BR. 410/42 Partial Demo Plan SR410 Pedestrian Improvements Bonney Lake, i i l l " "' WA .f "' ... ,::· General Notes This plan covers the partial removal of the SR41 0/42 fJridge. A Sitf SpecifiC Safety Pion (SSSP} has been prepofl!d for this pro]f!CI by Highmork Concrete Conlroclors (HCC). .AJI Stolon employees will follow the HC SSSP, OSHA Rules & Regulations, and Staron Componios' Safety Proqrom. .AJI tmployees wr11 attend a daily safely loHgote meeting. Acti»1ies, hazards, accident prevention, and en'drcnmef11ol protection issues wl1/ be discussed each day. for that day. Utilities will be disconnected or removed by the prime contractor prior to demolib'on. l<ppropriote traffic and pedestrian barriers will be installed by the prime contractor to prevent occidental access to the demolition work area. DemoHtion equipment will be coordinated with the prime contractor and staged near the work area. The bridge will be systematk.a/ly disas:;embled by sow cutting & picking operations and by COfiVenb'onally demolishing with lcborers utilizing chipping guns and pneumatic breaktm;. The removo! operaliotis will ulilize hydroulir: e>«:awtors with bucket and thumb. All warlc wnl o<:cur from within the designated warlc areas an lop of the existing bridge and the widening. STATON COMPANIES P.O. Box 7515 Springfield. OR 97475 Phone: (541) 726-9422 Fox: (541) 726-9837 one Nlch on original drawing. Adjust SCCJies accordingly. Material Handling .AJI debns will be source separated into 2 waste streams. The 2 waste streams, steel & concrete, will be handled on the ground and sorted for recycling and disposal. All demolition material will be processed down to manageable size as demolition progresses . Waste streams will be loaded into Staton trucks utilizing hydraulic excavators and transported to a designated recycle or disposal facility. Steel to be recycled ot: Schnitzer Steel 1902 Marine View Or. Tacoma, WA Cone. to be recycled at: Uoyd [nterprises Milton Pit Steel =Less than 1ton Concrete = T BLCY 80 5th Ave Milton, WA Drawing Index Sheet T Sheet 2 Attachment Title Sheet and General Noles Overview Coles & Cut Sheets Highmark Concrete Contractors SR 410 Pedestrian Improvements Sheet ond General Notes J. Carlton Date: 1/29/15 Sheet of 2

Upload: ray-still

Post on 29-Sep-2015

36 views

Category:

Documents


0 download

DESCRIPTION

The entire partial demolition plan for the SR 410 barrier wall

TRANSCRIPT

  • BR. 410/42 Partial Demo Plan SR410 Pedestrian Improvements

    Bonney Lake,

    i i l l " "'

    WA

    .f ~ "' ~

    ~

    '

    ~ ... ~,

    ,::

    General Notes This plan covers the partial removal of the SR41 0/42 fJridge. A Sitf SpecifiC Safety Pion (SSSP} has been prepofl!d for this pro]f!CI by Highmork Concrete Conlroclors (HCC). .AJI Stolon employees will follow the HC SSSP, OSHA Rules & Regulations, and Staron Componios' Safety Proqrom.

    .AJI tmployees wr11 attend a daily safely loHgote meeting. Acti1ies, hazards, accident prevention, and en'drcnmef11ol protection issues wl1/ be discussed each day. for that day.

    Utilities will be disconnected or removed by the prime contractor prior to demolib'on.