRCULATION FLOWCertain feed system control modes require the use of a bypass line back to the source tank ndash such as back to the deaerator tank

Method

NamePump Speed

TypeDuty

Is orifice flow by-pass line

required1 OnOff control and fixed speed pumps Fixed Intermittent No2 Feed control valve and fixed speed pumps Fixed Continuous Yes3 Feed control valve and variable speed pumps Variable Continuous Yes4 Variable speed pumps only (no control valve) Variable Continuous No

31

Sheet1

RECIRCULATION FLOW

bull The solid curve below shows the minimum flow rate as a percentage of the nominal flow rate in relation to the liquid temperature

bull Ignore the dotted line which indicates a pump with special high-temperature construction

32

CALCULATING REQUIRED FEED PUMP HEAD

+ Suction side head+ Discharge side head= Total Dynamic Head

Elevation of DA tank

Elevation of boiler

33

FEED VALVE IMPACTS PUMPING HEAD CALCULATION

34

CALCULATING THE HEADFOR THE FEED PUMP1) At the duty point flow rateHead in feet = Boiler operating pressure X 231 X 103 divide Liquid Specific Gravity

Example Head = 130 psi X 231 X 103 divide 0953 = 324 feet

2) At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific Gravity

Example Head = 160 psi X 231 X 103 divide 0953 = 400 feet

35

NPSH ndashFORMULA FOR CALCULATION

NPSHr is obtained from the pump curve

Add two to four feet of safety factor to the NPSHr stated on the curve

NPSHa is calculated

+ Absolute pressure in deaerator tank

plusmn Elevation of minimum water level in tank above feed pump

- Vapor pressure of water in deaerator tank

- Suction line friction loss

= Net Positive Suction Head Available

To avoid cavitation NPSHa must be greater than NPSHr

36

NPSH AND ELEVATIONDeaerator

tank

Boiler feed

pumps

Minimum water level in DA tank

Location of eye of lowest impeller

Difference in elevation

37

NPSH AND SUCTION LINE CONSIDERATIONS

Critical suction line considerations here

38

Check list for boiler feed pump selection

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

39

Sheet2

BOILER FEED PUMPS USEFUL FORMULAS

40

Sheet1

SPECIFICATION FOR EXERCISEa) Control Method Continuous duty fixed speed pump with bypass line and feed valveb) Boiler maximum capacity = 250 HPc) Boiler safety valve setting = 125 psigd) Pressure safety factor = 3 above boilerrsquos safety valve settinge) Boiler operating pressure = 100 psigf) Continuous Boiler Blowdown flow - Requiredg) Bypass recirculation flow ndash Requiredh) Altitude ndash Sea leveli) Pressure in deaerator tank above atmospheric pressure = 5 psi (147 + 5 = 197 psi absolute)j) Height of deaerator tank minimum water level above pumprsquos first impeller = 10 feetk) Friction line loss through suction piping = 5 footl) Friction loss through suction side fittings = 5 footm) Friction loss through suction side valves = Nonen) Friction loss through suction side strainer = 1 feeto) Friction loss through discharge piping = 1 footp) Friction loss through discharge side fittings = 1 footq) Pressure drop across feed valve ndash 15 psir) Elevation of boiler maximum water level above pumprsquos discharge port = 5 feets) Liquid Specific Gravity = 0953t) Temperature of water in deaerator tank = 227 degrees Fu) Vapor pressure in deaerator tank = 197 psiv) Pump materials all 316 stainless steel to resist treatment chemicalsw) Mechanical seal to be silicon carbidesilicon carbideEPDM to withstand liquid temperature

41

Feed pumps

CONTROL METHOD

Fixed speed pumps with feed valve and recirculation line

Recirc line

Feed valve

42

STEP 1 ndashDetermine control methodFeed valve controlled system with a continuous duty fixed speed pump has been specified

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

43

Sheet2

STEP 2 ndashCalculate the BASE feed pump flow rate

The formula for this calculation is

bull Boiler maximum capacity in horsepower X 0069 X C

bull The maximum capacity in boiler horsepower is 250

bull The C factor is 115 for continuous duty

Therefore

250 X 0069 X 115 = 20 gpm = BASE flow rate

44

STEP 3 ndashContinuous Boiler Blowdown Flow

Determination

1 The BASE flow rate has been established at 20 gpm

2 We will on next slide need to add for bypass flow which can add 10 to 20 percent to the BASE flow rate

3 Blowdown flow is to be approximately 10 percent of flow at pumprsquos Best Efficiency Point

4 So the total boiler blowdown flow required is approximately 3 gpm

45

STEP 4 ndashAdd for by-pass flow

bull Control is via feed valve with fixed speed pump and for continuous dutybull A bypass will be required

bull Solid curve to right shows minimum flow rate as a percentage of nominal flow rate in relation to liquid temperature

bull Ignore dotted line which indicates a pump with special high-temperature construction

bull At 227degF we require a bypass flow that is about 20 of BEP flow

bull Presuming we can find a pump with BEP at about 25 or so gpm the bypass flow must be about 5 gpm

46

STEP 5 ndashCalculate total flow requiredbull BASE flow = 20 gpmbull Blowdown flow = 3 gpmbull Recirculation flow = 5 gpmbull Total flow required = 28 gpm

XXXX

X

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

47

Sheet2

STEP 6 ndashCalculate BASE pumping head

Boiler operating pressure setting + 3

Formula BASE head in feet = Boiler operating pressure X 231 X 103 divide Specific Gravity

BASE head = 100 psi X 231 X 103 divide 0953 = 250 feet

48

STEP 7 ndashAdd for suction piping system head components

From specificationAbsolute pressure on deaerator tank = 197 psi X 231 = - 46 feetWater elevation above first impeller = - 10 feetFriction loss through suction piping = + 5 feetFriction loss through suction fittings = + 5 feetFriction loss through suction side valves and strainer = + 1 feet

Total = - 54 feet

49

STEP 8 ndashAdd for discharge piping system head components

From specificationFriction loss through discharge piping = + 1 footFriction loss through discharge fittings = + 1 footFriction loss through feed valve is 15 psi X 231 = + 35 feetElevation of boiler maximum water level above pump = + 5 feet

Total = + 42 feet

50

STEP 9 ndashSum of all head components

BASE head with safety factor = + 250 feetSuction side piping system head = - 54 feetDischarge side piping system head = + 42 feet

Total = + 238 feet

51

STEP 10 ndashPressure safety valve considerations At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific GravityExample Head = 125 psi X 231 X 103 divide 0953 = 312 feet

XXXXXXXXX

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

52

Sheet2

STEP 11 ndashDetermine deaerator tank water temperature

From specification 227degF

53

STEP 12 ndashNPSHa calculation

NPSHa equation

plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa

10 feet + (197 psi X 231) - (197 psi X 231) - 2 feet = NPSHa10 feet + 46 feet - 46 feet - 2 feet = 8 feet NPSHa

54

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
1 Base flow calculation equation
Boiler maximum capacity horsepower X 0069 X C = Base flow rate
C = 150 for OnOff intermittent operation
C = 115 for continuous feed operation
2 Determine BASE head for feed pump
Formula based on Safety Valve setting
Pump head in feet = Maximum pressure X 231 X 103 divide Liquid Specific Gravity
3 Head components on suction side of piping system
Pressure above atmospheric on deaerator converted to feet of head = feet
Elevation difference between minimum deaerator water level and pump inlet = feet
Suction pipe friction loss = feet
Suction fitting friction loss = feet
Suction line valves and strainer friction loss = feet
Total = feet
4 Head components on discharge side of piping system
Friction loss through discharge piping = feet
Friction loss through discharge fittings = feet
Friction loss through feed valve = feet
Elevation of boiler maximum water level above pump = feet
Total = feet
5 NPSHa equation
plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa
(Feet) (psi X 231 = Feet) (psi X 231 = Feet) (Feet) (Feet)
Elevation of deaerator tank minimum water level above pumprsquos first impeller
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Method Name Is there head loss across feed valve Typical psi loss across feed valve Typical feed water temperature Typical Specific Gravity Conversion formula Typical feet of head loss across feed valve Pump Speed Type Duty Is orifce flow by-pass line required Orifice flow rate
1 On Off control and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Intermittent No Not applicable
2 Feed control valve and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Continuous Yes 20 of nominal
3 Feed control valve and variable speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Variable Continuous Yes 20 of nominal
4 Variable speed pumps only (no control valve) No None 225degF 0954 Not applicable Not applicable Variable Continuous No Not applicable
Orifice flow rate varies by manufacturers Will use 20 for these exercises
Must add for all head factors on suction and discharge sides of pump
Method Name Pump Speed Type Duty Is orifice flow by-pass line required
1 OnOff control and fixed speed pumps Fixed Intermittent No
2 Feed control valve and fixed speed pumps Fixed Continuous Yes
3 Feed control valve and variable speed pumps Variable Continuous Yes
4 Variable speed pumps only (no control valve) Variable Continuous No
Page 10: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

CONDENSATE IS LIQUID GOLD

A finite resource

10

TYPICAL STEAM SYSTEM

T

T

T

T

T

LegendSteamCond

Vapor

H P Cond Return

D A TankD A Tank

Feed PumpBoiler

Strainer

Trap Trap

TrapTT

TT

DA Tank

TT

TT

TTT

Legend

Trap

HP SteamPRV

LP Steam

Trap

LP Condensate Return

MotiveForce

FlashCondensate tank amp Pump system

11

CONDENSATE RETURN PUMPS

12

FLASH STEAM

T

T

T

T

T

H P Condensate Return

Cond Pump

D A TankD A Tank

Feed PumpBoiler

Strainer

Trap Trap

Trap TrapTT

TT

TT

TT

TTT

HP SteamPRV 15 psig

250 FLP Steam

150 psig366 F

TrapMotiveForce

Feed Tank or DA

13

Flash Tank

Low pressure condensate line

Flash Tank Flash Tank wEconomizer

Use flash steam for heating or deaerating Why not recover the heat from the hot condensate

14

HOT CONDENSATE RETURNED

DeaeratorBoiler Feed System

A vented receiver wastes energy

Pressurized receiver saves energy

Steam diffusing tube

15

Steam

HP Return

Vent

Exhaust OrFlash Steam

ToBoiler

Boiler FeedWater Pump(s)

OverflowDrainer

Cold Make-UpWater

LP Condensate

Make-Up Valve

Check Valve

PRV

Level control

16

SPRAY DEAERATOR

Spray cone

17

TRAY DEAERATOR

steam

Trays

18

PACKED COLUMN DA

19

BOILER FEED WATER TANKSSpray DA Tray DA Column DA

Vented Receiver

20

T

T

T

T

TH P Condensate Return

Cond Pump D A TankD A Tank

Feed PumpBoiler

Strainer

Trap Trap

TrapTrapTT

TT

TT

TT

TTT

HP SteamPRV 15 psig

250 F

LP Steam150 psig366 F

TrapMotiveForce

Feed Tank or DA

HP CONDENSATE RECOVERY

21

HIGH PRESSURE CONDENSATE RECEIVER

bull Takes high pressure condensate directly from the user

bull No need to deaeratebull Pump directly into boilerbull Feed the HPR from the DA

22

BOILER FEED WATER TANK OPTIONSSpray DA Tray DA Column DA

Vented Receiver

HPCR

23

FEED WATER SYSTEMSFor multiple boiler Installations

24

METHOD 1 ndashDirect feed for multiple boilers

Deaerator

Boiler A

Boiler AControlle

r4-20mA signal directly to

Grundfos E-pump instead of

control valve

Boiler BBoiler BControlle

r4-20mA signal directly to

Grundfos E-pump instead of

control valve

25

METHOD 2 ndashBooster sets for multiple boilers

Deaerator Pressure sensor

Bypass

Multiple pump

controller

26

STEAM BOILER PUMP APPLICATIONS AND TYPESBoiler feed pumpsCollection tank pumpsWater treatment pumpsCondensate return pumpsDeaerator tank recycle pumpsDeaerator vacuum pumps (vacuum deaerator tanks only)Economizer pumps

27

SIZING COMPLEXITY FOR BOILER FEED PUMPS

28

BASE FLOW RATE CALCULATION

Base flow = Boiler maximum capacity horsepower X 0069 X C

bull C = 15 for OnOff intermittent operation

bull C = 115 for continuous feed operation

29

ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW

To the Base flow we MIGHT add if specified

For Continuous Boiler Blowdown flowbull Approximately 5 to10 of the pumprsquos flow

rate at the Best Efficiency Point

30

ADD FOR BYPASS RECIRCULATION FLOWCertain feed system control modes require the use of a bypass line back to the source tank ndash such as back to the deaerator tank

Method

NamePump Speed

TypeDuty

Is orifice flow by-pass line

required1 OnOff control and fixed speed pumps Fixed Intermittent No2 Feed control valve and fixed speed pumps Fixed Continuous Yes3 Feed control valve and variable speed pumps Variable Continuous Yes4 Variable speed pumps only (no control valve) Variable Continuous No

31

Sheet1

RECIRCULATION FLOW

bull The solid curve below shows the minimum flow rate as a percentage of the nominal flow rate in relation to the liquid temperature

bull Ignore the dotted line which indicates a pump with special high-temperature construction

32

CALCULATING REQUIRED FEED PUMP HEAD

+ Suction side head+ Discharge side head= Total Dynamic Head

Elevation of DA tank

Elevation of boiler

33

FEED VALVE IMPACTS PUMPING HEAD CALCULATION

34

CALCULATING THE HEADFOR THE FEED PUMP1) At the duty point flow rateHead in feet = Boiler operating pressure X 231 X 103 divide Liquid Specific Gravity

Example Head = 130 psi X 231 X 103 divide 0953 = 324 feet

2) At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific Gravity

Example Head = 160 psi X 231 X 103 divide 0953 = 400 feet

35

NPSH ndashFORMULA FOR CALCULATION

NPSHr is obtained from the pump curve

Add two to four feet of safety factor to the NPSHr stated on the curve

NPSHa is calculated

+ Absolute pressure in deaerator tank

plusmn Elevation of minimum water level in tank above feed pump

- Vapor pressure of water in deaerator tank

- Suction line friction loss

= Net Positive Suction Head Available

To avoid cavitation NPSHa must be greater than NPSHr

36

NPSH AND ELEVATIONDeaerator

tank

Boiler feed

pumps

Minimum water level in DA tank

Location of eye of lowest impeller

Difference in elevation

37

NPSH AND SUCTION LINE CONSIDERATIONS

Critical suction line considerations here

38

Check list for boiler feed pump selection

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

39

Sheet2

BOILER FEED PUMPS USEFUL FORMULAS

40

Sheet1

SPECIFICATION FOR EXERCISEa) Control Method Continuous duty fixed speed pump with bypass line and feed valveb) Boiler maximum capacity = 250 HPc) Boiler safety valve setting = 125 psigd) Pressure safety factor = 3 above boilerrsquos safety valve settinge) Boiler operating pressure = 100 psigf) Continuous Boiler Blowdown flow - Requiredg) Bypass recirculation flow ndash Requiredh) Altitude ndash Sea leveli) Pressure in deaerator tank above atmospheric pressure = 5 psi (147 + 5 = 197 psi absolute)j) Height of deaerator tank minimum water level above pumprsquos first impeller = 10 feetk) Friction line loss through suction piping = 5 footl) Friction loss through suction side fittings = 5 footm) Friction loss through suction side valves = Nonen) Friction loss through suction side strainer = 1 feeto) Friction loss through discharge piping = 1 footp) Friction loss through discharge side fittings = 1 footq) Pressure drop across feed valve ndash 15 psir) Elevation of boiler maximum water level above pumprsquos discharge port = 5 feets) Liquid Specific Gravity = 0953t) Temperature of water in deaerator tank = 227 degrees Fu) Vapor pressure in deaerator tank = 197 psiv) Pump materials all 316 stainless steel to resist treatment chemicalsw) Mechanical seal to be silicon carbidesilicon carbideEPDM to withstand liquid temperature

41

Feed pumps

CONTROL METHOD

Fixed speed pumps with feed valve and recirculation line

Recirc line

Feed valve

42

STEP 1 ndashDetermine control methodFeed valve controlled system with a continuous duty fixed speed pump has been specified

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

43

Sheet2

STEP 2 ndashCalculate the BASE feed pump flow rate

The formula for this calculation is

bull Boiler maximum capacity in horsepower X 0069 X C

bull The maximum capacity in boiler horsepower is 250

bull The C factor is 115 for continuous duty

Therefore

250 X 0069 X 115 = 20 gpm = BASE flow rate

44

STEP 3 ndashContinuous Boiler Blowdown Flow

Determination

1 The BASE flow rate has been established at 20 gpm

2 We will on next slide need to add for bypass flow which can add 10 to 20 percent to the BASE flow rate

3 Blowdown flow is to be approximately 10 percent of flow at pumprsquos Best Efficiency Point

4 So the total boiler blowdown flow required is approximately 3 gpm

45

STEP 4 ndashAdd for by-pass flow

bull Control is via feed valve with fixed speed pump and for continuous dutybull A bypass will be required

bull Solid curve to right shows minimum flow rate as a percentage of nominal flow rate in relation to liquid temperature

bull Ignore dotted line which indicates a pump with special high-temperature construction

bull At 227degF we require a bypass flow that is about 20 of BEP flow

bull Presuming we can find a pump with BEP at about 25 or so gpm the bypass flow must be about 5 gpm

46

STEP 5 ndashCalculate total flow requiredbull BASE flow = 20 gpmbull Blowdown flow = 3 gpmbull Recirculation flow = 5 gpmbull Total flow required = 28 gpm

XXXX

X

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

47

Sheet2

STEP 6 ndashCalculate BASE pumping head

Boiler operating pressure setting + 3

Formula BASE head in feet = Boiler operating pressure X 231 X 103 divide Specific Gravity

BASE head = 100 psi X 231 X 103 divide 0953 = 250 feet

48

STEP 7 ndashAdd for suction piping system head components

From specificationAbsolute pressure on deaerator tank = 197 psi X 231 = - 46 feetWater elevation above first impeller = - 10 feetFriction loss through suction piping = + 5 feetFriction loss through suction fittings = + 5 feetFriction loss through suction side valves and strainer = + 1 feet

Total = - 54 feet

49

STEP 8 ndashAdd for discharge piping system head components

From specificationFriction loss through discharge piping = + 1 footFriction loss through discharge fittings = + 1 footFriction loss through feed valve is 15 psi X 231 = + 35 feetElevation of boiler maximum water level above pump = + 5 feet

Total = + 42 feet

50

STEP 9 ndashSum of all head components

BASE head with safety factor = + 250 feetSuction side piping system head = - 54 feetDischarge side piping system head = + 42 feet

Total = + 238 feet

51

STEP 10 ndashPressure safety valve considerations At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific GravityExample Head = 125 psi X 231 X 103 divide 0953 = 312 feet

XXXXXXXXX

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

52

Sheet2

STEP 11 ndashDetermine deaerator tank water temperature

From specification 227degF

53

STEP 12 ndashNPSHa calculation

NPSHa equation

plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa

10 feet + (197 psi X 231) - (197 psi X 231) - 2 feet = NPSHa10 feet + 46 feet - 46 feet - 2 feet = 8 feet NPSHa

54

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
1 Base flow calculation equation
Boiler maximum capacity horsepower X 0069 X C = Base flow rate
C = 150 for OnOff intermittent operation
C = 115 for continuous feed operation
2 Determine BASE head for feed pump
Formula based on Safety Valve setting
Pump head in feet = Maximum pressure X 231 X 103 divide Liquid Specific Gravity
3 Head components on suction side of piping system
Pressure above atmospheric on deaerator converted to feet of head = feet
Elevation difference between minimum deaerator water level and pump inlet = feet
Suction pipe friction loss = feet
Suction fitting friction loss = feet
Suction line valves and strainer friction loss = feet
Total = feet
4 Head components on discharge side of piping system
Friction loss through discharge piping = feet
Friction loss through discharge fittings = feet
Friction loss through feed valve = feet
Elevation of boiler maximum water level above pump = feet
Total = feet
5 NPSHa equation
plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa
(Feet) (psi X 231 = Feet) (psi X 231 = Feet) (Feet) (Feet)
Elevation of deaerator tank minimum water level above pumprsquos first impeller
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Method Name Is there head loss across feed valve Typical psi loss across feed valve Typical feed water temperature Typical Specific Gravity Conversion formula Typical feet of head loss across feed valve Pump Speed Type Duty Is orifce flow by-pass line required Orifice flow rate
1 On Off control and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Intermittent No Not applicable
2 Feed control valve and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Continuous Yes 20 of nominal
3 Feed control valve and variable speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Variable Continuous Yes 20 of nominal
4 Variable speed pumps only (no control valve) No None 225degF 0954 Not applicable Not applicable Variable Continuous No Not applicable
Orifice flow rate varies by manufacturers Will use 20 for these exercises
Must add for all head factors on suction and discharge sides of pump
Method Name Pump Speed Type Duty Is orifice flow by-pass line required
1 OnOff control and fixed speed pumps Fixed Intermittent No
2 Feed control valve and fixed speed pumps Fixed Continuous Yes
3 Feed control valve and variable speed pumps Variable Continuous Yes
4 Variable speed pumps only (no control valve) Variable Continuous No
Page 11: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

TYPICAL STEAM SYSTEM

T

T

T

T

T

LegendSteamCond

Vapor

H P Cond Return

D A TankD A Tank

Feed PumpBoiler

Strainer

Trap Trap

TrapTT

TT

DA Tank

TT

TT

TTT

Legend

Trap

HP SteamPRV

LP Steam

Trap

LP Condensate Return

MotiveForce

FlashCondensate tank amp Pump system

11

CONDENSATE RETURN PUMPS

12

FLASH STEAM

T

T

T

T

T

H P Condensate Return

Cond Pump

D A TankD A Tank

Feed PumpBoiler

Strainer

Trap Trap

Trap TrapTT

TT

TT

TT

TTT

HP SteamPRV 15 psig

250 FLP Steam

150 psig366 F

TrapMotiveForce

Feed Tank or DA

13

Flash Tank

Low pressure condensate line

Flash Tank Flash Tank wEconomizer

Use flash steam for heating or deaerating Why not recover the heat from the hot condensate

14

HOT CONDENSATE RETURNED

DeaeratorBoiler Feed System

A vented receiver wastes energy

Pressurized receiver saves energy

Steam diffusing tube

15

Steam

HP Return

Vent

Exhaust OrFlash Steam

ToBoiler

Boiler FeedWater Pump(s)

OverflowDrainer

Cold Make-UpWater

LP Condensate

Make-Up Valve

Check Valve

PRV

Level control

16

SPRAY DEAERATOR

Spray cone

17

TRAY DEAERATOR

steam

Trays

18

PACKED COLUMN DA

19

BOILER FEED WATER TANKSSpray DA Tray DA Column DA

Vented Receiver

20

T

T

T

T

TH P Condensate Return

Cond Pump D A TankD A Tank

Feed PumpBoiler

Strainer

Trap Trap

TrapTrapTT

TT

TT

TT

TTT

HP SteamPRV 15 psig

250 F

LP Steam150 psig366 F

TrapMotiveForce

Feed Tank or DA

HP CONDENSATE RECOVERY

21

HIGH PRESSURE CONDENSATE RECEIVER

bull Takes high pressure condensate directly from the user

bull No need to deaeratebull Pump directly into boilerbull Feed the HPR from the DA

22

BOILER FEED WATER TANK OPTIONSSpray DA Tray DA Column DA

Vented Receiver

HPCR

23

FEED WATER SYSTEMSFor multiple boiler Installations

24

METHOD 1 ndashDirect feed for multiple boilers

Deaerator

Boiler A

Boiler AControlle

r4-20mA signal directly to

Grundfos E-pump instead of

control valve

Boiler BBoiler BControlle

r4-20mA signal directly to

Grundfos E-pump instead of

control valve

25

METHOD 2 ndashBooster sets for multiple boilers

Deaerator Pressure sensor

Bypass

Multiple pump

controller

26

STEAM BOILER PUMP APPLICATIONS AND TYPESBoiler feed pumpsCollection tank pumpsWater treatment pumpsCondensate return pumpsDeaerator tank recycle pumpsDeaerator vacuum pumps (vacuum deaerator tanks only)Economizer pumps

27

SIZING COMPLEXITY FOR BOILER FEED PUMPS

28

BASE FLOW RATE CALCULATION

Base flow = Boiler maximum capacity horsepower X 0069 X C

bull C = 15 for OnOff intermittent operation

bull C = 115 for continuous feed operation

29

ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW

To the Base flow we MIGHT add if specified

For Continuous Boiler Blowdown flowbull Approximately 5 to10 of the pumprsquos flow

rate at the Best Efficiency Point

30

ADD FOR BYPASS RECIRCULATION FLOWCertain feed system control modes require the use of a bypass line back to the source tank ndash such as back to the deaerator tank

Method

NamePump Speed

TypeDuty

Is orifice flow by-pass line

required1 OnOff control and fixed speed pumps Fixed Intermittent No2 Feed control valve and fixed speed pumps Fixed Continuous Yes3 Feed control valve and variable speed pumps Variable Continuous Yes4 Variable speed pumps only (no control valve) Variable Continuous No

31

Sheet1

RECIRCULATION FLOW

bull The solid curve below shows the minimum flow rate as a percentage of the nominal flow rate in relation to the liquid temperature

bull Ignore the dotted line which indicates a pump with special high-temperature construction

32

CALCULATING REQUIRED FEED PUMP HEAD

+ Suction side head+ Discharge side head= Total Dynamic Head

Elevation of DA tank

Elevation of boiler

33

FEED VALVE IMPACTS PUMPING HEAD CALCULATION

34

CALCULATING THE HEADFOR THE FEED PUMP1) At the duty point flow rateHead in feet = Boiler operating pressure X 231 X 103 divide Liquid Specific Gravity

Example Head = 130 psi X 231 X 103 divide 0953 = 324 feet

2) At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific Gravity

Example Head = 160 psi X 231 X 103 divide 0953 = 400 feet

35

NPSH ndashFORMULA FOR CALCULATION

NPSHr is obtained from the pump curve

Add two to four feet of safety factor to the NPSHr stated on the curve

NPSHa is calculated

+ Absolute pressure in deaerator tank

plusmn Elevation of minimum water level in tank above feed pump

- Vapor pressure of water in deaerator tank

- Suction line friction loss

= Net Positive Suction Head Available

To avoid cavitation NPSHa must be greater than NPSHr

36

NPSH AND ELEVATIONDeaerator

tank

Boiler feed

pumps

Minimum water level in DA tank

Location of eye of lowest impeller

Difference in elevation

37

NPSH AND SUCTION LINE CONSIDERATIONS

Critical suction line considerations here

38

Check list for boiler feed pump selection

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

39

Sheet2

BOILER FEED PUMPS USEFUL FORMULAS

40

Sheet1

SPECIFICATION FOR EXERCISEa) Control Method Continuous duty fixed speed pump with bypass line and feed valveb) Boiler maximum capacity = 250 HPc) Boiler safety valve setting = 125 psigd) Pressure safety factor = 3 above boilerrsquos safety valve settinge) Boiler operating pressure = 100 psigf) Continuous Boiler Blowdown flow - Requiredg) Bypass recirculation flow ndash Requiredh) Altitude ndash Sea leveli) Pressure in deaerator tank above atmospheric pressure = 5 psi (147 + 5 = 197 psi absolute)j) Height of deaerator tank minimum water level above pumprsquos first impeller = 10 feetk) Friction line loss through suction piping = 5 footl) Friction loss through suction side fittings = 5 footm) Friction loss through suction side valves = Nonen) Friction loss through suction side strainer = 1 feeto) Friction loss through discharge piping = 1 footp) Friction loss through discharge side fittings = 1 footq) Pressure drop across feed valve ndash 15 psir) Elevation of boiler maximum water level above pumprsquos discharge port = 5 feets) Liquid Specific Gravity = 0953t) Temperature of water in deaerator tank = 227 degrees Fu) Vapor pressure in deaerator tank = 197 psiv) Pump materials all 316 stainless steel to resist treatment chemicalsw) Mechanical seal to be silicon carbidesilicon carbideEPDM to withstand liquid temperature

41

Feed pumps

CONTROL METHOD

Fixed speed pumps with feed valve and recirculation line

Recirc line

Feed valve

42

STEP 1 ndashDetermine control methodFeed valve controlled system with a continuous duty fixed speed pump has been specified

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

43

Sheet2

STEP 2 ndashCalculate the BASE feed pump flow rate

The formula for this calculation is

bull Boiler maximum capacity in horsepower X 0069 X C

bull The maximum capacity in boiler horsepower is 250

bull The C factor is 115 for continuous duty

Therefore

250 X 0069 X 115 = 20 gpm = BASE flow rate

44

STEP 3 ndashContinuous Boiler Blowdown Flow

Determination

1 The BASE flow rate has been established at 20 gpm

2 We will on next slide need to add for bypass flow which can add 10 to 20 percent to the BASE flow rate

3 Blowdown flow is to be approximately 10 percent of flow at pumprsquos Best Efficiency Point

4 So the total boiler blowdown flow required is approximately 3 gpm

45

STEP 4 ndashAdd for by-pass flow

bull Control is via feed valve with fixed speed pump and for continuous dutybull A bypass will be required

bull Solid curve to right shows minimum flow rate as a percentage of nominal flow rate in relation to liquid temperature

bull Ignore dotted line which indicates a pump with special high-temperature construction

bull At 227degF we require a bypass flow that is about 20 of BEP flow

bull Presuming we can find a pump with BEP at about 25 or so gpm the bypass flow must be about 5 gpm

46

STEP 5 ndashCalculate total flow requiredbull BASE flow = 20 gpmbull Blowdown flow = 3 gpmbull Recirculation flow = 5 gpmbull Total flow required = 28 gpm

XXXX

X

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

47

Sheet2

STEP 6 ndashCalculate BASE pumping head

Boiler operating pressure setting + 3

Formula BASE head in feet = Boiler operating pressure X 231 X 103 divide Specific Gravity

BASE head = 100 psi X 231 X 103 divide 0953 = 250 feet

48

STEP 7 ndashAdd for suction piping system head components

From specificationAbsolute pressure on deaerator tank = 197 psi X 231 = - 46 feetWater elevation above first impeller = - 10 feetFriction loss through suction piping = + 5 feetFriction loss through suction fittings = + 5 feetFriction loss through suction side valves and strainer = + 1 feet

Total = - 54 feet

49

STEP 8 ndashAdd for discharge piping system head components

From specificationFriction loss through discharge piping = + 1 footFriction loss through discharge fittings = + 1 footFriction loss through feed valve is 15 psi X 231 = + 35 feetElevation of boiler maximum water level above pump = + 5 feet

Total = + 42 feet

50

STEP 9 ndashSum of all head components

BASE head with safety factor = + 250 feetSuction side piping system head = - 54 feetDischarge side piping system head = + 42 feet

Total = + 238 feet

51

STEP 10 ndashPressure safety valve considerations At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific GravityExample Head = 125 psi X 231 X 103 divide 0953 = 312 feet

XXXXXXXXX

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

52

Sheet2

STEP 11 ndashDetermine deaerator tank water temperature

From specification 227degF

53

STEP 12 ndashNPSHa calculation

NPSHa equation

plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa

10 feet + (197 psi X 231) - (197 psi X 231) - 2 feet = NPSHa10 feet + 46 feet - 46 feet - 2 feet = 8 feet NPSHa

54

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
1 Base flow calculation equation
Boiler maximum capacity horsepower X 0069 X C = Base flow rate
C = 150 for OnOff intermittent operation
C = 115 for continuous feed operation
2 Determine BASE head for feed pump
Formula based on Safety Valve setting
Pump head in feet = Maximum pressure X 231 X 103 divide Liquid Specific Gravity
3 Head components on suction side of piping system
Pressure above atmospheric on deaerator converted to feet of head = feet
Elevation difference between minimum deaerator water level and pump inlet = feet
Suction pipe friction loss = feet
Suction fitting friction loss = feet
Suction line valves and strainer friction loss = feet
Total = feet
4 Head components on discharge side of piping system
Friction loss through discharge piping = feet
Friction loss through discharge fittings = feet
Friction loss through feed valve = feet
Elevation of boiler maximum water level above pump = feet
Total = feet
5 NPSHa equation
plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa
(Feet) (psi X 231 = Feet) (psi X 231 = Feet) (Feet) (Feet)
Elevation of deaerator tank minimum water level above pumprsquos first impeller
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Method Name Is there head loss across feed valve Typical psi loss across feed valve Typical feed water temperature Typical Specific Gravity Conversion formula Typical feet of head loss across feed valve Pump Speed Type Duty Is orifce flow by-pass line required Orifice flow rate
1 On Off control and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Intermittent No Not applicable
2 Feed control valve and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Continuous Yes 20 of nominal
3 Feed control valve and variable speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Variable Continuous Yes 20 of nominal
4 Variable speed pumps only (no control valve) No None 225degF 0954 Not applicable Not applicable Variable Continuous No Not applicable
Orifice flow rate varies by manufacturers Will use 20 for these exercises
Must add for all head factors on suction and discharge sides of pump
Method Name Pump Speed Type Duty Is orifice flow by-pass line required
1 OnOff control and fixed speed pumps Fixed Intermittent No
2 Feed control valve and fixed speed pumps Fixed Continuous Yes
3 Feed control valve and variable speed pumps Variable Continuous Yes
4 Variable speed pumps only (no control valve) Variable Continuous No
Page 12: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

CONDENSATE RETURN PUMPS

12

FLASH STEAM

T

T

T

T

T

H P Condensate Return

Cond Pump

D A TankD A Tank

Feed PumpBoiler

Strainer

Trap Trap

Trap TrapTT

TT

TT

TT

TTT

HP SteamPRV 15 psig

250 FLP Steam

150 psig366 F

TrapMotiveForce

Feed Tank or DA

13

Flash Tank

Low pressure condensate line

Flash Tank Flash Tank wEconomizer

Use flash steam for heating or deaerating Why not recover the heat from the hot condensate

14

HOT CONDENSATE RETURNED

DeaeratorBoiler Feed System

A vented receiver wastes energy

Pressurized receiver saves energy

Steam diffusing tube

15

Steam

HP Return

Vent

Exhaust OrFlash Steam

ToBoiler

Boiler FeedWater Pump(s)

OverflowDrainer

Cold Make-UpWater

LP Condensate

Make-Up Valve

Check Valve

PRV

Level control

16

SPRAY DEAERATOR

Spray cone

17

TRAY DEAERATOR

steam

Trays

18

PACKED COLUMN DA

19

BOILER FEED WATER TANKSSpray DA Tray DA Column DA

Vented Receiver

20

T

T

T

T

TH P Condensate Return

Cond Pump D A TankD A Tank

Feed PumpBoiler

Strainer

Trap Trap

TrapTrapTT

TT

TT

TT

TTT

HP SteamPRV 15 psig

250 F

LP Steam150 psig366 F

TrapMotiveForce

Feed Tank or DA

HP CONDENSATE RECOVERY

21

HIGH PRESSURE CONDENSATE RECEIVER

bull Takes high pressure condensate directly from the user

bull No need to deaeratebull Pump directly into boilerbull Feed the HPR from the DA

22

BOILER FEED WATER TANK OPTIONSSpray DA Tray DA Column DA

Vented Receiver

HPCR

23

FEED WATER SYSTEMSFor multiple boiler Installations

24

METHOD 1 ndashDirect feed for multiple boilers

Deaerator

Boiler A

Boiler AControlle

r4-20mA signal directly to

Grundfos E-pump instead of

control valve

Boiler BBoiler BControlle

r4-20mA signal directly to

Grundfos E-pump instead of

control valve

25

METHOD 2 ndashBooster sets for multiple boilers

Deaerator Pressure sensor

Bypass

Multiple pump

controller

26

STEAM BOILER PUMP APPLICATIONS AND TYPESBoiler feed pumpsCollection tank pumpsWater treatment pumpsCondensate return pumpsDeaerator tank recycle pumpsDeaerator vacuum pumps (vacuum deaerator tanks only)Economizer pumps

27

SIZING COMPLEXITY FOR BOILER FEED PUMPS

28

BASE FLOW RATE CALCULATION

Base flow = Boiler maximum capacity horsepower X 0069 X C

bull C = 15 for OnOff intermittent operation

bull C = 115 for continuous feed operation

29

ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW

To the Base flow we MIGHT add if specified

For Continuous Boiler Blowdown flowbull Approximately 5 to10 of the pumprsquos flow

rate at the Best Efficiency Point

30

ADD FOR BYPASS RECIRCULATION FLOWCertain feed system control modes require the use of a bypass line back to the source tank ndash such as back to the deaerator tank

Method

NamePump Speed

TypeDuty

Is orifice flow by-pass line

required1 OnOff control and fixed speed pumps Fixed Intermittent No2 Feed control valve and fixed speed pumps Fixed Continuous Yes3 Feed control valve and variable speed pumps Variable Continuous Yes4 Variable speed pumps only (no control valve) Variable Continuous No

31

Sheet1

RECIRCULATION FLOW

bull The solid curve below shows the minimum flow rate as a percentage of the nominal flow rate in relation to the liquid temperature

bull Ignore the dotted line which indicates a pump with special high-temperature construction

32

CALCULATING REQUIRED FEED PUMP HEAD

+ Suction side head+ Discharge side head= Total Dynamic Head

Elevation of DA tank

Elevation of boiler

33

FEED VALVE IMPACTS PUMPING HEAD CALCULATION

34

CALCULATING THE HEADFOR THE FEED PUMP1) At the duty point flow rateHead in feet = Boiler operating pressure X 231 X 103 divide Liquid Specific Gravity

Example Head = 130 psi X 231 X 103 divide 0953 = 324 feet

2) At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific Gravity

Example Head = 160 psi X 231 X 103 divide 0953 = 400 feet

35

NPSH ndashFORMULA FOR CALCULATION

NPSHr is obtained from the pump curve

Add two to four feet of safety factor to the NPSHr stated on the curve

NPSHa is calculated

+ Absolute pressure in deaerator tank

plusmn Elevation of minimum water level in tank above feed pump

- Vapor pressure of water in deaerator tank

- Suction line friction loss

= Net Positive Suction Head Available

To avoid cavitation NPSHa must be greater than NPSHr

36

NPSH AND ELEVATIONDeaerator

tank

Boiler feed

pumps

Minimum water level in DA tank

Location of eye of lowest impeller

Difference in elevation

37

NPSH AND SUCTION LINE CONSIDERATIONS

Critical suction line considerations here

38

Check list for boiler feed pump selection

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

39

Sheet2

BOILER FEED PUMPS USEFUL FORMULAS

40

Sheet1

SPECIFICATION FOR EXERCISEa) Control Method Continuous duty fixed speed pump with bypass line and feed valveb) Boiler maximum capacity = 250 HPc) Boiler safety valve setting = 125 psigd) Pressure safety factor = 3 above boilerrsquos safety valve settinge) Boiler operating pressure = 100 psigf) Continuous Boiler Blowdown flow - Requiredg) Bypass recirculation flow ndash Requiredh) Altitude ndash Sea leveli) Pressure in deaerator tank above atmospheric pressure = 5 psi (147 + 5 = 197 psi absolute)j) Height of deaerator tank minimum water level above pumprsquos first impeller = 10 feetk) Friction line loss through suction piping = 5 footl) Friction loss through suction side fittings = 5 footm) Friction loss through suction side valves = Nonen) Friction loss through suction side strainer = 1 feeto) Friction loss through discharge piping = 1 footp) Friction loss through discharge side fittings = 1 footq) Pressure drop across feed valve ndash 15 psir) Elevation of boiler maximum water level above pumprsquos discharge port = 5 feets) Liquid Specific Gravity = 0953t) Temperature of water in deaerator tank = 227 degrees Fu) Vapor pressure in deaerator tank = 197 psiv) Pump materials all 316 stainless steel to resist treatment chemicalsw) Mechanical seal to be silicon carbidesilicon carbideEPDM to withstand liquid temperature

41

Feed pumps

CONTROL METHOD

Fixed speed pumps with feed valve and recirculation line

Recirc line

Feed valve

42

STEP 1 ndashDetermine control methodFeed valve controlled system with a continuous duty fixed speed pump has been specified

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

43

Sheet2

STEP 2 ndashCalculate the BASE feed pump flow rate

The formula for this calculation is

bull Boiler maximum capacity in horsepower X 0069 X C

bull The maximum capacity in boiler horsepower is 250

bull The C factor is 115 for continuous duty

Therefore

250 X 0069 X 115 = 20 gpm = BASE flow rate

44

STEP 3 ndashContinuous Boiler Blowdown Flow

Determination

1 The BASE flow rate has been established at 20 gpm

2 We will on next slide need to add for bypass flow which can add 10 to 20 percent to the BASE flow rate

3 Blowdown flow is to be approximately 10 percent of flow at pumprsquos Best Efficiency Point

4 So the total boiler blowdown flow required is approximately 3 gpm

45

STEP 4 ndashAdd for by-pass flow

bull Control is via feed valve with fixed speed pump and for continuous dutybull A bypass will be required

bull Solid curve to right shows minimum flow rate as a percentage of nominal flow rate in relation to liquid temperature

bull Ignore dotted line which indicates a pump with special high-temperature construction

bull At 227degF we require a bypass flow that is about 20 of BEP flow

bull Presuming we can find a pump with BEP at about 25 or so gpm the bypass flow must be about 5 gpm

46

STEP 5 ndashCalculate total flow requiredbull BASE flow = 20 gpmbull Blowdown flow = 3 gpmbull Recirculation flow = 5 gpmbull Total flow required = 28 gpm

XXXX

X

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

47

Sheet2

STEP 6 ndashCalculate BASE pumping head

Boiler operating pressure setting + 3

Formula BASE head in feet = Boiler operating pressure X 231 X 103 divide Specific Gravity

