    Next Generation Access

    Ivan Boyd

    BT Research and Venturing

  • 8/8/2019 BOYD Next Generation Access

    2/15

  • 8/8/2019 BOYD Next Generation Access

    3/15

    BritishTelecommunications plc

    BT Current Position on FTTP

    BT infrastructure operations in separate unit called Openreach

    Openreach will own infrastructure of future Optical Access/Metro Network

    Openreach provides equal access for all Communications

    Providers (CPs) - Equivalence of Input (EOI) FTTP viable in Greenfield sites with ~>20 premises

    (actual number depends on detailed economics)

    GPON preferred FTTP solution

    No commitment at this point to mass market roll out of FTTP.

  • 8/8/2019 BOYD Next Generation Access

    4/15

    BritishTelecommunications plc

    Research to address the Challenges

    Capital Cost- New architecture to eliminate equipment

    - Improved and more efficient deployment processes

    - Maximise the lifetime of infrastructure (plan day 1

    for evolution)

    Operation Cost

    - Simplify the network

    - Consolidate nodes

  • 8/8/2019 BOYD Next Generation Access

    5/15

    BritishTelecommunications plc

    Research Network Vision

    100km

    1000-way

    split 10Gbit/s

    10Gbit/s

  • 8/8/2019 BOYD Next Generation Access

    6/15

    BritishTelecommunications plc

    Steeping stones to the Vision1. Extended Reach GPON(60km reach, 128-way split, 2.5/1.25Gbit/s)

    ONU

    ONU

    ONU

    ONU

    4x32-way

    Split

    4

    X

    4

    60km

    128-way total split

    Local Exchange

    OLT S

    OLT W

    2. Asymmetrical Long Reach(100km reach, 512-way split, 10/2.5Gbit/s)

    CORE

    NODE

    CORE

    NODE

    CORE

    NODE

    METRO

    NODE

    METRO

    NODE

    ACCESS/

    BACKHAULCUSTOMER

    LR-PON ServicesJack PC

    Server

    Video

    Server

    HD CCTV

    Xbox 360

    HD CCTV

    Media PC

    Jack PC

    Client

    Video

    Client

    Demo 1:

    Demo 3:

    Demo 2:

    Demo 3:

    Demo 3:

    100km

    GPONClient

    OLTONT

    ONT

    ONT

    ONT

    hiD 6630

    IP/MPLSPCisco

    CRS

    Super Metro

    Node

    Super Metro

    Node

    Optical Core

    DWDM

    P

    GMPLS control

    hiD 6670

    Core

    EthernetCore Ethernet

    PBT/PBB-TEhiD 6670Core

    EthernetOLT

    Switch

    PEPE

    Aggregator

  • 8/8/2019 BOYD Next Generation Access

    7/15

    BritishTelecommunications plc

    Capex savings: Conventional FTTH vs Long reachPON

    FSAN PON 1:1

    Duct Build

    Fibre Enclosures

    Fibre Cable

    Splitters

    SDH Backhaul

    Exchange

    Electronics

    50% Penetration, No Duct Build

    PO

    N

    bac

    khaul

    CostperC u

    stomer

    ONU's

    Fibre Enclosures

    Fibre Cable

    Splitters

    Backhaul

    Exchange

    Electronics

    Urban

    Rural

    LongReac

    hPON

    PON

    backhaul

    LongReac

    hPON

  • 8/8/2019 BOYD Next Generation Access

    8/15

    BritishTelecommunications plc

    7%

    16%

    23%34%

    8%

    3%

    5%4%

    E-side Duct

    D-side infrastructure

    On-site DiG ductDrop

    Fibre

    Enclosures

    Splitters

    BF Tube

    2%12%

    31%

    25%

    11%

    5%

    8%6%

    E-side Duct

    D-side infrastructure

    On-site DiG duct

    Drop

    Fibre

    Enclosures

    Splitters

    BF Tube

    Infrastructure Research Deployment Cost savings

    Cost reduced

    by ~1/3

    Single man blown fibre

    Overhead Blown fibre

    Duct congestion relief

  • 8/8/2019 BOYD Next Generation Access

    9/15

    BritishTelecommunications plc

    backhaul

    Evolution to Future networks-extending the infrastructure lifeDay 1 Greenfield GPON deployment

