british library / qatar foundation partnership proiect

174

Upload: phamkhanh

Post on 30-Dec-2016

223 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: British Library / Qatar Foundation Partnership Proiect
Page 2: British Library / Qatar Foundation Partnership Proiect
Page 3: British Library / Qatar Foundation Partnership Proiect
Page 4: British Library / Qatar Foundation Partnership Proiect
Page 5: British Library / Qatar Foundation Partnership Proiect
Page 6: British Library / Qatar Foundation Partnership Proiect
Page 7: British Library / Qatar Foundation Partnership Proiect
Page 8: British Library / Qatar Foundation Partnership Proiect
Page 9: British Library / Qatar Foundation Partnership Proiect
Page 10: British Library / Qatar Foundation Partnership Proiect
Page 11: British Library / Qatar Foundation Partnership Proiect
Page 12: British Library / Qatar Foundation Partnership Proiect
Page 13: British Library / Qatar Foundation Partnership Proiect
Page 14: British Library / Qatar Foundation Partnership Proiect
Page 15: British Library / Qatar Foundation Partnership Proiect
Page 16: British Library / Qatar Foundation Partnership Proiect
Page 17: British Library / Qatar Foundation Partnership Proiect
Page 18: British Library / Qatar Foundation Partnership Proiect
Page 19: British Library / Qatar Foundation Partnership Proiect
Page 20: British Library / Qatar Foundation Partnership Proiect
Page 21: British Library / Qatar Foundation Partnership Proiect
Page 22: British Library / Qatar Foundation Partnership Proiect

CORPORATE PROCUREMENT UNIT

CONDITIONS OF CONTRACT FOR CONTRACT SERVICES

PR FOR THE BRITISH LIBRARY / QATAR FOUNDATION PARTNERSHIP PROJECT

SMC8220

CONTENTS

1 DEFINITIONS AND INTERPRETATION 3

2 DESIGNATED REPRESENTATIVES 5

3 THE PROJECT 5

4 CONTRACTOR’S PERSONNEL 6

5 FEES AND EXPENSES 7

6 INSURANCE AND INDEMNITIES 7

7 NO EMPLOYMENT OR AGENCY 8

8 VARIATIONS 8

9 TERMINATION 9

10 CONSEQUENCES OF TERMINATION 10

11 ASSIGNMENT AND SUB-CONTRACTING 11

12 INVENTIONS AND OTHER INTELLECTUAL PROPERTY 11

13 PROTECTION OF DATA 13

14 ANTI BRIBERY 13

15 AUDIT AND RECORDS 14

16 NATIONAL AUDIT OFFICE ACCESS 14

17 CONFIDENTIALITY AND DOCUMENTATION 14

18 COMPLIANCE WITH DATA PROTECTION ACT 1998 15

19 FREEDOM OF INFORMATION ACT 2000 AND THE ENVIRONMENTAL INFORMATION REGULATIONS 2004 16

20 IDENTIFYING MARK 17

21 ADVERTISING 17

22 WAIVER 17

23 NOTICES 17

24 FORCE MAJEURE 18

25 DISCRIMINATION AND DIVERSITY 18

26 ENTIRETY AND SUPREMACY 18

27 ADJUDICATION 19

Page 23: British Library / Qatar Foundation Partnership Proiect

CONDITIONS OF CONTRACT FOR CONTRACT SERVICES – SMC8220 PAGE 2 OF 24

28 CONTRACTS (RIGHTS OF THIRD PARTIES) ACT 1999 19

29 ARBITRATION 20

30 GOVERNING LAW AND LANGUAGE 20

31 HEADINGS 20

32 RIGHT TO PUBLISH 21

SCHEDULE 1 22

FEE STRUCTURE 22

SCHEDULE 2 22

SCOPE OF PROJECT 22

SCHEDULE 3 22

CHANGE CONTROL PROCEDURE 22

1 General 22

2 Procedures 22

SCHEDULE 4 24

COMMERCIALLY SENSITIVE INFORMATION 24

Page 24: British Library / Qatar Foundation Partnership Proiect

CONDITIONS OF CONTRACT FOR CONTRACT SERVICES – SMC8220 PAGE 3 OF 24

1 DEFINITIONS AND INTERPRETATION

1.1 In these Conditions of Contract:

“Appointment Letter” means the Library’s letter to the Contractor, appointing the Contractor for the performance of the Project.

“BLR” means the British Library Representative who shall have authority to act on behalf of the British Library on matters connected with the Contract as shall be specified by notice to the Contractor upon award of the Contract.

“Clause” means a Clause in this document.