BASE head = 100 psi X 231 X 103 divide 0953 = 250 feet

48

STEP 7 ndashAdd for suction piping system head components

From specificationAbsolute pressure on deaerator tank = 197 psi X 231 = - 46 feetWater elevation above first impeller = - 10 feetFriction loss through suction piping = + 5 feetFriction loss through suction fittings = + 5 feetFriction loss through suction side valves and strainer = + 1 feet

Total = - 54 feet

49

STEP 8 ndashAdd for discharge piping system head components

From specificationFriction loss through discharge piping = + 1 footFriction loss through discharge fittings = + 1 footFriction loss through feed valve is 15 psi X 231 = + 35 feetElevation of boiler maximum water level above pump = + 5 feet

Total = + 42 feet

50

STEP 9 ndashSum of all head components

BASE head with safety factor = + 250 feetSuction side piping system head = - 54 feetDischarge side piping system head = + 42 feet

Total = + 238 feet

51

STEP 10 ndashPressure safety valve considerations At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific GravityExample Head = 125 psi X 231 X 103 divide 0953 = 312 feet

XXXXXXXXX

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

52

Sheet2

STEP 11 ndashDetermine deaerator tank water temperature

From specification 227degF

53

STEP 12 ndashNPSHa calculation

NPSHa equation

plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa

10 feet + (197 psi X 231) - (197 psi X 231) - 2 feet = NPSHa10 feet + 46 feet - 46 feet - 2 feet = 8 feet NPSHa

54

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
1 Base flow calculation equation
Boiler maximum capacity horsepower X 0069 X C = Base flow rate
C = 150 for OnOff intermittent operation
C = 115 for continuous feed operation
2 Determine BASE head for feed pump
Formula based on Safety Valve setting
Pump head in feet = Maximum pressure X 231 X 103 divide Liquid Specific Gravity
3 Head components on suction side of piping system
Pressure above atmospheric on deaerator converted to feet of head = feet
Elevation difference between minimum deaerator water level and pump inlet = feet
Suction pipe friction loss = feet
Suction fitting friction loss = feet
Suction line valves and strainer friction loss = feet
Total = feet
4 Head components on discharge side of piping system
Friction loss through discharge piping = feet
Friction loss through discharge fittings = feet
Friction loss through feed valve = feet
Elevation of boiler maximum water level above pump = feet
Total = feet
5 NPSHa equation
plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa
(Feet) (psi X 231 = Feet) (psi X 231 = Feet) (Feet) (Feet)
Elevation of deaerator tank minimum water level above pumprsquos first impeller
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Method Name Is there head loss across feed valve Typical psi loss across feed valve Typical feed water temperature Typical Specific Gravity Conversion formula Typical feet of head loss across feed valve Pump Speed Type Duty Is orifce flow by-pass line required Orifice flow rate
1 On Off control and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Intermittent No Not applicable
2 Feed control valve and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Continuous Yes 20 of nominal
3 Feed control valve and variable speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Variable Continuous Yes 20 of nominal
4 Variable speed pumps only (no control valve) No None 225degF 0954 Not applicable Not applicable Variable Continuous No Not applicable
Orifice flow rate varies by manufacturers Will use 20 for these exercises
Must add for all head factors on suction and discharge sides of pump
Method Name Pump Speed Type Duty Is orifice flow by-pass line required
1 OnOff control and fixed speed pumps Fixed Intermittent No
2 Feed control valve and fixed speed pumps Fixed Continuous Yes
3 Feed control valve and variable speed pumps Variable Continuous Yes
4 Variable speed pumps only (no control valve) Variable Continuous No
Page 13: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

FLASH STEAM

T

T

T

T

T

H P Condensate Return

Cond Pump

D A TankD A Tank

Feed PumpBoiler

Strainer

Trap Trap

Trap TrapTT

TT

TT

TT

TTT

HP SteamPRV 15 psig

250 FLP Steam

150 psig366 F

TrapMotiveForce

Feed Tank or DA

13

Flash Tank

Low pressure condensate line

Flash Tank Flash Tank wEconomizer

Use flash steam for heating or deaerating Why not recover the heat from the hot condensate

14

HOT CONDENSATE RETURNED

DeaeratorBoiler Feed System

A vented receiver wastes energy

Pressurized receiver saves energy

Steam diffusing tube

15

Steam

HP Return

Vent

Exhaust OrFlash Steam

ToBoiler

Boiler FeedWater Pump(s)

OverflowDrainer

Cold Make-UpWater

LP Condensate

Make-Up Valve

Check Valve

PRV

Level control

16

SPRAY DEAERATOR

Spray cone

17

TRAY DEAERATOR

steam

Trays

18

PACKED COLUMN DA

19

BOILER FEED WATER TANKSSpray DA Tray DA Column DA

Vented Receiver

20

T

T

T

T

TH P Condensate Return

Cond Pump D A TankD A Tank

Feed PumpBoiler

Strainer

Trap Trap

TrapTrapTT

TT

TT

TT

TTT

HP SteamPRV 15 psig

250 F

LP Steam150 psig366 F

TrapMotiveForce

Feed Tank or DA

HP CONDENSATE RECOVERY

21

HIGH PRESSURE CONDENSATE RECEIVER

bull Takes high pressure condensate directly from the user

bull No need to deaeratebull Pump directly into boilerbull Feed the HPR from the DA

22

BOILER FEED WATER TANK OPTIONSSpray DA Tray DA Column DA

Vented Receiver

HPCR

23

FEED WATER SYSTEMSFor multiple boiler Installations

24

METHOD 1 ndashDirect feed for multiple boilers

Deaerator

Boiler A

Boiler AControlle

r4-20mA signal directly to

Grundfos E-pump instead of

control valve

Boiler BBoiler BControlle

r4-20mA signal directly to

Grundfos E-pump instead of

control valve

25

METHOD 2 ndashBooster sets for multiple boilers

Deaerator Pressure sensor

Bypass

Multiple pump

controller

26

STEAM BOILER PUMP APPLICATIONS AND TYPESBoiler feed pumpsCollection tank pumpsWater treatment pumpsCondensate return pumpsDeaerator tank recycle pumpsDeaerator vacuum pumps (vacuum deaerator tanks only)Economizer pumps

27

SIZING COMPLEXITY FOR BOILER FEED PUMPS

28

BASE FLOW RATE CALCULATION

Base flow = Boiler maximum capacity horsepower X 0069 X C

bull C = 15 for OnOff intermittent operation

bull C = 115 for continuous feed operation

29

ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW

To the Base flow we MIGHT add if specified

For Continuous Boiler Blowdown flowbull Approximately 5 to10 of the pumprsquos flow

rate at the Best Efficiency Point

30

ADD FOR BYPASS RECIRCULATION FLOWCertain feed system control modes require the use of a bypass line back to the source tank ndash such as back to the deaerator tank

Method

NamePump Speed

TypeDuty

Is orifice flow by-pass line

required1 OnOff control and fixed speed pumps Fixed Intermittent No2 Feed control valve and fixed speed pumps Fixed Continuous Yes3 Feed control valve and variable speed pumps Variable Continuous Yes4 Variable speed pumps only (no control valve) Variable Continuous No

31

Sheet1

RECIRCULATION FLOW

bull The solid curve below shows the minimum flow rate as a percentage of the nominal flow rate in relation to the liquid temperature

bull Ignore the dotted line which indicates a pump with special high-temperature construction

32

CALCULATING REQUIRED FEED PUMP HEAD

+ Suction side head+ Discharge side head= Total Dynamic Head

Elevation of DA tank

Elevation of boiler

33

FEED VALVE IMPACTS PUMPING HEAD CALCULATION

34

CALCULATING THE HEADFOR THE FEED PUMP1) At the duty point flow rateHead in feet = Boiler operating pressure X 231 X 103 divide Liquid Specific Gravity

Example Head = 130 psi X 231 X 103 divide 0953 = 324 feet

2) At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific Gravity

Example Head = 160 psi X 231 X 103 divide 0953 = 400 feet

35

NPSH ndashFORMULA FOR CALCULATION

NPSHr is obtained from the pump curve

Add two to four feet of safety factor to the NPSHr stated on the curve

NPSHa is calculated

+ Absolute pressure in deaerator tank

plusmn Elevation of minimum water level in tank above feed pump

- Vapor pressure of water in deaerator tank

- Suction line friction loss

= Net Positive Suction Head Available

To avoid cavitation NPSHa must be greater than NPSHr

36

NPSH AND ELEVATIONDeaerator

tank

Boiler feed

pumps

Minimum water level in DA tank

Location of eye of lowest impeller

Difference in elevation

37

NPSH AND SUCTION LINE CONSIDERATIONS

Critical suction line considerations here

38

Check list for boiler feed pump selection

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

39

Sheet2

BOILER FEED PUMPS USEFUL FORMULAS

40

Sheet1

SPECIFICATION FOR EXERCISEa) Control Method Continuous duty fixed speed pump with bypass line and feed valveb) Boiler maximum capacity = 250 HPc) Boiler safety valve setting = 125 psigd) Pressure safety factor = 3 above boilerrsquos safety valve settinge) Boiler operating pressure = 100 psigf) Continuous Boiler Blowdown flow - Requiredg) Bypass recirculation flow ndash Requiredh) Altitude ndash Sea leveli) Pressure in deaerator tank above atmospheric pressure = 5 psi (147 + 5 = 197 psi absolute)j) Height of deaerator tank minimum water level above pumprsquos first impeller = 10 feetk) Friction line loss through suction piping = 5 footl) Friction loss through suction side fittings = 5 footm) Friction loss through suction side valves = Nonen) Friction loss through suction side strainer = 1 feeto) Friction loss through discharge piping = 1 footp) Friction loss through discharge side fittings = 1 footq) Pressure drop across feed valve ndash 15 psir) Elevation of boiler maximum water level above pumprsquos discharge port = 5 feets) Liquid Specific Gravity = 0953t) Temperature of water in deaerator tank = 227 degrees Fu) Vapor pressure in deaerator tank = 197 psiv) Pump materials all 316 stainless steel to resist treatment chemicalsw) Mechanical seal to be silicon carbidesilicon carbideEPDM to withstand liquid temperature

41

Feed pumps

CONTROL METHOD

Fixed speed pumps with feed valve and recirculation line

Recirc line

Feed valve

42

STEP 1 ndashDetermine control methodFeed valve controlled system with a continuous duty fixed speed pump has been specified

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

43

Sheet2

STEP 2 ndashCalculate the BASE feed pump flow rate

The formula for this calculation is

bull Boiler maximum capacity in horsepower X 0069 X C

bull The maximum capacity in boiler horsepower is 250

bull The C factor is 115 for continuous duty

Therefore

250 X 0069 X 115 = 20 gpm = BASE flow rate

44

STEP 3 ndashContinuous Boiler Blowdown Flow

Determination

1 The BASE flow rate has been established at 20 gpm

2 We will on next slide need to add for bypass flow which can add 10 to 20 percent to the BASE flow rate

3 Blowdown flow is to be approximately 10 percent of flow at pumprsquos Best Efficiency Point

4 So the total boiler blowdown flow required is approximately 3 gpm

45

STEP 4 ndashAdd for by-pass flow

bull Control is via feed valve with fixed speed pump and for continuous dutybull A bypass will be required

bull Solid curve to right shows minimum flow rate as a percentage of nominal flow rate in relation to liquid temperature

bull Ignore dotted line which indicates a pump with special high-temperature construction

bull At 227degF we require a bypass flow that is about 20 of BEP flow

bull Presuming we can find a pump with BEP at about 25 or so gpm the bypass flow must be about 5 gpm

46

STEP 5 ndashCalculate total flow requiredbull BASE flow = 20 gpmbull Blowdown flow = 3 gpmbull Recirculation flow = 5 gpmbull Total flow required = 28 gpm

XXXX

X

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

47

Sheet2

STEP 6 ndashCalculate BASE pumping head

Boiler operating pressure setting + 3

Formula BASE head in feet = Boiler operating pressure X 231 X 103 divide Specific Gravity

BASE head = 100 psi X 231 X 103 divide 0953 = 250 feet

48

STEP 7 ndashAdd for suction piping system head components

From specificationAbsolute pressure on deaerator tank = 197 psi X 231 = - 46 feetWater elevation above first impeller = - 10 feetFriction loss through suction piping = + 5 feetFriction loss through suction fittings = + 5 feetFriction loss through suction side valves and strainer = + 1 feet

Total = - 54 feet

49

STEP 8 ndashAdd for discharge piping system head components

From specificationFriction loss through discharge piping = + 1 footFriction loss through discharge fittings = + 1 footFriction loss through feed valve is 15 psi X 231 = + 35 feetElevation of boiler maximum water level above pump = + 5 feet

Total = + 42 feet

50

STEP 9 ndashSum of all head components

BASE head with safety factor = + 250 feetSuction side piping system head = - 54 feetDischarge side piping system head = + 42 feet

Total = + 238 feet

51

STEP 10 ndashPressure safety valve considerations At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific GravityExample Head = 125 psi X 231 X 103 divide 0953 = 312 feet

XXXXXXXXX

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

52

Sheet2

STEP 11 ndashDetermine deaerator tank water temperature

From specification 227degF

53

STEP 12 ndashNPSHa calculation

NPSHa equation

plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa

10 feet + (197 psi X 231) - (197 psi X 231) - 2 feet = NPSHa10 feet + 46 feet - 46 feet - 2 feet = 8 feet NPSHa

54

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
1 Base flow calculation equation
Boiler maximum capacity horsepower X 0069 X C = Base flow rate
C = 150 for OnOff intermittent operation
C = 115 for continuous feed operation
2 Determine BASE head for feed pump
Formula based on Safety Valve setting
Pump head in feet = Maximum pressure X 231 X 103 divide Liquid Specific Gravity
3 Head components on suction side of piping system
Pressure above atmospheric on deaerator converted to feet of head = feet
Elevation difference between minimum deaerator water level and pump inlet = feet
Suction pipe friction loss = feet
Suction fitting friction loss = feet
Suction line valves and strainer friction loss = feet
Total = feet
4 Head components on discharge side of piping system
Friction loss through discharge piping = feet
Friction loss through discharge fittings = feet
Friction loss through feed valve = feet
Elevation of boiler maximum water level above pump = feet
Total = feet
5 NPSHa equation
plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa
(Feet) (psi X 231 = Feet) (psi X 231 = Feet) (Feet) (Feet)
Elevation of deaerator tank minimum water level above pumprsquos first impeller
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Method Name Is there head loss across feed valve Typical psi loss across feed valve Typical feed water temperature Typical Specific Gravity Conversion formula Typical feet of head loss across feed valve Pump Speed Type Duty Is orifce flow by-pass line required Orifice flow rate
1 On Off control and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Intermittent No Not applicable
2 Feed control valve and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Continuous Yes 20 of nominal
3 Feed control valve and variable speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Variable Continuous Yes 20 of nominal
4 Variable speed pumps only (no control valve) No None 225degF 0954 Not applicable Not applicable Variable Continuous No Not applicable
Orifice flow rate varies by manufacturers Will use 20 for these exercises
Must add for all head factors on suction and discharge sides of pump
Method Name Pump Speed Type Duty Is orifice flow by-pass line required
1 OnOff control and fixed speed pumps Fixed Intermittent No
2 Feed control valve and fixed speed pumps Fixed Continuous Yes
3 Feed control valve and variable speed pumps Variable Continuous Yes
4 Variable speed pumps only (no control valve) Variable Continuous No
Page 14: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

Flash Tank Flash Tank wEconomizer

Use flash steam for heating or deaerating Why not recover the heat from the hot condensate

14

HOT CONDENSATE RETURNED

DeaeratorBoiler Feed System

A vented receiver wastes energy

Pressurized receiver saves energy

Steam diffusing tube

15

Steam

HP Return

Vent

Exhaust OrFlash Steam

ToBoiler

Boiler FeedWater Pump(s)

OverflowDrainer

Cold Make-UpWater

LP Condensate

Make-Up Valve

Check Valve

PRV

Level control

16

SPRAY DEAERATOR

Spray cone

17

TRAY DEAERATOR

steam

Trays

18

PACKED COLUMN DA

19

BOILER FEED WATER TANKSSpray DA Tray DA Column DA

Vented Receiver

20

T

T

T

T

TH P Condensate Return

Cond Pump D A TankD A Tank

Feed PumpBoiler

Strainer

Trap Trap

TrapTrapTT

TT

TT

TT

TTT

HP SteamPRV 15 psig

250 F

LP Steam150 psig366 F

TrapMotiveForce

Feed Tank or DA

HP CONDENSATE RECOVERY

21

HIGH PRESSURE CONDENSATE RECEIVER

bull Takes high pressure condensate directly from the user

bull No need to deaeratebull Pump directly into boilerbull Feed the HPR from the DA

22

BOILER FEED WATER TANK OPTIONSSpray DA Tray DA Column DA

Vented Receiver

HPCR

23

FEED WATER SYSTEMSFor multiple boiler Installations

24

METHOD 1 ndashDirect feed for multiple boilers

Deaerator

Boiler A

Boiler AControlle

r4-20mA signal directly to

Grundfos E-pump instead of

control valve

Boiler BBoiler BControlle

r4-20mA signal directly to

Grundfos E-pump instead of

control valve

25

METHOD 2 ndashBooster sets for multiple boilers

Deaerator Pressure sensor

Bypass

Multiple pump

controller

26

STEAM BOILER PUMP APPLICATIONS AND TYPESBoiler feed pumpsCollection tank pumpsWater treatment pumpsCondensate return pumpsDeaerator tank recycle pumpsDeaerator vacuum pumps (vacuum deaerator tanks only)Economizer pumps

27

SIZING COMPLEXITY FOR BOILER FEED PUMPS

28

BASE FLOW RATE CALCULATION

Base flow = Boiler maximum capacity horsepower X 0069 X C

bull C = 15 for OnOff intermittent operation

bull C = 115 for continuous feed operation

29

ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW

To the Base flow we MIGHT add if specified

For Continuous Boiler Blowdown flowbull Approximately 5 to10 of the pumprsquos flow

rate at the Best Efficiency Point

30

ADD FOR BYPASS RECIRCULATION FLOWCertain feed system control modes require the use of a bypass line back to the source tank ndash such as back to the deaerator tank

Method

NamePump Speed

TypeDuty

Is orifice flow by-pass line

required1 OnOff control and fixed speed pumps Fixed Intermittent No2 Feed control valve and fixed speed pumps Fixed Continuous Yes3 Feed control valve and variable speed pumps Variable Continuous Yes4 Variable speed pumps only (no control valve) Variable Continuous No

31

Sheet1

RECIRCULATION FLOW

bull The solid curve below shows the minimum flow rate as a percentage of the nominal flow rate in relation to the liquid temperature

bull Ignore the dotted line which indicates a pump with special high-temperature construction

32

CALCULATING REQUIRED FEED PUMP HEAD

+ Suction side head+ Discharge side head= Total Dynamic Head

Elevation of DA tank

Elevation of boiler

33

FEED VALVE IMPACTS PUMPING HEAD CALCULATION

34

CALCULATING THE HEADFOR THE FEED PUMP1) At the duty point flow rateHead in feet = Boiler operating pressure X 231 X 103 divide Liquid Specific Gravity

Example Head = 130 psi X 231 X 103 divide 0953 = 324 feet

2) At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific Gravity

Example Head = 160 psi X 231 X 103 divide 0953 = 400 feet

35

NPSH ndashFORMULA FOR CALCULATION

NPSHr is obtained from the pump curve

Add two to four feet of safety factor to the NPSHr stated on the curve

NPSHa is calculated

+ Absolute pressure in deaerator tank

plusmn Elevation of minimum water level in tank above feed pump

- Vapor pressure of water in deaerator tank

- Suction line friction loss

= Net Positive Suction Head Available

To avoid cavitation NPSHa must be greater than NPSHr

36

NPSH AND ELEVATIONDeaerator

tank

Boiler feed

pumps

Minimum water level in DA tank

Location of eye of lowest impeller

Difference in elevation

37

NPSH AND SUCTION LINE CONSIDERATIONS

Critical suction line considerations here

38

Check list for boiler feed pump selection

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

39

Sheet2

BOILER FEED PUMPS USEFUL FORMULAS

40

Sheet1

SPECIFICATION FOR EXERCISEa) Control Method Continuous duty fixed speed pump with bypass line and feed valveb) Boiler maximum capacity = 250 HPc) Boiler safety valve setting = 125 psigd) Pressure safety factor = 3 above boilerrsquos safety valve settinge) Boiler operating pressure = 100 psigf) Continuous Boiler Blowdown flow - Requiredg) Bypass recirculation flow ndash Requiredh) Altitude ndash Sea leveli) Pressure in deaerator tank above atmospheric pressure = 5 psi (147 + 5 = 197 psi absolute)j) Height of deaerator tank minimum water level above pumprsquos first impeller = 10 feetk) Friction line loss through suction piping = 5 footl) Friction loss through suction side fittings = 5 footm) Friction loss through suction side valves = Nonen) Friction loss through suction side strainer = 1 feeto) Friction loss through discharge piping = 1 footp) Friction loss through discharge side fittings = 1 footq) Pressure drop across feed valve ndash 15 psir) Elevation of boiler maximum water level above pumprsquos discharge port = 5 feets) Liquid Specific Gravity = 0953t) Temperature of water in deaerator tank = 227 degrees Fu) Vapor pressure in deaerator tank = 197 psiv) Pump materials all 316 stainless steel to resist treatment chemicalsw) Mechanical seal to be silicon carbidesilicon carbideEPDM to withstand liquid temperature

41

Feed pumps

CONTROL METHOD

Fixed speed pumps with feed valve and recirculation line

Recirc line

Feed valve

42

STEP 1 ndashDetermine control methodFeed valve controlled system with a continuous duty fixed speed pump has been specified

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

43

Sheet2

STEP 2 ndashCalculate the BASE feed pump flow rate

The formula for this calculation is

bull Boiler maximum capacity in horsepower X 0069 X C

bull The maximum capacity in boiler horsepower is 250

bull The C factor is 115 for continuous duty

Therefore

250 X 0069 X 115 = 20 gpm = BASE flow rate

44

STEP 3 ndashContinuous Boiler Blowdown Flow

Determination

1 The BASE flow rate has been established at 20 gpm

2 We will on next slide need to add for bypass flow which can add 10 to 20 percent to the BASE flow rate

3 Blowdown flow is to be approximately 10 percent of flow at pumprsquos Best Efficiency Point

4 So the total boiler blowdown flow required is approximately 3 gpm

45

STEP 4 ndashAdd for by-pass flow

bull Control is via feed valve with fixed speed pump and for continuous dutybull A bypass will be required

bull Solid curve to right shows minimum flow rate as a percentage of nominal flow rate in relation to liquid temperature

bull Ignore dotted line which indicates a pump with special high-temperature construction

bull At 227degF we require a bypass flow that is about 20 of BEP flow

bull Presuming we can find a pump with BEP at about 25 or so gpm the bypass flow must be about 5 gpm

46

STEP 5 ndashCalculate total flow requiredbull BASE flow = 20 gpmbull Blowdown flow = 3 gpmbull Recirculation flow = 5 gpmbull Total flow required = 28 gpm

XXXX

X

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

47

Sheet2

STEP 6 ndashCalculate BASE pumping head

Boiler operating pressure setting + 3

Formula BASE head in feet = Boiler operating pressure X 231 X 103 divide Specific Gravity

BASE head = 100 psi X 231 X 103 divide 0953 = 250 feet

48

STEP 7 ndashAdd for suction piping system head components

From specificationAbsolute pressure on deaerator tank = 197 psi X 231 = - 46 feetWater elevation above first impeller = - 10 feetFriction loss through suction piping = + 5 feetFriction loss through suction fittings = + 5 feetFriction loss through suction side valves and strainer = + 1 feet

Total = - 54 feet

49

STEP 8 ndashAdd for discharge piping system head components

From specificationFriction loss through discharge piping = + 1 footFriction loss through discharge fittings = + 1 footFriction loss through feed valve is 15 psi X 231 = + 35 feetElevation of boiler maximum water level above pump = + 5 feet

Total = + 42 feet

50

STEP 9 ndashSum of all head components

BASE head with safety factor = + 250 feetSuction side piping system head = - 54 feetDischarge side piping system head = + 42 feet

Total = + 238 feet

51

STEP 10 ndashPressure safety valve considerations At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific GravityExample Head = 125 psi X 231 X 103 divide 0953 = 312 feet

XXXXXXXXX

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

52

Sheet2

STEP 11 ndashDetermine deaerator tank water temperature

From specification 227degF

53

STEP 12 ndashNPSHa calculation

NPSHa equation

plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa

10 feet + (197 psi X 231) - (197 psi X 231) - 2 feet = NPSHa10 feet + 46 feet - 46 feet - 2 feet = 8 feet NPSHa

54

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
1 Base flow calculation equation
Boiler maximum capacity horsepower X 0069 X C = Base flow rate
C = 150 for OnOff intermittent operation
C = 115 for continuous feed operation
2 Determine BASE head for feed pump
Formula based on Safety Valve setting
Pump head in feet = Maximum pressure X 231 X 103 divide Liquid Specific Gravity
3 Head components on suction side of piping system
Pressure above atmospheric on deaerator converted to feet of head = feet
Elevation difference between minimum deaerator water level and pump inlet = feet
Suction pipe friction loss = feet
Suction fitting friction loss = feet
Suction line valves and strainer friction loss = feet
Total = feet
4 Head components on discharge side of piping system
Friction loss through discharge piping = feet
Friction loss through discharge fittings = feet
Friction loss through feed valve = feet
Elevation of boiler maximum water level above pump = feet
Total = feet
5 NPSHa equation
plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa
(Feet) (psi X 231 = Feet) (psi X 231 = Feet) (Feet) (Feet)
Elevation of deaerator tank minimum water level above pumprsquos first impeller
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Method Name Is there head loss across feed valve Typical psi loss across feed valve Typical feed water temperature Typical Specific Gravity Conversion formula Typical feet of head loss across feed valve Pump Speed Type Duty Is orifce flow by-pass line required Orifice flow rate
1 On Off control and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Intermittent No Not applicable
2 Feed control valve and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Continuous Yes 20 of nominal
3 Feed control valve and variable speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Variable Continuous Yes 20 of nominal
4 Variable speed pumps only (no control valve) No None 225degF 0954 Not applicable Not applicable Variable Continuous No Not applicable
Orifice flow rate varies by manufacturers Will use 20 for these exercises
Must add for all head factors on suction and discharge sides of pump
Method Name Pump Speed Type Duty Is orifice flow by-pass line required
1 OnOff control and fixed speed pumps Fixed Intermittent No
2 Feed control valve and fixed speed pumps Fixed Continuous Yes
3 Feed control valve and variable speed pumps Variable Continuous Yes
4 Variable speed pumps only (no control valve) Variable Continuous No
Page 15: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

HOT CONDENSATE RETURNED

DeaeratorBoiler Feed System

A vented receiver wastes energy

Pressurized receiver saves energy

Steam diffusing tube

15

Steam

HP Return

Vent

Exhaust OrFlash Steam

ToBoiler

Boiler FeedWater Pump(s)

OverflowDrainer

Cold Make-UpWater

LP Condensate

Make-Up Valve

Check Valve

PRV

Level control

16

SPRAY DEAERATOR

Spray cone

17

TRAY DEAERATOR

steam

Trays

18

PACKED COLUMN DA

19

BOILER FEED WATER TANKSSpray DA Tray DA Column DA

Vented Receiver

20

T

T

T

T

TH P Condensate Return

Cond Pump D A TankD A Tank

Feed PumpBoiler

Strainer

Trap Trap

TrapTrapTT

TT

TT

TT

TTT

HP SteamPRV 15 psig

250 F

LP Steam150 psig366 F

TrapMotiveForce

Feed Tank or DA

HP CONDENSATE RECOVERY

21

HIGH PRESSURE CONDENSATE RECEIVER

bull Takes high pressure condensate directly from the user

bull No need to deaeratebull Pump directly into boilerbull Feed the HPR from the DA

22

BOILER FEED WATER TANK OPTIONSSpray DA Tray DA Column DA

Vented Receiver

HPCR

23

FEED WATER SYSTEMSFor multiple boiler Installations

24

METHOD 1 ndashDirect feed for multiple boilers

Deaerator

Boiler A

Boiler AControlle

r4-20mA signal directly to

Grundfos E-pump instead of

control valve

Boiler BBoiler BControlle

r4-20mA signal directly to

Grundfos E-pump instead of

control valve

25

METHOD 2 ndashBooster sets for multiple boilers

Deaerator Pressure sensor

Bypass

Multiple pump

controller

26

STEAM BOILER PUMP APPLICATIONS AND TYPESBoiler feed pumpsCollection tank pumpsWater treatment pumpsCondensate return pumpsDeaerator tank recycle pumpsDeaerator vacuum pumps (vacuum deaerator tanks only)Economizer pumps

27

SIZING COMPLEXITY FOR BOILER FEED PUMPS

28

BASE FLOW RATE CALCULATION

Base flow = Boiler maximum capacity horsepower X 0069 X C

bull C = 15 for OnOff intermittent operation

bull C = 115 for continuous feed operation

29

ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW

To the Base flow we MIGHT add if specified

For Continuous Boiler Blowdown flowbull Approximately 5 to10 of the pumprsquos flow

rate at the Best Efficiency Point

30

ADD FOR BYPASS RECIRCULATION FLOWCertain feed system control modes require the use of a bypass line back to the source tank ndash such as back to the deaerator tank

Method

NamePump Speed

TypeDuty

Is orifice flow by-pass line

required1 OnOff control and fixed speed pumps Fixed Intermittent No2 Feed control valve and fixed speed pumps Fixed Continuous Yes3 Feed control valve and variable speed pumps Variable Continuous Yes4 Variable speed pumps only (no control valve) Variable Continuous No

31

Sheet1

RECIRCULATION FLOW

bull The solid curve below shows the minimum flow rate as a percentage of the nominal flow rate in relation to the liquid temperature

bull Ignore the dotted line which indicates a pump with special high-temperature construction

32

CALCULATING REQUIRED FEED PUMP HEAD

+ Suction side head+ Discharge side head= Total Dynamic Head

Elevation of DA tank

Elevation of boiler

33

FEED VALVE IMPACTS PUMPING HEAD CALCULATION

34

CALCULATING THE HEADFOR THE FEED PUMP1) At the duty point flow rateHead in feet = Boiler operating pressure X 231 X 103 divide Liquid Specific Gravity

Example Head = 130 psi X 231 X 103 divide 0953 = 324 feet

2) At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific Gravity

Example Head = 160 psi X 231 X 103 divide 0953 = 400 feet

35

NPSH ndashFORMULA FOR CALCULATION

NPSHr is obtained from the pump curve

Add two to four feet of safety factor to the NPSHr stated on the curve

NPSHa is calculated

+ Absolute pressure in deaerator tank

plusmn Elevation of minimum water level in tank above feed pump

- Vapor pressure of water in deaerator tank

- Suction line friction loss

= Net Positive Suction Head Available

To avoid cavitation NPSHa must be greater than NPSHr

36

NPSH AND ELEVATIONDeaerator

tank

Boiler feed

pumps

Minimum water level in DA tank

Location of eye of lowest impeller

Difference in elevation

37

NPSH AND SUCTION LINE CONSIDERATIONS

Critical suction line considerations here

38

Check list for boiler feed pump selection

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

39

Sheet2

BOILER FEED PUMPS USEFUL FORMULAS

40

Sheet1

SPECIFICATION FOR EXERCISEa) Control Method Continuous duty fixed speed pump with bypass line and feed valveb) Boiler maximum capacity = 250 HPc) Boiler safety valve setting = 125 psigd) Pressure safety factor = 3 above boilerrsquos safety valve settinge) Boiler operating pressure = 100 psigf) Continuous Boiler Blowdown flow - Requiredg) Bypass recirculation flow ndash Requiredh) Altitude ndash Sea leveli) Pressure in deaerator tank above atmospheric pressure = 5 psi (147 + 5 = 197 psi absolute)j) Height of deaerator tank minimum water level above pumprsquos first impeller = 10 feetk) Friction line loss through suction piping = 5 footl) Friction loss through suction side fittings = 5 footm) Friction loss through suction side valves = Nonen) Friction loss through suction side strainer = 1 feeto) Friction loss through discharge piping = 1 footp) Friction loss through discharge side fittings = 1 footq) Pressure drop across feed valve ndash 15 psir) Elevation of boiler maximum water level above pumprsquos discharge port = 5 feets) Liquid Specific Gravity = 0953t) Temperature of water in deaerator tank = 227 degrees Fu) Vapor pressure in deaerator tank = 197 psiv) Pump materials all 316 stainless steel to resist treatment chemicalsw) Mechanical seal to be silicon carbidesilicon carbideEPDM to withstand liquid temperature

41

Feed pumps

CONTROL METHOD

Fixed speed pumps with feed valve and recirculation line

Recirc line

Feed valve

42

STEP 1 ndashDetermine control methodFeed valve controlled system with a continuous duty fixed speed pump has been specified

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

43

Sheet2

STEP 2 ndashCalculate the BASE feed pump flow rate

The formula for this calculation is

bull Boiler maximum capacity in horsepower X 0069 X C

bull The maximum capacity in boiler horsepower is 250

bull The C factor is 115 for continuous duty

Therefore

250 X 0069 X 115 = 20 gpm = BASE flow rate

44

STEP 3 ndashContinuous Boiler Blowdown Flow

Determination

1 The BASE flow rate has been established at 20 gpm

2 We will on next slide need to add for bypass flow which can add 10 to 20 percent to the BASE flow rate

3 Blowdown flow is to be approximately 10 percent of flow at pumprsquos Best Efficiency Point

4 So the total boiler blowdown flow required is approximately 3 gpm

45

STEP 4 ndashAdd for by-pass flow

bull Control is via feed valve with fixed speed pump and for continuous dutybull A bypass will be required

bull Solid curve to right shows minimum flow rate as a percentage of nominal flow rate in relation to liquid temperature

bull Ignore dotted line which indicates a pump with special high-temperature construction

bull At 227degF we require a bypass flow that is about 20 of BEP flow

bull Presuming we can find a pump with BEP at about 25 or so gpm the bypass flow must be about 5 gpm

46

STEP 5 ndashCalculate total flow requiredbull BASE flow = 20 gpmbull Blowdown flow = 3 gpmbull Recirculation flow = 5 gpmbull Total flow required = 28 gpm

XXXX

X

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

47

Sheet2

STEP 6 ndashCalculate BASE pumping head

Boiler operating pressure setting + 3

Formula BASE head in feet = Boiler operating pressure X 231 X 103 divide Specific Gravity

BASE head = 100 psi X 231 X 103 divide 0953 = 250 feet

48

STEP 7 ndashAdd for suction piping system head components

From specificationAbsolute pressure on deaerator tank = 197 psi X 231 = - 46 feetWater elevation above first impeller = - 10 feetFriction loss through suction piping = + 5 feetFriction loss through suction fittings = + 5 feetFriction loss through suction side valves and strainer = + 1 feet

Total = - 54 feet

49

STEP 8 ndashAdd for discharge piping system head components

From specificationFriction loss through discharge piping = + 1 footFriction loss through discharge fittings = + 1 footFriction loss through feed valve is 15 psi X 231 = + 35 feetElevation of boiler maximum water level above pump = + 5 feet

Total = + 42 feet

50

STEP 9 ndashSum of all head components

BASE head with safety factor = + 250 feetSuction side piping system head = - 54 feetDischarge side piping system head = + 42 feet

Total = + 238 feet

51

STEP 10 ndashPressure safety valve considerations At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific GravityExample Head = 125 psi X 231 X 103 divide 0953 = 312 feet

XXXXXXXXX

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

52

Sheet2

STEP 11 ndashDetermine deaerator tank water temperature

From specification 227degF

53

STEP 12 ndashNPSHa calculation

NPSHa equation

plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa

10 feet + (197 psi X 231) - (197 psi X 231) - 2 feet = NPSHa10 feet + 46 feet - 46 feet - 2 feet = 8 feet NPSHa

54

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
1 Base flow calculation equation
Boiler maximum capacity horsepower X 0069 X C = Base flow rate
C = 150 for OnOff intermittent operation
C = 115 for continuous feed operation
2 Determine BASE head for feed pump
Formula based on Safety Valve setting
Pump head in feet = Maximum pressure X 231 X 103 divide Liquid Specific Gravity
3 Head components on suction side of piping system
Pressure above atmospheric on deaerator converted to feet of head = feet
Elevation difference between minimum deaerator water level and pump inlet = feet
Suction pipe friction loss = feet
Suction fitting friction loss = feet
Suction line valves and strainer friction loss = feet
Total = feet
4 Head components on discharge side of piping system
Friction loss through discharge piping = feet
Friction loss through discharge fittings = feet
Friction loss through feed valve = feet
Elevation of boiler maximum water level above pump = feet
Total = feet
5 NPSHa equation
plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa
(Feet) (psi X 231 = Feet) (psi X 231 = Feet) (Feet) (Feet)
Elevation of deaerator tank minimum water level above pumprsquos first impeller
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Method Name Is there head loss across feed valve Typical psi loss across feed valve Typical feed water temperature Typical Specific Gravity Conversion formula Typical feet of head loss across feed valve Pump Speed Type Duty Is orifce flow by-pass line required Orifice flow rate
1 On Off control and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Intermittent No Not applicable
2 Feed control valve and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Continuous Yes 20 of nominal
3 Feed control valve and variable speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Variable Continuous Yes 20 of nominal
4 Variable speed pumps only (no control valve) No None 225degF 0954 Not applicable Not applicable Variable Continuous No Not applicable
Orifice flow rate varies by manufacturers Will use 20 for these exercises
Must add for all head factors on suction and discharge sides of pump
Method Name Pump Speed Type Duty Is orifice flow by-pass line required
1 OnOff control and fixed speed pumps Fixed Intermittent No
2 Feed control valve and fixed speed pumps Fixed Continuous Yes
3 Feed control valve and variable speed pumps Variable Continuous Yes
4 Variable speed pumps only (no control valve) Variable Continuous No
Page 16: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

Steam

HP Return

Vent

Exhaust OrFlash Steam

ToBoiler

Boiler FeedWater Pump(s)

OverflowDrainer

Cold Make-UpWater

LP Condensate

Make-Up Valve

Check Valve

PRV

Level control

16

SPRAY DEAERATOR

Spray cone

17

TRAY DEAERATOR

steam

Trays

18

PACKED COLUMN DA

19

BOILER FEED WATER TANKSSpray DA Tray DA Column DA

Vented Receiver

20

T

T

T

T

TH P Condensate Return

Cond Pump D A TankD A Tank

Feed PumpBoiler

Strainer

Trap Trap

TrapTrapTT

TT

TT

TT

TTT

HP SteamPRV 15 psig

250 F

LP Steam150 psig366 F

TrapMotiveForce

Feed Tank or DA

HP CONDENSATE RECOVERY

21

HIGH PRESSURE CONDENSATE RECEIVER

bull Takes high pressure condensate directly from the user

bull No need to deaeratebull Pump directly into boilerbull Feed the HPR from the DA

22

BOILER FEED WATER TANK OPTIONSSpray DA Tray DA Column DA

Vented Receiver

HPCR

23

FEED WATER SYSTEMSFor multiple boiler Installations

24

METHOD 1 ndashDirect feed for multiple boilers

Deaerator

Boiler A

Boiler AControlle

r4-20mA signal directly to

Grundfos E-pump instead of

control valve

Boiler BBoiler BControlle

r4-20mA signal directly to

Grundfos E-pump instead of

control valve

25

METHOD 2 ndashBooster sets for multiple boilers

Deaerator Pressure sensor

Bypass

Multiple pump

controller

26

STEAM BOILER PUMP APPLICATIONS AND TYPESBoiler feed pumpsCollection tank pumpsWater treatment pumpsCondensate return pumpsDeaerator tank recycle pumpsDeaerator vacuum pumps (vacuum deaerator tanks only)Economizer pumps

27

SIZING COMPLEXITY FOR BOILER FEED PUMPS

28

BASE FLOW RATE CALCULATION

Base flow = Boiler maximum capacity horsepower X 0069 X C

bull C = 15 for OnOff intermittent operation

bull C = 115 for continuous feed operation

29

ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW

To the Base flow we MIGHT add if specified

For Continuous Boiler Blowdown flowbull Approximately 5 to10 of the pumprsquos flow

rate at the Best Efficiency Point

30

ADD FOR BYPASS RECIRCULATION FLOWCertain feed system control modes require the use of a bypass line back to the source tank ndash such as back to the deaerator tank

Method

NamePump Speed

TypeDuty

Is orifice flow by-pass line

required1 OnOff control and fixed speed pumps Fixed Intermittent No2 Feed control valve and fixed speed pumps Fixed Continuous Yes3 Feed control valve and variable speed pumps Variable Continuous Yes4 Variable speed pumps only (no control valve) Variable Continuous No

31

Sheet1

RECIRCULATION FLOW

bull The solid curve below shows the minimum flow rate as a percentage of the nominal flow rate in relation to the liquid temperature

bull Ignore the dotted line which indicates a pump with special high-temperature construction

32

CALCULATING REQUIRED FEED PUMP HEAD

+ Suction side head+ Discharge side head= Total Dynamic Head

Elevation of DA tank

Elevation of boiler

33

FEED VALVE IMPACTS PUMPING HEAD CALCULATION

34

CALCULATING THE HEADFOR THE FEED PUMP1) At the duty point flow rateHead in feet = Boiler operating pressure X 231 X 103 divide Liquid Specific Gravity

