Install Net Metering up to 100kW to reduce the risk of standby charge Analyze the change of basic facility charge and demand charge Standardize equipment installed to avoid additional fee Educate dealer of multiple financing alternatives Bosch Solar Energy Business Strategy Intern, Afief Baasir (MBA 2014) Note: to prevent confidentiality issue, several numbers and locations are changed / hidden Objectives Duke Progress Policy Net Metering Financial Analysis Incentives Recommendation Incentives Map & Sourcing Model Prospective revenue of more than $300k per installation Enable operation and sales team to coordinate quicker to identify target market and ideal price point Business Impact

Upload: lenora

Post on 20-Feb-2016

21 views

Category:

Documents


5 download

DESCRIPTION

Incentives. Financial Analysis. Objectives. Bosch Solar Energy Business Strategy Intern, Afief Baasir (MBA 2014). Duke Progress Policy. Recommendation. Install Net Metering up to 100kW to reduce the risk of standby charge Analyze the change of basic facility charge and demand charge - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Bosch Solar Energy Business Strategy Intern, Afief Baasir (MBA 2014)

• Install Net Metering up to 100kW to reduce the risk of standby charge

• Analyze the change of basic facility charge and demand charge

• Standardize equipment installed to avoid additional fee

• Educate dealer of multiple financing alternatives

Bosch Solar EnergyBusiness Strategy Intern, Afief Baasir (MBA 2014)

Note: to prevent confidentiality issue, several numbers and locations are changed / hidden

Objectives

Duke Progress Policy

Net Metering

Financial AnalysisIncentives

Recommendation

Incentives Map & Sourcing Model

• Prospective revenue of more than $300k per installation

• Enable operation and sales team to coordinate quicker to identify target market and ideal price point

Business Impact