bombeo mecanico
TRANSCRIPT
Porcentaje de Pozos por Método de Levantamiento
LAG41%
BMC46%
FN4%
BCP5%
BES4%
El 96% de los pozos utilizan Métodos de Levantamiento Artificial
Situación Actual
Balancín
Balancín
Pumping UnitPumping UnitWireline (Bridle)Wireline (Bridle)
Polished Rod ClampPolished Rod ClampWireline HangerWireline Hanger(Carrier Bar)(Carrier Bar)
Polished RodPolished RodStuffing BoxStuffing Box
FlowlineFlowline
Tubing HeadTubing Head
Casing HeadCasing Head
Polished Rod Polished Rod Sub-CouplingSub-Coupling
Surface PipeSurface Pipe
Oilstring (Casing)Oilstring (Casing)Sucker RodSucker Rod
TubingTubing
BarrelBarrelCouplingCoupling
Sucker Sucker RodRodCouplingCouplingSee PumpSee PumpDetailsDetails
TubingTubingCouplingCoupling
Per-Per-foratedforatedNippleNipple
Tubing Tubing CouplingCoupling
Gas Gas AnchorAnchor
Mud AnchorMud Anchor
Bull PlugBull Plug
Bottom End of Bottom End of Oilstring (Casing)Oilstring (Casing)
TubingTubingCouplingCoupling
Lift NippleLift Nipple
BarrelBarrelCouplingCoupling
BarrelBarrel
Barrel Barrel CouplingCoupling
ExtensionExtensionNippleNipple
Tubing Tubing CouplingCoupling
Seating Seating NippleNipple
Cage,Cage,Top OpenTop Open
Ball & SeatBall & Seat
PlungerPlunger
Cage Cage (Closed)(Closed)
Ball & SeatBall & Seat
StandingStandingBalveBalvePullerPuller
Tubing PumpTubing Pump
Insert PumpInsert Pump
BushingBushing
Valve RodValve Rod
Cage (Open)Cage (Open)
PlungerPlunger
Cage (Closed)Cage (Closed)
Ball & SeatBall & Seat
Plug SeatPlug Seat
GuideGuide
Con-Con-nectornector
BarrelBarrel
CageCageBall & Ball & SeatSeatMandrelMandrelCupCupSpacerSpacerLocknutLocknutCouplingCoupling
Unidad deBombeo
Caja deEngranaje
Motor
BarraPulida
Prensaestopa
Línea de Flujo
Revestidor
Eductor
Bomba deSubsuelo
Sistema de Bombeo Mecánico
Válvula Viajera
Válvula Fija
Barril
Pistón
Vastago de Tiro
Sarta de Cabillas
Bomba de Subsuelo
Funcionamiento de una Bomba de Subsuelo
Convencional Mark II
Balanceado por aire
Hidrowell
Rotaflex
Tail down deflection assistant balance pumping unit
Swing staff assistance balance pumping unit
Pure Tail down deflection balance pumping unit
Cabillas Continuas
Johnson, L.D.: “Here are Guidelines for Picking an Artificial Lift Method” - The Oil And Gas Journal, August 26, 1968
En base a 1/8” de pulgadas
Ejemplo:
1” , 7/8” , 3/4”
86
86
87
88
Nomenclatura API de Sarta de Cabillas
Flo
win
g B
ott
om
ho
le P
ress
ure
,F
low
ing
Bo
tto
mh
ole
Pre
ssu
re, p
pw
fw
f
Liquid Rate, Liquid Rate, qqll
Análisis Nodal para LAB
Curva de “inflow”Curva de “inflow”Psuc= IPR - (DP)Psuc= IPR - (DP)perf-bombperf-bomb
Curva de “outflow” (del sistema)Curva de “outflow” (del sistema)Pdesc= Pcabz + columna + fricciónPdesc= Pcabz + columna + fricción
DP requerido en DP requerido en la bombala bomba
Análisis dinagráfico ideal
Posición
Car
gaPeso de la sarta de cabillas
sumergida +
Peso del fluido manejado
Peso de la sarta de cabillas sumergida
Stroke
Análisis dinagráfico con gas
Posición
Car
gaPeso de la sarta de cabillas
sumergida +
Peso del fluido manejado
Peso de la sarta de cabillas sumergida
Carrera efectiva
Trabajo gastado en comprimir gas
Diseño en Bombeo Mecánico por ecuación de onda
18,695
12,033
5370
-1292
25,358
0.0 48.0 96.0 144.0 192.0
Load
, lb
Stroke Length, in.
Evolución de los Métodos de Diseño en BMC
Mill´s Method - 1940´sMill´s Method - 1940´s
API RP 11L - 1950´sAPI RP 11L - 1950´s
Wave Equation - 1960’sWave Equation - 1960’s
Expert Wave Equation - 1990´sExpert Wave Equation - 1990´s
Análisis Dinagráfico en campo
Echometer
Separadores de gas
Ancla de gas natural
Casing
Tubing
Rods
Producing Zone
Pump
Seating Nipple
Tubing IntakePerforations
Ancla Poor-boyAncla Poor-boy
TubingTubing
RodsRods
PumpPump
Tubing IntakeTubing IntakePerforationsPerforations
Producing ZoneProducing Zone
CasingCasing
Seating NippleSeating Nipple
Suction TubeSuction Tube
Mud AnchorMud Anchor
Ancla de copasAncla de copas
Separadores de gas
Fluid LevelFluid Level
LiquidLiquid
GasGas
5 1/2-in. Casing5 1/2-in. Casing
DecontralizerDecontralizerDiametrically Diametrically Opposed to Lower Opposed to Lower Port (not to scale)Port (not to scale)
CasingCasingPerforationsPerforations
2 7/8-in. Tubing2 7/8-in. Tubing
Seating NippleSeating Nipple
Upper PortUpper Port
3 5/8-in. 3 5/8-in. Thin WallThin WallPipe Pipe (1/8-in.)(1/8-in.)