Example Head = 130 psi X 231 X 103 divide 0953 = 324 feet

2) At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific Gravity

Example Head = 160 psi X 231 X 103 divide 0953 = 400 feet

35

NPSH ndashFORMULA FOR CALCULATION

NPSHr is obtained from the pump curve

Add two to four feet of safety factor to the NPSHr stated on the curve

NPSHa is calculated

+ Absolute pressure in deaerator tank

plusmn Elevation of minimum water level in tank above feed pump

- Vapor pressure of water in deaerator tank

- Suction line friction loss

= Net Positive Suction Head Available

To avoid cavitation NPSHa must be greater than NPSHr

36

NPSH AND ELEVATIONDeaerator

tank

Boiler feed

pumps

Minimum water level in DA tank

Location of eye of lowest impeller

Difference in elevation

37

NPSH AND SUCTION LINE CONSIDERATIONS

Critical suction line considerations here

38

Check list for boiler feed pump selection

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

39

Sheet2

BOILER FEED PUMPS USEFUL FORMULAS

40

Sheet1

SPECIFICATION FOR EXERCISEa) Control Method Continuous duty fixed speed pump with bypass line and feed valveb) Boiler maximum capacity = 250 HPc) Boiler safety valve setting = 125 psigd) Pressure safety factor = 3 above boilerrsquos safety valve settinge) Boiler operating pressure = 100 psigf) Continuous Boiler Blowdown flow - Requiredg) Bypass recirculation flow ndash Requiredh) Altitude ndash Sea leveli) Pressure in deaerator tank above atmospheric pressure = 5 psi (147 + 5 = 197 psi absolute)j) Height of deaerator tank minimum water level above pumprsquos first impeller = 10 feetk) Friction line loss through suction piping = 5 footl) Friction loss through suction side fittings = 5 footm) Friction loss through suction side valves = Nonen) Friction loss through suction side strainer = 1 feeto) Friction loss through discharge piping = 1 footp) Friction loss through discharge side fittings = 1 footq) Pressure drop across feed valve ndash 15 psir) Elevation of boiler maximum water level above pumprsquos discharge port = 5 feets) Liquid Specific Gravity = 0953t) Temperature of water in deaerator tank = 227 degrees Fu) Vapor pressure in deaerator tank = 197 psiv) Pump materials all 316 stainless steel to resist treatment chemicalsw) Mechanical seal to be silicon carbidesilicon carbideEPDM to withstand liquid temperature

41

Feed pumps

CONTROL METHOD

Fixed speed pumps with feed valve and recirculation line

Recirc line

Feed valve

42

STEP 1 ndashDetermine control methodFeed valve controlled system with a continuous duty fixed speed pump has been specified

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

43

Sheet2

STEP 2 ndashCalculate the BASE feed pump flow rate

The formula for this calculation is

bull Boiler maximum capacity in horsepower X 0069 X C

bull The maximum capacity in boiler horsepower is 250

bull The C factor is 115 for continuous duty

Therefore

250 X 0069 X 115 = 20 gpm = BASE flow rate

44

STEP 3 ndashContinuous Boiler Blowdown Flow

Determination

1 The BASE flow rate has been established at 20 gpm

2 We will on next slide need to add for bypass flow which can add 10 to 20 percent to the BASE flow rate

3 Blowdown flow is to be approximately 10 percent of flow at pumprsquos Best Efficiency Point

4 So the total boiler blowdown flow required is approximately 3 gpm

45

STEP 4 ndashAdd for by-pass flow

bull Control is via feed valve with fixed speed pump and for continuous dutybull A bypass will be required

bull Solid curve to right shows minimum flow rate as a percentage of nominal flow rate in relation to liquid temperature

bull Ignore dotted line which indicates a pump with special high-temperature construction

bull At 227degF we require a bypass flow that is about 20 of BEP flow

bull Presuming we can find a pump with BEP at about 25 or so gpm the bypass flow must be about 5 gpm

46

STEP 5 ndashCalculate total flow requiredbull BASE flow = 20 gpmbull Blowdown flow = 3 gpmbull Recirculation flow = 5 gpmbull Total flow required = 28 gpm

XXXX

X

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

47

Sheet2

STEP 6 ndashCalculate BASE pumping head

Boiler operating pressure setting + 3

Formula BASE head in feet = Boiler operating pressure X 231 X 103 divide Specific Gravity

BASE head = 100 psi X 231 X 103 divide 0953 = 250 feet

48

STEP 7 ndashAdd for suction piping system head components

From specificationAbsolute pressure on deaerator tank = 197 psi X 231 = - 46 feetWater elevation above first impeller = - 10 feetFriction loss through suction piping = + 5 feetFriction loss through suction fittings = + 5 feetFriction loss through suction side valves and strainer = + 1 feet

Total = - 54 feet

49

STEP 8 ndashAdd for discharge piping system head components

From specificationFriction loss through discharge piping = + 1 footFriction loss through discharge fittings = + 1 footFriction loss through feed valve is 15 psi X 231 = + 35 feetElevation of boiler maximum water level above pump = + 5 feet

Total = + 42 feet

50

STEP 9 ndashSum of all head components

BASE head with safety factor = + 250 feetSuction side piping system head = - 54 feetDischarge side piping system head = + 42 feet

Total = + 238 feet

51

STEP 10 ndashPressure safety valve considerations At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific GravityExample Head = 125 psi X 231 X 103 divide 0953 = 312 feet

XXXXXXXXX

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

52

Sheet2

STEP 11 ndashDetermine deaerator tank water temperature

From specification 227degF

53

STEP 12 ndashNPSHa calculation

NPSHa equation

plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa

10 feet + (197 psi X 231) - (197 psi X 231) - 2 feet = NPSHa10 feet + 46 feet - 46 feet - 2 feet = 8 feet NPSHa

54

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
1 Base flow calculation equation
Boiler maximum capacity horsepower X 0069 X C = Base flow rate
C = 150 for OnOff intermittent operation
C = 115 for continuous feed operation
2 Determine BASE head for feed pump
Formula based on Safety Valve setting
Pump head in feet = Maximum pressure X 231 X 103 divide Liquid Specific Gravity
3 Head components on suction side of piping system
Pressure above atmospheric on deaerator converted to feet of head = feet
Elevation difference between minimum deaerator water level and pump inlet = feet
Suction pipe friction loss = feet
Suction fitting friction loss = feet
Suction line valves and strainer friction loss = feet
Total = feet
4 Head components on discharge side of piping system
Friction loss through discharge piping = feet
Friction loss through discharge fittings = feet
Friction loss through feed valve = feet
Elevation of boiler maximum water level above pump = feet
Total = feet
5 NPSHa equation
plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa
(Feet) (psi X 231 = Feet) (psi X 231 = Feet) (Feet) (Feet)
Elevation of deaerator tank minimum water level above pumprsquos first impeller
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Method Name Is there head loss across feed valve Typical psi loss across feed valve Typical feed water temperature Typical Specific Gravity Conversion formula Typical feet of head loss across feed valve Pump Speed Type Duty Is orifce flow by-pass line required Orifice flow rate
1 On Off control and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Intermittent No Not applicable
2 Feed control valve and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Continuous Yes 20 of nominal
3 Feed control valve and variable speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Variable Continuous Yes 20 of nominal
4 Variable speed pumps only (no control valve) No None 225degF 0954 Not applicable Not applicable Variable Continuous No Not applicable
Orifice flow rate varies by manufacturers Will use 20 for these exercises
Must add for all head factors on suction and discharge sides of pump
Method Name Pump Speed Type Duty Is orifice flow by-pass line required
1 OnOff control and fixed speed pumps Fixed Intermittent No
2 Feed control valve and fixed speed pumps Fixed Continuous Yes
3 Feed control valve and variable speed pumps Variable Continuous Yes
4 Variable speed pumps only (no control valve) Variable Continuous No
Page 17: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

SPRAY DEAERATOR

Spray cone

17

TRAY DEAERATOR

steam

Trays

18

PACKED COLUMN DA

19

BOILER FEED WATER TANKSSpray DA Tray DA Column DA

Vented Receiver

20

T

T

T

T

TH P Condensate Return

Cond Pump D A TankD A Tank

Feed PumpBoiler

Strainer

Trap Trap

TrapTrapTT

TT

TT

TT

TTT

HP SteamPRV 15 psig

250 F

LP Steam150 psig366 F

TrapMotiveForce

Feed Tank or DA

HP CONDENSATE RECOVERY

21

HIGH PRESSURE CONDENSATE RECEIVER

bull Takes high pressure condensate directly from the user

bull No need to deaeratebull Pump directly into boilerbull Feed the HPR from the DA

22

BOILER FEED WATER TANK OPTIONSSpray DA Tray DA Column DA

Vented Receiver

HPCR

23

FEED WATER SYSTEMSFor multiple boiler Installations

24

METHOD 1 ndashDirect feed for multiple boilers

Deaerator

Boiler A

Boiler AControlle

r4-20mA signal directly to

Grundfos E-pump instead of

control valve

Boiler BBoiler BControlle

r4-20mA signal directly to

Grundfos E-pump instead of

control valve

25

METHOD 2 ndashBooster sets for multiple boilers

Deaerator Pressure sensor

Bypass

Multiple pump

controller

26

STEAM BOILER PUMP APPLICATIONS AND TYPESBoiler feed pumpsCollection tank pumpsWater treatment pumpsCondensate return pumpsDeaerator tank recycle pumpsDeaerator vacuum pumps (vacuum deaerator tanks only)Economizer pumps

27

SIZING COMPLEXITY FOR BOILER FEED PUMPS

28

BASE FLOW RATE CALCULATION

Base flow = Boiler maximum capacity horsepower X 0069 X C

bull C = 15 for OnOff intermittent operation

bull C = 115 for continuous feed operation

29

ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW

To the Base flow we MIGHT add if specified

For Continuous Boiler Blowdown flowbull Approximately 5 to10 of the pumprsquos flow

rate at the Best Efficiency Point

30

ADD FOR BYPASS RECIRCULATION FLOWCertain feed system control modes require the use of a bypass line back to the source tank ndash such as back to the deaerator tank

Method

NamePump Speed

TypeDuty

Is orifice flow by-pass line

required1 OnOff control and fixed speed pumps Fixed Intermittent No2 Feed control valve and fixed speed pumps Fixed Continuous Yes3 Feed control valve and variable speed pumps Variable Continuous Yes4 Variable speed pumps only (no control valve) Variable Continuous No

31

Sheet1

RECIRCULATION FLOW

bull The solid curve below shows the minimum flow rate as a percentage of the nominal flow rate in relation to the liquid temperature

bull Ignore the dotted line which indicates a pump with special high-temperature construction

32

CALCULATING REQUIRED FEED PUMP HEAD

+ Suction side head+ Discharge side head= Total Dynamic Head

Elevation of DA tank

Elevation of boiler

33

FEED VALVE IMPACTS PUMPING HEAD CALCULATION

34

CALCULATING THE HEADFOR THE FEED PUMP1) At the duty point flow rateHead in feet = Boiler operating pressure X 231 X 103 divide Liquid Specific Gravity

Example Head = 130 psi X 231 X 103 divide 0953 = 324 feet

2) At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific Gravity

Example Head = 160 psi X 231 X 103 divide 0953 = 400 feet

35

NPSH ndashFORMULA FOR CALCULATION

NPSHr is obtained from the pump curve

Add two to four feet of safety factor to the NPSHr stated on the curve

NPSHa is calculated

+ Absolute pressure in deaerator tank

plusmn Elevation of minimum water level in tank above feed pump

- Vapor pressure of water in deaerator tank

- Suction line friction loss

= Net Positive Suction Head Available

To avoid cavitation NPSHa must be greater than NPSHr

36

NPSH AND ELEVATIONDeaerator

tank

Boiler feed

pumps

Minimum water level in DA tank

Location of eye of lowest impeller

Difference in elevation

37

NPSH AND SUCTION LINE CONSIDERATIONS

Critical suction line considerations here

38

Check list for boiler feed pump selection

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

39

Sheet2

BOILER FEED PUMPS USEFUL FORMULAS

40

Sheet1

SPECIFICATION FOR EXERCISEa) Control Method Continuous duty fixed speed pump with bypass line and feed valveb) Boiler maximum capacity = 250 HPc) Boiler safety valve setting = 125 psigd) Pressure safety factor = 3 above boilerrsquos safety valve settinge) Boiler operating pressure = 100 psigf) Continuous Boiler Blowdown flow - Requiredg) Bypass recirculation flow ndash Requiredh) Altitude ndash Sea leveli) Pressure in deaerator tank above atmospheric pressure = 5 psi (147 + 5 = 197 psi absolute)j) Height of deaerator tank minimum water level above pumprsquos first impeller = 10 feetk) Friction line loss through suction piping = 5 footl) Friction loss through suction side fittings = 5 footm) Friction loss through suction side valves = Nonen) Friction loss through suction side strainer = 1 feeto) Friction loss through discharge piping = 1 footp) Friction loss through discharge side fittings = 1 footq) Pressure drop across feed valve ndash 15 psir) Elevation of boiler maximum water level above pumprsquos discharge port = 5 feets) Liquid Specific Gravity = 0953t) Temperature of water in deaerator tank = 227 degrees Fu) Vapor pressure in deaerator tank = 197 psiv) Pump materials all 316 stainless steel to resist treatment chemicalsw) Mechanical seal to be silicon carbidesilicon carbideEPDM to withstand liquid temperature

41

Feed pumps

CONTROL METHOD

Fixed speed pumps with feed valve and recirculation line

Recirc line

Feed valve

42

STEP 1 ndashDetermine control methodFeed valve controlled system with a continuous duty fixed speed pump has been specified

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

43

Sheet2

STEP 2 ndashCalculate the BASE feed pump flow rate

The formula for this calculation is

bull Boiler maximum capacity in horsepower X 0069 X C

bull The maximum capacity in boiler horsepower is 250

bull The C factor is 115 for continuous duty

Therefore

250 X 0069 X 115 = 20 gpm = BASE flow rate

44

STEP 3 ndashContinuous Boiler Blowdown Flow

Determination

1 The BASE flow rate has been established at 20 gpm

2 We will on next slide need to add for bypass flow which can add 10 to 20 percent to the BASE flow rate

3 Blowdown flow is to be approximately 10 percent of flow at pumprsquos Best Efficiency Point

4 So the total boiler blowdown flow required is approximately 3 gpm

45

STEP 4 ndashAdd for by-pass flow

bull Control is via feed valve with fixed speed pump and for continuous dutybull A bypass will be required

bull Solid curve to right shows minimum flow rate as a percentage of nominal flow rate in relation to liquid temperature

bull Ignore dotted line which indicates a pump with special high-temperature construction

bull At 227degF we require a bypass flow that is about 20 of BEP flow

bull Presuming we can find a pump with BEP at about 25 or so gpm the bypass flow must be about 5 gpm

46

STEP 5 ndashCalculate total flow requiredbull BASE flow = 20 gpmbull Blowdown flow = 3 gpmbull Recirculation flow = 5 gpmbull Total flow required = 28 gpm

XXXX

X

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

47

Sheet2

STEP 6 ndashCalculate BASE pumping head

Boiler operating pressure setting + 3

Formula BASE head in feet = Boiler operating pressure X 231 X 103 divide Specific Gravity

BASE head = 100 psi X 231 X 103 divide 0953 = 250 feet

48

STEP 7 ndashAdd for suction piping system head components

From specificationAbsolute pressure on deaerator tank = 197 psi X 231 = - 46 feetWater elevation above first impeller = - 10 feetFriction loss through suction piping = + 5 feetFriction loss through suction fittings = + 5 feetFriction loss through suction side valves and strainer = + 1 feet

Total = - 54 feet

49

STEP 8 ndashAdd for discharge piping system head components

From specificationFriction loss through discharge piping = + 1 footFriction loss through discharge fittings = + 1 footFriction loss through feed valve is 15 psi X 231 = + 35 feetElevation of boiler maximum water level above pump = + 5 feet

Total = + 42 feet

50

STEP 9 ndashSum of all head components

BASE head with safety factor = + 250 feetSuction side piping system head = - 54 feetDischarge side piping system head = + 42 feet

Total = + 238 feet

51

STEP 10 ndashPressure safety valve considerations At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific GravityExample Head = 125 psi X 231 X 103 divide 0953 = 312 feet

XXXXXXXXX

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

52

Sheet2

STEP 11 ndashDetermine deaerator tank water temperature

From specification 227degF

53

STEP 12 ndashNPSHa calculation

NPSHa equation

plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa

10 feet + (197 psi X 231) - (197 psi X 231) - 2 feet = NPSHa10 feet + 46 feet - 46 feet - 2 feet = 8 feet NPSHa

54

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
1 Base flow calculation equation
Boiler maximum capacity horsepower X 0069 X C = Base flow rate
C = 150 for OnOff intermittent operation
C = 115 for continuous feed operation
2 Determine BASE head for feed pump
Formula based on Safety Valve setting
Pump head in feet = Maximum pressure X 231 X 103 divide Liquid Specific Gravity
3 Head components on suction side of piping system
Pressure above atmospheric on deaerator converted to feet of head = feet
Elevation difference between minimum deaerator water level and pump inlet = feet
Suction pipe friction loss = feet
Suction fitting friction loss = feet
Suction line valves and strainer friction loss = feet
Total = feet
4 Head components on discharge side of piping system
Friction loss through discharge piping = feet
Friction loss through discharge fittings = feet
Friction loss through feed valve = feet
Elevation of boiler maximum water level above pump = feet
Total = feet
5 NPSHa equation
plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa
(Feet) (psi X 231 = Feet) (psi X 231 = Feet) (Feet) (Feet)
Elevation of deaerator tank minimum water level above pumprsquos first impeller
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Method Name Is there head loss across feed valve Typical psi loss across feed valve Typical feed water temperature Typical Specific Gravity Conversion formula Typical feet of head loss across feed valve Pump Speed Type Duty Is orifce flow by-pass line required Orifice flow rate
1 On Off control and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Intermittent No Not applicable
2 Feed control valve and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Continuous Yes 20 of nominal
3 Feed control valve and variable speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Variable Continuous Yes 20 of nominal
4 Variable speed pumps only (no control valve) No None 225degF 0954 Not applicable Not applicable Variable Continuous No Not applicable
Orifice flow rate varies by manufacturers Will use 20 for these exercises
Must add for all head factors on suction and discharge sides of pump
Method Name Pump Speed Type Duty Is orifice flow by-pass line required
1 OnOff control and fixed speed pumps Fixed Intermittent No
2 Feed control valve and fixed speed pumps Fixed Continuous Yes
3 Feed control valve and variable speed pumps Variable Continuous Yes
4 Variable speed pumps only (no control valve) Variable Continuous No
Page 18: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

TRAY DEAERATOR

steam

Trays

18

PACKED COLUMN DA

19

BOILER FEED WATER TANKSSpray DA Tray DA Column DA

Vented Receiver

20

T

T

T

T

TH P Condensate Return

Cond Pump D A TankD A Tank

Feed PumpBoiler

Strainer

Trap Trap

TrapTrapTT

TT

TT

TT

TTT

HP SteamPRV 15 psig

250 F

LP Steam150 psig366 F

TrapMotiveForce

Feed Tank or DA

HP CONDENSATE RECOVERY

21

HIGH PRESSURE CONDENSATE RECEIVER

bull Takes high pressure condensate directly from the user

bull No need to deaeratebull Pump directly into boilerbull Feed the HPR from the DA

22

BOILER FEED WATER TANK OPTIONSSpray DA Tray DA Column DA

Vented Receiver

HPCR

23

FEED WATER SYSTEMSFor multiple boiler Installations

24

METHOD 1 ndashDirect feed for multiple boilers

Deaerator

Boiler A

Boiler AControlle

r4-20mA signal directly to

Grundfos E-pump instead of

control valve

Boiler BBoiler BControlle

r4-20mA signal directly to

Grundfos E-pump instead of

control valve

25

METHOD 2 ndashBooster sets for multiple boilers

Deaerator Pressure sensor

Bypass

Multiple pump

controller

26

STEAM BOILER PUMP APPLICATIONS AND TYPESBoiler feed pumpsCollection tank pumpsWater treatment pumpsCondensate return pumpsDeaerator tank recycle pumpsDeaerator vacuum pumps (vacuum deaerator tanks only)Economizer pumps

27

SIZING COMPLEXITY FOR BOILER FEED PUMPS

28

BASE FLOW RATE CALCULATION

Base flow = Boiler maximum capacity horsepower X 0069 X C

bull C = 15 for OnOff intermittent operation

bull C = 115 for continuous feed operation

29

ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW

To the Base flow we MIGHT add if specified

For Continuous Boiler Blowdown flowbull Approximately 5 to10 of the pumprsquos flow

rate at the Best Efficiency Point

30

ADD FOR BYPASS RECIRCULATION FLOWCertain feed system control modes require the use of a bypass line back to the source tank ndash such as back to the deaerator tank

Method

NamePump Speed

TypeDuty

Is orifice flow by-pass line

required1 OnOff control and fixed speed pumps Fixed Intermittent No2 Feed control valve and fixed speed pumps Fixed Continuous Yes3 Feed control valve and variable speed pumps Variable Continuous Yes4 Variable speed pumps only (no control valve) Variable Continuous No

31

Sheet1

RECIRCULATION FLOW

bull The solid curve below shows the minimum flow rate as a percentage of the nominal flow rate in relation to the liquid temperature

bull Ignore the dotted line which indicates a pump with special high-temperature construction

32

CALCULATING REQUIRED FEED PUMP HEAD

+ Suction side head+ Discharge side head= Total Dynamic Head

Elevation of DA tank

Elevation of boiler

33

FEED VALVE IMPACTS PUMPING HEAD CALCULATION

34

CALCULATING THE HEADFOR THE FEED PUMP1) At the duty point flow rateHead in feet = Boiler operating pressure X 231 X 103 divide Liquid Specific Gravity

Example Head = 130 psi X 231 X 103 divide 0953 = 324 feet

2) At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific Gravity

Example Head = 160 psi X 231 X 103 divide 0953 = 400 feet

35

NPSH ndashFORMULA FOR CALCULATION

NPSHr is obtained from the pump curve

Add two to four feet of safety factor to the NPSHr stated on the curve

NPSHa is calculated

+ Absolute pressure in deaerator tank

plusmn Elevation of minimum water level in tank above feed pump

- Vapor pressure of water in deaerator tank

- Suction line friction loss

= Net Positive Suction Head Available

To avoid cavitation NPSHa must be greater than NPSHr

36

NPSH AND ELEVATIONDeaerator

tank

Boiler feed

pumps

Minimum water level in DA tank

Location of eye of lowest impeller

Difference in elevation

37

NPSH AND SUCTION LINE CONSIDERATIONS

Critical suction line considerations here

38

Check list for boiler feed pump selection

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

39

Sheet2

BOILER FEED PUMPS USEFUL FORMULAS

40

Sheet1

SPECIFICATION FOR EXERCISEa) Control Method Continuous duty fixed speed pump with bypass line and feed valveb) Boiler maximum capacity = 250 HPc) Boiler safety valve setting = 125 psigd) Pressure safety factor = 3 above boilerrsquos safety valve settinge) Boiler operating pressure = 100 psigf) Continuous Boiler Blowdown flow - Requiredg) Bypass recirculation flow ndash Requiredh) Altitude ndash Sea leveli) Pressure in deaerator tank above atmospheric pressure = 5 psi (147 + 5 = 197 psi absolute)j) Height of deaerator tank minimum water level above pumprsquos first impeller = 10 feetk) Friction line loss through suction piping = 5 footl) Friction loss through suction side fittings = 5 footm) Friction loss through suction side valves = Nonen) Friction loss through suction side strainer = 1 feeto) Friction loss through discharge piping = 1 footp) Friction loss through discharge side fittings = 1 footq) Pressure drop across feed valve ndash 15 psir) Elevation of boiler maximum water level above pumprsquos discharge port = 5 feets) Liquid Specific Gravity = 0953t) Temperature of water in deaerator tank = 227 degrees Fu) Vapor pressure in deaerator tank = 197 psiv) Pump materials all 316 stainless steel to resist treatment chemicalsw) Mechanical seal to be silicon carbidesilicon carbideEPDM to withstand liquid temperature

41

Feed pumps

CONTROL METHOD

Fixed speed pumps with feed valve and recirculation line

Recirc line

Feed valve

42

STEP 1 ndashDetermine control methodFeed valve controlled system with a continuous duty fixed speed pump has been specified

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

43

Sheet2

STEP 2 ndashCalculate the BASE feed pump flow rate

The formula for this calculation is

bull Boiler maximum capacity in horsepower X 0069 X C

bull The maximum capacity in boiler horsepower is 250

bull The C factor is 115 for continuous duty

Therefore

250 X 0069 X 115 = 20 gpm = BASE flow rate

44

STEP 3 ndashContinuous Boiler Blowdown Flow

Determination

1 The BASE flow rate has been established at 20 gpm

2 We will on next slide need to add for bypass flow which can add 10 to 20 percent to the BASE flow rate

3 Blowdown flow is to be approximately 10 percent of flow at pumprsquos Best Efficiency Point

4 So the total boiler blowdown flow required is approximately 3 gpm

45

STEP 4 ndashAdd for by-pass flow

bull Control is via feed valve with fixed speed pump and for continuous dutybull A bypass will be required

bull Solid curve to right shows minimum flow rate as a percentage of nominal flow rate in relation to liquid temperature

bull Ignore dotted line which indicates a pump with special high-temperature construction

bull At 227degF we require a bypass flow that is about 20 of BEP flow

bull Presuming we can find a pump with BEP at about 25 or so gpm the bypass flow must be about 5 gpm

46

STEP 5 ndashCalculate total flow requiredbull BASE flow = 20 gpmbull Blowdown flow = 3 gpmbull Recirculation flow = 5 gpmbull Total flow required = 28 gpm

XXXX

X

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

47

Sheet2

STEP 6 ndashCalculate BASE pumping head

Boiler operating pressure setting + 3

Formula BASE head in feet = Boiler operating pressure X 231 X 103 divide Specific Gravity

BASE head = 100 psi X 231 X 103 divide 0953 = 250 feet

48

STEP 7 ndashAdd for suction piping system head components

From specificationAbsolute pressure on deaerator tank = 197 psi X 231 = - 46 feetWater elevation above first impeller = - 10 feetFriction loss through suction piping = + 5 feetFriction loss through suction fittings = + 5 feetFriction loss through suction side valves and strainer = + 1 feet

Total = - 54 feet

49

STEP 8 ndashAdd for discharge piping system head components

From specificationFriction loss through discharge piping = + 1 footFriction loss through discharge fittings = + 1 footFriction loss through feed valve is 15 psi X 231 = + 35 feetElevation of boiler maximum water level above pump = + 5 feet

Total = + 42 feet

50

STEP 9 ndashSum of all head components

BASE head with safety factor = + 250 feetSuction side piping system head = - 54 feetDischarge side piping system head = + 42 feet

Total = + 238 feet

51

STEP 10 ndashPressure safety valve considerations At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific GravityExample Head = 125 psi X 231 X 103 divide 0953 = 312 feet

XXXXXXXXX

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

52

Sheet2

STEP 11 ndashDetermine deaerator tank water temperature

From specification 227degF

53

STEP 12 ndashNPSHa calculation

NPSHa equation

plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa

10 feet + (197 psi X 231) - (197 psi X 231) - 2 feet = NPSHa10 feet + 46 feet - 46 feet - 2 feet = 8 feet NPSHa

54

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
1 Base flow calculation equation
Boiler maximum capacity horsepower X 0069 X C = Base flow rate
C = 150 for OnOff intermittent operation
C = 115 for continuous feed operation
2 Determine BASE head for feed pump
Formula based on Safety Valve setting
Pump head in feet = Maximum pressure X 231 X 103 divide Liquid Specific Gravity
3 Head components on suction side of piping system
Pressure above atmospheric on deaerator converted to feet of head = feet
Elevation difference between minimum deaerator water level and pump inlet = feet
Suction pipe friction loss = feet
Suction fitting friction loss = feet
Suction line valves and strainer friction loss = feet
Total = feet
4 Head components on discharge side of piping system
Friction loss through discharge piping = feet
Friction loss through discharge fittings = feet
Friction loss through feed valve = feet
Elevation of boiler maximum water level above pump = feet
Total = feet
5 NPSHa equation
plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa
(Feet) (psi X 231 = Feet) (psi X 231 = Feet) (Feet) (Feet)
Elevation of deaerator tank minimum water level above pumprsquos first impeller
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Method Name Is there head loss across feed valve Typical psi loss across feed valve Typical feed water temperature Typical Specific Gravity Conversion formula Typical feet of head loss across feed valve Pump Speed Type Duty Is orifce flow by-pass line required Orifice flow rate
1 On Off control and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Intermittent No Not applicable
2 Feed control valve and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Continuous Yes 20 of nominal
3 Feed control valve and variable speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Variable Continuous Yes 20 of nominal
4 Variable speed pumps only (no control valve) No None 225degF 0954 Not applicable Not applicable Variable Continuous No Not applicable
Orifice flow rate varies by manufacturers Will use 20 for these exercises
Must add for all head factors on suction and discharge sides of pump
Method Name Pump Speed Type Duty Is orifice flow by-pass line required
1 OnOff control and fixed speed pumps Fixed Intermittent No
2 Feed control valve and fixed speed pumps Fixed Continuous Yes
3 Feed control valve and variable speed pumps Variable Continuous Yes
4 Variable speed pumps only (no control valve) Variable Continuous No
Page 19: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

PACKED COLUMN DA

19

BOILER FEED WATER TANKSSpray DA Tray DA Column DA

Vented Receiver

20

T

T

T

T

TH P Condensate Return

Cond Pump D A TankD A Tank

Feed PumpBoiler

Strainer

Trap Trap

TrapTrapTT

TT

TT

TT

TTT

HP SteamPRV 15 psig

250 F

LP Steam150 psig366 F

TrapMotiveForce

Feed Tank or DA

HP CONDENSATE RECOVERY

21

HIGH PRESSURE CONDENSATE RECEIVER

bull Takes high pressure condensate directly from the user

bull No need to deaeratebull Pump directly into boilerbull Feed the HPR from the DA

22

BOILER FEED WATER TANK OPTIONSSpray DA Tray DA Column DA

Vented Receiver

HPCR

23

FEED WATER SYSTEMSFor multiple boiler Installations

24

METHOD 1 ndashDirect feed for multiple boilers

Deaerator

Boiler A

Boiler AControlle

r4-20mA signal directly to

Grundfos E-pump instead of

control valve

Boiler BBoiler BControlle

r4-20mA signal directly to

Grundfos E-pump instead of

control valve

25

METHOD 2 ndashBooster sets for multiple boilers

Deaerator Pressure sensor

Bypass

Multiple pump

controller

26

STEAM BOILER PUMP APPLICATIONS AND TYPESBoiler feed pumpsCollection tank pumpsWater treatment pumpsCondensate return pumpsDeaerator tank recycle pumpsDeaerator vacuum pumps (vacuum deaerator tanks only)Economizer pumps

27

SIZING COMPLEXITY FOR BOILER FEED PUMPS

28

BASE FLOW RATE CALCULATION

Base flow = Boiler maximum capacity horsepower X 0069 X C

bull C = 15 for OnOff intermittent operation

bull C = 115 for continuous feed operation

29

ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW

To the Base flow we MIGHT add if specified

For Continuous Boiler Blowdown flowbull Approximately 5 to10 of the pumprsquos flow

rate at the Best Efficiency Point

30

ADD FOR BYPASS RECIRCULATION FLOWCertain feed system control modes require the use of a bypass line back to the source tank ndash such as back to the deaerator tank

Method

NamePump Speed

TypeDuty

Is orifice flow by-pass line

required1 OnOff control and fixed speed pumps Fixed Intermittent No2 Feed control valve and fixed speed pumps Fixed Continuous Yes3 Feed control valve and variable speed pumps Variable Continuous Yes4 Variable speed pumps only (no control valve) Variable Continuous No

31

Sheet1

RECIRCULATION FLOW

bull The solid curve below shows the minimum flow rate as a percentage of the nominal flow rate in relation to the liquid temperature

bull Ignore the dotted line which indicates a pump with special high-temperature construction

32

CALCULATING REQUIRED FEED PUMP HEAD

+ Suction side head+ Discharge side head= Total Dynamic Head

Elevation of DA tank

Elevation of boiler

33

FEED VALVE IMPACTS PUMPING HEAD CALCULATION

34

CALCULATING THE HEADFOR THE FEED PUMP1) At the duty point flow rateHead in feet = Boiler operating pressure X 231 X 103 divide Liquid Specific Gravity

Example Head = 130 psi X 231 X 103 divide 0953 = 324 feet

2) At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific Gravity

Example Head = 160 psi X 231 X 103 divide 0953 = 400 feet

35

NPSH ndashFORMULA FOR CALCULATION

NPSHr is obtained from the pump curve

Add two to four feet of safety factor to the NPSHr stated on the curve

NPSHa is calculated

+ Absolute pressure in deaerator tank

plusmn Elevation of minimum water level in tank above feed pump

- Vapor pressure of water in deaerator tank

- Suction line friction loss

= Net Positive Suction Head Available

To avoid cavitation NPSHa must be greater than NPSHr

36

NPSH AND ELEVATIONDeaerator

tank

Boiler feed

pumps

Minimum water level in DA tank

Location of eye of lowest impeller

Difference in elevation

37

NPSH AND SUCTION LINE CONSIDERATIONS

Critical suction line considerations here

38

Check list for boiler feed pump selection

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

39

Sheet2

BOILER FEED PUMPS USEFUL FORMULAS

40

Sheet1

SPECIFICATION FOR EXERCISEa) Control Method Continuous duty fixed speed pump with bypass line and feed valveb) Boiler maximum capacity = 250 HPc) Boiler safety valve setting = 125 psigd) Pressure safety factor = 3 above boilerrsquos safety valve settinge) Boiler operating pressure = 100 psigf) Continuous Boiler Blowdown flow - Requiredg) Bypass recirculation flow ndash Requiredh) Altitude ndash Sea leveli) Pressure in deaerator tank above atmospheric pressure = 5 psi (147 + 5 = 197 psi absolute)j) Height of deaerator tank minimum water level above pumprsquos first impeller = 10 feetk) Friction line loss through suction piping = 5 footl) Friction loss through suction side fittings = 5 footm) Friction loss through suction side valves = Nonen) Friction loss through suction side strainer = 1 feeto) Friction loss through discharge piping = 1 footp) Friction loss through discharge side fittings = 1 footq) Pressure drop across feed valve ndash 15 psir) Elevation of boiler maximum water level above pumprsquos discharge port = 5 feets) Liquid Specific Gravity = 0953t) Temperature of water in deaerator tank = 227 degrees Fu) Vapor pressure in deaerator tank = 197 psiv) Pump materials all 316 stainless steel to resist treatment chemicalsw) Mechanical seal to be silicon carbidesilicon carbideEPDM to withstand liquid temperature

41

Feed pumps

CONTROL METHOD

Fixed speed pumps with feed valve and recirculation line

Recirc line

Feed valve

42

STEP 1 ndashDetermine control methodFeed valve controlled system with a continuous duty fixed speed pump has been specified

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

43

Sheet2

STEP 2 ndashCalculate the BASE feed pump flow rate

The formula for this calculation is

bull Boiler maximum capacity in horsepower X 0069 X C

bull The maximum capacity in boiler horsepower is 250

bull The C factor is 115 for continuous duty

Therefore

250 X 0069 X 115 = 20 gpm = BASE flow rate

44

STEP 3 ndashContinuous Boiler Blowdown Flow

Determination

1 The BASE flow rate has been established at 20 gpm

2 We will on next slide need to add for bypass flow which can add 10 to 20 percent to the BASE flow rate

3 Blowdown flow is to be approximately 10 percent of flow at pumprsquos Best Efficiency Point

4 So the total boiler blowdown flow required is approximately 3 gpm

45

STEP 4 ndashAdd for by-pass flow

bull Control is via feed valve with fixed speed pump and for continuous dutybull A bypass will be required

bull Solid curve to right shows minimum flow rate as a percentage of nominal flow rate in relation to liquid temperature

bull Ignore dotted line which indicates a pump with special high-temperature construction

bull At 227degF we require a bypass flow that is about 20 of BEP flow

bull Presuming we can find a pump with BEP at about 25 or so gpm the bypass flow must be about 5 gpm

46

STEP 5 ndashCalculate total flow requiredbull BASE flow = 20 gpmbull Blowdown flow = 3 gpmbull Recirculation flow = 5 gpmbull Total flow required = 28 gpm

XXXX

X

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

47

Sheet2

STEP 6 ndashCalculate BASE pumping head

Boiler operating pressure setting + 3

Formula BASE head in feet = Boiler operating pressure X 231 X 103 divide Specific Gravity

BASE head = 100 psi X 231 X 103 divide 0953 = 250 feet

48

STEP 7 ndashAdd for suction piping system head components

From specificationAbsolute pressure on deaerator tank = 197 psi X 231 = - 46 feetWater elevation above first impeller = - 10 feetFriction loss through suction piping = + 5 feetFriction loss through suction fittings = + 5 feetFriction loss through suction side valves and strainer = + 1 feet

Total = - 54 feet

49

STEP 8 ndashAdd for discharge piping system head components

From specificationFriction loss through discharge piping = + 1 footFriction loss through discharge fittings = + 1 footFriction loss through feed valve is 15 psi X 231 = + 35 feetElevation of boiler maximum water level above pump = + 5 feet

Total = + 42 feet

50

STEP 9 ndashSum of all head components

BASE head with safety factor = + 250 feetSuction side piping system head = - 54 feetDischarge side piping system head = + 42 feet

Total = + 238 feet

51

STEP 10 ndashPressure safety valve considerations At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific GravityExample Head = 125 psi X 231 X 103 divide 0953 = 312 feet

XXXXXXXXX

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

52

Sheet2

STEP 11 ndashDetermine deaerator tank water temperature

From specification 227degF

53

STEP 12 ndashNPSHa calculation

NPSHa equation

plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa

10 feet + (197 psi X 231) - (197 psi X 231) - 2 feet = NPSHa10 feet + 46 feet - 46 feet - 2 feet = 8 feet NPSHa

54

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
1 Base flow calculation equation
Boiler maximum capacity horsepower X 0069 X C = Base flow rate
C = 150 for OnOff intermittent operation
C = 115 for continuous feed operation
2 Determine BASE head for feed pump
Formula based on Safety Valve setting
Pump head in feet = Maximum pressure X 231 X 103 divide Liquid Specific Gravity
3 Head components on suction side of piping system
Pressure above atmospheric on deaerator converted to feet of head = feet
Elevation difference between minimum deaerator water level and pump inlet = feet
Suction pipe friction loss = feet
Suction fitting friction loss = feet
Suction line valves and strainer friction loss = feet
Total = feet
4 Head components on discharge side of piping system
Friction loss through discharge piping = feet
Friction loss through discharge fittings = feet
Friction loss through feed valve = feet
Elevation of boiler maximum water level above pump = feet
Total = feet
5 NPSHa equation
plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa
(Feet) (psi X 231 = Feet) (psi X 231 = Feet) (Feet) (Feet)
Elevation of deaerator tank minimum water level above pumprsquos first impeller
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Method Name Is there head loss across feed valve Typical psi loss across feed valve Typical feed water temperature Typical Specific Gravity Conversion formula Typical feet of head loss across feed valve Pump Speed Type Duty Is orifce flow by-pass line required Orifice flow rate
1 On Off control and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Intermittent No Not applicable
2 Feed control valve and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Continuous Yes 20 of nominal
3 Feed control valve and variable speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Variable Continuous Yes 20 of nominal
4 Variable speed pumps only (no control valve) No None 225degF 0954 Not applicable Not applicable Variable Continuous No Not applicable
Orifice flow rate varies by manufacturers Will use 20 for these exercises
Must add for all head factors on suction and discharge sides of pump
Method Name Pump Speed Type Duty Is orifice flow by-pass line required
1 OnOff control and fixed speed pumps Fixed Intermittent No
2 Feed control valve and fixed speed pumps Fixed Continuous Yes
3 Feed control valve and variable speed pumps Variable Continuous Yes
4 Variable speed pumps only (no control valve) Variable Continuous No
Page 20: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

BOILER FEED WATER TANKSSpray DA Tray DA Column DA

Vented Receiver

20

T

T

T

T

TH P Condensate Return

Cond Pump D A TankD A Tank

Feed PumpBoiler

Strainer

Trap Trap

TrapTrapTT

TT

TT

TT

TTT

HP SteamPRV 15 psig

250 F

LP Steam150 psig366 F

TrapMotiveForce

Feed Tank or DA

HP CONDENSATE RECOVERY

21

HIGH PRESSURE CONDENSATE RECEIVER

bull Takes high pressure condensate directly from the user

bull No need to deaeratebull Pump directly into boilerbull Feed the HPR from the DA

22

BOILER FEED WATER TANK OPTIONSSpray DA Tray DA Column DA

Vented Receiver

HPCR

23

FEED WATER SYSTEMSFor multiple boiler Installations

24

METHOD 1 ndashDirect feed for multiple boilers

Deaerator

Boiler A

Boiler AControlle

r4-20mA signal directly to

Grundfos E-pump instead of

control valve

Boiler BBoiler BControlle

r4-20mA signal directly to

Grundfos E-pump instead of

control valve

25

METHOD 2 ndashBooster sets for multiple boilers

Deaerator Pressure sensor

Bypass

Multiple pump

controller

26

STEAM BOILER PUMP APPLICATIONS AND TYPESBoiler feed pumpsCollection tank pumpsWater treatment pumpsCondensate return pumpsDeaerator tank recycle pumpsDeaerator vacuum pumps (vacuum deaerator tanks only)Economizer pumps