“Commercially Sensitive Information” means the information: (a) listed in Schedule 2 – Commercially Sensitive Information provided by the Contractor; or (b) notified to the Library in writing (prior to commencement of the contract) which has clearly been marked as Commercially Sensitive Information:

(i) which is provided by the Contractor to the Library in confidence for the period set out in that Schedule or notification; and/or

(ii) that constitutes a trade secret.

“Conditions” means these Conditions of Contract for the Provision of Contract Services together with any supplementary conditions, and any amendments or additions agreed in writing between the parties.

“Confidential Information” means any information which has been designated as confidential by either Party in writing or that ought to be considered as confidential however it is conveyed, including information which relates to the business, affairs, developments, trade secrets, know-how, personnel and suppliers of the Contractor, including IPRs, together with all information derived from the above, and any other information clearly designated as being confidential (whether or not it is marked as “confidential”) or which ought reasonably to be considered to be confidential.

“Contractor” means the person(s), firm or company awarded the Contract by the Library and includes the Contractors legal personal representatives, successors and permitted assignees.

“Contractor Representative” means the person so nominated by the Contractor who shall have authority to act on behalf of the Contractor in connection with the Contract on such matters in connection with the Contract as shall be specified by notice to the Library upon award of the Contract.

“Contract” means the Schedule of Documents appended to the Library’s Appointment Letter described as forming the Contract.

“Contract Price” means the sum(s) to be paid by the Library to the Contractor under the Contract.

“Contracting Authority” means any contracting authority as defined in Regulation 5(2) of the Public Contracts (Works, Services and Supply) Regulations 2000 other than the Library.

Page 25: British Library / Qatar Foundation Partnership Proiect

CONDITIONS OF CONTRACT FOR CONTRACT SERVICES – SMC8220 PAGE 4 OF 24

“Data” means all information, text, drawings, diagrams, images or sounds which are embodied in any electronic or tangible medium and which are supplied or of which access is granted to the Contractor under this Contract.

“Data Controller” shall have the meaning given to it under the Data Protection Act.

“Data Processing” shall have the meaning given to it under the Data Protection Act.

“DPA” means the Data Protection Act 1998 and any and all associated legislation.

“Environmental Information Regulations” means the Environmental Information Regulations 2004.

“FOIA” means the Freedom of Information Act 2000 and any subordinate legislation made under this Act from time to time together with any guidance and/or codes of practice issued by the Information Commissioner in relation to such legislation.

“Force Majeure” means fire, explosion, flood, lightning, act of God, act of terrorism, war, rebellion, riot, sabotage, or official strike or similar official labour dispute of a third party. Industrial action taken by employees, agents or Sub-contractors of either party shall not constitute a Force Majeure Event in relation to the party whose employees, agents or Sub-contractors take such action.

“Information” has the meaning given under section 84 of the Freedom of Information Act 2000.

“Library Materials” means (as appropriate) either: (i) all materials, plant, machinery, equipment and any other items supplied to the Contractor by the Library; or (ii) all items of property supplied or paid for by the Library for the purposes of the performance of the Project.

“Personnel” shall have the meaning set out at Clause 4.1 of this Contract.

“Personal data” shall have the meaning given to it under the Data Protection Act.

“Premises” means the place(s) where the Services are to be performed.

This includes work carried out at home or in transit, for example working on a laptop during travel.

“Project” means the services to be provided as specified in Schedule 2 hereto and/or in the Appointment Letter.

“Requests for Information” shall have the meaning set out in FOIA or any apparent request for information under the FOIA, the Environmental Information Regulations or the Code of Practice on Access to Government Information (2nd Edition).

“Site Procedures Document” means the relevant Library Site Procedures Document current during the performance of the Project by the Contractor.

“Sub-contractor” means any third party employed by the Contractor in connection with the Contract, and Sub-contract shall be construed accordingly.

“Subject Access Request” means the right of access under Part II Section 7 of the Data Protection Act.

Page 26: British Library / Qatar Foundation Partnership Proiect

CONDITIONS OF CONTRACT FOR CONTRACT SERVICES – SMC8220 PAGE 5 OF 24

“The Library” means the British Library Board and includes the Library’s successors and assigns.

“Works” means any discovery, development, invention, improvement, design, process, formula, information, computer program, semi-conductor topography or other topography, copyright work, trade mark or trade name or get-up made, created, devised, developed or discovered by the Contractor or any of the Personnel during the Project (whether capable of being patented or not) either alone or with any other person in connection with or in a manner affecting or relating to the business of the Library or capable of being used or adapted for use therein or in connection therewith.

References to any enactment, order, regulation or other similar instrument shall be construed as a reference to that or any amending or subsequent enactment, order, regulation or instrument.

2 DESIGNATED REPRESENTATIVES

2.1 The Library will, by written notice to the Contractor, appoint a British Library Representative (“BLR”) who shall have the authority to act on behalf of the Library on such matters in connection with the Contract as shall be specified in such notice.

