BILL OF QUANTITY.NAME OF WORK:- REPAIR OF GOVT: BUILDINGS IN DISTRICT UPPER DIR

SUB HEAD:-(1)T.M.A. Office Wari (2)Tehsildar Office Barawal

(3)Tehsildar Office Kalkot (4) Tehsildar Office Barawal

(5)EDO Education Office Upper Dir.

S#Description Qty:Unit Rate Amount

AT.M.A. OFFICE WARI

01P:C:C (1:3:6) plain 3.16M33477/-Rs.10989/-

02B:B Masonry (1:6) 10.19M33721/-Rs.37926/-

03Wooden Joinery 2.32M24036/-Rs.15335/-

04White Washing 280M220Rs.5600/-

05Painting 3-Coats 179M260Rs.10740/-

Total:- Rs.80590/-

Add: Cost Factor Rs.88649/-

Add: 2-0 % Above RS.15730/-

Total:-RS.106379/-

Add: 0.50 % Contingency Rs.532/-

SUB TOTAL:- (A)RS.106911/-

BTEHSILDAR OFFICE BARAWAL

01P/L P:C:C: (1:2:4) Plain 66.79M34156/-Rs.277575/-

02W/O light point , Call bell, Celling Fan 27Nos867/-Rs.23409/-

TOTAL:-RS.300984/-

Add: Cost Factor RS.331082/-

Add: 20 % PremiumRs.66216/-

SUB TOTAL (B)RS.397298/-

CTEHSILDAR OFFICE KALKOT

01P:C:C: (1:3:6) Plain 54.06M34156/-Rs.224675/-

02Water Supply ---Rs.20000/-

03Total:-Rs.244675/-

04Add: Cost Factor RS.269142/-

ADD: 20 % Premium RS.53828/-

TOTAL:-RS.322970/-

Add: 0.50 % Contingency RS.1615/-

SUB TOTAL:- ( C)RS.324585/-

DEDO EDUCATION OFFICE DIR

01Excavation as in foundation 107.36M3105/-RS.11273/-

02P:C:C: (1:4:8) as in foundation 26.86M32578/-RS 69245/-

03R:R Stone Masonry (1:6) CSM 155.04M33185/-RS 493810/-

04P:C:C: (1:3:6) as coping 8.94M33477/-RS 29520/-

05B:B Masonry (1:6) as specified 29.53M33721/-RS 109881/-

Total:-Rs.713739/-

Add: Cost Factor 1.1Rs.785113/-

Add: 20 % PremiumRs.157023/-

Total:-Rs.942136/-

Add: 0.50 % Contingency Rs.4711/-

SUB TOTAL:- (D)RS.946847/-

ETEHSILDAR OFFICE BARAWAL

01

02

03

04

05

06

07

08

TOTAL:-RS.

Add: Cost Factor 1.1RS.

Add: 20 % Premium RS.

TOTAL:-RS.

Add: 0.50 % Contingency RS.

G: TOTAL (A+B+C+D)RS.

SUB DIVISIONAL OFFICER

C&W SUB DIVISION PF - 91

UPPER DIR

Add:___________% Above/Below/AT PAR

On CSR 2009.

CONTRACTOR

BILL OF QUANTITY.NAME OF WORK:- REPAIR OF GOVT: BUILDINGS IN DISTRICT UPPER DIR

SUB HEAD:-(1)T.M.A. Office Dir (2)EDO Agriculture

(3)District Officer Live Stock

S#Description Qty:Unit Rate Amount

ADISTRICT OFFICE LIVE STOCK

01Excavation As in foundation 31.71M3105/-Rs.3380/-

02P:C:C: (1:4:8) as in foundation 5.23M32578/-Rs.13483/-

03R:R Stone Masonry (1:6) 83.67M33185/-Rs.266511/-

04P:C:C: (1:3:6) as in coping 1.98M33477/-Rs.6891/-

TOTAL:-RS.290215/-

Add: Cost Factor RS.63847/-

Add: 20 % PremiumRs.383085/-

Add: 0.50 % Contingency Rs.1915/-

SUB TOTAL (B)RS.385000/-

BEDO AGRICULTURE UPPER DIR

01Excavation as in foundation 4.58M3105/-Rs.480/-

02P:C:C: (1:4:8) as in foundation 1.45M32578/-Rs.3738/-

03R:R Stone Masonry (1:6) CSM 8.01M33185/-Rs.25511/-

04Feb: of Mild Steel 0.077Ton82234/-Rs.6332/-

05R:C:C: (1:2:4) as beam 1.07M35261/-Rs.5629/-

06Wooden Trusses 0.25M2112020/-Rs.28005/-

07B:B Work Masonry (1:6) CSM 4.27M33721/-Rs.15889/-

08Wooden Celling6.41M341667/-Rs.10600/-

09E/Board " thick2.41M22229/-Rs.5386/-

10P:C: Plaster (1:4) CSM 22.11M21231/-Rs.2721/-

11P:C Pointing (1:3) CSM 21.65M2128/-Rs.2771/-

12Steel Door 2M22890/-Rs.5780/-

13P:C:C: (1:2:4) 2" thick 3.25M2338/-Rs.1098/-

14CGI Sheet 6.59M2825/-Rs.5436/-

15Oil Painting 3-Coats all Building 328.32M2184/-Rs.60502/-

16W:C 1M22731/-Rs.2731/-

17Floor Trip 1M2273/-Rs.273/-

18White Washing ,distempering 400M242/-Rs.16800/-

19P:C:C: (1:3:6) plaster 30.62M23477/-Rs.106465/-

Total:-Rs.182159/-

VIP Bath Room Rs.161129/-

Civil Work Rs.182159/-

Total:-Rs.343288/-

Add: Cost Factor Rs.377617/-

Add: 20 % Premium Rs.75523/

Total:-Rs.453141/-

Add: 0.50 % Contingency Rs.2266/-

SUB TOTAL:- (C )RS.455407/-

G: TOTAL:- (A+B))RS.2783678/-

SUB DIVISIONAL OFFICER

C&W SUB DIVISION PF - 91

UPPER DIR

Add:___________% Above/Below/AT PAR

On CSR 2009.

CONTRACTOR