27

SIZING COMPLEXITY FOR BOILER FEED PUMPS

28

BASE FLOW RATE CALCULATION

Base flow = Boiler maximum capacity horsepower X 0069 X C

bull C = 15 for OnOff intermittent operation

bull C = 115 for continuous feed operation

29

ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW

To the Base flow we MIGHT add if specified

For Continuous Boiler Blowdown flowbull Approximately 5 to10 of the pumprsquos flow

rate at the Best Efficiency Point

30

ADD FOR BYPASS RECIRCULATION FLOWCertain feed system control modes require the use of a bypass line back to the source tank ndash such as back to the deaerator tank

Method

NamePump Speed

TypeDuty

Is orifice flow by-pass line

required1 OnOff control and fixed speed pumps Fixed Intermittent No2 Feed control valve and fixed speed pumps Fixed Continuous Yes3 Feed control valve and variable speed pumps Variable Continuous Yes4 Variable speed pumps only (no control valve) Variable Continuous No

31

Sheet1

RECIRCULATION FLOW

bull The solid curve below shows the minimum flow rate as a percentage of the nominal flow rate in relation to the liquid temperature

bull Ignore the dotted line which indicates a pump with special high-temperature construction

32

CALCULATING REQUIRED FEED PUMP HEAD

+ Suction side head+ Discharge side head= Total Dynamic Head

Elevation of DA tank

Elevation of boiler

33

FEED VALVE IMPACTS PUMPING HEAD CALCULATION

34

CALCULATING THE HEADFOR THE FEED PUMP1) At the duty point flow rateHead in feet = Boiler operating pressure X 231 X 103 divide Liquid Specific Gravity

Example Head = 130 psi X 231 X 103 divide 0953 = 324 feet

2) At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific Gravity

Example Head = 160 psi X 231 X 103 divide 0953 = 400 feet

35

NPSH ndashFORMULA FOR CALCULATION

NPSHr is obtained from the pump curve

Add two to four feet of safety factor to the NPSHr stated on the curve

NPSHa is calculated

+ Absolute pressure in deaerator tank

plusmn Elevation of minimum water level in tank above feed pump

- Vapor pressure of water in deaerator tank

- Suction line friction loss

= Net Positive Suction Head Available

To avoid cavitation NPSHa must be greater than NPSHr

36

NPSH AND ELEVATIONDeaerator

tank

Boiler feed

pumps

Minimum water level in DA tank

Location of eye of lowest impeller

Difference in elevation

37

NPSH AND SUCTION LINE CONSIDERATIONS

Critical suction line considerations here

38

Check list for boiler feed pump selection

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

39

Sheet2

BOILER FEED PUMPS USEFUL FORMULAS

40

Sheet1

SPECIFICATION FOR EXERCISEa) Control Method Continuous duty fixed speed pump with bypass line and feed valveb) Boiler maximum capacity = 250 HPc) Boiler safety valve setting = 125 psigd) Pressure safety factor = 3 above boilerrsquos safety valve settinge) Boiler operating pressure = 100 psigf) Continuous Boiler Blowdown flow - Requiredg) Bypass recirculation flow ndash Requiredh) Altitude ndash Sea leveli) Pressure in deaerator tank above atmospheric pressure = 5 psi (147 + 5 = 197 psi absolute)j) Height of deaerator tank minimum water level above pumprsquos first impeller = 10 feetk) Friction line loss through suction piping = 5 footl) Friction loss through suction side fittings = 5 footm) Friction loss through suction side valves = Nonen) Friction loss through suction side strainer = 1 feeto) Friction loss through discharge piping = 1 footp) Friction loss through discharge side fittings = 1 footq) Pressure drop across feed valve ndash 15 psir) Elevation of boiler maximum water level above pumprsquos discharge port = 5 feets) Liquid Specific Gravity = 0953t) Temperature of water in deaerator tank = 227 degrees Fu) Vapor pressure in deaerator tank = 197 psiv) Pump materials all 316 stainless steel to resist treatment chemicalsw) Mechanical seal to be silicon carbidesilicon carbideEPDM to withstand liquid temperature

41

Feed pumps

CONTROL METHOD

Fixed speed pumps with feed valve and recirculation line

Recirc line

Feed valve

42

STEP 1 ndashDetermine control methodFeed valve controlled system with a continuous duty fixed speed pump has been specified

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

43

Sheet2

STEP 2 ndashCalculate the BASE feed pump flow rate

The formula for this calculation is

bull Boiler maximum capacity in horsepower X 0069 X C

bull The maximum capacity in boiler horsepower is 250

bull The C factor is 115 for continuous duty

Therefore

250 X 0069 X 115 = 20 gpm = BASE flow rate

44

STEP 3 ndashContinuous Boiler Blowdown Flow

Determination

1 The BASE flow rate has been established at 20 gpm

2 We will on next slide need to add for bypass flow which can add 10 to 20 percent to the BASE flow rate

3 Blowdown flow is to be approximately 10 percent of flow at pumprsquos Best Efficiency Point

4 So the total boiler blowdown flow required is approximately 3 gpm

45

STEP 4 ndashAdd for by-pass flow

bull Control is via feed valve with fixed speed pump and for continuous dutybull A bypass will be required

bull Solid curve to right shows minimum flow rate as a percentage of nominal flow rate in relation to liquid temperature

bull Ignore dotted line which indicates a pump with special high-temperature construction

bull At 227degF we require a bypass flow that is about 20 of BEP flow

bull Presuming we can find a pump with BEP at about 25 or so gpm the bypass flow must be about 5 gpm

46

STEP 5 ndashCalculate total flow requiredbull BASE flow = 20 gpmbull Blowdown flow = 3 gpmbull Recirculation flow = 5 gpmbull Total flow required = 28 gpm

XXXX

X

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

47

Sheet2

STEP 6 ndashCalculate BASE pumping head

Boiler operating pressure setting + 3

Formula BASE head in feet = Boiler operating pressure X 231 X 103 divide Specific Gravity

BASE head = 100 psi X 231 X 103 divide 0953 = 250 feet

48

STEP 7 ndashAdd for suction piping system head components

From specificationAbsolute pressure on deaerator tank = 197 psi X 231 = - 46 feetWater elevation above first impeller = - 10 feetFriction loss through suction piping = + 5 feetFriction loss through suction fittings = + 5 feetFriction loss through suction side valves and strainer = + 1 feet

Total = - 54 feet

49

STEP 8 ndashAdd for discharge piping system head components

From specificationFriction loss through discharge piping = + 1 footFriction loss through discharge fittings = + 1 footFriction loss through feed valve is 15 psi X 231 = + 35 feetElevation of boiler maximum water level above pump = + 5 feet

Total = + 42 feet

50

STEP 9 ndashSum of all head components

BASE head with safety factor = + 250 feetSuction side piping system head = - 54 feetDischarge side piping system head = + 42 feet

Total = + 238 feet

51

STEP 10 ndashPressure safety valve considerations At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific GravityExample Head = 125 psi X 231 X 103 divide 0953 = 312 feet

XXXXXXXXX

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

52

Sheet2

STEP 11 ndashDetermine deaerator tank water temperature

From specification 227degF

53

STEP 12 ndashNPSHa calculation

NPSHa equation

plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa

10 feet + (197 psi X 231) - (197 psi X 231) - 2 feet = NPSHa10 feet + 46 feet - 46 feet - 2 feet = 8 feet NPSHa

54

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
1 Base flow calculation equation
Boiler maximum capacity horsepower X 0069 X C = Base flow rate
C = 150 for OnOff intermittent operation
C = 115 for continuous feed operation
2 Determine BASE head for feed pump
Formula based on Safety Valve setting
Pump head in feet = Maximum pressure X 231 X 103 divide Liquid Specific Gravity
3 Head components on suction side of piping system
Pressure above atmospheric on deaerator converted to feet of head = feet
Elevation difference between minimum deaerator water level and pump inlet = feet
Suction pipe friction loss = feet
Suction fitting friction loss = feet
Suction line valves and strainer friction loss = feet
Total = feet
4 Head components on discharge side of piping system
Friction loss through discharge piping = feet
Friction loss through discharge fittings = feet
Friction loss through feed valve = feet
Elevation of boiler maximum water level above pump = feet
Total = feet
5 NPSHa equation
plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa
(Feet) (psi X 231 = Feet) (psi X 231 = Feet) (Feet) (Feet)
Elevation of deaerator tank minimum water level above pumprsquos first impeller
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Method Name Is there head loss across feed valve Typical psi loss across feed valve Typical feed water temperature Typical Specific Gravity Conversion formula Typical feet of head loss across feed valve Pump Speed Type Duty Is orifce flow by-pass line required Orifice flow rate
1 On Off control and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Intermittent No Not applicable
2 Feed control valve and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Continuous Yes 20 of nominal
3 Feed control valve and variable speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Variable Continuous Yes 20 of nominal
4 Variable speed pumps only (no control valve) No None 225degF 0954 Not applicable Not applicable Variable Continuous No Not applicable
Orifice flow rate varies by manufacturers Will use 20 for these exercises
Must add for all head factors on suction and discharge sides of pump
Method Name Pump Speed Type Duty Is orifice flow by-pass line required
1 OnOff control and fixed speed pumps Fixed Intermittent No
2 Feed control valve and fixed speed pumps Fixed Continuous Yes
3 Feed control valve and variable speed pumps Variable Continuous Yes
4 Variable speed pumps only (no control valve) Variable Continuous No
Page 21: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

T

T

T

T

TH P Condensate Return

Cond Pump D A TankD A Tank

Feed PumpBoiler

Strainer

Trap Trap

TrapTrapTT

TT

TT

TT

TTT

HP SteamPRV 15 psig

250 F

LP Steam150 psig366 F

TrapMotiveForce

Feed Tank or DA

HP CONDENSATE RECOVERY

21

HIGH PRESSURE CONDENSATE RECEIVER

bull Takes high pressure condensate directly from the user

bull No need to deaeratebull Pump directly into boilerbull Feed the HPR from the DA

22

BOILER FEED WATER TANK OPTIONSSpray DA Tray DA Column DA

Vented Receiver

HPCR

23

FEED WATER SYSTEMSFor multiple boiler Installations

24

METHOD 1 ndashDirect feed for multiple boilers

Deaerator

Boiler A

Boiler AControlle

r4-20mA signal directly to

Grundfos E-pump instead of

control valve

Boiler BBoiler BControlle

r4-20mA signal directly to

Grundfos E-pump instead of

control valve

25

METHOD 2 ndashBooster sets for multiple boilers

Deaerator Pressure sensor

Bypass

Multiple pump

controller

26

STEAM BOILER PUMP APPLICATIONS AND TYPESBoiler feed pumpsCollection tank pumpsWater treatment pumpsCondensate return pumpsDeaerator tank recycle pumpsDeaerator vacuum pumps (vacuum deaerator tanks only)Economizer pumps

27

SIZING COMPLEXITY FOR BOILER FEED PUMPS

28

BASE FLOW RATE CALCULATION

Base flow = Boiler maximum capacity horsepower X 0069 X C

bull C = 15 for OnOff intermittent operation

bull C = 115 for continuous feed operation

29

ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW

To the Base flow we MIGHT add if specified

For Continuous Boiler Blowdown flowbull Approximately 5 to10 of the pumprsquos flow

rate at the Best Efficiency Point

30

ADD FOR BYPASS RECIRCULATION FLOWCertain feed system control modes require the use of a bypass line back to the source tank ndash such as back to the deaerator tank

Method

NamePump Speed

TypeDuty

Is orifice flow by-pass line

required1 OnOff control and fixed speed pumps Fixed Intermittent No2 Feed control valve and fixed speed pumps Fixed Continuous Yes3 Feed control valve and variable speed pumps Variable Continuous Yes4 Variable speed pumps only (no control valve) Variable Continuous No

31

Sheet1

RECIRCULATION FLOW

bull The solid curve below shows the minimum flow rate as a percentage of the nominal flow rate in relation to the liquid temperature

bull Ignore the dotted line which indicates a pump with special high-temperature construction

32

CALCULATING REQUIRED FEED PUMP HEAD

+ Suction side head+ Discharge side head= Total Dynamic Head

Elevation of DA tank

Elevation of boiler

33

FEED VALVE IMPACTS PUMPING HEAD CALCULATION

34

CALCULATING THE HEADFOR THE FEED PUMP1) At the duty point flow rateHead in feet = Boiler operating pressure X 231 X 103 divide Liquid Specific Gravity

Example Head = 130 psi X 231 X 103 divide 0953 = 324 feet

2) At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific Gravity

Example Head = 160 psi X 231 X 103 divide 0953 = 400 feet

35

NPSH ndashFORMULA FOR CALCULATION

NPSHr is obtained from the pump curve

Add two to four feet of safety factor to the NPSHr stated on the curve

NPSHa is calculated

+ Absolute pressure in deaerator tank

plusmn Elevation of minimum water level in tank above feed pump

- Vapor pressure of water in deaerator tank

- Suction line friction loss

= Net Positive Suction Head Available

To avoid cavitation NPSHa must be greater than NPSHr

36

NPSH AND ELEVATIONDeaerator

tank

Boiler feed

pumps

Minimum water level in DA tank

Location of eye of lowest impeller

Difference in elevation

37

NPSH AND SUCTION LINE CONSIDERATIONS

Critical suction line considerations here

38

Check list for boiler feed pump selection

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

39

Sheet2

BOILER FEED PUMPS USEFUL FORMULAS

40

Sheet1

SPECIFICATION FOR EXERCISEa) Control Method Continuous duty fixed speed pump with bypass line and feed valveb) Boiler maximum capacity = 250 HPc) Boiler safety valve setting = 125 psigd) Pressure safety factor = 3 above boilerrsquos safety valve settinge) Boiler operating pressure = 100 psigf) Continuous Boiler Blowdown flow - Requiredg) Bypass recirculation flow ndash Requiredh) Altitude ndash Sea leveli) Pressure in deaerator tank above atmospheric pressure = 5 psi (147 + 5 = 197 psi absolute)j) Height of deaerator tank minimum water level above pumprsquos first impeller = 10 feetk) Friction line loss through suction piping = 5 footl) Friction loss through suction side fittings = 5 footm) Friction loss through suction side valves = Nonen) Friction loss through suction side strainer = 1 feeto) Friction loss through discharge piping = 1 footp) Friction loss through discharge side fittings = 1 footq) Pressure drop across feed valve ndash 15 psir) Elevation of boiler maximum water level above pumprsquos discharge port = 5 feets) Liquid Specific Gravity = 0953t) Temperature of water in deaerator tank = 227 degrees Fu) Vapor pressure in deaerator tank = 197 psiv) Pump materials all 316 stainless steel to resist treatment chemicalsw) Mechanical seal to be silicon carbidesilicon carbideEPDM to withstand liquid temperature

41

Feed pumps

CONTROL METHOD

Fixed speed pumps with feed valve and recirculation line

Recirc line

Feed valve

42

STEP 1 ndashDetermine control methodFeed valve controlled system with a continuous duty fixed speed pump has been specified

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

43

Sheet2

STEP 2 ndashCalculate the BASE feed pump flow rate

The formula for this calculation is

bull Boiler maximum capacity in horsepower X 0069 X C

bull The maximum capacity in boiler horsepower is 250

bull The C factor is 115 for continuous duty

Therefore

250 X 0069 X 115 = 20 gpm = BASE flow rate

44

STEP 3 ndashContinuous Boiler Blowdown Flow

Determination

1 The BASE flow rate has been established at 20 gpm

2 We will on next slide need to add for bypass flow which can add 10 to 20 percent to the BASE flow rate

3 Blowdown flow is to be approximately 10 percent of flow at pumprsquos Best Efficiency Point

4 So the total boiler blowdown flow required is approximately 3 gpm

45

STEP 4 ndashAdd for by-pass flow

bull Control is via feed valve with fixed speed pump and for continuous dutybull A bypass will be required

bull Solid curve to right shows minimum flow rate as a percentage of nominal flow rate in relation to liquid temperature

bull Ignore dotted line which indicates a pump with special high-temperature construction

bull At 227degF we require a bypass flow that is about 20 of BEP flow

bull Presuming we can find a pump with BEP at about 25 or so gpm the bypass flow must be about 5 gpm

46

STEP 5 ndashCalculate total flow requiredbull BASE flow = 20 gpmbull Blowdown flow = 3 gpmbull Recirculation flow = 5 gpmbull Total flow required = 28 gpm

XXXX

X

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

47

Sheet2

STEP 6 ndashCalculate BASE pumping head

Boiler operating pressure setting + 3

Formula BASE head in feet = Boiler operating pressure X 231 X 103 divide Specific Gravity

BASE head = 100 psi X 231 X 103 divide 0953 = 250 feet

48

STEP 7 ndashAdd for suction piping system head components

From specificationAbsolute pressure on deaerator tank = 197 psi X 231 = - 46 feetWater elevation above first impeller = - 10 feetFriction loss through suction piping = + 5 feetFriction loss through suction fittings = + 5 feetFriction loss through suction side valves and strainer = + 1 feet

Total = - 54 feet

49

STEP 8 ndashAdd for discharge piping system head components

From specificationFriction loss through discharge piping = + 1 footFriction loss through discharge fittings = + 1 footFriction loss through feed valve is 15 psi X 231 = + 35 feetElevation of boiler maximum water level above pump = + 5 feet

Total = + 42 feet

50

STEP 9 ndashSum of all head components

BASE head with safety factor = + 250 feetSuction side piping system head = - 54 feetDischarge side piping system head = + 42 feet

Total = + 238 feet

51

STEP 10 ndashPressure safety valve considerations At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific GravityExample Head = 125 psi X 231 X 103 divide 0953 = 312 feet

XXXXXXXXX

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

52

Sheet2

STEP 11 ndashDetermine deaerator tank water temperature

From specification 227degF

53

STEP 12 ndashNPSHa calculation

NPSHa equation

plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa

10 feet + (197 psi X 231) - (197 psi X 231) - 2 feet = NPSHa10 feet + 46 feet - 46 feet - 2 feet = 8 feet NPSHa

54

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
1 Base flow calculation equation
Boiler maximum capacity horsepower X 0069 X C = Base flow rate
C = 150 for OnOff intermittent operation
C = 115 for continuous feed operation
2 Determine BASE head for feed pump
Formula based on Safety Valve setting
Pump head in feet = Maximum pressure X 231 X 103 divide Liquid Specific Gravity
3 Head components on suction side of piping system
Pressure above atmospheric on deaerator converted to feet of head = feet
Elevation difference between minimum deaerator water level and pump inlet = feet
Suction pipe friction loss = feet
Suction fitting friction loss = feet
Suction line valves and strainer friction loss = feet
Total = feet
4 Head components on discharge side of piping system
Friction loss through discharge piping = feet
Friction loss through discharge fittings = feet
Friction loss through feed valve = feet
Elevation of boiler maximum water level above pump = feet
Total = feet
5 NPSHa equation
plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa
(Feet) (psi X 231 = Feet) (psi X 231 = Feet) (Feet) (Feet)
Elevation of deaerator tank minimum water level above pumprsquos first impeller
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Method Name Is there head loss across feed valve Typical psi loss across feed valve Typical feed water temperature Typical Specific Gravity Conversion formula Typical feet of head loss across feed valve Pump Speed Type Duty Is orifce flow by-pass line required Orifice flow rate
1 On Off control and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Intermittent No Not applicable
2 Feed control valve and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Continuous Yes 20 of nominal
3 Feed control valve and variable speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Variable Continuous Yes 20 of nominal
4 Variable speed pumps only (no control valve) No None 225degF 0954 Not applicable Not applicable Variable Continuous No Not applicable
Orifice flow rate varies by manufacturers Will use 20 for these exercises
Must add for all head factors on suction and discharge sides of pump
Method Name Pump Speed Type Duty Is orifice flow by-pass line required
1 OnOff control and fixed speed pumps Fixed Intermittent No
2 Feed control valve and fixed speed pumps Fixed Continuous Yes
3 Feed control valve and variable speed pumps Variable Continuous Yes
4 Variable speed pumps only (no control valve) Variable Continuous No
Page 22: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

HIGH PRESSURE CONDENSATE RECEIVER

bull Takes high pressure condensate directly from the user

bull No need to deaeratebull Pump directly into boilerbull Feed the HPR from the DA

22

BOILER FEED WATER TANK OPTIONSSpray DA Tray DA Column DA

Vented Receiver

HPCR

23

FEED WATER SYSTEMSFor multiple boiler Installations

24

METHOD 1 ndashDirect feed for multiple boilers

Deaerator

Boiler A

Boiler AControlle

r4-20mA signal directly to

Grundfos E-pump instead of

control valve

Boiler BBoiler BControlle

r4-20mA signal directly to

Grundfos E-pump instead of

control valve

25

METHOD 2 ndashBooster sets for multiple boilers

Deaerator Pressure sensor

Bypass

Multiple pump

controller

26

STEAM BOILER PUMP APPLICATIONS AND TYPESBoiler feed pumpsCollection tank pumpsWater treatment pumpsCondensate return pumpsDeaerator tank recycle pumpsDeaerator vacuum pumps (vacuum deaerator tanks only)Economizer pumps

27

SIZING COMPLEXITY FOR BOILER FEED PUMPS

28

BASE FLOW RATE CALCULATION

Base flow = Boiler maximum capacity horsepower X 0069 X C

bull C = 15 for OnOff intermittent operation

bull C = 115 for continuous feed operation

29

ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW

To the Base flow we MIGHT add if specified

For Continuous Boiler Blowdown flowbull Approximately 5 to10 of the pumprsquos flow

rate at the Best Efficiency Point

30

ADD FOR BYPASS RECIRCULATION FLOWCertain feed system control modes require the use of a bypass line back to the source tank ndash such as back to the deaerator tank

Method

NamePump Speed

TypeDuty

Is orifice flow by-pass line

required1 OnOff control and fixed speed pumps Fixed Intermittent No2 Feed control valve and fixed speed pumps Fixed Continuous Yes3 Feed control valve and variable speed pumps Variable Continuous Yes4 Variable speed pumps only (no control valve) Variable Continuous No

31

Sheet1

RECIRCULATION FLOW

bull The solid curve below shows the minimum flow rate as a percentage of the nominal flow rate in relation to the liquid temperature

bull Ignore the dotted line which indicates a pump with special high-temperature construction

32

CALCULATING REQUIRED FEED PUMP HEAD

+ Suction side head+ Discharge side head= Total Dynamic Head

Elevation of DA tank

Elevation of boiler

33

FEED VALVE IMPACTS PUMPING HEAD CALCULATION

34

CALCULATING THE HEADFOR THE FEED PUMP1) At the duty point flow rateHead in feet = Boiler operating pressure X 231 X 103 divide Liquid Specific Gravity

Example Head = 130 psi X 231 X 103 divide 0953 = 324 feet

2) At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific Gravity

Example Head = 160 psi X 231 X 103 divide 0953 = 400 feet

35

NPSH ndashFORMULA FOR CALCULATION

NPSHr is obtained from the pump curve

Add two to four feet of safety factor to the NPSHr stated on the curve

NPSHa is calculated

+ Absolute pressure in deaerator tank

plusmn Elevation of minimum water level in tank above feed pump

- Vapor pressure of water in deaerator tank

- Suction line friction loss

= Net Positive Suction Head Available

To avoid cavitation NPSHa must be greater than NPSHr

36

NPSH AND ELEVATIONDeaerator

tank

Boiler feed

pumps

Minimum water level in DA tank

Location of eye of lowest impeller

Difference in elevation

37

NPSH AND SUCTION LINE CONSIDERATIONS

Critical suction line considerations here

38

Check list for boiler feed pump selection

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

39

Sheet2

BOILER FEED PUMPS USEFUL FORMULAS

40

Sheet1

SPECIFICATION FOR EXERCISEa) Control Method Continuous duty fixed speed pump with bypass line and feed valveb) Boiler maximum capacity = 250 HPc) Boiler safety valve setting = 125 psigd) Pressure safety factor = 3 above boilerrsquos safety valve settinge) Boiler operating pressure = 100 psigf) Continuous Boiler Blowdown flow - Requiredg) Bypass recirculation flow ndash Requiredh) Altitude ndash Sea leveli) Pressure in deaerator tank above atmospheric pressure = 5 psi (147 + 5 = 197 psi absolute)j) Height of deaerator tank minimum water level above pumprsquos first impeller = 10 feetk) Friction line loss through suction piping = 5 footl) Friction loss through suction side fittings = 5 footm) Friction loss through suction side valves = Nonen) Friction loss through suction side strainer = 1 feeto) Friction loss through discharge piping = 1 footp) Friction loss through discharge side fittings = 1 footq) Pressure drop across feed valve ndash 15 psir) Elevation of boiler maximum water level above pumprsquos discharge port = 5 feets) Liquid Specific Gravity = 0953t) Temperature of water in deaerator tank = 227 degrees Fu) Vapor pressure in deaerator tank = 197 psiv) Pump materials all 316 stainless steel to resist treatment chemicalsw) Mechanical seal to be silicon carbidesilicon carbideEPDM to withstand liquid temperature

41

Feed pumps

CONTROL METHOD

Fixed speed pumps with feed valve and recirculation line

Recirc line

Feed valve

42

STEP 1 ndashDetermine control methodFeed valve controlled system with a continuous duty fixed speed pump has been specified

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

43

Sheet2

STEP 2 ndashCalculate the BASE feed pump flow rate

The formula for this calculation is

bull Boiler maximum capacity in horsepower X 0069 X C

bull The maximum capacity in boiler horsepower is 250

bull The C factor is 115 for continuous duty

Therefore

250 X 0069 X 115 = 20 gpm = BASE flow rate

44

STEP 3 ndashContinuous Boiler Blowdown Flow

Determination

1 The BASE flow rate has been established at 20 gpm

2 We will on next slide need to add for bypass flow which can add 10 to 20 percent to the BASE flow rate

3 Blowdown flow is to be approximately 10 percent of flow at pumprsquos Best Efficiency Point

4 So the total boiler blowdown flow required is approximately 3 gpm

45

STEP 4 ndashAdd for by-pass flow

bull Control is via feed valve with fixed speed pump and for continuous dutybull A bypass will be required

bull Solid curve to right shows minimum flow rate as a percentage of nominal flow rate in relation to liquid temperature

bull Ignore dotted line which indicates a pump with special high-temperature construction

bull At 227degF we require a bypass flow that is about 20 of BEP flow

bull Presuming we can find a pump with BEP at about 25 or so gpm the bypass flow must be about 5 gpm

46

STEP 5 ndashCalculate total flow requiredbull BASE flow = 20 gpmbull Blowdown flow = 3 gpmbull Recirculation flow = 5 gpmbull Total flow required = 28 gpm

XXXX

X

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

47

Sheet2

STEP 6 ndashCalculate BASE pumping head

Boiler operating pressure setting + 3

Formula BASE head in feet = Boiler operating pressure X 231 X 103 divide Specific Gravity

BASE head = 100 psi X 231 X 103 divide 0953 = 250 feet

48

STEP 7 ndashAdd for suction piping system head components

From specificationAbsolute pressure on deaerator tank = 197 psi X 231 = - 46 feetWater elevation above first impeller = - 10 feetFriction loss through suction piping = + 5 feetFriction loss through suction fittings = + 5 feetFriction loss through suction side valves and strainer = + 1 feet

Total = - 54 feet

49

STEP 8 ndashAdd for discharge piping system head components

From specificationFriction loss through discharge piping = + 1 footFriction loss through discharge fittings = + 1 footFriction loss through feed valve is 15 psi X 231 = + 35 feetElevation of boiler maximum water level above pump = + 5 feet

Total = + 42 feet

50

STEP 9 ndashSum of all head components

BASE head with safety factor = + 250 feetSuction side piping system head = - 54 feetDischarge side piping system head = + 42 feet

Total = + 238 feet

51

STEP 10 ndashPressure safety valve considerations At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific GravityExample Head = 125 psi X 231 X 103 divide 0953 = 312 feet

XXXXXXXXX

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

52

Sheet2

STEP 11 ndashDetermine deaerator tank water temperature

From specification 227degF

53

STEP 12 ndashNPSHa calculation

NPSHa equation

plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa

10 feet + (197 psi X 231) - (197 psi X 231) - 2 feet = NPSHa10 feet + 46 feet - 46 feet - 2 feet = 8 feet NPSHa

54

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
1 Base flow calculation equation
Boiler maximum capacity horsepower X 0069 X C = Base flow rate
C = 150 for OnOff intermittent operation
C = 115 for continuous feed operation
2 Determine BASE head for feed pump
Formula based on Safety Valve setting
Pump head in feet = Maximum pressure X 231 X 103 divide Liquid Specific Gravity
3 Head components on suction side of piping system
Pressure above atmospheric on deaerator converted to feet of head = feet
Elevation difference between minimum deaerator water level and pump inlet = feet
Suction pipe friction loss = feet
Suction fitting friction loss = feet
Suction line valves and strainer friction loss = feet
Total = feet
4 Head components on discharge side of piping system
Friction loss through discharge piping = feet
Friction loss through discharge fittings = feet
Friction loss through feed valve = feet
Elevation of boiler maximum water level above pump = feet
Total = feet
5 NPSHa equation
plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa
(Feet) (psi X 231 = Feet) (psi X 231 = Feet) (Feet) (Feet)
Elevation of deaerator tank minimum water level above pumprsquos first impeller
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Method Name Is there head loss across feed valve Typical psi loss across feed valve Typical feed water temperature Typical Specific Gravity Conversion formula Typical feet of head loss across feed valve Pump Speed Type Duty Is orifce flow by-pass line required Orifice flow rate
1 On Off control and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Intermittent No Not applicable
2 Feed control valve and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Continuous Yes 20 of nominal
3 Feed control valve and variable speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Variable Continuous Yes 20 of nominal
4 Variable speed pumps only (no control valve) No None 225degF 0954 Not applicable Not applicable Variable Continuous No Not applicable
Orifice flow rate varies by manufacturers Will use 20 for these exercises
Must add for all head factors on suction and discharge sides of pump
Method Name Pump Speed Type Duty Is orifice flow by-pass line required
1 OnOff control and fixed speed pumps Fixed Intermittent No
2 Feed control valve and fixed speed pumps Fixed Continuous Yes
3 Feed control valve and variable speed pumps Variable Continuous Yes
4 Variable speed pumps only (no control valve) Variable Continuous No
Page 23: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

BOILER FEED WATER TANK OPTIONSSpray DA Tray DA Column DA

Vented Receiver

HPCR

23

FEED WATER SYSTEMSFor multiple boiler Installations

24

METHOD 1 ndashDirect feed for multiple boilers

Deaerator

Boiler A

Boiler AControlle

r4-20mA signal directly to

Grundfos E-pump instead of

control valve

Boiler BBoiler BControlle

r4-20mA signal directly to

Grundfos E-pump instead of

control valve

25

METHOD 2 ndashBooster sets for multiple boilers

Deaerator Pressure sensor

Bypass

Multiple pump

controller

26

STEAM BOILER PUMP APPLICATIONS AND TYPESBoiler feed pumpsCollection tank pumpsWater treatment pumpsCondensate return pumpsDeaerator tank recycle pumpsDeaerator vacuum pumps (vacuum deaerator tanks only)Economizer pumps

27

SIZING COMPLEXITY FOR BOILER FEED PUMPS

28

BASE FLOW RATE CALCULATION

Base flow = Boiler maximum capacity horsepower X 0069 X C

bull C = 15 for OnOff intermittent operation

bull C = 115 for continuous feed operation

29

ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW

To the Base flow we MIGHT add if specified

For Continuous Boiler Blowdown flowbull Approximately 5 to10 of the pumprsquos flow

rate at the Best Efficiency Point

30

ADD FOR BYPASS RECIRCULATION FLOWCertain feed system control modes require the use of a bypass line back to the source tank ndash such as back to the deaerator tank

Method

NamePump Speed

TypeDuty

Is orifice flow by-pass line

required1 OnOff control and fixed speed pumps Fixed Intermittent No2 Feed control valve and fixed speed pumps Fixed Continuous Yes3 Feed control valve and variable speed pumps Variable Continuous Yes4 Variable speed pumps only (no control valve) Variable Continuous No

31

Sheet1

RECIRCULATION FLOW

bull The solid curve below shows the minimum flow rate as a percentage of the nominal flow rate in relation to the liquid temperature

bull Ignore the dotted line which indicates a pump with special high-temperature construction

32

CALCULATING REQUIRED FEED PUMP HEAD

+ Suction side head+ Discharge side head= Total Dynamic Head

Elevation of DA tank

Elevation of boiler

33

FEED VALVE IMPACTS PUMPING HEAD CALCULATION

34

CALCULATING THE HEADFOR THE FEED PUMP1) At the duty point flow rateHead in feet = Boiler operating pressure X 231 X 103 divide Liquid Specific Gravity

Example Head = 130 psi X 231 X 103 divide 0953 = 324 feet

2) At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific Gravity

Example Head = 160 psi X 231 X 103 divide 0953 = 400 feet

35

NPSH ndashFORMULA FOR CALCULATION

NPSHr is obtained from the pump curve

Add two to four feet of safety factor to the NPSHr stated on the curve

NPSHa is calculated

+ Absolute pressure in deaerator tank

plusmn Elevation of minimum water level in tank above feed pump

- Vapor pressure of water in deaerator tank

- Suction line friction loss

= Net Positive Suction Head Available

To avoid cavitation NPSHa must be greater than NPSHr

36

NPSH AND ELEVATIONDeaerator

tank

Boiler feed

pumps

Minimum water level in DA tank

Location of eye of lowest impeller

Difference in elevation

37

NPSH AND SUCTION LINE CONSIDERATIONS

Critical suction line considerations here

38

Check list for boiler feed pump selection

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

39

Sheet2

BOILER FEED PUMPS USEFUL FORMULAS

40

Sheet1

SPECIFICATION FOR EXERCISEa) Control Method Continuous duty fixed speed pump with bypass line and feed valveb) Boiler maximum capacity = 250 HPc) Boiler safety valve setting = 125 psigd) Pressure safety factor = 3 above boilerrsquos safety valve settinge) Boiler operating pressure = 100 psigf) Continuous Boiler Blowdown flow - Requiredg) Bypass recirculation flow ndash Requiredh) Altitude ndash Sea leveli) Pressure in deaerator tank above atmospheric pressure = 5 psi (147 + 5 = 197 psi absolute)j) Height of deaerator tank minimum water level above pumprsquos first impeller = 10 feetk) Friction line loss through suction piping = 5 footl) Friction loss through suction side fittings = 5 footm) Friction loss through suction side valves = Nonen) Friction loss through suction side strainer = 1 feeto) Friction loss through discharge piping = 1 footp) Friction loss through discharge side fittings = 1 footq) Pressure drop across feed valve ndash 15 psir) Elevation of boiler maximum water level above pumprsquos discharge port = 5 feets) Liquid Specific Gravity = 0953t) Temperature of water in deaerator tank = 227 degrees Fu) Vapor pressure in deaerator tank = 197 psiv) Pump materials all 316 stainless steel to resist treatment chemicalsw) Mechanical seal to be silicon carbidesilicon carbideEPDM to withstand liquid temperature

41

Feed pumps

CONTROL METHOD

Fixed speed pumps with feed valve and recirculation line

Recirc line

Feed valve

42

STEP 1 ndashDetermine control methodFeed valve controlled system with a continuous duty fixed speed pump has been specified

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

43

Sheet2

STEP 2 ndashCalculate the BASE feed pump flow rate

The formula for this calculation is

bull Boiler maximum capacity in horsepower X 0069 X C

bull The maximum capacity in boiler horsepower is 250

bull The C factor is 115 for continuous duty

Therefore

250 X 0069 X 115 = 20 gpm = BASE flow rate

44

STEP 3 ndashContinuous Boiler Blowdown Flow

Determination

1 The BASE flow rate has been established at 20 gpm

2 We will on next slide need to add for bypass flow which can add 10 to 20 percent to the BASE flow rate

3 Blowdown flow is to be approximately 10 percent of flow at pumprsquos Best Efficiency Point

4 So the total boiler blowdown flow required is approximately 3 gpm

45

STEP 4 ndashAdd for by-pass flow

bull Control is via feed valve with fixed speed pump and for continuous dutybull A bypass will be required

bull Solid curve to right shows minimum flow rate as a percentage of nominal flow rate in relation to liquid temperature

bull Ignore dotted line which indicates a pump with special high-temperature construction

bull At 227degF we require a bypass flow that is about 20 of BEP flow

bull Presuming we can find a pump with BEP at about 25 or so gpm the bypass flow must be about 5 gpm

46

STEP 5 ndashCalculate total flow requiredbull BASE flow = 20 gpmbull Blowdown flow = 3 gpmbull Recirculation flow = 5 gpmbull Total flow required = 28 gpm

XXXX

X

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

47

Sheet2

STEP 6 ndashCalculate BASE pumping head

Boiler operating pressure setting + 3

Formula BASE head in feet = Boiler operating pressure X 231 X 103 divide Specific Gravity

BASE head = 100 psi X 231 X 103 divide 0953 = 250 feet

48

STEP 7 ndashAdd for suction piping system head components

From specificationAbsolute pressure on deaerator tank = 197 psi X 231 = - 46 feetWater elevation above first impeller = - 10 feetFriction loss through suction piping = + 5 feetFriction loss through suction fittings = + 5 feetFriction loss through suction side valves and strainer = + 1 feet

Total = - 54 feet

49

STEP 8 ndashAdd for discharge piping system head components

From specificationFriction loss through discharge piping = + 1 footFriction loss through discharge fittings = + 1 footFriction loss through feed valve is 15 psi X 231 = + 35 feetElevation of boiler maximum water level above pump = + 5 feet

Total = + 42 feet

50

STEP 9 ndashSum of all head components

BASE head with safety factor = + 250 feetSuction side piping system head = - 54 feetDischarge side piping system head = + 42 feet

Total = + 238 feet

51

STEP 10 ndashPressure safety valve considerations At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific GravityExample Head = 125 psi X 231 X 103 divide 0953 = 312 feet

XXXXXXXXX

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

52

Sheet2

STEP 11 ndashDetermine deaerator tank water temperature

From specification 227degF

53

STEP 12 ndashNPSHa calculation

NPSHa equation

plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa

10 feet + (197 psi X 231) - (197 psi X 231) - 2 feet = NPSHa10 feet + 46 feet - 46 feet - 2 feet = 8 feet NPSHa

54

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
1 Base flow calculation equation
Boiler maximum capacity horsepower X 0069 X C = Base flow rate
C = 150 for OnOff intermittent operation
C = 115 for continuous feed operation
2 Determine BASE head for feed pump
Formula based on Safety Valve setting
Pump head in feet = Maximum pressure X 231 X 103 divide Liquid Specific Gravity
3 Head components on suction side of piping system
Pressure above atmospheric on deaerator converted to feet of head = feet
Elevation difference between minimum deaerator water level and pump inlet = feet
Suction pipe friction loss = feet
Suction fitting friction loss = feet
Suction line valves and strainer friction loss = feet
Total = feet
4 Head components on discharge side of piping system
Friction loss through discharge piping = feet
Friction loss through discharge fittings = feet
Friction loss through feed valve = feet
Elevation of boiler maximum water level above pump = feet
Total = feet
5 NPSHa equation
plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa
(Feet) (psi X 231 = Feet) (psi X 231 = Feet) (Feet) (Feet)
Elevation of deaerator tank minimum water level above pumprsquos first impeller
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Method Name Is there head loss across feed valve Typical psi loss across feed valve Typical feed water temperature Typical Specific Gravity Conversion formula Typical feet of head loss across feed valve Pump Speed Type Duty Is orifce flow by-pass line required Orifice flow rate
1 On Off control and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Intermittent No Not applicable
2 Feed control valve and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Continuous Yes 20 of nominal
3 Feed control valve and variable speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Variable Continuous Yes 20 of nominal
4 Variable speed pumps only (no control valve) No None 225degF 0954 Not applicable Not applicable Variable Continuous No Not applicable
Orifice flow rate varies by manufacturers Will use 20 for these exercises
Must add for all head factors on suction and discharge sides of pump
Method Name Pump Speed Type Duty Is orifice flow by-pass line required
1 OnOff control and fixed speed pumps Fixed Intermittent No
2 Feed control valve and fixed speed pumps Fixed Continuous Yes
3 Feed control valve and variable speed pumps Variable Continuous Yes
4 Variable speed pumps only (no control valve) Variable Continuous No
Page 24: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

FEED WATER SYSTEMSFor multiple boiler Installations

24

METHOD 1 ndashDirect feed for multiple boilers

Deaerator

Boiler A

Boiler AControlle

r4-20mA signal directly to

Grundfos E-pump instead of

control valve

Boiler BBoiler BControlle

r4-20mA signal directly to

Grundfos E-pump instead of

control valve

25

METHOD 2 ndashBooster sets for multiple boilers

Deaerator Pressure sensor

Bypass

Multiple pump

controller

26

STEAM BOILER PUMP APPLICATIONS AND TYPESBoiler feed pumpsCollection tank pumpsWater treatment pumpsCondensate return pumpsDeaerator tank recycle pumpsDeaerator vacuum pumps (vacuum deaerator tanks only)Economizer pumps

27

SIZING COMPLEXITY FOR BOILER FEED PUMPS

28

BASE FLOW RATE CALCULATION

Base flow = Boiler maximum capacity horsepower X 0069 X C

bull C = 15 for OnOff intermittent operation

bull C = 115 for continuous feed operation

29

ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW

To the Base flow we MIGHT add if specified

For Continuous Boiler Blowdown flowbull Approximately 5 to10 of the pumprsquos flow

rate at the Best Efficiency Point

30

ADD FOR BYPASS RECIRCULATION FLOWCertain feed system control modes require the use of a bypass line back to the source tank ndash such as back to the deaerator tank