    Fibre lean cable back

    towards Exchange

    Local

    Exchange

    to metro node

    Cable

    chamber

    GPON-ONU

    GPON-ONU

    GPON-ONU

    GPON-ONU

    GPON-ONU

    LR-ONU

    LR-ONU

    At day one install WDM

    couplers in local exchange

    GPONGPONGPON

    LR-ONU

    GPON

    GPON ONUs with blocking filters

    Optical NTE to simplify ONU upgrade

  • 8/8/2019 BOYD Next Generation Access

    10/15

    BritishTelecommunications plc

    backhaul

    Upgrade to Long Reach PON

    Fibre lean cable back

    towards Exchange

    Local

    Exchange

    to metro node

    Cable

    chamber

    GPON-ONU

    GPON-ONU

    GPON-ONU

    GPON-ONU

    GPON-ONU

    LR-ONU

    LR-ONU

    GPONGPONGPON

    LR-ONU

    GPON

    LR-ONU

    GPON OLT removed from local exchange

    LR-ONU

    LR-ONU

  • 8/8/2019 BOYD Next Generation Access

    11/15

    BritishTelecommunications plc

    Capex savings: Long reach PON + Optical NTEdeployed with infrastructure

    FSAN PON 1:1

    Duct Build

    Fibre Enclosures

    Fibre Cable

    Splitters

    SDH Backhaul

    Exchange

    Electronics

    50% Penetration, No Duct Build

    PO

    N

    bac

    khaul

    CostperC u

    stomer

    ONU's

    Fibre Enclosures

    Fibre Cable

    Splitters

    Backhaul

    Exchange

    Electronics

    Urban

    Rural

    PON

    bac

    khaul

    ONU

    Long Reach

    PONLong Reach

    PON

    Optical NTE

  • 8/8/2019 BOYD Next Generation Access

    12/15

    BritishTelecommunications plc

    Operational Cost

    High Density Pop, Head End Consolidation

    OpEx Drivers as Fraction of Opex Cost

    $0

    $10

    $20

    $30

    $40

    $50

    $60

    $70

    $80

    $90

    Case 3 Case 4 Case 5

    AnnualCostpe

    rSub

    CO Related

    Fiber Related

    Hardware Related

    5km 20km 20km

    1x4,1x8 1x4,1x8 1x4,1x32

    OpEx

    51% OpEx

    Savings59% OpEx

    Savings

  • 8/8/2019 BOYD Next Generation Access

    13/15

    BritishTelecommunications plc

    Fiber-Related OpEx

    High Density Pop, Head End Consolidation

    $0

    $2

    $4

    $6

    $8

    Case 3 Case 4 Case 5

    AnnualCostp

    erSub

    Fiber Related OpEx

    5km 20km 20km

    1x4,1x8 1x4,1x8 1x4,1x32

    8.8% Savings/Sub/yr

    47% Savings/Sub/yr

    Even greater

    savings to be

    expected with

    LR-PON

  • 8/8/2019 BOYD Next Generation Access

    14/15

    BritishTelecommunications plc

    CO-Related OpEx

    High Density Pop, Head End Consolidation

    $0

    $10

    $20

    $30

    $40

    $50

    $60

    $70

    $80

    Case 3 Case 4 Case 5

    AnnualCostp

    erSub

    CO Related

    5km 20km 20km

    1x4,1x8 1x4,1x8 1x4,1x32

    75% Savings/Sub/yr 75% Savings/Sub/yr4 COs

    1 CO1 CO

    Greater CO consolidation

    with LR-PON . Therefore

    much greater savings

    anticipated.

  • 8/8/2019 BOYD Next Generation Access

    15/15

    BritishTelecommunications plc

    Conclusions

    There is no economic case for large scale FTTP roll out in the UK

    based on existing solutions

    Research team investigating a radical Long Reach PON solutionthat changes the economic structure of networks:

    Longer reach access to eliminate metro networks Higher capacity 10GBit/s symmetrical Greater split/sharing to improve economics Network simplification and node consolidation to reduce opex Optical NTE and Self-install ONU to reduce capital cost of the

    infrastructure provider and simplify upgrades

    An intermediate step could be extended reach GPON

    There is an on-going need for infrastructure research thataddresses more efficient fibre deployment