Lower PortLower Port
Dip TubeDip Tube
Separadores de gas
20,0
30,0
40,0
50,0
60,0
70,0
80,0
90,0
100,0
110,0
0 400 800 1200 1600 2000
CAUDAL DE LIQUIDO
EF
ICIE
NC
I A
CO601200.D2O601200.D1O601200.EGO1200.EFO601200.PO601200TO601200.
Separación Estática de Fondo
INCREMENTO DE HASTA 30% DE EFICIENCIA VOLUMETRICA DE SEPARACION PARA MAS DE 3000 POZOS.
CAPACIDAD DE SELECCION OPTIMA PARA SEPARADORES ESTATICOS DE FONDO.
IMPACTO POTENCIALECOGAS™, TIENE EXCELENTE DESEMPEÑO EN LA EFICIENCIA DE SEPARACIÓN DE GAS
BANCO DE PRUEBAS PARA BOMBAS DE SUBSUELO
Válvula fija
Válvula viajera
Revestidor de Plexiglass
Bomba de subsuelo
Estructura metálica
Separador
Rotámetros
Inyección aire-líquido
Actuador neumático
Posicionador
Vástago
P1
P3
P2
L
Metodologia para los experimento
P1, P3P1, P3
P2P2
P1P1
P3P3
Tomas de presión
BARRA PULIDA
CONEXION REVESTIDOR
LINEA DE FLUJO
CRUDO
GA
SFORRO
RANURADO (LINER)
UNIDAD DE BOMBEO
PRENSAESTOPA DE SUPERFICIE
CABEZAL
SARTA DE CABILLAS
REVESTIDOR
EDUCTOR
PISTON
VALVULA VIAJERA
VALVULA FIJA
CRUDO
COLGADOR
GRAVA
LINEA DE GAS
LINEA DE FLUJO
ELEVADOR
GUAYA
CONVENCIONAL
CONEXION REVESTIDOR
LINEA DE FLUJO
FORRO RANURADO
(LINER)
UNIDAD DE BOMBEO
INYECCION DE DILUENTE
MEZCLA CRUDO-DILUENTE
CABEZAL
SARTA DE CABILLAS
REVESTIDOR
EDUCTOR
PISTON
VALVULA VIAJERA
VALVULA FIJA
CRUDO
COLGADOR
GRAVA
GA
S
LINEA DE FLUJOBARRA PULIDA
PRENSAESTOPA DE SUPERFICIE
ELEVADOR
GUAYA
DILUENTE POR ANULARSIN EMPACADURA
BARRA PULIDA
FORRO RANURADO
(LINER)
UNIDAD DE BOMBEO
INYECCION DE DILUENTE
MEZCLA CRUDO-DILUENTE
CABEZAL
SARTA DE CABILLAS
REVESTIDOR
EDUCTOR
PISTON
VALVULA VIAJERA
VALVULA FIJA
CRUDO
EMPACADURA
COLGADOR
GRAVA
DOSIFICADOR
LINEA DE FLUJO
PRENSAESTOPA DE SUPERFICIE
ELEVADOR
GUAYA
DILUENTE POR ANULARCON EMPACADURA
FORRO RANURADO
(LINER)
UNIDAD DE BOMBEO
CABEZAL
INYECCION DE DILUENTE
MEZCLA CRUDO-DILUENTE
SARTA DE CABILLAS
REVESTIDOR
EDUCTOR
NIPLE RANURADO
PISTON
VALVULA VIAJERA
VALVULA FIJA
CRUDO
EMPACADURA
COLGADOR
GRAVA
LINEA DE FLUJO
BARRA PULIDA
PRENSAESTOPA DE SUPERFICIE
ELEVADOR
GUAYA
DILUENTE POR LATUBERIA
FLUIDO PERMANENTE PARA LUBRICACION
FORRO RANURADO
(LINER)
UNIDAD DE BOMBEO
CABEZAL
SARTA DE CABILLAS
REVESTIDOR
EDUCTOR
PISTON
VALVULA VIAJERA
VALVULA FIJA
CRUDO
EMPACADURA
COLGADOR
GRAVA
CRUDO
PRENSAESTOPA DE SUBSUELO
VALVULA PARA REPOSICION DE FLUIDO DE LUBRICACION
LINEA DE FLUJO
BARRA PULIDA
PRENSAESTOPA DE SUPERFICIE
ELEVADOR
GUAYA
PRENSAESTOPADE SUBSUELO
Base en Análisis Base en Análisis NodalNodal
Base en Análisis Base en Análisis DinagráficoDinagráfico
Software en Bombeo Mecánico
Software en Bombeo Mecánico
PDVSA
Software en Bombeo Mecánico