Method

NamePump Speed

TypeDuty

Is orifice flow by-pass line

required1 OnOff control and fixed speed pumps Fixed Intermittent No2 Feed control valve and fixed speed pumps Fixed Continuous Yes3 Feed control valve and variable speed pumps Variable Continuous Yes4 Variable speed pumps only (no control valve) Variable Continuous No

31

Sheet1

RECIRCULATION FLOW

bull The solid curve below shows the minimum flow rate as a percentage of the nominal flow rate in relation to the liquid temperature

bull Ignore the dotted line which indicates a pump with special high-temperature construction

32

CALCULATING REQUIRED FEED PUMP HEAD

+ Suction side head+ Discharge side head= Total Dynamic Head

Elevation of DA tank

Elevation of boiler

33

FEED VALVE IMPACTS PUMPING HEAD CALCULATION

34

CALCULATING THE HEADFOR THE FEED PUMP1) At the duty point flow rateHead in feet = Boiler operating pressure X 231 X 103 divide Liquid Specific Gravity

Example Head = 130 psi X 231 X 103 divide 0953 = 324 feet

2) At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific Gravity

Example Head = 160 psi X 231 X 103 divide 0953 = 400 feet

35

NPSH ndashFORMULA FOR CALCULATION

NPSHr is obtained from the pump curve

Add two to four feet of safety factor to the NPSHr stated on the curve

NPSHa is calculated

+ Absolute pressure in deaerator tank

plusmn Elevation of minimum water level in tank above feed pump

- Vapor pressure of water in deaerator tank

- Suction line friction loss

= Net Positive Suction Head Available

To avoid cavitation NPSHa must be greater than NPSHr

36

NPSH AND ELEVATIONDeaerator

tank

Boiler feed

pumps

Minimum water level in DA tank

Location of eye of lowest impeller

Difference in elevation

37

NPSH AND SUCTION LINE CONSIDERATIONS

Critical suction line considerations here

38

Check list for boiler feed pump selection

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

39

Sheet2

BOILER FEED PUMPS USEFUL FORMULAS

40

Sheet1

SPECIFICATION FOR EXERCISEa) Control Method Continuous duty fixed speed pump with bypass line and feed valveb) Boiler maximum capacity = 250 HPc) Boiler safety valve setting = 125 psigd) Pressure safety factor = 3 above boilerrsquos safety valve settinge) Boiler operating pressure = 100 psigf) Continuous Boiler Blowdown flow - Requiredg) Bypass recirculation flow ndash Requiredh) Altitude ndash Sea leveli) Pressure in deaerator tank above atmospheric pressure = 5 psi (147 + 5 = 197 psi absolute)j) Height of deaerator tank minimum water level above pumprsquos first impeller = 10 feetk) Friction line loss through suction piping = 5 footl) Friction loss through suction side fittings = 5 footm) Friction loss through suction side valves = Nonen) Friction loss through suction side strainer = 1 feeto) Friction loss through discharge piping = 1 footp) Friction loss through discharge side fittings = 1 footq) Pressure drop across feed valve ndash 15 psir) Elevation of boiler maximum water level above pumprsquos discharge port = 5 feets) Liquid Specific Gravity = 0953t) Temperature of water in deaerator tank = 227 degrees Fu) Vapor pressure in deaerator tank = 197 psiv) Pump materials all 316 stainless steel to resist treatment chemicalsw) Mechanical seal to be silicon carbidesilicon carbideEPDM to withstand liquid temperature

41

Feed pumps

CONTROL METHOD

Fixed speed pumps with feed valve and recirculation line

Recirc line

Feed valve

42

STEP 1 ndashDetermine control methodFeed valve controlled system with a continuous duty fixed speed pump has been specified

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

43

Sheet2

STEP 2 ndashCalculate the BASE feed pump flow rate

The formula for this calculation is

bull Boiler maximum capacity in horsepower X 0069 X C

bull The maximum capacity in boiler horsepower is 250

bull The C factor is 115 for continuous duty

Therefore

250 X 0069 X 115 = 20 gpm = BASE flow rate

44

STEP 3 ndashContinuous Boiler Blowdown Flow

Determination

1 The BASE flow rate has been established at 20 gpm

2 We will on next slide need to add for bypass flow which can add 10 to 20 percent to the BASE flow rate

3 Blowdown flow is to be approximately 10 percent of flow at pumprsquos Best Efficiency Point

4 So the total boiler blowdown flow required is approximately 3 gpm

45

STEP 4 ndashAdd for by-pass flow

bull Control is via feed valve with fixed speed pump and for continuous dutybull A bypass will be required

bull Solid curve to right shows minimum flow rate as a percentage of nominal flow rate in relation to liquid temperature

bull Ignore dotted line which indicates a pump with special high-temperature construction

bull At 227degF we require a bypass flow that is about 20 of BEP flow

bull Presuming we can find a pump with BEP at about 25 or so gpm the bypass flow must be about 5 gpm

46

STEP 5 ndashCalculate total flow requiredbull BASE flow = 20 gpmbull Blowdown flow = 3 gpmbull Recirculation flow = 5 gpmbull Total flow required = 28 gpm

XXXX

X

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

47

Sheet2

STEP 6 ndashCalculate BASE pumping head

Boiler operating pressure setting + 3

Formula BASE head in feet = Boiler operating pressure X 231 X 103 divide Specific Gravity

BASE head = 100 psi X 231 X 103 divide 0953 = 250 feet

48

STEP 7 ndashAdd for suction piping system head components

From specificationAbsolute pressure on deaerator tank = 197 psi X 231 = - 46 feetWater elevation above first impeller = - 10 feetFriction loss through suction piping = + 5 feetFriction loss through suction fittings = + 5 feetFriction loss through suction side valves and strainer = + 1 feet

Total = - 54 feet

49

STEP 8 ndashAdd for discharge piping system head components

From specificationFriction loss through discharge piping = + 1 footFriction loss through discharge fittings = + 1 footFriction loss through feed valve is 15 psi X 231 = + 35 feetElevation of boiler maximum water level above pump = + 5 feet

Total = + 42 feet

50

STEP 9 ndashSum of all head components

BASE head with safety factor = + 250 feetSuction side piping system head = - 54 feetDischarge side piping system head = + 42 feet

Total = + 238 feet

51

STEP 10 ndashPressure safety valve considerations At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific GravityExample Head = 125 psi X 231 X 103 divide 0953 = 312 feet

XXXXXXXXX

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

52

Sheet2

STEP 11 ndashDetermine deaerator tank water temperature

From specification 227degF

53

STEP 12 ndashNPSHa calculation

NPSHa equation

plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa

10 feet + (197 psi X 231) - (197 psi X 231) - 2 feet = NPSHa10 feet + 46 feet - 46 feet - 2 feet = 8 feet NPSHa

54

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
1 Base flow calculation equation
Boiler maximum capacity horsepower X 0069 X C = Base flow rate
C = 150 for OnOff intermittent operation
C = 115 for continuous feed operation
2 Determine BASE head for feed pump
Formula based on Safety Valve setting
Pump head in feet = Maximum pressure X 231 X 103 divide Liquid Specific Gravity
3 Head components on suction side of piping system
Pressure above atmospheric on deaerator converted to feet of head = feet
Elevation difference between minimum deaerator water level and pump inlet = feet
Suction pipe friction loss = feet
Suction fitting friction loss = feet
Suction line valves and strainer friction loss = feet
Total = feet
4 Head components on discharge side of piping system
Friction loss through discharge piping = feet
Friction loss through discharge fittings = feet
Friction loss through feed valve = feet
Elevation of boiler maximum water level above pump = feet
Total = feet
5 NPSHa equation
plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa
(Feet) (psi X 231 = Feet) (psi X 231 = Feet) (Feet) (Feet)
Elevation of deaerator tank minimum water level above pumprsquos first impeller
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Method Name Is there head loss across feed valve Typical psi loss across feed valve Typical feed water temperature Typical Specific Gravity Conversion formula Typical feet of head loss across feed valve Pump Speed Type Duty Is orifce flow by-pass line required Orifice flow rate
1 On Off control and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Intermittent No Not applicable
2 Feed control valve and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Continuous Yes 20 of nominal
3 Feed control valve and variable speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Variable Continuous Yes 20 of nominal
4 Variable speed pumps only (no control valve) No None 225degF 0954 Not applicable Not applicable Variable Continuous No Not applicable
Orifice flow rate varies by manufacturers Will use 20 for these exercises
Must add for all head factors on suction and discharge sides of pump
Method Name Pump Speed Type Duty Is orifice flow by-pass line required
1 OnOff control and fixed speed pumps Fixed Intermittent No
2 Feed control valve and fixed speed pumps Fixed Continuous Yes
3 Feed control valve and variable speed pumps Variable Continuous Yes
4 Variable speed pumps only (no control valve) Variable Continuous No
Page 25: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

METHOD 1 ndashDirect feed for multiple boilers

Deaerator

Boiler A

Boiler AControlle

r4-20mA signal directly to

Grundfos E-pump instead of

control valve

Boiler BBoiler BControlle

r4-20mA signal directly to

Grundfos E-pump instead of

control valve

25

METHOD 2 ndashBooster sets for multiple boilers

Deaerator Pressure sensor

Bypass

Multiple pump

controller

26

STEAM BOILER PUMP APPLICATIONS AND TYPESBoiler feed pumpsCollection tank pumpsWater treatment pumpsCondensate return pumpsDeaerator tank recycle pumpsDeaerator vacuum pumps (vacuum deaerator tanks only)Economizer pumps

27

SIZING COMPLEXITY FOR BOILER FEED PUMPS

28

BASE FLOW RATE CALCULATION

Base flow = Boiler maximum capacity horsepower X 0069 X C

bull C = 15 for OnOff intermittent operation

bull C = 115 for continuous feed operation

29

ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW

To the Base flow we MIGHT add if specified

For Continuous Boiler Blowdown flowbull Approximately 5 to10 of the pumprsquos flow

rate at the Best Efficiency Point

30

ADD FOR BYPASS RECIRCULATION FLOWCertain feed system control modes require the use of a bypass line back to the source tank ndash such as back to the deaerator tank

Method

NamePump Speed

TypeDuty

Is orifice flow by-pass line

required1 OnOff control and fixed speed pumps Fixed Intermittent No2 Feed control valve and fixed speed pumps Fixed Continuous Yes3 Feed control valve and variable speed pumps Variable Continuous Yes4 Variable speed pumps only (no control valve) Variable Continuous No

31

Sheet1

RECIRCULATION FLOW

bull The solid curve below shows the minimum flow rate as a percentage of the nominal flow rate in relation to the liquid temperature

bull Ignore the dotted line which indicates a pump with special high-temperature construction

32

CALCULATING REQUIRED FEED PUMP HEAD

+ Suction side head+ Discharge side head= Total Dynamic Head

Elevation of DA tank

Elevation of boiler

33

FEED VALVE IMPACTS PUMPING HEAD CALCULATION

34

CALCULATING THE HEADFOR THE FEED PUMP1) At the duty point flow rateHead in feet = Boiler operating pressure X 231 X 103 divide Liquid Specific Gravity

Example Head = 130 psi X 231 X 103 divide 0953 = 324 feet

2) At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific Gravity

Example Head = 160 psi X 231 X 103 divide 0953 = 400 feet

35

NPSH ndashFORMULA FOR CALCULATION

NPSHr is obtained from the pump curve

Add two to four feet of safety factor to the NPSHr stated on the curve

NPSHa is calculated

+ Absolute pressure in deaerator tank

plusmn Elevation of minimum water level in tank above feed pump

- Vapor pressure of water in deaerator tank

- Suction line friction loss

= Net Positive Suction Head Available

To avoid cavitation NPSHa must be greater than NPSHr

36

NPSH AND ELEVATIONDeaerator

tank

Boiler feed

pumps

Minimum water level in DA tank

Location of eye of lowest impeller

Difference in elevation

37

NPSH AND SUCTION LINE CONSIDERATIONS

Critical suction line considerations here

38

Check list for boiler feed pump selection

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

39

Sheet2

BOILER FEED PUMPS USEFUL FORMULAS

40

Sheet1

SPECIFICATION FOR EXERCISEa) Control Method Continuous duty fixed speed pump with bypass line and feed valveb) Boiler maximum capacity = 250 HPc) Boiler safety valve setting = 125 psigd) Pressure safety factor = 3 above boilerrsquos safety valve settinge) Boiler operating pressure = 100 psigf) Continuous Boiler Blowdown flow - Requiredg) Bypass recirculation flow ndash Requiredh) Altitude ndash Sea leveli) Pressure in deaerator tank above atmospheric pressure = 5 psi (147 + 5 = 197 psi absolute)j) Height of deaerator tank minimum water level above pumprsquos first impeller = 10 feetk) Friction line loss through suction piping = 5 footl) Friction loss through suction side fittings = 5 footm) Friction loss through suction side valves = Nonen) Friction loss through suction side strainer = 1 feeto) Friction loss through discharge piping = 1 footp) Friction loss through discharge side fittings = 1 footq) Pressure drop across feed valve ndash 15 psir) Elevation of boiler maximum water level above pumprsquos discharge port = 5 feets) Liquid Specific Gravity = 0953t) Temperature of water in deaerator tank = 227 degrees Fu) Vapor pressure in deaerator tank = 197 psiv) Pump materials all 316 stainless steel to resist treatment chemicalsw) Mechanical seal to be silicon carbidesilicon carbideEPDM to withstand liquid temperature

41

Feed pumps

CONTROL METHOD

Fixed speed pumps with feed valve and recirculation line

Recirc line

Feed valve

42

STEP 1 ndashDetermine control methodFeed valve controlled system with a continuous duty fixed speed pump has been specified

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

43

Sheet2

STEP 2 ndashCalculate the BASE feed pump flow rate

The formula for this calculation is

bull Boiler maximum capacity in horsepower X 0069 X C

bull The maximum capacity in boiler horsepower is 250

bull The C factor is 115 for continuous duty

Therefore

250 X 0069 X 115 = 20 gpm = BASE flow rate

44

STEP 3 ndashContinuous Boiler Blowdown Flow

Determination

1 The BASE flow rate has been established at 20 gpm

2 We will on next slide need to add for bypass flow which can add 10 to 20 percent to the BASE flow rate

3 Blowdown flow is to be approximately 10 percent of flow at pumprsquos Best Efficiency Point

4 So the total boiler blowdown flow required is approximately 3 gpm

45

STEP 4 ndashAdd for by-pass flow

bull Control is via feed valve with fixed speed pump and for continuous dutybull A bypass will be required

bull Solid curve to right shows minimum flow rate as a percentage of nominal flow rate in relation to liquid temperature

bull Ignore dotted line which indicates a pump with special high-temperature construction

bull At 227degF we require a bypass flow that is about 20 of BEP flow

bull Presuming we can find a pump with BEP at about 25 or so gpm the bypass flow must be about 5 gpm

46

STEP 5 ndashCalculate total flow requiredbull BASE flow = 20 gpmbull Blowdown flow = 3 gpmbull Recirculation flow = 5 gpmbull Total flow required = 28 gpm

XXXX

X

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

47

Sheet2

STEP 6 ndashCalculate BASE pumping head

Boiler operating pressure setting + 3

Formula BASE head in feet = Boiler operating pressure X 231 X 103 divide Specific Gravity

BASE head = 100 psi X 231 X 103 divide 0953 = 250 feet

48

STEP 7 ndashAdd for suction piping system head components

From specificationAbsolute pressure on deaerator tank = 197 psi X 231 = - 46 feetWater elevation above first impeller = - 10 feetFriction loss through suction piping = + 5 feetFriction loss through suction fittings = + 5 feetFriction loss through suction side valves and strainer = + 1 feet

Total = - 54 feet

49

STEP 8 ndashAdd for discharge piping system head components

From specificationFriction loss through discharge piping = + 1 footFriction loss through discharge fittings = + 1 footFriction loss through feed valve is 15 psi X 231 = + 35 feetElevation of boiler maximum water level above pump = + 5 feet

Total = + 42 feet

50

STEP 9 ndashSum of all head components

BASE head with safety factor = + 250 feetSuction side piping system head = - 54 feetDischarge side piping system head = + 42 feet

Total = + 238 feet

51

STEP 10 ndashPressure safety valve considerations At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific GravityExample Head = 125 psi X 231 X 103 divide 0953 = 312 feet

XXXXXXXXX

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

52

Sheet2

STEP 11 ndashDetermine deaerator tank water temperature

From specification 227degF

53

STEP 12 ndashNPSHa calculation

NPSHa equation

plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa

10 feet + (197 psi X 231) - (197 psi X 231) - 2 feet = NPSHa10 feet + 46 feet - 46 feet - 2 feet = 8 feet NPSHa

54

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
1 Base flow calculation equation
Boiler maximum capacity horsepower X 0069 X C = Base flow rate
C = 150 for OnOff intermittent operation
C = 115 for continuous feed operation
2 Determine BASE head for feed pump
Formula based on Safety Valve setting
Pump head in feet = Maximum pressure X 231 X 103 divide Liquid Specific Gravity
3 Head components on suction side of piping system
Pressure above atmospheric on deaerator converted to feet of head = feet
Elevation difference between minimum deaerator water level and pump inlet = feet
Suction pipe friction loss = feet
Suction fitting friction loss = feet
Suction line valves and strainer friction loss = feet
Total = feet
4 Head components on discharge side of piping system
Friction loss through discharge piping = feet
Friction loss through discharge fittings = feet
Friction loss through feed valve = feet
Elevation of boiler maximum water level above pump = feet
Total = feet
5 NPSHa equation
plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa
(Feet) (psi X 231 = Feet) (psi X 231 = Feet) (Feet) (Feet)
Elevation of deaerator tank minimum water level above pumprsquos first impeller
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Method Name Is there head loss across feed valve Typical psi loss across feed valve Typical feed water temperature Typical Specific Gravity Conversion formula Typical feet of head loss across feed valve Pump Speed Type Duty Is orifce flow by-pass line required Orifice flow rate
1 On Off control and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Intermittent No Not applicable
2 Feed control valve and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Continuous Yes 20 of nominal
3 Feed control valve and variable speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Variable Continuous Yes 20 of nominal
4 Variable speed pumps only (no control valve) No None 225degF 0954 Not applicable Not applicable Variable Continuous No Not applicable
Orifice flow rate varies by manufacturers Will use 20 for these exercises
Must add for all head factors on suction and discharge sides of pump
Method Name Pump Speed Type Duty Is orifice flow by-pass line required
1 OnOff control and fixed speed pumps Fixed Intermittent No
2 Feed control valve and fixed speed pumps Fixed Continuous Yes
3 Feed control valve and variable speed pumps Variable Continuous Yes
4 Variable speed pumps only (no control valve) Variable Continuous No
Page 26: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

METHOD 2 ndashBooster sets for multiple boilers

Deaerator Pressure sensor

Bypass

Multiple pump

controller

26

STEAM BOILER PUMP APPLICATIONS AND TYPESBoiler feed pumpsCollection tank pumpsWater treatment pumpsCondensate return pumpsDeaerator tank recycle pumpsDeaerator vacuum pumps (vacuum deaerator tanks only)Economizer pumps

27

SIZING COMPLEXITY FOR BOILER FEED PUMPS

28

BASE FLOW RATE CALCULATION

Base flow = Boiler maximum capacity horsepower X 0069 X C

bull C = 15 for OnOff intermittent operation

bull C = 115 for continuous feed operation

29

ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW

To the Base flow we MIGHT add if specified

For Continuous Boiler Blowdown flowbull Approximately 5 to10 of the pumprsquos flow

rate at the Best Efficiency Point

30

ADD FOR BYPASS RECIRCULATION FLOWCertain feed system control modes require the use of a bypass line back to the source tank ndash such as back to the deaerator tank

Method

NamePump Speed

TypeDuty

Is orifice flow by-pass line

required1 OnOff control and fixed speed pumps Fixed Intermittent No2 Feed control valve and fixed speed pumps Fixed Continuous Yes3 Feed control valve and variable speed pumps Variable Continuous Yes4 Variable speed pumps only (no control valve) Variable Continuous No

31

Sheet1

RECIRCULATION FLOW

bull The solid curve below shows the minimum flow rate as a percentage of the nominal flow rate in relation to the liquid temperature

bull Ignore the dotted line which indicates a pump with special high-temperature construction

32

CALCULATING REQUIRED FEED PUMP HEAD

+ Suction side head+ Discharge side head= Total Dynamic Head

Elevation of DA tank

Elevation of boiler

33

FEED VALVE IMPACTS PUMPING HEAD CALCULATION

34

CALCULATING THE HEADFOR THE FEED PUMP1) At the duty point flow rateHead in feet = Boiler operating pressure X 231 X 103 divide Liquid Specific Gravity

Example Head = 130 psi X 231 X 103 divide 0953 = 324 feet

2) At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific Gravity

Example Head = 160 psi X 231 X 103 divide 0953 = 400 feet

35

NPSH ndashFORMULA FOR CALCULATION

NPSHr is obtained from the pump curve

Add two to four feet of safety factor to the NPSHr stated on the curve

NPSHa is calculated

+ Absolute pressure in deaerator tank

plusmn Elevation of minimum water level in tank above feed pump

- Vapor pressure of water in deaerator tank

- Suction line friction loss

= Net Positive Suction Head Available

To avoid cavitation NPSHa must be greater than NPSHr

36

NPSH AND ELEVATIONDeaerator

tank

Boiler feed

pumps

Minimum water level in DA tank

Location of eye of lowest impeller

Difference in elevation

37

NPSH AND SUCTION LINE CONSIDERATIONS

Critical suction line considerations here

38

Check list for boiler feed pump selection

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

39

Sheet2

BOILER FEED PUMPS USEFUL FORMULAS

40

Sheet1

SPECIFICATION FOR EXERCISEa) Control Method Continuous duty fixed speed pump with bypass line and feed valveb) Boiler maximum capacity = 250 HPc) Boiler safety valve setting = 125 psigd) Pressure safety factor = 3 above boilerrsquos safety valve settinge) Boiler operating pressure = 100 psigf) Continuous Boiler Blowdown flow - Requiredg) Bypass recirculation flow ndash Requiredh) Altitude ndash Sea leveli) Pressure in deaerator tank above atmospheric pressure = 5 psi (147 + 5 = 197 psi absolute)j) Height of deaerator tank minimum water level above pumprsquos first impeller = 10 feetk) Friction line loss through suction piping = 5 footl) Friction loss through suction side fittings = 5 footm) Friction loss through suction side valves = Nonen) Friction loss through suction side strainer = 1 feeto) Friction loss through discharge piping = 1 footp) Friction loss through discharge side fittings = 1 footq) Pressure drop across feed valve ndash 15 psir) Elevation of boiler maximum water level above pumprsquos discharge port = 5 feets) Liquid Specific Gravity = 0953t) Temperature of water in deaerator tank = 227 degrees Fu) Vapor pressure in deaerator tank = 197 psiv) Pump materials all 316 stainless steel to resist treatment chemicalsw) Mechanical seal to be silicon carbidesilicon carbideEPDM to withstand liquid temperature

41

Feed pumps

CONTROL METHOD

Fixed speed pumps with feed valve and recirculation line

Recirc line

Feed valve

42

STEP 1 ndashDetermine control methodFeed valve controlled system with a continuous duty fixed speed pump has been specified

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

43

Sheet2

STEP 2 ndashCalculate the BASE feed pump flow rate

The formula for this calculation is

bull Boiler maximum capacity in horsepower X 0069 X C

bull The maximum capacity in boiler horsepower is 250

bull The C factor is 115 for continuous duty

Therefore

250 X 0069 X 115 = 20 gpm = BASE flow rate

44

STEP 3 ndashContinuous Boiler Blowdown Flow

Determination

1 The BASE flow rate has been established at 20 gpm

2 We will on next slide need to add for bypass flow which can add 10 to 20 percent to the BASE flow rate

3 Blowdown flow is to be approximately 10 percent of flow at pumprsquos Best Efficiency Point

4 So the total boiler blowdown flow required is approximately 3 gpm

45

STEP 4 ndashAdd for by-pass flow

bull Control is via feed valve with fixed speed pump and for continuous dutybull A bypass will be required

bull Solid curve to right shows minimum flow rate as a percentage of nominal flow rate in relation to liquid temperature

bull Ignore dotted line which indicates a pump with special high-temperature construction

bull At 227degF we require a bypass flow that is about 20 of BEP flow

bull Presuming we can find a pump with BEP at about 25 or so gpm the bypass flow must be about 5 gpm

46

STEP 5 ndashCalculate total flow requiredbull BASE flow = 20 gpmbull Blowdown flow = 3 gpmbull Recirculation flow = 5 gpmbull Total flow required = 28 gpm

XXXX

X

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

47

Sheet2

STEP 6 ndashCalculate BASE pumping head

Boiler operating pressure setting + 3

Formula BASE head in feet = Boiler operating pressure X 231 X 103 divide Specific Gravity

BASE head = 100 psi X 231 X 103 divide 0953 = 250 feet

48

STEP 7 ndashAdd for suction piping system head components

From specificationAbsolute pressure on deaerator tank = 197 psi X 231 = - 46 feetWater elevation above first impeller = - 10 feetFriction loss through suction piping = + 5 feetFriction loss through suction fittings = + 5 feetFriction loss through suction side valves and strainer = + 1 feet

Total = - 54 feet

49

STEP 8 ndashAdd for discharge piping system head components

From specificationFriction loss through discharge piping = + 1 footFriction loss through discharge fittings = + 1 footFriction loss through feed valve is 15 psi X 231 = + 35 feetElevation of boiler maximum water level above pump = + 5 feet

Total = + 42 feet

50

STEP 9 ndashSum of all head components

BASE head with safety factor = + 250 feetSuction side piping system head = - 54 feetDischarge side piping system head = + 42 feet

Total = + 238 feet

51

STEP 10 ndashPressure safety valve considerations At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific GravityExample Head = 125 psi X 231 X 103 divide 0953 = 312 feet

XXXXXXXXX

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

52

Sheet2

STEP 11 ndashDetermine deaerator tank water temperature

From specification 227degF

53

STEP 12 ndashNPSHa calculation

NPSHa equation

plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa

10 feet + (197 psi X 231) - (197 psi X 231) - 2 feet = NPSHa10 feet + 46 feet - 46 feet - 2 feet = 8 feet NPSHa

54

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
1 Base flow calculation equation
Boiler maximum capacity horsepower X 0069 X C = Base flow rate
C = 150 for OnOff intermittent operation
C = 115 for continuous feed operation
2 Determine BASE head for feed pump
Formula based on Safety Valve setting
Pump head in feet = Maximum pressure X 231 X 103 divide Liquid Specific Gravity
3 Head components on suction side of piping system
Pressure above atmospheric on deaerator converted to feet of head = feet
Elevation difference between minimum deaerator water level and pump inlet = feet
Suction pipe friction loss = feet
Suction fitting friction loss = feet
Suction line valves and strainer friction loss = feet
Total = feet
4 Head components on discharge side of piping system
Friction loss through discharge piping = feet
Friction loss through discharge fittings = feet
Friction loss through feed valve = feet
Elevation of boiler maximum water level above pump = feet
Total = feet
5 NPSHa equation
plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa
(Feet) (psi X 231 = Feet) (psi X 231 = Feet) (Feet) (Feet)
Elevation of deaerator tank minimum water level above pumprsquos first impeller
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Method Name Is there head loss across feed valve Typical psi loss across feed valve Typical feed water temperature Typical Specific Gravity Conversion formula Typical feet of head loss across feed valve Pump Speed Type Duty Is orifce flow by-pass line required Orifice flow rate
1 On Off control and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Intermittent No Not applicable
2 Feed control valve and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Continuous Yes 20 of nominal
3 Feed control valve and variable speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Variable Continuous Yes 20 of nominal
4 Variable speed pumps only (no control valve) No None 225degF 0954 Not applicable Not applicable Variable Continuous No Not applicable
Orifice flow rate varies by manufacturers Will use 20 for these exercises
Must add for all head factors on suction and discharge sides of pump
Method Name Pump Speed Type Duty Is orifice flow by-pass line required
1 OnOff control and fixed speed pumps Fixed Intermittent No
2 Feed control valve and fixed speed pumps Fixed Continuous Yes
3 Feed control valve and variable speed pumps Variable Continuous Yes
4 Variable speed pumps only (no control valve) Variable Continuous No
Page 27: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

STEAM BOILER PUMP APPLICATIONS AND TYPESBoiler feed pumpsCollection tank pumpsWater treatment pumpsCondensate return pumpsDeaerator tank recycle pumpsDeaerator vacuum pumps (vacuum deaerator tanks only)Economizer pumps

27

SIZING COMPLEXITY FOR BOILER FEED PUMPS

28

BASE FLOW RATE CALCULATION

Base flow = Boiler maximum capacity horsepower X 0069 X C

bull C = 15 for OnOff intermittent operation

bull C = 115 for continuous feed operation

29

ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW

To the Base flow we MIGHT add if specified

For Continuous Boiler Blowdown flowbull Approximately 5 to10 of the pumprsquos flow

rate at the Best Efficiency Point

30

ADD FOR BYPASS RECIRCULATION FLOWCertain feed system control modes require the use of a bypass line back to the source tank ndash such as back to the deaerator tank

Method

NamePump Speed

TypeDuty

Is orifice flow by-pass line

required1 OnOff control and fixed speed pumps Fixed Intermittent No2 Feed control valve and fixed speed pumps Fixed Continuous Yes3 Feed control valve and variable speed pumps Variable Continuous Yes4 Variable speed pumps only (no control valve) Variable Continuous No

31

Sheet1

RECIRCULATION FLOW

bull The solid curve below shows the minimum flow rate as a percentage of the nominal flow rate in relation to the liquid temperature

bull Ignore the dotted line which indicates a pump with special high-temperature construction

32

CALCULATING REQUIRED FEED PUMP HEAD

+ Suction side head+ Discharge side head= Total Dynamic Head

Elevation of DA tank

Elevation of boiler

33

FEED VALVE IMPACTS PUMPING HEAD CALCULATION

34

CALCULATING THE HEADFOR THE FEED PUMP1) At the duty point flow rateHead in feet = Boiler operating pressure X 231 X 103 divide Liquid Specific Gravity

Example Head = 130 psi X 231 X 103 divide 0953 = 324 feet

2) At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific Gravity

Example Head = 160 psi X 231 X 103 divide 0953 = 400 feet

35

NPSH ndashFORMULA FOR CALCULATION

NPSHr is obtained from the pump curve

Add two to four feet of safety factor to the NPSHr stated on the curve

NPSHa is calculated

+ Absolute pressure in deaerator tank

plusmn Elevation of minimum water level in tank above feed pump

- Vapor pressure of water in deaerator tank

- Suction line friction loss

= Net Positive Suction Head Available

To avoid cavitation NPSHa must be greater than NPSHr

36

NPSH AND ELEVATIONDeaerator

tank

Boiler feed

pumps

Minimum water level in DA tank

Location of eye of lowest impeller

Difference in elevation

37

NPSH AND SUCTION LINE CONSIDERATIONS

Critical suction line considerations here

38

Check list for boiler feed pump selection

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

39

Sheet2

BOILER FEED PUMPS USEFUL FORMULAS

40

Sheet1

SPECIFICATION FOR EXERCISEa) Control Method Continuous duty fixed speed pump with bypass line and feed valveb) Boiler maximum capacity = 250 HPc) Boiler safety valve setting = 125 psigd) Pressure safety factor = 3 above boilerrsquos safety valve settinge) Boiler operating pressure = 100 psigf) Continuous Boiler Blowdown flow - Requiredg) Bypass recirculation flow ndash Requiredh) Altitude ndash Sea leveli) Pressure in deaerator tank above atmospheric pressure = 5 psi (147 + 5 = 197 psi absolute)j) Height of deaerator tank minimum water level above pumprsquos first impeller = 10 feetk) Friction line loss through suction piping = 5 footl) Friction loss through suction side fittings = 5 footm) Friction loss through suction side valves = Nonen) Friction loss through suction side strainer = 1 feeto) Friction loss through discharge piping = 1 footp) Friction loss through discharge side fittings = 1 footq) Pressure drop across feed valve ndash 15 psir) Elevation of boiler maximum water level above pumprsquos discharge port = 5 feets) Liquid Specific Gravity = 0953t) Temperature of water in deaerator tank = 227 degrees Fu) Vapor pressure in deaerator tank = 197 psiv) Pump materials all 316 stainless steel to resist treatment chemicalsw) Mechanical seal to be silicon carbidesilicon carbideEPDM to withstand liquid temperature

41

Feed pumps

CONTROL METHOD

Fixed speed pumps with feed valve and recirculation line

Recirc line

Feed valve

42

STEP 1 ndashDetermine control methodFeed valve controlled system with a continuous duty fixed speed pump has been specified

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

43

Sheet2

STEP 2 ndashCalculate the BASE feed pump flow rate

The formula for this calculation is

bull Boiler maximum capacity in horsepower X 0069 X C

bull The maximum capacity in boiler horsepower is 250

bull The C factor is 115 for continuous duty

Therefore

250 X 0069 X 115 = 20 gpm = BASE flow rate

44

STEP 3 ndashContinuous Boiler Blowdown Flow

Determination

1 The BASE flow rate has been established at 20 gpm

2 We will on next slide need to add for bypass flow which can add 10 to 20 percent to the BASE flow rate

3 Blowdown flow is to be approximately 10 percent of flow at pumprsquos Best Efficiency Point

4 So the total boiler blowdown flow required is approximately 3 gpm

45

STEP 4 ndashAdd for by-pass flow

bull Control is via feed valve with fixed speed pump and for continuous dutybull A bypass will be required

bull Solid curve to right shows minimum flow rate as a percentage of nominal flow rate in relation to liquid temperature

bull Ignore dotted line which indicates a pump with special high-temperature construction

bull At 227degF we require a bypass flow that is about 20 of BEP flow

bull Presuming we can find a pump with BEP at about 25 or so gpm the bypass flow must be about 5 gpm

46

STEP 5 ndashCalculate total flow requiredbull BASE flow = 20 gpmbull Blowdown flow = 3 gpmbull Recirculation flow = 5 gpmbull Total flow required = 28 gpm

XXXX

X

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

47

Sheet2

STEP 6 ndashCalculate BASE pumping head

Boiler operating pressure setting + 3

Formula BASE head in feet = Boiler operating pressure X 231 X 103 divide Specific Gravity

BASE head = 100 psi X 231 X 103 divide 0953 = 250 feet

48

STEP 7 ndashAdd for suction piping system head components

From specificationAbsolute pressure on deaerator tank = 197 psi X 231 = - 46 feetWater elevation above first impeller = - 10 feetFriction loss through suction piping = + 5 feetFriction loss through suction fittings = + 5 feetFriction loss through suction side valves and strainer = + 1 feet

Total = - 54 feet

49

STEP 8 ndashAdd for discharge piping system head components

From specificationFriction loss through discharge piping = + 1 footFriction loss through discharge fittings = + 1 footFriction loss through feed valve is 15 psi X 231 = + 35 feetElevation of boiler maximum water level above pump = + 5 feet

Total = + 42 feet

50

STEP 9 ndashSum of all head components

BASE head with safety factor = + 250 feetSuction side piping system head = - 54 feetDischarge side piping system head = + 42 feet

Total = + 238 feet

51

STEP 10 ndashPressure safety valve considerations At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific GravityExample Head = 125 psi X 231 X 103 divide 0953 = 312 feet

XXXXXXXXX

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

52

Sheet2

STEP 11 ndashDetermine deaerator tank water temperature

From specification 227degF

53

STEP 12 ndashNPSHa calculation

NPSHa equation

plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa

10 feet + (197 psi X 231) - (197 psi X 231) - 2 feet = NPSHa10 feet + 46 feet - 46 feet - 2 feet = 8 feet NPSHa

54

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
1 Base flow calculation equation
Boiler maximum capacity horsepower X 0069 X C = Base flow rate
C = 150 for OnOff intermittent operation
C = 115 for continuous feed operation
2 Determine BASE head for feed pump
Formula based on Safety Valve setting
Pump head in feet = Maximum pressure X 231 X 103 divide Liquid Specific Gravity
3 Head components on suction side of piping system
Pressure above atmospheric on deaerator converted to feet of head = feet
Elevation difference between minimum deaerator water level and pump inlet = feet
Suction pipe friction loss = feet
Suction fitting friction loss = feet
Suction line valves and strainer friction loss = feet
Total = feet
4 Head components on discharge side of piping system
Friction loss through discharge piping = feet
Friction loss through discharge fittings = feet
Friction loss through feed valve = feet
Elevation of boiler maximum water level above pump = feet
Total = feet
5 NPSHa equation
plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa
(Feet) (psi X 231 = Feet) (psi X 231 = Feet) (Feet) (Feet)
Elevation of deaerator tank minimum water level above pumprsquos first impeller
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Method Name Is there head loss across feed valve Typical psi loss across feed valve Typical feed water temperature Typical Specific Gravity Conversion formula Typical feet of head loss across feed valve Pump Speed Type Duty Is orifce flow by-pass line required Orifice flow rate
1 On Off control and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Intermittent No Not applicable
2 Feed control valve and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Continuous Yes 20 of nominal
3 Feed control valve and variable speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Variable Continuous Yes 20 of nominal
4 Variable speed pumps only (no control valve) No None 225degF 0954 Not applicable Not applicable Variable Continuous No Not applicable
Orifice flow rate varies by manufacturers Will use 20 for these exercises
Must add for all head factors on suction and discharge sides of pump
Method Name Pump Speed Type Duty Is orifice flow by-pass line required
1 OnOff control and fixed speed pumps Fixed Intermittent No
2 Feed control valve and fixed speed pumps Fixed Continuous Yes
3 Feed control valve and variable speed pumps Variable Continuous Yes
4 Variable speed pumps only (no control valve) Variable Continuous No
Page 28: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

SIZING COMPLEXITY FOR BOILER FEED PUMPS

28

BASE FLOW RATE CALCULATION

Base flow = Boiler maximum capacity horsepower X 0069 X C

bull C = 15 for OnOff intermittent operation

bull C = 115 for continuous feed operation

29

ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW

To the Base flow we MIGHT add if specified

For Continuous Boiler Blowdown flowbull Approximately 5 to10 of the pumprsquos flow

rate at the Best Efficiency Point

30

ADD FOR BYPASS RECIRCULATION FLOWCertain feed system control modes require the use of a bypass line back to the source tank ndash such as back to the deaerator tank

Method

NamePump Speed

TypeDuty

Is orifice flow by-pass line

required1 OnOff control and fixed speed pumps Fixed Intermittent No2 Feed control valve and fixed speed pumps Fixed Continuous Yes3 Feed control valve and variable speed pumps Variable Continuous Yes4 Variable speed pumps only (no control valve) Variable Continuous No

31

Sheet1

RECIRCULATION FLOW

bull The solid curve below shows the minimum flow rate as a percentage of the nominal flow rate in relation to the liquid temperature

bull Ignore the dotted line which indicates a pump with special high-temperature construction

32

CALCULATING REQUIRED FEED PUMP HEAD

+ Suction side head+ Discharge side head= Total Dynamic Head

Elevation of DA tank

Elevation of boiler

33

FEED VALVE IMPACTS PUMPING HEAD CALCULATION

34

CALCULATING THE HEADFOR THE FEED PUMP1) At the duty point flow rateHead in feet = Boiler operating pressure X 231 X 103 divide Liquid Specific Gravity

Example Head = 130 psi X 231 X 103 divide 0953 = 324 feet

2) At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific Gravity

Example Head = 160 psi X 231 X 103 divide 0953 = 400 feet

35

NPSH ndashFORMULA FOR CALCULATION

NPSHr is obtained from the pump curve

Add two to four feet of safety factor to the NPSHr stated on the curve

NPSHa is calculated

+ Absolute pressure in deaerator tank

plusmn Elevation of minimum water level in tank above feed pump

- Vapor pressure of water in deaerator tank

- Suction line friction loss

= Net Positive Suction Head Available

To avoid cavitation NPSHa must be greater than NPSHr

36

NPSH AND ELEVATIONDeaerator

tank

Boiler feed

pumps

Minimum water level in DA tank

Location of eye of lowest impeller

Difference in elevation

37

NPSH AND SUCTION LINE CONSIDERATIONS

Critical suction line considerations here

38

Check list for boiler feed pump selection

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

39

Sheet2

BOILER FEED PUMPS USEFUL FORMULAS

40

Sheet1

SPECIFICATION FOR EXERCISEa) Control Method Continuous duty fixed speed pump with bypass line and feed valveb) Boiler maximum capacity = 250 HPc) Boiler safety valve setting = 125 psigd) Pressure safety factor = 3 above boilerrsquos safety valve settinge) Boiler operating pressure = 100 psigf) Continuous Boiler Blowdown flow - Requiredg) Bypass recirculation flow ndash Requiredh) Altitude ndash Sea leveli) Pressure in deaerator tank above atmospheric pressure = 5 psi (147 + 5 = 197 psi absolute)j) Height of deaerator tank minimum water level above pumprsquos first impeller = 10 feetk) Friction line loss through suction piping = 5 footl) Friction loss through suction side fittings = 5 footm) Friction loss through suction side valves = Nonen) Friction loss through suction side strainer = 1 feeto) Friction loss through discharge piping = 1 footp) Friction loss through discharge side fittings = 1 footq) Pressure drop across feed valve ndash 15 psir) Elevation of boiler maximum water level above pumprsquos discharge port = 5 feets) Liquid Specific Gravity = 0953t) Temperature of water in deaerator tank = 227 degrees Fu) Vapor pressure in deaerator tank = 197 psiv) Pump materials all 316 stainless steel to resist treatment chemicalsw) Mechanical seal to be silicon carbidesilicon carbideEPDM to withstand liquid temperature

41

Feed pumps

CONTROL METHOD

Fixed speed pumps with feed valve and recirculation line

Recirc line

Feed valve

42

STEP 1 ndashDetermine control methodFeed valve controlled system with a continuous duty fixed speed pump has been specified

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

43

Sheet2

STEP 2 ndashCalculate the BASE feed pump flow rate

The formula for this calculation is

bull Boiler maximum capacity in horsepower X 0069 X C

bull The maximum capacity in boiler horsepower is 250

bull The C factor is 115 for continuous duty

Therefore

250 X 0069 X 115 = 20 gpm = BASE flow rate

44

STEP 3 ndashContinuous Boiler Blowdown Flow

Determination

1 The BASE flow rate has been established at 20 gpm

2 We will on next slide need to add for bypass flow which can add 10 to 20 percent to the BASE flow rate

3 Blowdown flow is to be approximately 10 percent of flow at pumprsquos Best Efficiency Point

4 So the total boiler blowdown flow required is approximately 3 gpm

45

STEP 4 ndashAdd for by-pass flow

bull Control is via feed valve with fixed speed pump and for continuous dutybull A bypass will be required

bull Solid curve to right shows minimum flow rate as a percentage of nominal flow rate in relation to liquid temperature

bull Ignore dotted line which indicates a pump with special high-temperature construction

bull At 227degF we require a bypass flow that is about 20 of BEP flow

bull Presuming we can find a pump with BEP at about 25 or so gpm the bypass flow must be about 5 gpm

46

STEP 5 ndashCalculate total flow requiredbull BASE flow = 20 gpmbull Blowdown flow = 3 gpmbull Recirculation flow = 5 gpmbull Total flow required = 28 gpm

XXXX

X

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

47

Sheet2

STEP 6 ndashCalculate BASE pumping head

Boiler operating pressure setting + 3

Formula BASE head in feet = Boiler operating pressure X 231 X 103 divide Specific Gravity

BASE head = 100 psi X 231 X 103 divide 0953 = 250 feet

48

STEP 7 ndashAdd for suction piping system head components

From specificationAbsolute pressure on deaerator tank = 197 psi X 231 = - 46 feetWater elevation above first impeller = - 10 feetFriction loss through suction piping = + 5 feetFriction loss through suction fittings = + 5 feetFriction loss through suction side valves and strainer = + 1 feet

Total = - 54 feet

49

STEP 8 ndashAdd for discharge piping system head components

From specificationFriction loss through discharge piping = + 1 footFriction loss through discharge fittings = + 1 footFriction loss through feed valve is 15 psi X 231 = + 35 feetElevation of boiler maximum water level above pump = + 5 feet

Total = + 42 feet

50

STEP 9 ndashSum of all head components

BASE head with safety factor = + 250 feetSuction side piping system head = - 54 feetDischarge side piping system head = + 42 feet

Total = + 238 feet

51

STEP 10 ndashPressure safety valve considerations At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific GravityExample Head = 125 psi X 231 X 103 divide 0953 = 312 feet

XXXXXXXXX

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

52

Sheet2

STEP 11 ndashDetermine deaerator tank water temperature

From specification 227degF

53

STEP 12 ndashNPSHa calculation

NPSHa equation

plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa

10 feet + (197 psi X 231) - (197 psi X 231) - 2 feet = NPSHa10 feet + 46 feet - 46 feet - 2 feet = 8 feet NPSHa

54

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
1 Base flow calculation equation
Boiler maximum capacity horsepower X 0069 X C = Base flow rate
C = 150 for OnOff intermittent operation
C = 115 for continuous feed operation
2 Determine BASE head for feed pump
Formula based on Safety Valve setting
Pump head in feet = Maximum pressure X 231 X 103 divide Liquid Specific Gravity
3 Head components on suction side of piping system
Pressure above atmospheric on deaerator converted to feet of head = feet
Elevation difference between minimum deaerator water level and pump inlet = feet
Suction pipe friction loss = feet
Suction fitting friction loss = feet
Suction line valves and strainer friction loss = feet
Total = feet
4 Head components on discharge side of piping system
Friction loss through discharge piping = feet
Friction loss through discharge fittings = feet
Friction loss through feed valve = feet
Elevation of boiler maximum water level above pump = feet
Total = feet
5 NPSHa equation
plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa
(Feet) (psi X 231 = Feet) (psi X 231 = Feet) (Feet) (Feet)
Elevation of deaerator tank minimum water level above pumprsquos first impeller
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Method Name Is there head loss across feed valve Typical psi loss across feed valve Typical feed water temperature Typical Specific Gravity Conversion formula Typical feet of head loss across feed valve Pump Speed Type Duty Is orifce flow by-pass line required Orifice flow rate
1 On Off control and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Intermittent No Not applicable
2 Feed control valve and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Continuous Yes 20 of nominal
3 Feed control valve and variable speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Variable Continuous Yes 20 of nominal
4 Variable speed pumps only (no control valve) No None 225degF 0954 Not applicable Not applicable Variable Continuous No Not applicable
Orifice flow rate varies by manufacturers Will use 20 for these exercises
Must add for all head factors on suction and discharge sides of pump
Method Name Pump Speed Type Duty Is orifice flow by-pass line required
1 OnOff control and fixed speed pumps Fixed Intermittent No
2 Feed control valve and fixed speed pumps Fixed Continuous Yes
3 Feed control valve and variable speed pumps Variable Continuous Yes
4 Variable speed pumps only (no control valve) Variable Continuous No
Page 29: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

BASE FLOW RATE CALCULATION

Base flow = Boiler maximum capacity horsepower X 0069 X C

bull C = 15 for OnOff intermittent operation

bull C = 115 for continuous feed operation

29

ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW

To the Base flow we MIGHT add if specified

For Continuous Boiler Blowdown flowbull Approximately 5 to10 of the pumprsquos flow

rate at the Best Efficiency Point

30

ADD FOR BYPASS RECIRCULATION FLOWCertain feed system control modes require the use of a bypass line back to the source tank ndash such as back to the deaerator tank

Method

NamePump Speed

TypeDuty

Is orifice flow by-pass line

required1 OnOff control and fixed speed pumps Fixed Intermittent No2 Feed control valve and fixed speed pumps Fixed Continuous Yes3 Feed control valve and variable speed pumps Variable Continuous Yes4 Variable speed pumps only (no control valve) Variable Continuous No

31

Sheet1

RECIRCULATION FLOW

bull The solid curve below shows the minimum flow rate as a percentage of the nominal flow rate in relation to the liquid temperature

bull Ignore the dotted line which indicates a pump with special high-temperature construction

32

CALCULATING REQUIRED FEED PUMP HEAD

+ Suction side head+ Discharge side head= Total Dynamic Head

Elevation of DA tank

Elevation of boiler

33

FEED VALVE IMPACTS PUMPING HEAD CALCULATION

34

CALCULATING THE HEADFOR THE FEED PUMP1) At the duty point flow rateHead in feet = Boiler operating pressure X 231 X 103 divide Liquid Specific Gravity

Example Head = 130 psi X 231 X 103 divide 0953 = 324 feet

2) At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific Gravity

Example Head = 160 psi X 231 X 103 divide 0953 = 400 feet

35

NPSH ndashFORMULA FOR CALCULATION

NPSHr is obtained from the pump curve

Add two to four feet of safety factor to the NPSHr stated on the curve

NPSHa is calculated

+ Absolute pressure in deaerator tank

plusmn Elevation of minimum water level in tank above feed pump

- Vapor pressure of water in deaerator tank

- Suction line friction loss

= Net Positive Suction Head Available

To avoid cavitation NPSHa must be greater than NPSHr

36

NPSH AND ELEVATIONDeaerator

tank

Boiler feed

pumps

Minimum water level in DA tank

Location of eye of lowest impeller

Difference in elevation

37

NPSH AND SUCTION LINE CONSIDERATIONS

Critical suction line considerations here

38

Check list for boiler feed pump selection

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

39

Sheet2

BOILER FEED PUMPS USEFUL FORMULAS

40

Sheet1

SPECIFICATION FOR EXERCISEa) Control Method Continuous duty fixed speed pump with bypass line and feed valveb) Boiler maximum capacity = 250 HPc) Boiler safety valve setting = 125 psigd) Pressure safety factor = 3 above boilerrsquos safety valve settinge) Boiler operating pressure = 100 psigf) Continuous Boiler Blowdown flow - Requiredg) Bypass recirculation flow ndash Requiredh) Altitude ndash Sea leveli) Pressure in deaerator tank above atmospheric pressure = 5 psi (147 + 5 = 197 psi absolute)j) Height of deaerator tank minimum water level above pumprsquos first impeller = 10 feetk) Friction line loss through suction piping = 5 footl) Friction loss through suction side fittings = 5 footm) Friction loss through suction side valves = Nonen) Friction loss through suction side strainer = 1 feeto) Friction loss through discharge piping = 1 footp) Friction loss through discharge side fittings = 1 footq) Pressure drop across feed valve ndash 15 psir) Elevation of boiler maximum water level above pumprsquos discharge port = 5 feets) Liquid Specific Gravity = 0953t) Temperature of water in deaerator tank = 227 degrees Fu) Vapor pressure in deaerator tank = 197 psiv) Pump materials all 316 stainless steel to resist treatment chemicalsw) Mechanical seal to be silicon carbidesilicon carbideEPDM to withstand liquid temperature

41

Feed pumps

CONTROL METHOD

Fixed speed pumps with feed valve and recirculation line

Recirc line

Feed valve

42

STEP 1 ndashDetermine control methodFeed valve controlled system with a continuous duty fixed speed pump has been specified

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

43

Sheet2

STEP 2 ndashCalculate the BASE feed pump flow rate

The formula for this calculation is

bull Boiler maximum capacity in horsepower X 0069 X C

bull The maximum capacity in boiler horsepower is 250

bull The C factor is 115 for continuous duty

Therefore

250 X 0069 X 115 = 20 gpm = BASE flow rate

44

STEP 3 ndashContinuous Boiler Blowdown Flow

Determination

1 The BASE flow rate has been established at 20 gpm

2 We will on next slide need to add for bypass flow which can add 10 to 20 percent to the BASE flow rate

3 Blowdown flow is to be approximately 10 percent of flow at pumprsquos Best Efficiency Point

4 So the total boiler blowdown flow required is approximately 3 gpm

45

STEP 4 ndashAdd for by-pass flow

bull Control is via feed valve with fixed speed pump and for continuous dutybull A bypass will be required

bull Solid curve to right shows minimum flow rate as a percentage of nominal flow rate in relation to liquid temperature

bull Ignore dotted line which indicates a pump with special high-temperature construction

bull At 227degF we require a bypass flow that is about 20 of BEP flow

bull Presuming we can find a pump with BEP at about 25 or so gpm the bypass flow must be about 5 gpm

46

STEP 5 ndashCalculate total flow requiredbull BASE flow = 20 gpmbull Blowdown flow = 3 gpmbull Recirculation flow = 5 gpmbull Total flow required = 28 gpm

XXXX

X

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

47

Sheet2

STEP 6 ndashCalculate BASE pumping head

Boiler operating pressure setting + 3

Formula BASE head in feet = Boiler operating pressure X 231 X 103 divide Specific Gravity

BASE head = 100 psi X 231 X 103 divide 0953 = 250 feet

48

STEP 7 ndashAdd for suction piping system head components

From specificationAbsolute pressure on deaerator tank = 197 psi X 231 = - 46 feetWater elevation above first impeller = - 10 feetFriction loss through suction piping = + 5 feetFriction loss through suction fittings = + 5 feetFriction loss through suction side valves and strainer = + 1 feet

Total = - 54 feet

49

STEP 8 ndashAdd for discharge piping system head components

From specificationFriction loss through discharge piping = + 1 footFriction loss through discharge fittings = + 1 footFriction loss through feed valve is 15 psi X 231 = + 35 feetElevation of boiler maximum water level above pump = + 5 feet

Total = + 42 feet

50

STEP 9 ndashSum of all head components

BASE head with safety factor = + 250 feetSuction side piping system head = - 54 feetDischarge side piping system head = + 42 feet

Total = + 238 feet

51

STEP 10 ndashPressure safety valve considerations At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific GravityExample Head = 125 psi X 231 X 103 divide 0953 = 312 feet

XXXXXXXXX

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

52

Sheet2

STEP 11 ndashDetermine deaerator tank water temperature

From specification 227degF

53

STEP 12 ndashNPSHa calculation

NPSHa equation

plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa

10 feet + (197 psi X 231) - (197 psi X 231) - 2 feet = NPSHa10 feet + 46 feet - 46 feet - 2 feet = 8 feet NPSHa

54

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
1 Base flow calculation equation
Boiler maximum capacity horsepower X 0069 X C = Base flow rate
C = 150 for OnOff intermittent operation
C = 115 for continuous feed operation
2 Determine BASE head for feed pump
Formula based on Safety Valve setting
Pump head in feet = Maximum pressure X 231 X 103 divide Liquid Specific Gravity
3 Head components on suction side of piping system
Pressure above atmospheric on deaerator converted to feet of head = feet
Elevation difference between minimum deaerator water level and pump inlet = feet
Suction pipe friction loss = feet
Suction fitting friction loss = feet
Suction line valves and strainer friction loss = feet
Total = feet
4 Head components on discharge side of piping system
Friction loss through discharge piping = feet
Friction loss through discharge fittings = feet
Friction loss through feed valve = feet
Elevation of boiler maximum water level above pump = feet
Total = feet
5 NPSHa equation
plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa
(Feet) (psi X 231 = Feet) (psi X 231 = Feet) (Feet) (Feet)
Elevation of deaerator tank minimum water level above pumprsquos first impeller
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Method Name Is there head loss across feed valve Typical psi loss across feed valve Typical feed water temperature Typical Specific Gravity Conversion formula Typical feet of head loss across feed valve Pump Speed Type Duty Is orifce flow by-pass line required Orifice flow rate
1 On Off control and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Intermittent No Not applicable
2 Feed control valve and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Continuous Yes 20 of nominal
3 Feed control valve and variable speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Variable Continuous Yes 20 of nominal
4 Variable speed pumps only (no control valve) No None 225degF 0954 Not applicable Not applicable Variable Continuous No Not applicable
Orifice flow rate varies by manufacturers Will use 20 for these exercises
Must add for all head factors on suction and discharge sides of pump
Method Name Pump Speed Type Duty Is orifice flow by-pass line required
1 OnOff control and fixed speed pumps Fixed Intermittent No
2 Feed control valve and fixed speed pumps Fixed Continuous Yes
3 Feed control valve and variable speed pumps Variable Continuous Yes
4 Variable speed pumps only (no control valve) Variable Continuous No
Page 30: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW

To the Base flow we MIGHT add if specified

For Continuous Boiler Blowdown flowbull Approximately 5 to10 of the pumprsquos flow

rate at the Best Efficiency Point

30

ADD FOR BYPASS RECIRCULATION FLOWCertain feed system control modes require the use of a bypass line back to the source tank ndash such as back to the deaerator tank

Method

NamePump Speed

TypeDuty

Is orifice flow by-pass line

required1 OnOff control and fixed speed pumps Fixed Intermittent No2 Feed control valve and fixed speed pumps Fixed Continuous Yes3 Feed control valve and variable speed pumps Variable Continuous Yes4 Variable speed pumps only (no control valve) Variable Continuous No

31

Sheet1

RECIRCULATION FLOW

bull The solid curve below shows the minimum flow rate as a percentage of the nominal flow rate in relation to the liquid temperature

bull Ignore the dotted line which indicates a pump with special high-temperature construction

32

CALCULATING REQUIRED FEED PUMP HEAD

+ Suction side head+ Discharge side head= Total Dynamic Head

Elevation of DA tank

Elevation of boiler

33

FEED VALVE IMPACTS PUMPING HEAD CALCULATION

34

CALCULATING THE HEADFOR THE FEED PUMP1) At the duty point flow rateHead in feet = Boiler operating pressure X 231 X 103 divide Liquid Specific Gravity

Example Head = 130 psi X 231 X 103 divide 0953 = 324 feet

2) At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific Gravity

Example Head = 160 psi X 231 X 103 divide 0953 = 400 feet

35

NPSH ndashFORMULA FOR CALCULATION

NPSHr is obtained from the pump curve

Add two to four feet of safety factor to the NPSHr stated on the curve

NPSHa is calculated

+ Absolute pressure in deaerator tank

plusmn Elevation of minimum water level in tank above feed pump

- Vapor pressure of water in deaerator tank

- Suction line friction loss

= Net Positive Suction Head Available

To avoid cavitation NPSHa must be greater than NPSHr

36

NPSH AND ELEVATIONDeaerator

tank

Boiler feed

pumps

Minimum water level in DA tank

Location of eye of lowest impeller

Difference in elevation

37

NPSH AND SUCTION LINE CONSIDERATIONS

Critical suction line considerations here

38

Check list for boiler feed pump selection

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

39

Sheet2

BOILER FEED PUMPS USEFUL FORMULAS

40

Sheet1

SPECIFICATION FOR EXERCISEa) Control Method Continuous duty fixed speed pump with bypass line and feed valveb) Boiler maximum capacity = 250 HPc) Boiler safety valve setting = 125 psigd) Pressure safety factor = 3 above boilerrsquos safety valve settinge) Boiler operating pressure = 100 psigf) Continuous Boiler Blowdown flow - Requiredg) Bypass recirculation flow ndash Requiredh) Altitude ndash Sea leveli) Pressure in deaerator tank above atmospheric pressure = 5 psi (147 + 5 = 197 psi absolute)j) Height of deaerator tank minimum water level above pumprsquos first impeller = 10 feetk) Friction line loss through suction piping = 5 footl) Friction loss through suction side fittings = 5 footm) Friction loss through suction side valves = Nonen) Friction loss through suction side strainer = 1 feeto) Friction loss through discharge piping = 1 footp) Friction loss through discharge side fittings = 1 footq) Pressure drop across feed valve ndash 15 psir) Elevation of boiler maximum water level above pumprsquos discharge port = 5 feets) Liquid Specific Gravity = 0953t) Temperature of water in deaerator tank = 227 degrees Fu) Vapor pressure in deaerator tank = 197 psiv) Pump materials all 316 stainless steel to resist treatment chemicalsw) Mechanical seal to be silicon carbidesilicon carbideEPDM to withstand liquid temperature

41

Feed pumps

CONTROL METHOD

Fixed speed pumps with feed valve and recirculation line

Recirc line

Feed valve

42

STEP 1 ndashDetermine control methodFeed valve controlled system with a continuous duty fixed speed pump has been specified

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

43

Sheet2

STEP 2 ndashCalculate the BASE feed pump flow rate

The formula for this calculation is

bull Boiler maximum capacity in horsepower X 0069 X C

bull The maximum capacity in boiler horsepower is 250

bull The C factor is 115 for continuous duty

Therefore

250 X 0069 X 115 = 20 gpm = BASE flow rate

44

STEP 3 ndashContinuous Boiler Blowdown Flow

Determination

1 The BASE flow rate has been established at 20 gpm

2 We will on next slide need to add for bypass flow which can add 10 to 20 percent to the BASE flow rate

3 Blowdown flow is to be approximately 10 percent of flow at pumprsquos Best Efficiency Point

4 So the total boiler blowdown flow required is approximately 3 gpm

45

STEP 4 ndashAdd for by-pass flow

bull Control is via feed valve with fixed speed pump and for continuous dutybull A bypass will be required

bull Solid curve to right shows minimum flow rate as a percentage of nominal flow rate in relation to liquid temperature

bull Ignore dotted line which indicates a pump with special high-temperature construction

bull At 227degF we require a bypass flow that is about 20 of BEP flow

bull Presuming we can find a pump with BEP at about 25 or so gpm the bypass flow must be about 5 gpm

46

STEP 5 ndashCalculate total flow requiredbull BASE flow = 20 gpmbull Blowdown flow = 3 gpmbull Recirculation flow = 5 gpmbull Total flow required = 28 gpm

XXXX

X

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

47

Sheet2

STEP 6 ndashCalculate BASE pumping head

Boiler operating pressure setting + 3

Formula BASE head in feet = Boiler operating pressure X 231 X 103 divide Specific Gravity

BASE head = 100 psi X 231 X 103 divide 0953 = 250 feet

48

STEP 7 ndashAdd for suction piping system head components

From specificationAbsolute pressure on deaerator tank = 197 psi X 231 = - 46 feetWater elevation above first impeller = - 10 feetFriction loss through suction piping = + 5 feetFriction loss through suction fittings = + 5 feetFriction loss through suction side valves and strainer = + 1 feet

Total = - 54 feet

49

STEP 8 ndashAdd for discharge piping system head components

From specificationFriction loss through discharge piping = + 1 footFriction loss through discharge fittings = + 1 footFriction loss through feed valve is 15 psi X 231 = + 35 feetElevation of boiler maximum water level above pump = + 5 feet

Total = + 42 feet

50

STEP 9 ndashSum of all head components

BASE head with safety factor = + 250 feetSuction side piping system head = - 54 feetDischarge side piping system head = + 42 feet

Total = + 238 feet

51

STEP 10 ndashPressure safety valve considerations At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific GravityExample Head = 125 psi X 231 X 103 divide 0953 = 312 feet

XXXXXXXXX

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

52

Sheet2

STEP 11 ndashDetermine deaerator tank water temperature

From specification 227degF

53

STEP 12 ndashNPSHa calculation

NPSHa equation

plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa

10 feet + (197 psi X 231) - (197 psi X 231) - 2 feet = NPSHa10 feet + 46 feet - 46 feet - 2 feet = 8 feet NPSHa

54

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
1 Base flow calculation equation
Boiler maximum capacity horsepower X 0069 X C = Base flow rate
C = 150 for OnOff intermittent operation
C = 115 for continuous feed operation
2 Determine BASE head for feed pump
Formula based on Safety Valve setting
Pump head in feet = Maximum pressure X 231 X 103 divide Liquid Specific Gravity
3 Head components on suction side of piping system
Pressure above atmospheric on deaerator converted to feet of head = feet
Elevation difference between minimum deaerator water level and pump inlet = feet
Suction pipe friction loss = feet
Suction fitting friction loss = feet
Suction line valves and strainer friction loss = feet
Total = feet
4 Head components on discharge side of piping system
Friction loss through discharge piping = feet
Friction loss through discharge fittings = feet
Friction loss through feed valve = feet
Elevation of boiler maximum water level above pump = feet
Total = feet
5 NPSHa equation
plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa
(Feet) (psi X 231 = Feet) (psi X 231 = Feet) (Feet) (Feet)
Elevation of deaerator tank minimum water level above pumprsquos first impeller
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Method Name Is there head loss across feed valve Typical psi loss across feed valve Typical feed water temperature Typical Specific Gravity Conversion formula Typical feet of head loss across feed valve Pump Speed Type Duty Is orifce flow by-pass line required Orifice flow rate
1 On Off control and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Intermittent No Not applicable
2 Feed control valve and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Continuous Yes 20 of nominal
3 Feed control valve and variable speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Variable Continuous Yes 20 of nominal
4 Variable speed pumps only (no control valve) No None 225degF 0954 Not applicable Not applicable Variable Continuous No Not applicable
Orifice flow rate varies by manufacturers Will use 20 for these exercises
Must add for all head factors on suction and discharge sides of pump
Method Name Pump Speed Type Duty Is orifice flow by-pass line required
1 OnOff control and fixed speed pumps Fixed Intermittent No
2 Feed control valve and fixed speed pumps Fixed Continuous Yes
3 Feed control valve and variable speed pumps Variable Continuous Yes
4 Variable speed pumps only (no control valve) Variable Continuous No
Page 31: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

ADD FOR BYPASS RECIRCULATION FLOWCertain feed system control modes require the use of a bypass line back to the source tank ndash such as back to the deaerator tank

Method

NamePump Speed

TypeDuty

Is orifice flow by-pass line

required1 OnOff control and fixed speed pumps Fixed Intermittent No2 Feed control valve and fixed speed pumps Fixed Continuous Yes3 Feed control valve and variable speed pumps Variable Continuous Yes4 Variable speed pumps only (no control valve) Variable Continuous No

31

Sheet1

RECIRCULATION FLOW

bull The solid curve below shows the minimum flow rate as a percentage of the nominal flow rate in relation to the liquid temperature

bull Ignore the dotted line which indicates a pump with special high-temperature construction

32

CALCULATING REQUIRED FEED PUMP HEAD

+ Suction side head+ Discharge side head= Total Dynamic Head

Elevation of DA tank

Elevation of boiler

33

FEED VALVE IMPACTS PUMPING HEAD CALCULATION

34

CALCULATING THE HEADFOR THE FEED PUMP1) At the duty point flow rateHead in feet = Boiler operating pressure X 231 X 103 divide Liquid Specific Gravity

Example Head = 130 psi X 231 X 103 divide 0953 = 324 feet

2) At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific Gravity

Example Head = 160 psi X 231 X 103 divide 0953 = 400 feet

35

NPSH ndashFORMULA FOR CALCULATION

NPSHr is obtained from the pump curve

Add two to four feet of safety factor to the NPSHr stated on the curve

NPSHa is calculated

+ Absolute pressure in deaerator tank

plusmn Elevation of minimum water level in tank above feed pump

- Vapor pressure of water in deaerator tank

- Suction line friction loss

= Net Positive Suction Head Available

To avoid cavitation NPSHa must be greater than NPSHr

36

NPSH AND ELEVATIONDeaerator

tank

Boiler feed

pumps

Minimum water level in DA tank

Location of eye of lowest impeller

Difference in elevation

37

NPSH AND SUCTION LINE CONSIDERATIONS

Critical suction line considerations here

38

Check list for boiler feed pump selection

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

39

Sheet2

BOILER FEED PUMPS USEFUL FORMULAS

40

Sheet1

SPECIFICATION FOR EXERCISEa) Control Method Continuous duty fixed speed pump with bypass line and feed valveb) Boiler maximum capacity = 250 HPc) Boiler safety valve setting = 125 psigd) Pressure safety factor = 3 above boilerrsquos safety valve settinge) Boiler operating pressure = 100 psigf) Continuous Boiler Blowdown flow - Requiredg) Bypass recirculation flow ndash Requiredh) Altitude ndash Sea leveli) Pressure in deaerator tank above atmospheric pressure = 5 psi (147 + 5 = 197 psi absolute)j) Height of deaerator tank minimum water level above pumprsquos first impeller = 10 feetk) Friction line loss through suction piping = 5 footl) Friction loss through suction side fittings = 5 footm) Friction loss through suction side valves = Nonen) Friction loss through suction side strainer = 1 feeto) Friction loss through discharge piping = 1 footp) Friction loss through discharge side fittings = 1 footq) Pressure drop across feed valve ndash 15 psir) Elevation of boiler maximum water level above pumprsquos discharge port = 5 feets) Liquid Specific Gravity = 0953t) Temperature of water in deaerator tank = 227 degrees Fu) Vapor pressure in deaerator tank = 197 psiv) Pump materials all 316 stainless steel to resist treatment chemicalsw) Mechanical seal to be silicon carbidesilicon carbideEPDM to withstand liquid temperature

41

Feed pumps

CONTROL METHOD

Fixed speed pumps with feed valve and recirculation line

Recirc line

Feed valve

42

STEP 1 ndashDetermine control methodFeed valve controlled system with a continuous duty fixed speed pump has been specified

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

43

Sheet2

STEP 2 ndashCalculate the BASE feed pump flow rate

The formula for this calculation is

bull Boiler maximum capacity in horsepower X 0069 X C

bull The maximum capacity in boiler horsepower is 250

bull The C factor is 115 for continuous duty

Therefore

250 X 0069 X 115 = 20 gpm = BASE flow rate

44

STEP 3 ndashContinuous Boiler Blowdown Flow

Determination

1 The BASE flow rate has been established at 20 gpm

2 We will on next slide need to add for bypass flow which can add 10 to 20 percent to the BASE flow rate

3 Blowdown flow is to be approximately 10 percent of flow at pumprsquos Best Efficiency Point

4 So the total boiler blowdown flow required is approximately 3 gpm

45

STEP 4 ndashAdd for by-pass flow

bull Control is via feed valve with fixed speed pump and for continuous dutybull A bypass will be required

bull Solid curve to right shows minimum flow rate as a percentage of nominal flow rate in relation to liquid temperature

bull Ignore dotted line which indicates a pump with special high-temperature construction

bull At 227degF we require a bypass flow that is about 20 of BEP flow

bull Presuming we can find a pump with BEP at about 25 or so gpm the bypass flow must be about 5 gpm

46

STEP 5 ndashCalculate total flow requiredbull BASE flow = 20 gpmbull Blowdown flow = 3 gpmbull Recirculation flow = 5 gpmbull Total flow required = 28 gpm

XXXX

X

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

47

Sheet2

STEP 6 ndashCalculate BASE pumping head

Boiler operating pressure setting + 3

Formula BASE head in feet = Boiler operating pressure X 231 X 103 divide Specific Gravity

BASE head = 100 psi X 231 X 103 divide 0953 = 250 feet

48

STEP 7 ndashAdd for suction piping system head components

From specificationAbsolute pressure on deaerator tank = 197 psi X 231 = - 46 feetWater elevation above first impeller = - 10 feetFriction loss through suction piping = + 5 feetFriction loss through suction fittings = + 5 feetFriction loss through suction side valves and strainer = + 1 feet

Total = - 54 feet

49

STEP 8 ndashAdd for discharge piping system head components

From specificationFriction loss through discharge piping = + 1 footFriction loss through discharge fittings = + 1 footFriction loss through feed valve is 15 psi X 231 = + 35 feetElevation of boiler maximum water level above pump = + 5 feet

Total = + 42 feet

50

STEP 9 ndashSum of all head components

BASE head with safety factor = + 250 feetSuction side piping system head = - 54 feetDischarge side piping system head = + 42 feet

Total = + 238 feet

51

STEP 10 ndashPressure safety valve considerations At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific GravityExample Head = 125 psi X 231 X 103 divide 0953 = 312 feet

XXXXXXXXX

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

52

Sheet2

STEP 11 ndashDetermine deaerator tank water temperature

From specification 227degF

53

STEP 12 ndashNPSHa calculation

NPSHa equation

plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa

10 feet + (197 psi X 231) - (197 psi X 231) - 2 feet = NPSHa10 feet + 46 feet - 46 feet - 2 feet = 8 feet NPSHa

54

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
1 Base flow calculation equation
Boiler maximum capacity horsepower X 0069 X C = Base flow rate
C = 150 for OnOff intermittent operation
C = 115 for continuous feed operation
2 Determine BASE head for feed pump
Formula based on Safety Valve setting
Pump head in feet = Maximum pressure X 231 X 103 divide Liquid Specific Gravity
3 Head components on suction side of piping system
Pressure above atmospheric on deaerator converted to feet of head = feet
Elevation difference between minimum deaerator water level and pump inlet = feet
Suction pipe friction loss = feet
Suction fitting friction loss = feet
Suction line valves and strainer friction loss = feet
Total = feet
4 Head components on discharge side of piping system
Friction loss through discharge piping = feet
Friction loss through discharge fittings = feet
Friction loss through feed valve = feet
Elevation of boiler maximum water level above pump = feet
Total = feet
5 NPSHa equation
plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa
(Feet) (psi X 231 = Feet) (psi X 231 = Feet) (Feet) (Feet)
Elevation of deaerator tank minimum water level above pumprsquos first impeller
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Method Name Is there head loss across feed valve Typical psi loss across feed valve Typical feed water temperature Typical Specific Gravity Conversion formula Typical feet of head loss across feed valve Pump Speed Type Duty Is orifce flow by-pass line required Orifice flow rate
1 On Off control and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Intermittent No Not applicable
2 Feed control valve and fixed speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Fixed Continuous Yes 20 of nominal
3 Feed control valve and variable speed pumps Yes 30 225degF 0954 psi X 231 divide Sp Grv = feet 726 Variable Continuous Yes 20 of nominal
4 Variable speed pumps only (no control valve) No None 225degF 0954 Not applicable Not applicable Variable Continuous No Not applicable
Orifice flow rate varies by manufacturers Will use 20 for these exercises
Must add for all head factors on suction and discharge sides of pump
Method Name Pump Speed Type Duty Is orifice flow by-pass line required
1 OnOff control and fixed speed pumps Fixed Intermittent No
2 Feed control valve and fixed speed pumps Fixed Continuous Yes
3 Feed control valve and variable speed pumps Variable Continuous Yes
4 Variable speed pumps only (no control valve) Variable Continuous No
Page 32: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

RECIRCULATION FLOW

bull The solid curve below shows the minimum flow rate as a percentage of the nominal flow rate in relation to the liquid temperature

bull Ignore the dotted line which indicates a pump with special high-temperature construction

32

CALCULATING REQUIRED FEED PUMP HEAD

+ Suction side head+ Discharge side head= Total Dynamic Head

Elevation of DA tank

Elevation of boiler

33

FEED VALVE IMPACTS PUMPING HEAD CALCULATION

34

CALCULATING THE HEADFOR THE FEED PUMP1) At the duty point flow rateHead in feet = Boiler operating pressure X 231 X 103 divide Liquid Specific Gravity

Example Head = 130 psi X 231 X 103 divide 0953 = 324 feet

2) At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific Gravity

Example Head = 160 psi X 231 X 103 divide 0953 = 400 feet

35

NPSH ndashFORMULA FOR CALCULATION

NPSHr is obtained from the pump curve

Add two to four feet of safety factor to the NPSHr stated on the curve

NPSHa is calculated

+ Absolute pressure in deaerator tank

plusmn Elevation of minimum water level in tank above feed pump

- Vapor pressure of water in deaerator tank

- Suction line friction loss

= Net Positive Suction Head Available

To avoid cavitation NPSHa must be greater than NPSHr

36

NPSH AND ELEVATIONDeaerator

tank

Boiler feed

pumps

Minimum water level in DA tank

Location of eye of lowest impeller

Difference in elevation

37

NPSH AND SUCTION LINE CONSIDERATIONS

Critical suction line considerations here

38

Check list for boiler feed pump selection

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

39

Sheet2

BOILER FEED PUMPS USEFUL FORMULAS

40

Sheet1

SPECIFICATION FOR EXERCISEa) Control Method Continuous duty fixed speed pump with bypass line and feed valveb) Boiler maximum capacity = 250 HPc) Boiler safety valve setting = 125 psigd) Pressure safety factor = 3 above boilerrsquos safety valve settinge) Boiler operating pressure = 100 psigf) Continuous Boiler Blowdown flow - Requiredg) Bypass recirculation flow ndash Requiredh) Altitude ndash Sea leveli) Pressure in deaerator tank above atmospheric pressure = 5 psi (147 + 5 = 197 psi absolute)j) Height of deaerator tank minimum water level above pumprsquos first impeller = 10 feetk) Friction line loss through suction piping = 5 footl) Friction loss through suction side fittings = 5 footm) Friction loss through suction side valves = Nonen) Friction loss through suction side strainer = 1 feeto) Friction loss through discharge piping = 1 footp) Friction loss through discharge side fittings = 1 footq) Pressure drop across feed valve ndash 15 psir) Elevation of boiler maximum water level above pumprsquos discharge port = 5 feets) Liquid Specific Gravity = 0953t) Temperature of water in deaerator tank = 227 degrees Fu) Vapor pressure in deaerator tank = 197 psiv) Pump materials all 316 stainless steel to resist treatment chemicalsw) Mechanical seal to be silicon carbidesilicon carbideEPDM to withstand liquid temperature

41

Feed pumps

CONTROL METHOD

Fixed speed pumps with feed valve and recirculation line

Recirc line

Feed valve

42

STEP 1 ndashDetermine control methodFeed valve controlled system with a continuous duty fixed speed pump has been specified

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

43

Sheet2

STEP 2 ndashCalculate the BASE feed pump flow rate

The formula for this calculation is

bull Boiler maximum capacity in horsepower X 0069 X C

bull The maximum capacity in boiler horsepower is 250

bull The C factor is 115 for continuous duty

Therefore

250 X 0069 X 115 = 20 gpm = BASE flow rate

44

STEP 3 ndashContinuous Boiler Blowdown Flow

Determination

1 The BASE flow rate has been established at 20 gpm

2 We will on next slide need to add for bypass flow which can add 10 to 20 percent to the BASE flow rate

3 Blowdown flow is to be approximately 10 percent of flow at pumprsquos Best Efficiency Point

4 So the total boiler blowdown flow required is approximately 3 gpm

45

STEP 4 ndashAdd for by-pass flow

bull Control is via feed valve with fixed speed pump and for continuous dutybull A bypass will be required

bull Solid curve to right shows minimum flow rate as a percentage of nominal flow rate in relation to liquid temperature

bull Ignore dotted line which indicates a pump with special high-temperature construction

bull At 227degF we require a bypass flow that is about 20 of BEP flow

bull Presuming we can find a pump with BEP at about 25 or so gpm the bypass flow must be about 5 gpm

46

STEP 5 ndashCalculate total flow requiredbull BASE flow = 20 gpmbull Blowdown flow = 3 gpmbull Recirculation flow = 5 gpmbull Total flow required = 28 gpm

XXXX

X

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

47

Sheet2

STEP 6 ndashCalculate BASE pumping head

Boiler operating pressure setting + 3

Formula BASE head in feet = Boiler operating pressure X 231 X 103 divide Specific Gravity

BASE head = 100 psi X 231 X 103 divide 0953 = 250 feet

48

STEP 7 ndashAdd for suction piping system head components

From specificationAbsolute pressure on deaerator tank = 197 psi X 231 = - 46 feetWater elevation above first impeller = - 10 feetFriction loss through suction piping = + 5 feetFriction loss through suction fittings = + 5 feetFriction loss through suction side valves and strainer = + 1 feet

Total = - 54 feet

49

STEP 8 ndashAdd for discharge piping system head components

From specificationFriction loss through discharge piping = + 1 footFriction loss through discharge fittings = + 1 footFriction loss through feed valve is 15 psi X 231 = + 35 feetElevation of boiler maximum water level above pump = + 5 feet

Total = + 42 feet

50

STEP 9 ndashSum of all head components

BASE head with safety factor = + 250 feetSuction side piping system head = - 54 feetDischarge side piping system head = + 42 feet

Total = + 238 feet

51

STEP 10 ndashPressure safety valve considerations At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific GravityExample Head = 125 psi X 231 X 103 divide 0953 = 312 feet

XXXXXXXXX

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

52

Sheet2

STEP 11 ndashDetermine deaerator tank water temperature

From specification 227degF

53

STEP 12 ndashNPSHa calculation

NPSHa equation

plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa

10 feet + (197 psi X 231) - (197 psi X 231) - 2 feet = NPSHa10 feet + 46 feet - 46 feet - 2 feet = 8 feet NPSHa

54

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
1 Base flow calculation equation
Boiler maximum capacity horsepower X 0069 X C = Base flow rate
C = 150 for OnOff intermittent operation
C = 115 for continuous feed operation
2 Determine BASE head for feed pump
Formula based on Safety Valve setting
Pump head in feet = Maximum pressure X 231 X 103 divide Liquid Specific Gravity
3 Head components on suction side of piping system
Pressure above atmospheric on deaerator converted to feet of head = feet
Elevation difference between minimum deaerator water level and pump inlet = feet
Suction pipe friction loss = feet
Suction fitting friction loss = feet
Suction line valves and strainer friction loss = feet
Total = feet
4 Head components on discharge side of piping system
Friction loss through discharge piping = feet
Friction loss through discharge fittings = feet
Friction loss through feed valve = feet
Elevation of boiler maximum water level above pump = feet
Total = feet
5 NPSHa equation
plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa
(Feet) (psi X 231 = Feet) (psi X 231 = Feet) (Feet) (Feet)
Elevation of deaerator tank minimum water level above pumprsquos first impeller
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Page 33: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

CALCULATING REQUIRED FEED PUMP HEAD

+ Suction side head+ Discharge side head= Total Dynamic Head

Elevation of DA tank

Elevation of boiler

33

FEED VALVE IMPACTS PUMPING HEAD CALCULATION

34

CALCULATING THE HEADFOR THE FEED PUMP1) At the duty point flow rateHead in feet = Boiler operating pressure X 231 X 103 divide Liquid Specific Gravity

Example Head = 130 psi X 231 X 103 divide 0953 = 324 feet

2) At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific Gravity

Example Head = 160 psi X 231 X 103 divide 0953 = 400 feet

35

NPSH ndashFORMULA FOR CALCULATION

NPSHr is obtained from the pump curve

Add two to four feet of safety factor to the NPSHr stated on the curve

NPSHa is calculated

+ Absolute pressure in deaerator tank

plusmn Elevation of minimum water level in tank above feed pump

- Vapor pressure of water in deaerator tank

- Suction line friction loss

= Net Positive Suction Head Available

To avoid cavitation NPSHa must be greater than NPSHr

36

NPSH AND ELEVATIONDeaerator

tank

Boiler feed

pumps

Minimum water level in DA tank

Location of eye of lowest impeller

Difference in elevation

37

NPSH AND SUCTION LINE CONSIDERATIONS

Critical suction line considerations here

38

Check list for boiler feed pump selection

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

39

Sheet2

BOILER FEED PUMPS USEFUL FORMULAS

40

Sheet1

SPECIFICATION FOR EXERCISEa) Control Method Continuous duty fixed speed pump with bypass line and feed valveb) Boiler maximum capacity = 250 HPc) Boiler safety valve setting = 125 psigd) Pressure safety factor = 3 above boilerrsquos safety valve settinge) Boiler operating pressure = 100 psigf) Continuous Boiler Blowdown flow - Requiredg) Bypass recirculation flow ndash Requiredh) Altitude ndash Sea leveli) Pressure in deaerator tank above atmospheric pressure = 5 psi (147 + 5 = 197 psi absolute)j) Height of deaerator tank minimum water level above pumprsquos first impeller = 10 feetk) Friction line loss through suction piping = 5 footl) Friction loss through suction side fittings = 5 footm) Friction loss through suction side valves = Nonen) Friction loss through suction side strainer = 1 feeto) Friction loss through discharge piping = 1 footp) Friction loss through discharge side fittings = 1 footq) Pressure drop across feed valve ndash 15 psir) Elevation of boiler maximum water level above pumprsquos discharge port = 5 feets) Liquid Specific Gravity = 0953t) Temperature of water in deaerator tank = 227 degrees Fu) Vapor pressure in deaerator tank = 197 psiv) Pump materials all 316 stainless steel to resist treatment chemicalsw) Mechanical seal to be silicon carbidesilicon carbideEPDM to withstand liquid temperature

41

Feed pumps

CONTROL METHOD

Fixed speed pumps with feed valve and recirculation line

Recirc line

Feed valve

42

STEP 1 ndashDetermine control methodFeed valve controlled system with a continuous duty fixed speed pump has been specified

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

43

Sheet2

STEP 2 ndashCalculate the BASE feed pump flow rate

The formula for this calculation is

bull Boiler maximum capacity in horsepower X 0069 X C

bull The maximum capacity in boiler horsepower is 250

bull The C factor is 115 for continuous duty

Therefore

250 X 0069 X 115 = 20 gpm = BASE flow rate

44

STEP 3 ndashContinuous Boiler Blowdown Flow

Determination

1 The BASE flow rate has been established at 20 gpm

2 We will on next slide need to add for bypass flow which can add 10 to 20 percent to the BASE flow rate

3 Blowdown flow is to be approximately 10 percent of flow at pumprsquos Best Efficiency Point

4 So the total boiler blowdown flow required is approximately 3 gpm

45

STEP 4 ndashAdd for by-pass flow

bull Control is via feed valve with fixed speed pump and for continuous dutybull A bypass will be required

bull Solid curve to right shows minimum flow rate as a percentage of nominal flow rate in relation to liquid temperature

bull Ignore dotted line which indicates a pump with special high-temperature construction

bull At 227degF we require a bypass flow that is about 20 of BEP flow

bull Presuming we can find a pump with BEP at about 25 or so gpm the bypass flow must be about 5 gpm

46

STEP 5 ndashCalculate total flow requiredbull BASE flow = 20 gpmbull Blowdown flow = 3 gpmbull Recirculation flow = 5 gpmbull Total flow required = 28 gpm

XXXX

X

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

47

Sheet2

STEP 6 ndashCalculate BASE pumping head

Boiler operating pressure setting + 3

Formula BASE head in feet = Boiler operating pressure X 231 X 103 divide Specific Gravity

BASE head = 100 psi X 231 X 103 divide 0953 = 250 feet

48

STEP 7 ndashAdd for suction piping system head components

From specificationAbsolute pressure on deaerator tank = 197 psi X 231 = - 46 feetWater elevation above first impeller = - 10 feetFriction loss through suction piping = + 5 feetFriction loss through suction fittings = + 5 feetFriction loss through suction side valves and strainer = + 1 feet

Total = - 54 feet

49

STEP 8 ndashAdd for discharge piping system head components

From specificationFriction loss through discharge piping = + 1 footFriction loss through discharge fittings = + 1 footFriction loss through feed valve is 15 psi X 231 = + 35 feetElevation of boiler maximum water level above pump = + 5 feet

Total = + 42 feet

50

STEP 9 ndashSum of all head components

BASE head with safety factor = + 250 feetSuction side piping system head = - 54 feetDischarge side piping system head = + 42 feet

Total = + 238 feet

51

STEP 10 ndashPressure safety valve considerations At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific GravityExample Head = 125 psi X 231 X 103 divide 0953 = 312 feet

XXXXXXXXX

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

52

Sheet2

STEP 11 ndashDetermine deaerator tank water temperature

From specification 227degF

53

STEP 12 ndashNPSHa calculation

NPSHa equation

plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa

10 feet + (197 psi X 231) - (197 psi X 231) - 2 feet = NPSHa10 feet + 46 feet - 46 feet - 2 feet = 8 feet NPSHa

54

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
1 Base flow calculation equation
Boiler maximum capacity horsepower X 0069 X C = Base flow rate
C = 150 for OnOff intermittent operation
C = 115 for continuous feed operation
2 Determine BASE head for feed pump
Formula based on Safety Valve setting
Pump head in feet = Maximum pressure X 231 X 103 divide Liquid Specific Gravity
3 Head components on suction side of piping system
Pressure above atmospheric on deaerator converted to feet of head = feet
Elevation difference between minimum deaerator water level and pump inlet = feet
Suction pipe friction loss = feet
Suction fitting friction loss = feet
Suction line valves and strainer friction loss = feet
Total = feet
4 Head components on discharge side of piping system
Friction loss through discharge piping = feet
Friction loss through discharge fittings = feet
Friction loss through feed valve = feet
Elevation of boiler maximum water level above pump = feet
Total = feet
5 NPSHa equation
plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa
(Feet) (psi X 231 = Feet) (psi X 231 = Feet) (Feet) (Feet)
Elevation of deaerator tank minimum water level above pumprsquos first impeller
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Page 34: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

FEED VALVE IMPACTS PUMPING HEAD CALCULATION

34

CALCULATING THE HEADFOR THE FEED PUMP1) At the duty point flow rateHead in feet = Boiler operating pressure X 231 X 103 divide Liquid Specific Gravity

Example Head = 130 psi X 231 X 103 divide 0953 = 324 feet

2) At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific Gravity

Example Head = 160 psi X 231 X 103 divide 0953 = 400 feet

35

NPSH ndashFORMULA FOR CALCULATION

NPSHr is obtained from the pump curve

Add two to four feet of safety factor to the NPSHr stated on the curve

NPSHa is calculated

+ Absolute pressure in deaerator tank

plusmn Elevation of minimum water level in tank above feed pump

- Vapor pressure of water in deaerator tank

- Suction line friction loss

= Net Positive Suction Head Available

To avoid cavitation NPSHa must be greater than NPSHr

36

NPSH AND ELEVATIONDeaerator

tank

Boiler feed

pumps

Minimum water level in DA tank

Location of eye of lowest impeller

Difference in elevation

37

NPSH AND SUCTION LINE CONSIDERATIONS

Critical suction line considerations here

38

Check list for boiler feed pump selection

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

39

Sheet2

BOILER FEED PUMPS USEFUL FORMULAS

40

Sheet1

SPECIFICATION FOR EXERCISEa) Control Method Continuous duty fixed speed pump with bypass line and feed valveb) Boiler maximum capacity = 250 HPc) Boiler safety valve setting = 125 psigd) Pressure safety factor = 3 above boilerrsquos safety valve settinge) Boiler operating pressure = 100 psigf) Continuous Boiler Blowdown flow - Requiredg) Bypass recirculation flow ndash Requiredh) Altitude ndash Sea leveli) Pressure in deaerator tank above atmospheric pressure = 5 psi (147 + 5 = 197 psi absolute)j) Height of deaerator tank minimum water level above pumprsquos first impeller = 10 feetk) Friction line loss through suction piping = 5 footl) Friction loss through suction side fittings = 5 footm) Friction loss through suction side valves = Nonen) Friction loss through suction side strainer = 1 feeto) Friction loss through discharge piping = 1 footp) Friction loss through discharge side fittings = 1 footq) Pressure drop across feed valve ndash 15 psir) Elevation of boiler maximum water level above pumprsquos discharge port = 5 feets) Liquid Specific Gravity = 0953t) Temperature of water in deaerator tank = 227 degrees Fu) Vapor pressure in deaerator tank = 197 psiv) Pump materials all 316 stainless steel to resist treatment chemicalsw) Mechanical seal to be silicon carbidesilicon carbideEPDM to withstand liquid temperature

41

Feed pumps

CONTROL METHOD

Fixed speed pumps with feed valve and recirculation line

Recirc line

Feed valve

42

STEP 1 ndashDetermine control methodFeed valve controlled system with a continuous duty fixed speed pump has been specified

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

43

Sheet2

STEP 2 ndashCalculate the BASE feed pump flow rate

The formula for this calculation is

bull Boiler maximum capacity in horsepower X 0069 X C

bull The maximum capacity in boiler horsepower is 250

bull The C factor is 115 for continuous duty

Therefore

250 X 0069 X 115 = 20 gpm = BASE flow rate

44

STEP 3 ndashContinuous Boiler Blowdown Flow

Determination

1 The BASE flow rate has been established at 20 gpm

2 We will on next slide need to add for bypass flow which can add 10 to 20 percent to the BASE flow rate

3 Blowdown flow is to be approximately 10 percent of flow at pumprsquos Best Efficiency Point

4 So the total boiler blowdown flow required is approximately 3 gpm

45

STEP 4 ndashAdd for by-pass flow

bull Control is via feed valve with fixed speed pump and for continuous dutybull A bypass will be required

bull Solid curve to right shows minimum flow rate as a percentage of nominal flow rate in relation to liquid temperature

bull Ignore dotted line which indicates a pump with special high-temperature construction

bull At 227degF we require a bypass flow that is about 20 of BEP flow

bull Presuming we can find a pump with BEP at about 25 or so gpm the bypass flow must be about 5 gpm

46

STEP 5 ndashCalculate total flow requiredbull BASE flow = 20 gpmbull Blowdown flow = 3 gpmbull Recirculation flow = 5 gpmbull Total flow required = 28 gpm

XXXX

X

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

47

Sheet2

STEP 6 ndashCalculate BASE pumping head

Boiler operating pressure setting + 3

Formula BASE head in feet = Boiler operating pressure X 231 X 103 divide Specific Gravity

BASE head = 100 psi X 231 X 103 divide 0953 = 250 feet

48

STEP 7 ndashAdd for suction piping system head components

From specificationAbsolute pressure on deaerator tank = 197 psi X 231 = - 46 feetWater elevation above first impeller = - 10 feetFriction loss through suction piping = + 5 feetFriction loss through suction fittings = + 5 feetFriction loss through suction side valves and strainer = + 1 feet

Total = - 54 feet

49

STEP 8 ndashAdd for discharge piping system head components

From specificationFriction loss through discharge piping = + 1 footFriction loss through discharge fittings = + 1 footFriction loss through feed valve is 15 psi X 231 = + 35 feetElevation of boiler maximum water level above pump = + 5 feet

Total = + 42 feet

50

STEP 9 ndashSum of all head components

BASE head with safety factor = + 250 feetSuction side piping system head = - 54 feetDischarge side piping system head = + 42 feet

Total = + 238 feet

51

STEP 10 ndashPressure safety valve considerations At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific GravityExample Head = 125 psi X 231 X 103 divide 0953 = 312 feet

XXXXXXXXX

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

52

Sheet2

STEP 11 ndashDetermine deaerator tank water temperature

From specification 227degF

53

STEP 12 ndashNPSHa calculation

NPSHa equation

plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa

10 feet + (197 psi X 231) - (197 psi X 231) - 2 feet = NPSHa10 feet + 46 feet - 46 feet - 2 feet = 8 feet NPSHa

54

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
1 Base flow calculation equation
Boiler maximum capacity horsepower X 0069 X C = Base flow rate
C = 150 for OnOff intermittent operation
C = 115 for continuous feed operation
2 Determine BASE head for feed pump
Formula based on Safety Valve setting
Pump head in feet = Maximum pressure X 231 X 103 divide Liquid Specific Gravity
3 Head components on suction side of piping system
Pressure above atmospheric on deaerator converted to feet of head = feet
Elevation difference between minimum deaerator water level and pump inlet = feet
Suction pipe friction loss = feet
Suction fitting friction loss = feet
Suction line valves and strainer friction loss = feet
Total = feet
4 Head components on discharge side of piping system
Friction loss through discharge piping = feet
Friction loss through discharge fittings = feet
Friction loss through feed valve = feet
Elevation of boiler maximum water level above pump = feet
Total = feet
5 NPSHa equation
plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa
(Feet) (psi X 231 = Feet) (psi X 231 = Feet) (Feet) (Feet)
Elevation of deaerator tank minimum water level above pumprsquos first impeller
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Page 35: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

CALCULATING THE HEADFOR THE FEED PUMP1) At the duty point flow rateHead in feet = Boiler operating pressure X 231 X 103 divide Liquid Specific Gravity

Example Head = 130 psi X 231 X 103 divide 0953 = 324 feet

2) At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific Gravity

Example Head = 160 psi X 231 X 103 divide 0953 = 400 feet

35

NPSH ndashFORMULA FOR CALCULATION

NPSHr is obtained from the pump curve

Add two to four feet of safety factor to the NPSHr stated on the curve

NPSHa is calculated

+ Absolute pressure in deaerator tank

plusmn Elevation of minimum water level in tank above feed pump

- Vapor pressure of water in deaerator tank

- Suction line friction loss

= Net Positive Suction Head Available

To avoid cavitation NPSHa must be greater than NPSHr

36

NPSH AND ELEVATIONDeaerator

tank

Boiler feed

pumps

Minimum water level in DA tank

Location of eye of lowest impeller

Difference in elevation

37

NPSH AND SUCTION LINE CONSIDERATIONS

Critical suction line considerations here

38

Check list for boiler feed pump selection

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

39

Sheet2

BOILER FEED PUMPS USEFUL FORMULAS

40

Sheet1

SPECIFICATION FOR EXERCISEa) Control Method Continuous duty fixed speed pump with bypass line and feed valveb) Boiler maximum capacity = 250 HPc) Boiler safety valve setting = 125 psigd) Pressure safety factor = 3 above boilerrsquos safety valve settinge) Boiler operating pressure = 100 psigf) Continuous Boiler Blowdown flow - Requiredg) Bypass recirculation flow ndash Requiredh) Altitude ndash Sea leveli) Pressure in deaerator tank above atmospheric pressure = 5 psi (147 + 5 = 197 psi absolute)j) Height of deaerator tank minimum water level above pumprsquos first impeller = 10 feetk) Friction line loss through suction piping = 5 footl) Friction loss through suction side fittings = 5 footm) Friction loss through suction side valves = Nonen) Friction loss through suction side strainer = 1 feeto) Friction loss through discharge piping = 1 footp) Friction loss through discharge side fittings = 1 footq) Pressure drop across feed valve ndash 15 psir) Elevation of boiler maximum water level above pumprsquos discharge port = 5 feets) Liquid Specific Gravity = 0953t) Temperature of water in deaerator tank = 227 degrees Fu) Vapor pressure in deaerator tank = 197 psiv) Pump materials all 316 stainless steel to resist treatment chemicalsw) Mechanical seal to be silicon carbidesilicon carbideEPDM to withstand liquid temperature

41

Feed pumps

CONTROL METHOD

Fixed speed pumps with feed valve and recirculation line

Recirc line

Feed valve

42

STEP 1 ndashDetermine control methodFeed valve controlled system with a continuous duty fixed speed pump has been specified

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

43

Sheet2

STEP 2 ndashCalculate the BASE feed pump flow rate

The formula for this calculation is

bull Boiler maximum capacity in horsepower X 0069 X C

bull The maximum capacity in boiler horsepower is 250

bull The C factor is 115 for continuous duty

Therefore

250 X 0069 X 115 = 20 gpm = BASE flow rate

44

STEP 3 ndashContinuous Boiler Blowdown Flow

Determination

1 The BASE flow rate has been established at 20 gpm

2 We will on next slide need to add for bypass flow which can add 10 to 20 percent to the BASE flow rate

3 Blowdown flow is to be approximately 10 percent of flow at pumprsquos Best Efficiency Point

4 So the total boiler blowdown flow required is approximately 3 gpm

45

STEP 4 ndashAdd for by-pass flow

bull Control is via feed valve with fixed speed pump and for continuous dutybull A bypass will be required

bull Solid curve to right shows minimum flow rate as a percentage of nominal flow rate in relation to liquid temperature

bull Ignore dotted line which indicates a pump with special high-temperature construction

bull At 227degF we require a bypass flow that is about 20 of BEP flow

bull Presuming we can find a pump with BEP at about 25 or so gpm the bypass flow must be about 5 gpm

46

STEP 5 ndashCalculate total flow requiredbull BASE flow = 20 gpmbull Blowdown flow = 3 gpmbull Recirculation flow = 5 gpmbull Total flow required = 28 gpm

XXXX

X

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

47

Sheet2

STEP 6 ndashCalculate BASE pumping head

Boiler operating pressure setting + 3

Formula BASE head in feet = Boiler operating pressure X 231 X 103 divide Specific Gravity

BASE head = 100 psi X 231 X 103 divide 0953 = 250 feet

48

STEP 7 ndashAdd for suction piping system head components

From specificationAbsolute pressure on deaerator tank = 197 psi X 231 = - 46 feetWater elevation above first impeller = - 10 feetFriction loss through suction piping = + 5 feetFriction loss through suction fittings = + 5 feetFriction loss through suction side valves and strainer = + 1 feet

Total = - 54 feet

49

STEP 8 ndashAdd for discharge piping system head components

From specificationFriction loss through discharge piping = + 1 footFriction loss through discharge fittings = + 1 footFriction loss through feed valve is 15 psi X 231 = + 35 feetElevation of boiler maximum water level above pump = + 5 feet

Total = + 42 feet

50

STEP 9 ndashSum of all head components

BASE head with safety factor = + 250 feetSuction side piping system head = - 54 feetDischarge side piping system head = + 42 feet

Total = + 238 feet

51

STEP 10 ndashPressure safety valve considerations At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific GravityExample Head = 125 psi X 231 X 103 divide 0953 = 312 feet

XXXXXXXXX

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

52

Sheet2

STEP 11 ndashDetermine deaerator tank water temperature

From specification 227degF

53

STEP 12 ndashNPSHa calculation

NPSHa equation

plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa

10 feet + (197 psi X 231) - (197 psi X 231) - 2 feet = NPSHa10 feet + 46 feet - 46 feet - 2 feet = 8 feet NPSHa

54

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
1 Base flow calculation equation
Boiler maximum capacity horsepower X 0069 X C = Base flow rate
C = 150 for OnOff intermittent operation
C = 115 for continuous feed operation
2 Determine BASE head for feed pump
Formula based on Safety Valve setting
Pump head in feet = Maximum pressure X 231 X 103 divide Liquid Specific Gravity
3 Head components on suction side of piping system
Pressure above atmospheric on deaerator converted to feet of head = feet
Elevation difference between minimum deaerator water level and pump inlet = feet
Suction pipe friction loss = feet
Suction fitting friction loss = feet
Suction line valves and strainer friction loss = feet
Total = feet
4 Head components on discharge side of piping system
Friction loss through discharge piping = feet
Friction loss through discharge fittings = feet
Friction loss through feed valve = feet
Elevation of boiler maximum water level above pump = feet
Total = feet
5 NPSHa equation
plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa
(Feet) (psi X 231 = Feet) (psi X 231 = Feet) (Feet) (Feet)
Elevation of deaerator tank minimum water level above pumprsquos first impeller
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Page 36: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

NPSH ndashFORMULA FOR CALCULATION

NPSHr is obtained from the pump curve

Add two to four feet of safety factor to the NPSHr stated on the curve

NPSHa is calculated

+ Absolute pressure in deaerator tank

plusmn Elevation of minimum water level in tank above feed pump

- Vapor pressure of water in deaerator tank

- Suction line friction loss

= Net Positive Suction Head Available

To avoid cavitation NPSHa must be greater than NPSHr

36

NPSH AND ELEVATIONDeaerator

tank

Boiler feed

pumps

Minimum water level in DA tank

Location of eye of lowest impeller

Difference in elevation

37

NPSH AND SUCTION LINE CONSIDERATIONS

Critical suction line considerations here

38

Check list for boiler feed pump selection

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

39

Sheet2

BOILER FEED PUMPS USEFUL FORMULAS

40

Sheet1

SPECIFICATION FOR EXERCISEa) Control Method Continuous duty fixed speed pump with bypass line and feed valveb) Boiler maximum capacity = 250 HPc) Boiler safety valve setting = 125 psigd) Pressure safety factor = 3 above boilerrsquos safety valve settinge) Boiler operating pressure = 100 psigf) Continuous Boiler Blowdown flow - Requiredg) Bypass recirculation flow ndash Requiredh) Altitude ndash Sea leveli) Pressure in deaerator tank above atmospheric pressure = 5 psi (147 + 5 = 197 psi absolute)j) Height of deaerator tank minimum water level above pumprsquos first impeller = 10 feetk) Friction line loss through suction piping = 5 footl) Friction loss through suction side fittings = 5 footm) Friction loss through suction side valves = Nonen) Friction loss through suction side strainer = 1 feeto) Friction loss through discharge piping = 1 footp) Friction loss through discharge side fittings = 1 footq) Pressure drop across feed valve ndash 15 psir) Elevation of boiler maximum water level above pumprsquos discharge port = 5 feets) Liquid Specific Gravity = 0953t) Temperature of water in deaerator tank = 227 degrees Fu) Vapor pressure in deaerator tank = 197 psiv) Pump materials all 316 stainless steel to resist treatment chemicalsw) Mechanical seal to be silicon carbidesilicon carbideEPDM to withstand liquid temperature

41

Feed pumps

CONTROL METHOD

Fixed speed pumps with feed valve and recirculation line

Recirc line

Feed valve

42

STEP 1 ndashDetermine control methodFeed valve controlled system with a continuous duty fixed speed pump has been specified

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

43

Sheet2

STEP 2 ndashCalculate the BASE feed pump flow rate

The formula for this calculation is

bull Boiler maximum capacity in horsepower X 0069 X C

bull The maximum capacity in boiler horsepower is 250

bull The C factor is 115 for continuous duty

Therefore

250 X 0069 X 115 = 20 gpm = BASE flow rate

44

STEP 3 ndashContinuous Boiler Blowdown Flow

Determination

1 The BASE flow rate has been established at 20 gpm

2 We will on next slide need to add for bypass flow which can add 10 to 20 percent to the BASE flow rate

3 Blowdown flow is to be approximately 10 percent of flow at pumprsquos Best Efficiency Point

4 So the total boiler blowdown flow required is approximately 3 gpm

45

STEP 4 ndashAdd for by-pass flow

bull Control is via feed valve with fixed speed pump and for continuous dutybull A bypass will be required

bull Solid curve to right shows minimum flow rate as a percentage of nominal flow rate in relation to liquid temperature

bull Ignore dotted line which indicates a pump with special high-temperature construction

bull At 227degF we require a bypass flow that is about 20 of BEP flow

bull Presuming we can find a pump with BEP at about 25 or so gpm the bypass flow must be about 5 gpm

46

STEP 5 ndashCalculate total flow requiredbull BASE flow = 20 gpmbull Blowdown flow = 3 gpmbull Recirculation flow = 5 gpmbull Total flow required = 28 gpm

XXXX

X

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

47

Sheet2

STEP 6 ndashCalculate BASE pumping head

Boiler operating pressure setting + 3

Formula BASE head in feet = Boiler operating pressure X 231 X 103 divide Specific Gravity

BASE head = 100 psi X 231 X 103 divide 0953 = 250 feet

48

STEP 7 ndashAdd for suction piping system head components

From specificationAbsolute pressure on deaerator tank = 197 psi X 231 = - 46 feetWater elevation above first impeller = - 10 feetFriction loss through suction piping = + 5 feetFriction loss through suction fittings = + 5 feetFriction loss through suction side valves and strainer = + 1 feet

Total = - 54 feet

49

STEP 8 ndashAdd for discharge piping system head components

From specificationFriction loss through discharge piping = + 1 footFriction loss through discharge fittings = + 1 footFriction loss through feed valve is 15 psi X 231 = + 35 feetElevation of boiler maximum water level above pump = + 5 feet

Total = + 42 feet

50

STEP 9 ndashSum of all head components

BASE head with safety factor = + 250 feetSuction side piping system head = - 54 feetDischarge side piping system head = + 42 feet

Total = + 238 feet

51

STEP 10 ndashPressure safety valve considerations At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific GravityExample Head = 125 psi X 231 X 103 divide 0953 = 312 feet

XXXXXXXXX

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

52

Sheet2

STEP 11 ndashDetermine deaerator tank water temperature

From specification 227degF

53

STEP 12 ndashNPSHa calculation

NPSHa equation

plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa

10 feet + (197 psi X 231) - (197 psi X 231) - 2 feet = NPSHa10 feet + 46 feet - 46 feet - 2 feet = 8 feet NPSHa

54

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
1 Base flow calculation equation
Boiler maximum capacity horsepower X 0069 X C = Base flow rate
C = 150 for OnOff intermittent operation
C = 115 for continuous feed operation
2 Determine BASE head for feed pump
Formula based on Safety Valve setting
Pump head in feet = Maximum pressure X 231 X 103 divide Liquid Specific Gravity
3 Head components on suction side of piping system
Pressure above atmospheric on deaerator converted to feet of head = feet
Elevation difference between minimum deaerator water level and pump inlet = feet
Suction pipe friction loss = feet
Suction fitting friction loss = feet
Suction line valves and strainer friction loss = feet
Total = feet
4 Head components on discharge side of piping system
Friction loss through discharge piping = feet
Friction loss through discharge fittings = feet
Friction loss through feed valve = feet
Elevation of boiler maximum water level above pump = feet
Total = feet
5 NPSHa equation
plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa
(Feet) (psi X 231 = Feet) (psi X 231 = Feet) (Feet) (Feet)
Elevation of deaerator tank minimum water level above pumprsquos first impeller
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Page 37: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

NPSH AND ELEVATIONDeaerator

tank

Boiler feed

pumps

Minimum water level in DA tank

Location of eye of lowest impeller

Difference in elevation

37

NPSH AND SUCTION LINE CONSIDERATIONS

Critical suction line considerations here

38

Check list for boiler feed pump selection

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

39

Sheet2

BOILER FEED PUMPS USEFUL FORMULAS

40

Sheet1

SPECIFICATION FOR EXERCISEa) Control Method Continuous duty fixed speed pump with bypass line and feed valveb) Boiler maximum capacity = 250 HPc) Boiler safety valve setting = 125 psigd) Pressure safety factor = 3 above boilerrsquos safety valve settinge) Boiler operating pressure = 100 psigf) Continuous Boiler Blowdown flow - Requiredg) Bypass recirculation flow ndash Requiredh) Altitude ndash Sea leveli) Pressure in deaerator tank above atmospheric pressure = 5 psi (147 + 5 = 197 psi absolute)j) Height of deaerator tank minimum water level above pumprsquos first impeller = 10 feetk) Friction line loss through suction piping = 5 footl) Friction loss through suction side fittings = 5 footm) Friction loss through suction side valves = Nonen) Friction loss through suction side strainer = 1 feeto) Friction loss through discharge piping = 1 footp) Friction loss through discharge side fittings = 1 footq) Pressure drop across feed valve ndash 15 psir) Elevation of boiler maximum water level above pumprsquos discharge port = 5 feets) Liquid Specific Gravity = 0953t) Temperature of water in deaerator tank = 227 degrees Fu) Vapor pressure in deaerator tank = 197 psiv) Pump materials all 316 stainless steel to resist treatment chemicalsw) Mechanical seal to be silicon carbidesilicon carbideEPDM to withstand liquid temperature

41

Feed pumps

CONTROL METHOD

Fixed speed pumps with feed valve and recirculation line

Recirc line

Feed valve

42

STEP 1 ndashDetermine control methodFeed valve controlled system with a continuous duty fixed speed pump has been specified

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

43

Sheet2

STEP 2 ndashCalculate the BASE feed pump flow rate

The formula for this calculation is

bull Boiler maximum capacity in horsepower X 0069 X C

bull The maximum capacity in boiler horsepower is 250

bull The C factor is 115 for continuous duty

Therefore

250 X 0069 X 115 = 20 gpm = BASE flow rate

44

STEP 3 ndashContinuous Boiler Blowdown Flow

Determination

1 The BASE flow rate has been established at 20 gpm

2 We will on next slide need to add for bypass flow which can add 10 to 20 percent to the BASE flow rate

3 Blowdown flow is to be approximately 10 percent of flow at pumprsquos Best Efficiency Point

4 So the total boiler blowdown flow required is approximately 3 gpm

45

STEP 4 ndashAdd for by-pass flow

bull Control is via feed valve with fixed speed pump and for continuous dutybull A bypass will be required

bull Solid curve to right shows minimum flow rate as a percentage of nominal flow rate in relation to liquid temperature

bull Ignore dotted line which indicates a pump with special high-temperature construction

bull At 227degF we require a bypass flow that is about 20 of BEP flow

bull Presuming we can find a pump with BEP at about 25 or so gpm the bypass flow must be about 5 gpm

46

STEP 5 ndashCalculate total flow requiredbull BASE flow = 20 gpmbull Blowdown flow = 3 gpmbull Recirculation flow = 5 gpmbull Total flow required = 28 gpm

XXXX

X

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

47

Sheet2

STEP 6 ndashCalculate BASE pumping head

Boiler operating pressure setting + 3

Formula BASE head in feet = Boiler operating pressure X 231 X 103 divide Specific Gravity

BASE head = 100 psi X 231 X 103 divide 0953 = 250 feet

48

STEP 7 ndashAdd for suction piping system head components

From specificationAbsolute pressure on deaerator tank = 197 psi X 231 = - 46 feetWater elevation above first impeller = - 10 feetFriction loss through suction piping = + 5 feetFriction loss through suction fittings = + 5 feetFriction loss through suction side valves and strainer = + 1 feet

Total = - 54 feet

49

STEP 8 ndashAdd for discharge piping system head components

From specificationFriction loss through discharge piping = + 1 footFriction loss through discharge fittings = + 1 footFriction loss through feed valve is 15 psi X 231 = + 35 feetElevation of boiler maximum water level above pump = + 5 feet

Total = + 42 feet

50

STEP 9 ndashSum of all head components

BASE head with safety factor = + 250 feetSuction side piping system head = - 54 feetDischarge side piping system head = + 42 feet

Total = + 238 feet

51

STEP 10 ndashPressure safety valve considerations At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific GravityExample Head = 125 psi X 231 X 103 divide 0953 = 312 feet

XXXXXXXXX

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

52

Sheet2

STEP 11 ndashDetermine deaerator tank water temperature

From specification 227degF

53

STEP 12 ndashNPSHa calculation

NPSHa equation

plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa

10 feet + (197 psi X 231) - (197 psi X 231) - 2 feet = NPSHa10 feet + 46 feet - 46 feet - 2 feet = 8 feet NPSHa

54

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
1 Base flow calculation equation
Boiler maximum capacity horsepower X 0069 X C = Base flow rate
C = 150 for OnOff intermittent operation
C = 115 for continuous feed operation
2 Determine BASE head for feed pump
Formula based on Safety Valve setting
Pump head in feet = Maximum pressure X 231 X 103 divide Liquid Specific Gravity
3 Head components on suction side of piping system
Pressure above atmospheric on deaerator converted to feet of head = feet
Elevation difference between minimum deaerator water level and pump inlet = feet
Suction pipe friction loss = feet
Suction fitting friction loss = feet
Suction line valves and strainer friction loss = feet
Total = feet
4 Head components on discharge side of piping system
Friction loss through discharge piping = feet
Friction loss through discharge fittings = feet
Friction loss through feed valve = feet
Elevation of boiler maximum water level above pump = feet
Total = feet
5 NPSHa equation
plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa
(Feet) (psi X 231 = Feet) (psi X 231 = Feet) (Feet) (Feet)
Elevation of deaerator tank minimum water level above pumprsquos first impeller
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Page 38: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

NPSH AND SUCTION LINE CONSIDERATIONS

Critical suction line considerations here

38

Check list for boiler feed pump selection

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

39

Sheet2

BOILER FEED PUMPS USEFUL FORMULAS

40

Sheet1

SPECIFICATION FOR EXERCISEa) Control Method Continuous duty fixed speed pump with bypass line and feed valveb) Boiler maximum capacity = 250 HPc) Boiler safety valve setting = 125 psigd) Pressure safety factor = 3 above boilerrsquos safety valve settinge) Boiler operating pressure = 100 psigf) Continuous Boiler Blowdown flow - Requiredg) Bypass recirculation flow ndash Requiredh) Altitude ndash Sea leveli) Pressure in deaerator tank above atmospheric pressure = 5 psi (147 + 5 = 197 psi absolute)j) Height of deaerator tank minimum water level above pumprsquos first impeller = 10 feetk) Friction line loss through suction piping = 5 footl) Friction loss through suction side fittings = 5 footm) Friction loss through suction side valves = Nonen) Friction loss through suction side strainer = 1 feeto) Friction loss through discharge piping = 1 footp) Friction loss through discharge side fittings = 1 footq) Pressure drop across feed valve ndash 15 psir) Elevation of boiler maximum water level above pumprsquos discharge port = 5 feets) Liquid Specific Gravity = 0953t) Temperature of water in deaerator tank = 227 degrees Fu) Vapor pressure in deaerator tank = 197 psiv) Pump materials all 316 stainless steel to resist treatment chemicalsw) Mechanical seal to be silicon carbidesilicon carbideEPDM to withstand liquid temperature

41

Feed pumps

CONTROL METHOD

Fixed speed pumps with feed valve and recirculation line

Recirc line

Feed valve

42

STEP 1 ndashDetermine control methodFeed valve controlled system with a continuous duty fixed speed pump has been specified

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

43

Sheet2

STEP 2 ndashCalculate the BASE feed pump flow rate

The formula for this calculation is

bull Boiler maximum capacity in horsepower X 0069 X C

bull The maximum capacity in boiler horsepower is 250

bull The C factor is 115 for continuous duty

Therefore

250 X 0069 X 115 = 20 gpm = BASE flow rate

44

STEP 3 ndashContinuous Boiler Blowdown Flow

Determination

1 The BASE flow rate has been established at 20 gpm

2 We will on next slide need to add for bypass flow which can add 10 to 20 percent to the BASE flow rate

3 Blowdown flow is to be approximately 10 percent of flow at pumprsquos Best Efficiency Point

4 So the total boiler blowdown flow required is approximately 3 gpm

45

STEP 4 ndashAdd for by-pass flow

bull Control is via feed valve with fixed speed pump and for continuous dutybull A bypass will be required

bull Solid curve to right shows minimum flow rate as a percentage of nominal flow rate in relation to liquid temperature

bull Ignore dotted line which indicates a pump with special high-temperature construction

bull At 227degF we require a bypass flow that is about 20 of BEP flow

bull Presuming we can find a pump with BEP at about 25 or so gpm the bypass flow must be about 5 gpm

46

STEP 5 ndashCalculate total flow requiredbull BASE flow = 20 gpmbull Blowdown flow = 3 gpmbull Recirculation flow = 5 gpmbull Total flow required = 28 gpm

XXXX

X

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

47

Sheet2

STEP 6 ndashCalculate BASE pumping head

Boiler operating pressure setting + 3

Formula BASE head in feet = Boiler operating pressure X 231 X 103 divide Specific Gravity

BASE head = 100 psi X 231 X 103 divide 0953 = 250 feet

48

STEP 7 ndashAdd for suction piping system head components

From specificationAbsolute pressure on deaerator tank = 197 psi X 231 = - 46 feetWater elevation above first impeller = - 10 feetFriction loss through suction piping = + 5 feetFriction loss through suction fittings = + 5 feetFriction loss through suction side valves and strainer = + 1 feet

Total = - 54 feet

49

STEP 8 ndashAdd for discharge piping system head components

From specificationFriction loss through discharge piping = + 1 footFriction loss through discharge fittings = + 1 footFriction loss through feed valve is 15 psi X 231 = + 35 feetElevation of boiler maximum water level above pump = + 5 feet

Total = + 42 feet

50

STEP 9 ndashSum of all head components

BASE head with safety factor = + 250 feetSuction side piping system head = - 54 feetDischarge side piping system head = + 42 feet

Total = + 238 feet

51

STEP 10 ndashPressure safety valve considerations At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific GravityExample Head = 125 psi X 231 X 103 divide 0953 = 312 feet

XXXXXXXXX

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

52

Sheet2

STEP 11 ndashDetermine deaerator tank water temperature

From specification 227degF

53

STEP 12 ndashNPSHa calculation

NPSHa equation

plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa

10 feet + (197 psi X 231) - (197 psi X 231) - 2 feet = NPSHa10 feet + 46 feet - 46 feet - 2 feet = 8 feet NPSHa

54

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
1 Base flow calculation equation
Boiler maximum capacity horsepower X 0069 X C = Base flow rate
C = 150 for OnOff intermittent operation
C = 115 for continuous feed operation
2 Determine BASE head for feed pump
Formula based on Safety Valve setting
Pump head in feet = Maximum pressure X 231 X 103 divide Liquid Specific Gravity
3 Head components on suction side of piping system
Pressure above atmospheric on deaerator converted to feet of head = feet
Elevation difference between minimum deaerator water level and pump inlet = feet
Suction pipe friction loss = feet
Suction fitting friction loss = feet
Suction line valves and strainer friction loss = feet
Total = feet
4 Head components on discharge side of piping system
Friction loss through discharge piping = feet
Friction loss through discharge fittings = feet
Friction loss through feed valve = feet
Elevation of boiler maximum water level above pump = feet
Total = feet
5 NPSHa equation
plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa
(Feet) (psi X 231 = Feet) (psi X 231 = Feet) (Feet) (Feet)
Elevation of deaerator tank minimum water level above pumprsquos first impeller
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Page 39: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

Check list for boiler feed pump selection

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

39

Sheet2

BOILER FEED PUMPS USEFUL FORMULAS

40

Sheet1

SPECIFICATION FOR EXERCISEa) Control Method Continuous duty fixed speed pump with bypass line and feed valveb) Boiler maximum capacity = 250 HPc) Boiler safety valve setting = 125 psigd) Pressure safety factor = 3 above boilerrsquos safety valve settinge) Boiler operating pressure = 100 psigf) Continuous Boiler Blowdown flow - Requiredg) Bypass recirculation flow ndash Requiredh) Altitude ndash Sea leveli) Pressure in deaerator tank above atmospheric pressure = 5 psi (147 + 5 = 197 psi absolute)j) Height of deaerator tank minimum water level above pumprsquos first impeller = 10 feetk) Friction line loss through suction piping = 5 footl) Friction loss through suction side fittings = 5 footm) Friction loss through suction side valves = Nonen) Friction loss through suction side strainer = 1 feeto) Friction loss through discharge piping = 1 footp) Friction loss through discharge side fittings = 1 footq) Pressure drop across feed valve ndash 15 psir) Elevation of boiler maximum water level above pumprsquos discharge port = 5 feets) Liquid Specific Gravity = 0953t) Temperature of water in deaerator tank = 227 degrees Fu) Vapor pressure in deaerator tank = 197 psiv) Pump materials all 316 stainless steel to resist treatment chemicalsw) Mechanical seal to be silicon carbidesilicon carbideEPDM to withstand liquid temperature

41

Feed pumps

CONTROL METHOD

Fixed speed pumps with feed valve and recirculation line

Recirc line

Feed valve

42

STEP 1 ndashDetermine control methodFeed valve controlled system with a continuous duty fixed speed pump has been specified

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

43

Sheet2

STEP 2 ndashCalculate the BASE feed pump flow rate

The formula for this calculation is

bull Boiler maximum capacity in horsepower X 0069 X C

bull The maximum capacity in boiler horsepower is 250

bull The C factor is 115 for continuous duty

Therefore

250 X 0069 X 115 = 20 gpm = BASE flow rate

44

STEP 3 ndashContinuous Boiler Blowdown Flow

Determination

1 The BASE flow rate has been established at 20 gpm

2 We will on next slide need to add for bypass flow which can add 10 to 20 percent to the BASE flow rate

3 Blowdown flow is to be approximately 10 percent of flow at pumprsquos Best Efficiency Point

4 So the total boiler blowdown flow required is approximately 3 gpm

45

STEP 4 ndashAdd for by-pass flow

bull Control is via feed valve with fixed speed pump and for continuous dutybull A bypass will be required

bull Solid curve to right shows minimum flow rate as a percentage of nominal flow rate in relation to liquid temperature

bull Ignore dotted line which indicates a pump with special high-temperature construction

bull At 227degF we require a bypass flow that is about 20 of BEP flow

bull Presuming we can find a pump with BEP at about 25 or so gpm the bypass flow must be about 5 gpm

46

STEP 5 ndashCalculate total flow requiredbull BASE flow = 20 gpmbull Blowdown flow = 3 gpmbull Recirculation flow = 5 gpmbull Total flow required = 28 gpm

XXXX

X

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

47

Sheet2

STEP 6 ndashCalculate BASE pumping head

Boiler operating pressure setting + 3

Formula BASE head in feet = Boiler operating pressure X 231 X 103 divide Specific Gravity

BASE head = 100 psi X 231 X 103 divide 0953 = 250 feet

48

STEP 7 ndashAdd for suction piping system head components

From specificationAbsolute pressure on deaerator tank = 197 psi X 231 = - 46 feetWater elevation above first impeller = - 10 feetFriction loss through suction piping = + 5 feetFriction loss through suction fittings = + 5 feetFriction loss through suction side valves and strainer = + 1 feet

Total = - 54 feet

49

STEP 8 ndashAdd for discharge piping system head components

From specificationFriction loss through discharge piping = + 1 footFriction loss through discharge fittings = + 1 footFriction loss through feed valve is 15 psi X 231 = + 35 feetElevation of boiler maximum water level above pump = + 5 feet

Total = + 42 feet

50

STEP 9 ndashSum of all head components

BASE head with safety factor = + 250 feetSuction side piping system head = - 54 feetDischarge side piping system head = + 42 feet

Total = + 238 feet

51

STEP 10 ndashPressure safety valve considerations At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific GravityExample Head = 125 psi X 231 X 103 divide 0953 = 312 feet

XXXXXXXXX

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

52

Sheet2

STEP 11 ndashDetermine deaerator tank water temperature

From specification 227degF

53

STEP 12 ndashNPSHa calculation

NPSHa equation

plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa

10 feet + (197 psi X 231) - (197 psi X 231) - 2 feet = NPSHa10 feet + 46 feet - 46 feet - 2 feet = 8 feet NPSHa

54

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
1 Base flow calculation equation
Boiler maximum capacity horsepower X 0069 X C = Base flow rate
C = 150 for OnOff intermittent operation
C = 115 for continuous feed operation
2 Determine BASE head for feed pump
Formula based on Safety Valve setting
Pump head in feet = Maximum pressure X 231 X 103 divide Liquid Specific Gravity
3 Head components on suction side of piping system
Pressure above atmospheric on deaerator converted to feet of head = feet
Elevation difference between minimum deaerator water level and pump inlet = feet
Suction pipe friction loss = feet
Suction fitting friction loss = feet
Suction line valves and strainer friction loss = feet
Total = feet
4 Head components on discharge side of piping system
Friction loss through discharge piping = feet
Friction loss through discharge fittings = feet
Friction loss through feed valve = feet
Elevation of boiler maximum water level above pump = feet
Total = feet
5 NPSHa equation
plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa
(Feet) (psi X 231 = Feet) (psi X 231 = Feet) (Feet) (Feet)
Elevation of deaerator tank minimum water level above pumprsquos first impeller
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Page 40: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

BOILER FEED PUMPS USEFUL FORMULAS

40

Sheet1

SPECIFICATION FOR EXERCISEa) Control Method Continuous duty fixed speed pump with bypass line and feed valveb) Boiler maximum capacity = 250 HPc) Boiler safety valve setting = 125 psigd) Pressure safety factor = 3 above boilerrsquos safety valve settinge) Boiler operating pressure = 100 psigf) Continuous Boiler Blowdown flow - Requiredg) Bypass recirculation flow ndash Requiredh) Altitude ndash Sea leveli) Pressure in deaerator tank above atmospheric pressure = 5 psi (147 + 5 = 197 psi absolute)j) Height of deaerator tank minimum water level above pumprsquos first impeller = 10 feetk) Friction line loss through suction piping = 5 footl) Friction loss through suction side fittings = 5 footm) Friction loss through suction side valves = Nonen) Friction loss through suction side strainer = 1 feeto) Friction loss through discharge piping = 1 footp) Friction loss through discharge side fittings = 1 footq) Pressure drop across feed valve ndash 15 psir) Elevation of boiler maximum water level above pumprsquos discharge port = 5 feets) Liquid Specific Gravity = 0953t) Temperature of water in deaerator tank = 227 degrees Fu) Vapor pressure in deaerator tank = 197 psiv) Pump materials all 316 stainless steel to resist treatment chemicalsw) Mechanical seal to be silicon carbidesilicon carbideEPDM to withstand liquid temperature

41

Feed pumps

CONTROL METHOD

Fixed speed pumps with feed valve and recirculation line

Recirc line

Feed valve

42

STEP 1 ndashDetermine control methodFeed valve controlled system with a continuous duty fixed speed pump has been specified

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

43

Sheet2

STEP 2 ndashCalculate the BASE feed pump flow rate

The formula for this calculation is

bull Boiler maximum capacity in horsepower X 0069 X C

bull The maximum capacity in boiler horsepower is 250

bull The C factor is 115 for continuous duty

Therefore

250 X 0069 X 115 = 20 gpm = BASE flow rate

44

STEP 3 ndashContinuous Boiler Blowdown Flow

Determination

1 The BASE flow rate has been established at 20 gpm

2 We will on next slide need to add for bypass flow which can add 10 to 20 percent to the BASE flow rate

3 Blowdown flow is to be approximately 10 percent of flow at pumprsquos Best Efficiency Point

4 So the total boiler blowdown flow required is approximately 3 gpm

45

STEP 4 ndashAdd for by-pass flow

bull Control is via feed valve with fixed speed pump and for continuous dutybull A bypass will be required

bull Solid curve to right shows minimum flow rate as a percentage of nominal flow rate in relation to liquid temperature

bull Ignore dotted line which indicates a pump with special high-temperature construction

bull At 227degF we require a bypass flow that is about 20 of BEP flow

bull Presuming we can find a pump with BEP at about 25 or so gpm the bypass flow must be about 5 gpm

46

STEP 5 ndashCalculate total flow requiredbull BASE flow = 20 gpmbull Blowdown flow = 3 gpmbull Recirculation flow = 5 gpmbull Total flow required = 28 gpm

XXXX

X

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

47

Sheet2

STEP 6 ndashCalculate BASE pumping head

Boiler operating pressure setting + 3

Formula BASE head in feet = Boiler operating pressure X 231 X 103 divide Specific Gravity

BASE head = 100 psi X 231 X 103 divide 0953 = 250 feet

48

STEP 7 ndashAdd for suction piping system head components

From specificationAbsolute pressure on deaerator tank = 197 psi X 231 = - 46 feetWater elevation above first impeller = - 10 feetFriction loss through suction piping = + 5 feetFriction loss through suction fittings = + 5 feetFriction loss through suction side valves and strainer = + 1 feet

Total = - 54 feet

49

STEP 8 ndashAdd for discharge piping system head components

From specificationFriction loss through discharge piping = + 1 footFriction loss through discharge fittings = + 1 footFriction loss through feed valve is 15 psi X 231 = + 35 feetElevation of boiler maximum water level above pump = + 5 feet

Total = + 42 feet

50

STEP 9 ndashSum of all head components

BASE head with safety factor = + 250 feetSuction side piping system head = - 54 feetDischarge side piping system head = + 42 feet

Total = + 238 feet

51

STEP 10 ndashPressure safety valve considerations At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific GravityExample Head = 125 psi X 231 X 103 divide 0953 = 312 feet

XXXXXXXXX

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

52

Sheet2

STEP 11 ndashDetermine deaerator tank water temperature

From specification 227degF

53

STEP 12 ndashNPSHa calculation

NPSHa equation

plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa

10 feet + (197 psi X 231) - (197 psi X 231) - 2 feet = NPSHa10 feet + 46 feet - 46 feet - 2 feet = 8 feet NPSHa

54

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
1 Base flow calculation equation
Boiler maximum capacity horsepower X 0069 X C = Base flow rate
C = 150 for OnOff intermittent operation
C = 115 for continuous feed operation
2 Determine BASE head for feed pump
Formula based on Safety Valve setting
Pump head in feet = Maximum pressure X 231 X 103 divide Liquid Specific Gravity
3 Head components on suction side of piping system
Pressure above atmospheric on deaerator converted to feet of head = feet
Elevation difference between minimum deaerator water level and pump inlet = feet
Suction pipe friction loss = feet
Suction fitting friction loss = feet
Suction line valves and strainer friction loss = feet
Total = feet
4 Head components on discharge side of piping system
Friction loss through discharge piping = feet
Friction loss through discharge fittings = feet
Friction loss through feed valve = feet
Elevation of boiler maximum water level above pump = feet
Total = feet
5 NPSHa equation
plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa
(Feet) (psi X 231 = Feet) (psi X 231 = Feet) (Feet) (Feet)
Elevation of deaerator tank minimum water level above pumprsquos first impeller
Page 41: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

SPECIFICATION FOR EXERCISEa) Control Method Continuous duty fixed speed pump with bypass line and feed valveb) Boiler maximum capacity = 250 HPc) Boiler safety valve setting = 125 psigd) Pressure safety factor = 3 above boilerrsquos safety valve settinge) Boiler operating pressure = 100 psigf) Continuous Boiler Blowdown flow - Requiredg) Bypass recirculation flow ndash Requiredh) Altitude ndash Sea leveli) Pressure in deaerator tank above atmospheric pressure = 5 psi (147 + 5 = 197 psi absolute)j) Height of deaerator tank minimum water level above pumprsquos first impeller = 10 feetk) Friction line loss through suction piping = 5 footl) Friction loss through suction side fittings = 5 footm) Friction loss through suction side valves = Nonen) Friction loss through suction side strainer = 1 feeto) Friction loss through discharge piping = 1 footp) Friction loss through discharge side fittings = 1 footq) Pressure drop across feed valve ndash 15 psir) Elevation of boiler maximum water level above pumprsquos discharge port = 5 feets) Liquid Specific Gravity = 0953t) Temperature of water in deaerator tank = 227 degrees Fu) Vapor pressure in deaerator tank = 197 psiv) Pump materials all 316 stainless steel to resist treatment chemicalsw) Mechanical seal to be silicon carbidesilicon carbideEPDM to withstand liquid temperature

41

Feed pumps

CONTROL METHOD

Fixed speed pumps with feed valve and recirculation line

Recirc line

Feed valve

42

STEP 1 ndashDetermine control methodFeed valve controlled system with a continuous duty fixed speed pump has been specified

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

43

Sheet2

STEP 2 ndashCalculate the BASE feed pump flow rate

The formula for this calculation is

bull Boiler maximum capacity in horsepower X 0069 X C

bull The maximum capacity in boiler horsepower is 250

bull The C factor is 115 for continuous duty

Therefore

250 X 0069 X 115 = 20 gpm = BASE flow rate

44

STEP 3 ndashContinuous Boiler Blowdown Flow

Determination

1 The BASE flow rate has been established at 20 gpm

2 We will on next slide need to add for bypass flow which can add 10 to 20 percent to the BASE flow rate

3 Blowdown flow is to be approximately 10 percent of flow at pumprsquos Best Efficiency Point

4 So the total boiler blowdown flow required is approximately 3 gpm

45

STEP 4 ndashAdd for by-pass flow

bull Control is via feed valve with fixed speed pump and for continuous dutybull A bypass will be required

bull Solid curve to right shows minimum flow rate as a percentage of nominal flow rate in relation to liquid temperature

bull Ignore dotted line which indicates a pump with special high-temperature construction

bull At 227degF we require a bypass flow that is about 20 of BEP flow

bull Presuming we can find a pump with BEP at about 25 or so gpm the bypass flow must be about 5 gpm

46

STEP 5 ndashCalculate total flow requiredbull BASE flow = 20 gpmbull Blowdown flow = 3 gpmbull Recirculation flow = 5 gpmbull Total flow required = 28 gpm

XXXX

X

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

47

Sheet2

STEP 6 ndashCalculate BASE pumping head

Boiler operating pressure setting + 3

Formula BASE head in feet = Boiler operating pressure X 231 X 103 divide Specific Gravity

BASE head = 100 psi X 231 X 103 divide 0953 = 250 feet

48

STEP 7 ndashAdd for suction piping system head components

From specificationAbsolute pressure on deaerator tank = 197 psi X 231 = - 46 feetWater elevation above first impeller = - 10 feetFriction loss through suction piping = + 5 feetFriction loss through suction fittings = + 5 feetFriction loss through suction side valves and strainer = + 1 feet

Total = - 54 feet

49

STEP 8 ndashAdd for discharge piping system head components

From specificationFriction loss through discharge piping = + 1 footFriction loss through discharge fittings = + 1 footFriction loss through feed valve is 15 psi X 231 = + 35 feetElevation of boiler maximum water level above pump = + 5 feet

Total = + 42 feet

50

STEP 9 ndashSum of all head components

BASE head with safety factor = + 250 feetSuction side piping system head = - 54 feetDischarge side piping system head = + 42 feet

Total = + 238 feet

51

STEP 10 ndashPressure safety valve considerations At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific GravityExample Head = 125 psi X 231 X 103 divide 0953 = 312 feet

XXXXXXXXX

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

52

Sheet2

STEP 11 ndashDetermine deaerator tank water temperature

From specification 227degF

53

STEP 12 ndashNPSHa calculation

NPSHa equation

plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa

10 feet + (197 psi X 231) - (197 psi X 231) - 2 feet = NPSHa10 feet + 46 feet - 46 feet - 2 feet = 8 feet NPSHa

54

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Page 42: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

Feed pumps

CONTROL METHOD

Fixed speed pumps with feed valve and recirculation line

Recirc line

Feed valve

42

STEP 1 ndashDetermine control methodFeed valve controlled system with a continuous duty fixed speed pump has been specified

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

43

Sheet2

STEP 2 ndashCalculate the BASE feed pump flow rate

The formula for this calculation is

bull Boiler maximum capacity in horsepower X 0069 X C

bull The maximum capacity in boiler horsepower is 250

bull The C factor is 115 for continuous duty

Therefore

250 X 0069 X 115 = 20 gpm = BASE flow rate

44

STEP 3 ndashContinuous Boiler Blowdown Flow

Determination

1 The BASE flow rate has been established at 20 gpm

2 We will on next slide need to add for bypass flow which can add 10 to 20 percent to the BASE flow rate

3 Blowdown flow is to be approximately 10 percent of flow at pumprsquos Best Efficiency Point

4 So the total boiler blowdown flow required is approximately 3 gpm

45

STEP 4 ndashAdd for by-pass flow

bull Control is via feed valve with fixed speed pump and for continuous dutybull A bypass will be required

bull Solid curve to right shows minimum flow rate as a percentage of nominal flow rate in relation to liquid temperature

bull Ignore dotted line which indicates a pump with special high-temperature construction

bull At 227degF we require a bypass flow that is about 20 of BEP flow

bull Presuming we can find a pump with BEP at about 25 or so gpm the bypass flow must be about 5 gpm

46

STEP 5 ndashCalculate total flow requiredbull BASE flow = 20 gpmbull Blowdown flow = 3 gpmbull Recirculation flow = 5 gpmbull Total flow required = 28 gpm

XXXX

X

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

47

Sheet2

STEP 6 ndashCalculate BASE pumping head

Boiler operating pressure setting + 3

Formula BASE head in feet = Boiler operating pressure X 231 X 103 divide Specific Gravity

BASE head = 100 psi X 231 X 103 divide 0953 = 250 feet

48

STEP 7 ndashAdd for suction piping system head components

From specificationAbsolute pressure on deaerator tank = 197 psi X 231 = - 46 feetWater elevation above first impeller = - 10 feetFriction loss through suction piping = + 5 feetFriction loss through suction fittings = + 5 feetFriction loss through suction side valves and strainer = + 1 feet

Total = - 54 feet

49

STEP 8 ndashAdd for discharge piping system head components

From specificationFriction loss through discharge piping = + 1 footFriction loss through discharge fittings = + 1 footFriction loss through feed valve is 15 psi X 231 = + 35 feetElevation of boiler maximum water level above pump = + 5 feet

Total = + 42 feet

50

STEP 9 ndashSum of all head components

BASE head with safety factor = + 250 feetSuction side piping system head = - 54 feetDischarge side piping system head = + 42 feet

Total = + 238 feet

51

STEP 10 ndashPressure safety valve considerations At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific GravityExample Head = 125 psi X 231 X 103 divide 0953 = 312 feet

XXXXXXXXX

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

52

Sheet2

STEP 11 ndashDetermine deaerator tank water temperature

From specification 227degF

53

STEP 12 ndashNPSHa calculation

NPSHa equation

plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa

10 feet + (197 psi X 231) - (197 psi X 231) - 2 feet = NPSHa10 feet + 46 feet - 46 feet - 2 feet = 8 feet NPSHa

54

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Page 43: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

STEP 1 ndashDetermine control methodFeed valve controlled system with a continuous duty fixed speed pump has been specified

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

43

Sheet2

STEP 2 ndashCalculate the BASE feed pump flow rate

The formula for this calculation is

bull Boiler maximum capacity in horsepower X 0069 X C

bull The maximum capacity in boiler horsepower is 250

bull The C factor is 115 for continuous duty

Therefore

250 X 0069 X 115 = 20 gpm = BASE flow rate

44

STEP 3 ndashContinuous Boiler Blowdown Flow

Determination

1 The BASE flow rate has been established at 20 gpm

2 We will on next slide need to add for bypass flow which can add 10 to 20 percent to the BASE flow rate

3 Blowdown flow is to be approximately 10 percent of flow at pumprsquos Best Efficiency Point

4 So the total boiler blowdown flow required is approximately 3 gpm

45

STEP 4 ndashAdd for by-pass flow

bull Control is via feed valve with fixed speed pump and for continuous dutybull A bypass will be required

bull Solid curve to right shows minimum flow rate as a percentage of nominal flow rate in relation to liquid temperature

bull Ignore dotted line which indicates a pump with special high-temperature construction

bull At 227degF we require a bypass flow that is about 20 of BEP flow

bull Presuming we can find a pump with BEP at about 25 or so gpm the bypass flow must be about 5 gpm

46

STEP 5 ndashCalculate total flow requiredbull BASE flow = 20 gpmbull Blowdown flow = 3 gpmbull Recirculation flow = 5 gpmbull Total flow required = 28 gpm

XXXX

X

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

47

Sheet2

STEP 6 ndashCalculate BASE pumping head

Boiler operating pressure setting + 3

Formula BASE head in feet = Boiler operating pressure X 231 X 103 divide Specific Gravity

BASE head = 100 psi X 231 X 103 divide 0953 = 250 feet

48

STEP 7 ndashAdd for suction piping system head components

From specificationAbsolute pressure on deaerator tank = 197 psi X 231 = - 46 feetWater elevation above first impeller = - 10 feetFriction loss through suction piping = + 5 feetFriction loss through suction fittings = + 5 feetFriction loss through suction side valves and strainer = + 1 feet

Total = - 54 feet

49

STEP 8 ndashAdd for discharge piping system head components

From specificationFriction loss through discharge piping = + 1 footFriction loss through discharge fittings = + 1 footFriction loss through feed valve is 15 psi X 231 = + 35 feetElevation of boiler maximum water level above pump = + 5 feet

Total = + 42 feet

50

STEP 9 ndashSum of all head components

BASE head with safety factor = + 250 feetSuction side piping system head = - 54 feetDischarge side piping system head = + 42 feet

Total = + 238 feet

51

STEP 10 ndashPressure safety valve considerations At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific GravityExample Head = 125 psi X 231 X 103 divide 0953 = 312 feet

XXXXXXXXX

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

52

Sheet2

STEP 11 ndashDetermine deaerator tank water temperature

From specification 227degF

53

STEP 12 ndashNPSHa calculation

NPSHa equation

plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa

10 feet + (197 psi X 231) - (197 psi X 231) - 2 feet = NPSHa10 feet + 46 feet - 46 feet - 2 feet = 8 feet NPSHa

54

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Page 44: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

STEP 2 ndashCalculate the BASE feed pump flow rate

The formula for this calculation is

bull Boiler maximum capacity in horsepower X 0069 X C

bull The maximum capacity in boiler horsepower is 250

bull The C factor is 115 for continuous duty

Therefore

250 X 0069 X 115 = 20 gpm = BASE flow rate

44

STEP 3 ndashContinuous Boiler Blowdown Flow

Determination

1 The BASE flow rate has been established at 20 gpm

2 We will on next slide need to add for bypass flow which can add 10 to 20 percent to the BASE flow rate

3 Blowdown flow is to be approximately 10 percent of flow at pumprsquos Best Efficiency Point

4 So the total boiler blowdown flow required is approximately 3 gpm

45

STEP 4 ndashAdd for by-pass flow

bull Control is via feed valve with fixed speed pump and for continuous dutybull A bypass will be required

bull Solid curve to right shows minimum flow rate as a percentage of nominal flow rate in relation to liquid temperature

bull Ignore dotted line which indicates a pump with special high-temperature construction

bull At 227degF we require a bypass flow that is about 20 of BEP flow

bull Presuming we can find a pump with BEP at about 25 or so gpm the bypass flow must be about 5 gpm

46

STEP 5 ndashCalculate total flow requiredbull BASE flow = 20 gpmbull Blowdown flow = 3 gpmbull Recirculation flow = 5 gpmbull Total flow required = 28 gpm

XXXX

X

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

47

Sheet2

STEP 6 ndashCalculate BASE pumping head

Boiler operating pressure setting + 3

Formula BASE head in feet = Boiler operating pressure X 231 X 103 divide Specific Gravity

BASE head = 100 psi X 231 X 103 divide 0953 = 250 feet

48

STEP 7 ndashAdd for suction piping system head components

From specificationAbsolute pressure on deaerator tank = 197 psi X 231 = - 46 feetWater elevation above first impeller = - 10 feetFriction loss through suction piping = + 5 feetFriction loss through suction fittings = + 5 feetFriction loss through suction side valves and strainer = + 1 feet

Total = - 54 feet

49

STEP 8 ndashAdd for discharge piping system head components

From specificationFriction loss through discharge piping = + 1 footFriction loss through discharge fittings = + 1 footFriction loss through feed valve is 15 psi X 231 = + 35 feetElevation of boiler maximum water level above pump = + 5 feet

Total = + 42 feet

50

STEP 9 ndashSum of all head components

BASE head with safety factor = + 250 feetSuction side piping system head = - 54 feetDischarge side piping system head = + 42 feet

Total = + 238 feet

51

STEP 10 ndashPressure safety valve considerations At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific GravityExample Head = 125 psi X 231 X 103 divide 0953 = 312 feet

XXXXXXXXX

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

52

Sheet2

STEP 11 ndashDetermine deaerator tank water temperature

From specification 227degF

53

STEP 12 ndashNPSHa calculation

NPSHa equation

plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa

10 feet + (197 psi X 231) - (197 psi X 231) - 2 feet = NPSHa10 feet + 46 feet - 46 feet - 2 feet = 8 feet NPSHa

54

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Page 45: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

STEP 3 ndashContinuous Boiler Blowdown Flow

Determination

1 The BASE flow rate has been established at 20 gpm

2 We will on next slide need to add for bypass flow which can add 10 to 20 percent to the BASE flow rate

3 Blowdown flow is to be approximately 10 percent of flow at pumprsquos Best Efficiency Point

4 So the total boiler blowdown flow required is approximately 3 gpm

45

STEP 4 ndashAdd for by-pass flow

bull Control is via feed valve with fixed speed pump and for continuous dutybull A bypass will be required

bull Solid curve to right shows minimum flow rate as a percentage of nominal flow rate in relation to liquid temperature

bull Ignore dotted line which indicates a pump with special high-temperature construction

bull At 227degF we require a bypass flow that is about 20 of BEP flow

bull Presuming we can find a pump with BEP at about 25 or so gpm the bypass flow must be about 5 gpm

46

STEP 5 ndashCalculate total flow requiredbull BASE flow = 20 gpmbull Blowdown flow = 3 gpmbull Recirculation flow = 5 gpmbull Total flow required = 28 gpm

XXXX

X

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

47

Sheet2

STEP 6 ndashCalculate BASE pumping head

Boiler operating pressure setting + 3

Formula BASE head in feet = Boiler operating pressure X 231 X 103 divide Specific Gravity

BASE head = 100 psi X 231 X 103 divide 0953 = 250 feet

48

STEP 7 ndashAdd for suction piping system head components

From specificationAbsolute pressure on deaerator tank = 197 psi X 231 = - 46 feetWater elevation above first impeller = - 10 feetFriction loss through suction piping = + 5 feetFriction loss through suction fittings = + 5 feetFriction loss through suction side valves and strainer = + 1 feet

Total = - 54 feet

49

STEP 8 ndashAdd for discharge piping system head components

From specificationFriction loss through discharge piping = + 1 footFriction loss through discharge fittings = + 1 footFriction loss through feed valve is 15 psi X 231 = + 35 feetElevation of boiler maximum water level above pump = + 5 feet

Total = + 42 feet

50

STEP 9 ndashSum of all head components

BASE head with safety factor = + 250 feetSuction side piping system head = - 54 feetDischarge side piping system head = + 42 feet

Total = + 238 feet

51

STEP 10 ndashPressure safety valve considerations At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific GravityExample Head = 125 psi X 231 X 103 divide 0953 = 312 feet

XXXXXXXXX

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

52

Sheet2

STEP 11 ndashDetermine deaerator tank water temperature

From specification 227degF

53

STEP 12 ndashNPSHa calculation

NPSHa equation

plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa

10 feet + (197 psi X 231) - (197 psi X 231) - 2 feet = NPSHa10 feet + 46 feet - 46 feet - 2 feet = 8 feet NPSHa

54

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Page 46: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

STEP 4 ndashAdd for by-pass flow

bull Control is via feed valve with fixed speed pump and for continuous dutybull A bypass will be required

bull Solid curve to right shows minimum flow rate as a percentage of nominal flow rate in relation to liquid temperature

bull Ignore dotted line which indicates a pump with special high-temperature construction

bull At 227degF we require a bypass flow that is about 20 of BEP flow

bull Presuming we can find a pump with BEP at about 25 or so gpm the bypass flow must be about 5 gpm

46

STEP 5 ndashCalculate total flow requiredbull BASE flow = 20 gpmbull Blowdown flow = 3 gpmbull Recirculation flow = 5 gpmbull Total flow required = 28 gpm

XXXX

X

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

47

Sheet2

STEP 6 ndashCalculate BASE pumping head

Boiler operating pressure setting + 3

Formula BASE head in feet = Boiler operating pressure X 231 X 103 divide Specific Gravity

BASE head = 100 psi X 231 X 103 divide 0953 = 250 feet

48

STEP 7 ndashAdd for suction piping system head components

From specificationAbsolute pressure on deaerator tank = 197 psi X 231 = - 46 feetWater elevation above first impeller = - 10 feetFriction loss through suction piping = + 5 feetFriction loss through suction fittings = + 5 feetFriction loss through suction side valves and strainer = + 1 feet

Total = - 54 feet

49

STEP 8 ndashAdd for discharge piping system head components

From specificationFriction loss through discharge piping = + 1 footFriction loss through discharge fittings = + 1 footFriction loss through feed valve is 15 psi X 231 = + 35 feetElevation of boiler maximum water level above pump = + 5 feet

Total = + 42 feet

50

STEP 9 ndashSum of all head components

BASE head with safety factor = + 250 feetSuction side piping system head = - 54 feetDischarge side piping system head = + 42 feet

Total = + 238 feet

51

STEP 10 ndashPressure safety valve considerations At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific GravityExample Head = 125 psi X 231 X 103 divide 0953 = 312 feet

XXXXXXXXX

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

52

Sheet2

STEP 11 ndashDetermine deaerator tank water temperature

From specification 227degF

53

STEP 12 ndashNPSHa calculation

NPSHa equation

plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa

10 feet + (197 psi X 231) - (197 psi X 231) - 2 feet = NPSHa10 feet + 46 feet - 46 feet - 2 feet = 8 feet NPSHa

54

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Page 47: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

STEP 5 ndashCalculate total flow requiredbull BASE flow = 20 gpmbull Blowdown flow = 3 gpmbull Recirculation flow = 5 gpmbull Total flow required = 28 gpm

XXXX

X

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

47

Sheet2

STEP 6 ndashCalculate BASE pumping head

Boiler operating pressure setting + 3

Formula BASE head in feet = Boiler operating pressure X 231 X 103 divide Specific Gravity

BASE head = 100 psi X 231 X 103 divide 0953 = 250 feet

48

STEP 7 ndashAdd for suction piping system head components

From specificationAbsolute pressure on deaerator tank = 197 psi X 231 = - 46 feetWater elevation above first impeller = - 10 feetFriction loss through suction piping = + 5 feetFriction loss through suction fittings = + 5 feetFriction loss through suction side valves and strainer = + 1 feet

Total = - 54 feet

49

STEP 8 ndashAdd for discharge piping system head components

From specificationFriction loss through discharge piping = + 1 footFriction loss through discharge fittings = + 1 footFriction loss through feed valve is 15 psi X 231 = + 35 feetElevation of boiler maximum water level above pump = + 5 feet

Total = + 42 feet

50

STEP 9 ndashSum of all head components

BASE head with safety factor = + 250 feetSuction side piping system head = - 54 feetDischarge side piping system head = + 42 feet

Total = + 238 feet

51

STEP 10 ndashPressure safety valve considerations At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific GravityExample Head = 125 psi X 231 X 103 divide 0953 = 312 feet

XXXXXXXXX

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

52

Sheet2

STEP 11 ndashDetermine deaerator tank water temperature

From specification 227degF

53

STEP 12 ndashNPSHa calculation

NPSHa equation

plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa

10 feet + (197 psi X 231) - (197 psi X 231) - 2 feet = NPSHa10 feet + 46 feet - 46 feet - 2 feet = 8 feet NPSHa

54

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Page 48: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

STEP 6 ndashCalculate BASE pumping head

Boiler operating pressure setting + 3

Formula BASE head in feet = Boiler operating pressure X 231 X 103 divide Specific Gravity

BASE head = 100 psi X 231 X 103 divide 0953 = 250 feet

48

STEP 7 ndashAdd for suction piping system head components

From specificationAbsolute pressure on deaerator tank = 197 psi X 231 = - 46 feetWater elevation above first impeller = - 10 feetFriction loss through suction piping = + 5 feetFriction loss through suction fittings = + 5 feetFriction loss through suction side valves and strainer = + 1 feet

Total = - 54 feet

49

STEP 8 ndashAdd for discharge piping system head components

From specificationFriction loss through discharge piping = + 1 footFriction loss through discharge fittings = + 1 footFriction loss through feed valve is 15 psi X 231 = + 35 feetElevation of boiler maximum water level above pump = + 5 feet

Total = + 42 feet

50

STEP 9 ndashSum of all head components

BASE head with safety factor = + 250 feetSuction side piping system head = - 54 feetDischarge side piping system head = + 42 feet

Total = + 238 feet

51

STEP 10 ndashPressure safety valve considerations At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific GravityExample Head = 125 psi X 231 X 103 divide 0953 = 312 feet

XXXXXXXXX

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

52

Sheet2

STEP 11 ndashDetermine deaerator tank water temperature

From specification 227degF

53

STEP 12 ndashNPSHa calculation

NPSHa equation

plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa

10 feet + (197 psi X 231) - (197 psi X 231) - 2 feet = NPSHa10 feet + 46 feet - 46 feet - 2 feet = 8 feet NPSHa

54

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Page 49: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

STEP 7 ndashAdd for suction piping system head components

From specificationAbsolute pressure on deaerator tank = 197 psi X 231 = - 46 feetWater elevation above first impeller = - 10 feetFriction loss through suction piping = + 5 feetFriction loss through suction fittings = + 5 feetFriction loss through suction side valves and strainer = + 1 feet

Total = - 54 feet

49

STEP 8 ndashAdd for discharge piping system head components

From specificationFriction loss through discharge piping = + 1 footFriction loss through discharge fittings = + 1 footFriction loss through feed valve is 15 psi X 231 = + 35 feetElevation of boiler maximum water level above pump = + 5 feet

Total = + 42 feet

50

STEP 9 ndashSum of all head components

BASE head with safety factor = + 250 feetSuction side piping system head = - 54 feetDischarge side piping system head = + 42 feet

Total = + 238 feet

51

STEP 10 ndashPressure safety valve considerations At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific GravityExample Head = 125 psi X 231 X 103 divide 0953 = 312 feet

XXXXXXXXX

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

52

Sheet2

STEP 11 ndashDetermine deaerator tank water temperature

From specification 227degF

53

STEP 12 ndashNPSHa calculation

NPSHa equation

plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa

10 feet + (197 psi X 231) - (197 psi X 231) - 2 feet = NPSHa10 feet + 46 feet - 46 feet - 2 feet = 8 feet NPSHa

54

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Page 50: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

STEP 8 ndashAdd for discharge piping system head components

From specificationFriction loss through discharge piping = + 1 footFriction loss through discharge fittings = + 1 footFriction loss through feed valve is 15 psi X 231 = + 35 feetElevation of boiler maximum water level above pump = + 5 feet

Total = + 42 feet

50

STEP 9 ndashSum of all head components

BASE head with safety factor = + 250 feetSuction side piping system head = - 54 feetDischarge side piping system head = + 42 feet

Total = + 238 feet

51

STEP 10 ndashPressure safety valve considerations At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific GravityExample Head = 125 psi X 231 X 103 divide 0953 = 312 feet

XXXXXXXXX

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

52

Sheet2

STEP 11 ndashDetermine deaerator tank water temperature

From specification 227degF

53

STEP 12 ndashNPSHa calculation

NPSHa equation

plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa

10 feet + (197 psi X 231) - (197 psi X 231) - 2 feet = NPSHa10 feet + 46 feet - 46 feet - 2 feet = 8 feet NPSHa

54

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Page 51: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

STEP 9 ndashSum of all head components

BASE head with safety factor = + 250 feetSuction side piping system head = - 54 feetDischarge side piping system head = + 42 feet

Total = + 238 feet

51

STEP 10 ndashPressure safety valve considerations At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific GravityExample Head = 125 psi X 231 X 103 divide 0953 = 312 feet

XXXXXXXXX

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

52

Sheet2

STEP 11 ndashDetermine deaerator tank water temperature

From specification 227degF

53

STEP 12 ndashNPSHa calculation

NPSHa equation

plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa

10 feet + (197 psi X 231) - (197 psi X 231) - 2 feet = NPSHa10 feet + 46 feet - 46 feet - 2 feet = 8 feet NPSHa

54

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Page 52: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

STEP 10 ndashPressure safety valve considerations At shutoff head (dead head)Head in feet = Pressure relief valve setting X 231 X 103 divide Liquid Specific GravityExample Head = 125 psi X 231 X 103 divide 0953 = 312 feet

XXXXXXXXX

XStep Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

52

Sheet2

STEP 11 ndashDetermine deaerator tank water temperature

From specification 227degF

53

STEP 12 ndashNPSHa calculation

NPSHa equation

plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa

10 feet + (197 psi X 231) - (197 psi X 231) - 2 feet = NPSHa10 feet + 46 feet - 46 feet - 2 feet = 8 feet NPSHa

54

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Page 53: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

STEP 11 ndashDetermine deaerator tank water temperature

From specification 227degF

53

STEP 12 ndashNPSHa calculation

NPSHa equation

plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa

10 feet + (197 psi X 231) - (197 psi X 231) - 2 feet = NPSHa10 feet + 46 feet - 46 feet - 2 feet = 8 feet NPSHa

54

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Page 54: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

STEP 12 ndashNPSHa calculation

NPSHa equation

plusmn Elevation + Absolute pressure ndash Vapor Pressure ndash Suction Line Friction = NPSHa

10 feet + (197 psi X 231) - (197 psi X 231) - 2 feet = NPSHa10 feet + 46 feet - 46 feet - 2 feet = 8 feet NPSHa

54

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Page 55: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

STEP 13 ndashPreliminary pump selection

Conditions of Service Flow = 28 gpmHead = 238 Feet

Does this 10 stage pump pump meet the required flow and head conditions of service

YES

55

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Page 56: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

STEP 14 ndashPressure safety valve considerations

56

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Page 57: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

STEP 15 ndashCheck NPSHa vs NPSHr

Conditions of ServiceFlow = 28gpmHead = 238 FeetNPSHa = 8 Feet

bull Pump meets or exceeds flowhead requirement

bull Low-NPSHr first stage = 4 feet required

bull NPSHr safety factor = 2 to 4 feet

bull Target NPSHr = 8 feetbull NPSHa = 8 feet

Does NPSHa equal or exceed NPSHr

YES57

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Page 58: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

STEP 15 ndashNPSH - ContinuedConditions of Service Flow = 28 gpm Head = 238 Feet NPSHa = 8 FeetThe NPSHa is equal to or exceeds the NPSHr of 8 feet

XXXXXXXXXX

XXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

58

Sheet2

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Page 59: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

STEP 16 ndashCheck material compatibility

bull Pump materials 316 stainless steelbull Mechanical seal materials Silicon carbidesilicon

carbideEPDM

59

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Page 60: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

STEP 17 ndashFinal pump selectionPump meets all specification requirements

XXXXXXXXX

X

XXXXXXX

Step Action

1 Determine cont rol method to be used

2 Calculate BASE flow rate

3 Add for Cont inuous Boiler Blowdown flow

4 Add for by-pass flow if required

5 Sum of base flow by-pass flow and Blowdown flow is the total flow required

6 Calculate BASE pumping head

7 Add for all suct ion piping head components

8 Add for all discharge piping system head components (including feed valve if required)

9 Sum of all head components = total pumping head

10 Calculate head at boiler safety vavle set t ing plus three percent

11 Determine deaerator tank water temperature

12 Perform NPSHa calculat ion

13 Make preliminary pump select ion

14 Assure that shutoff head equals or exceeds three percent above safety valve set t ing

15 Check NPSHr versus NPSHa

16 Assure material compat ibilit y - chemical and temperature

17 Make final pump select ion

60

Sheet2

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Step Action
1 Determine control method to be used
2 Calculate BASE flow rate
3 Add for Continuous Boiler Blowdown flow
4 Add for by-pass flow if required
5 Sum of base flow by-pass flow and Blowdown flow is the total flow required
6 Calculate BASE pumping head
7 Add for all suction piping head components
8 Add for all discharge piping system head components (including feed valve if required)
9 Sum of all head components = total pumping head
10 Calculate head at boiler safety vavle setting plus three percent
11 Determine deaerator tank water temperature
12 Perform NPSHa calculation
13 Make preliminary pump selection
14 Assure that shutoff head equals or exceeds three percent above safety valve setting
15 Check NPSHr versus NPSHa
16 Assure material compatibility - chemical and temperature
17 Make final pump selection
Page 61: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

61

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Page 62: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

SUMMARYbull Steam condensate is a very valuable commodity which needs to saved and used as much as possiblebull Most commonly used boilers for process are industrial firetubes and watertube boilers IWTsbull High pressure condensate flash steam can be used for various purposes such as unit heaters or the

DAbull Condensate can be returned to vented receivers or pressurized deaerators (Spray Tray amp Column)bull Sometimes high pressure condensate receivers are employed Save considerable lossesbull Boiler feed pump selection involves 17 decision points which need to be carefully consideredbull Calculating the pumprsquos base flow rate differs when the pump operates continuously (15 safety factor)

or onoff (50 safety factor)bull Sometimes the base flow rate needs to include for continuous pump re-circulation and maybe for

continuous blow downbull Total Dynamic Head (TDH) is a that pressure the pump must overcome to get water in the boiler and

includes the positive pressure at the pumprsquos inlet after suction pipe losses and the piping losses through the discharge piping before overcoming the boilerrsquos operating pressure

bull Net Positive Suction Head (NPSH) is the pressure required at the pumprsquos suction to mitigate cavitation

bull NPSHA is the NPSH available after all the friction losses on the suction side have been determined in light of the pumprsquos minimum and maximum flow rates

bull The seal selection for the pump is very important and can vary based on the boilerrsquos operating pressuretemperature chemicals in the feed water etc

62

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS
Page 63: Boiler feed and pump sizing   c-b and grundfos july 2016(1)

Gregg Achtenhagengachtenhagencleaverbrookscom

Jim Swetyejswetyegrundfoscom

QUESTIONS

63

Over 25000 Grundfos parts are available through your local Cleaver-Brooks RepresentativeVisit cleaverbrookscomreps for all boiler sales and service

  • BOILER FEED amp PUMP SIZING
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HORIZONTAL FIRETUBE BOILERS
  • Slide Number 7
  • THE WATERTUBE BOILER
  • FLUE GAS SEALING
  • CONDENSATE IS LIQUID GOLD
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • HOT CONDENSATE RETURNED
  • Slide Number 16
  • Slide Number 17
  • TRAY DEAERATOR
  • PACKED COLUMN DA
  • BOILER FEED WATER TANKS
  • HP CONDENSATE RECOVERY
  • HIGH PRESSURE CONDENSATE RECEIVER
  • BOILER FEED WATER TANK OPTIONS
  • Slide Number 24
  • METHOD 1 ndash Direct feed for multiple boilers
  • METHOD 2 ndash Booster sets for multiple boilers
  • STEAM BOILER PUMP APPLICATIONS AND TYPES
  • SIZING COMPLEXITY FOR BOILER FEED PUMPS
  • BASE FLOW RATE CALCULATION
  • ADD FOR CONTINUOUS BOILER BLOWDOWN FLOW
  • ADD FOR BYPASS RECIRCULATION FLOW
  • RECIRCULATION FLOW
  • CALCULATING REQUIRED FEED PUMP HEAD
  • FEED VALVE IMPACTS PUMPING HEAD CALCULATION
  • CALCULATING THE HEAD FOR THE FEED PUMP
  • NPSH ndash FORMULA FOR CALCULATION
  • NPSH AND ELEVATION
  • NPSH AND SUCTION LINE CONSIDERATIONS
  • Check list for boiler feed pump selection
  • BOILER FEED PUMPS USEFUL FORMULAS
  • Slide Number 41
  • CONTROL METHODFixed speed pumps with feed valve and recirculation line
  • STEP 1 ndash
  • STEP 2 ndash Calculate the BASE feed pump flow rate
  • STEP 3 ndash Continuous Boiler Blowdown Flow
  • STEP 4 ndash Add for by-pass flow
  • STEP 5 ndash Calculate total flow required
  • STEP 6 ndash Calculate BASE pumping head
  • STEP 7 ndash Add for suction piping system head components
  • STEP 8 ndash Add for discharge piping system head components
  • STEP 9 ndash Sum of all head components
  • STEP 10 ndash Pressure safety valve considerations
  • STEP 11 ndash Determine deaerator tank water temperature
  • STEP 12 ndash NPSHa calculation
  • STEP 13 ndash Preliminary pump selection
  • STEP 14 ndash Pressure safety valve considerations
  • STEP 15 ndash Check NPSHa vs NPSHr
  • STEP 15 ndash NPSH - Continued
  • STEP 16 ndash Check material compatibility
  • STEP 17 ndash Final pump selection
  • Slide Number 61
  • SUMMARY
  • QUESTIONS