2.2 Subject to any limitations specified by the Library in Clause 2.1 the BLR may from time to time by written notice to the Contractor delegate any part of the BLR’s authority to an assistant or assistants.

2.3 The Contractor shall, immediately upon award of the Contract, appoint a Contractor Representative who shall have authority to act on behalf of the Contractor and shall notify the Library in writing of such appointment.

3 THE PROJECT

3.1 The Contractor shall perform and complete the Project and such other services consistent with the Project with reasonable skill and care and in accordance with the Contract.

3.2 The scope and specific terms of the Project shall be as set out in Schedule 2 hereto.

3.3 The Contractor shall provide the services of the Personnel for such hours and at such places as are necessary for the proper performance of the Project. The Contractor shall procure that the Personnel when working on the Project devote their full time, knowledge, skill and care to the Project.

3.4 The Contractor understands and agrees that, wherever practicable, the Personnel will undertake their best endeavours to ensure that knowledge transfer to the Library with regard to the Project takes place. For the avoidance of doubt, such knowledge transfer shall not encompass areas such as trade secrets; third party software or any areas which are the subject of a separate confidentiality agreement either between the parties to this Contract or between the parties to this Contract and any third party.

Page 27: British Library / Qatar Foundation Partnership Proiect

CONDITIONS OF CONTRACT FOR CONTRACT SERVICES – SMC8220 PAGE 6 OF 24

3.5 The Contractor shall undertake the Contract in full accordance with the Library’s Site Procedures Document where part or the whole of the Contract is undertaken on Library premises.

3.6 The Contractor shall provide the Library with such progress reports on the Project at such intervals and in such form as are set out in the specification and as the Library may from time to time require.

3.7 The Library may by notice to the Contractor modify its requirements for the Project and suitable amendment to the fees and/or timescales shall if necessary be agreed between the parties.

3.8 The Contractor shall immediately disclose to the Library any conflict of interest which arises in relation to the Project as a result of any present or future appointment, employment or other interest of the Contractor or any of the Personnel.

4 CONTRACTOR’S PERSONNEL

4.1 The Contractor shall provide to the Library prior to commencing the Project:

4.1.1 a list of all persons whose services the Contractor will be utilising in performance of the Project (“Personnel”); and

4.1.2 a list of all Personnel whose particular qualifications, skills and experience are, in the opinion of the Library and the Contractor, necessary for the successful completion of the Project (“Key Personnel”).

4.2 The Contractor shall not without the written approval of the Library replace or add to the Key Personnel. The Library shall not withhold its approval provided that in its reasonable opinion the qualifications, skills and experience of the proposed replacements or additions to the Key Personnel are adequate for the purposes of the Project.

4.3 The Library may at any time require a member of the Personnel to be added to the Key Personnel.

4.4 The decision of the Library on the matters referred to in sub-Clauses 4.2 and 4.3 shall be final, but the Library shall not exercise such powers unreasonably.

4.5 If the Library is dissatisfied with the performance of any Contractor’s personnel on the Project, the Contractor shall cease to employ such personnel on the Project and provide a competent substitute within 24 hours at no additional cost to the Library.

4.6 The Library reserves the right to refuse access to or to require the immediate removal from the Premises of any Contractor’s personnel appearing to be under the influence of alcohol or drugs.

4.7 If the Contractor becomes aware that any Contractor’s personnel have been, or are likely to be, convicted of a criminal offence, details thereof must immediately be given to the Library.

4.8 All Contractor’s personnel shall behave in a reasonable manner whilst on the Premises. Any Contractor’s personnel behaving unreasonably will be evicted and

Page 28: British Library / Qatar Foundation Partnership Proiect

CONDITIONS OF CONTRACT FOR CONTRACT SERVICES – SMC8220 PAGE 7 OF 24

may be prosecuted. For the purposes of this Clause, unreasonable behaviour means disruptive, eccentric, salacious or disturbing behaviour (especially where the offender persists despite requests to stop), verbal abuse or acts of violence.

4.9 Contractor’s personnel must not touch or handle any books or other items from the British Library’s collections at any time whilst they are on the Premises, except in an emergency situation and with the approval of the BLR or security staff. If the BLR becomes aware that Contractor’s personnel are in breach of this clause, he may request the Contractor to cease to employ such Personnel on the Project and provide a competent substitute within 24 hours at no additional cost to the Library. If, in the opinion of the BLR a serious or persistent breach of this clause takes place then the Contractor shall be deemed to be in breach of Contract.

4.10 The Contractor acknowledges vicarious liability for all acts or omissions of its personnel.

5 FEES AND EXPENSES

5.1 The Library shall pay to the Contractor fees as set out in Schedule 1 hereto. Expenses in addition to the fees shall not normally be paid by the Library unless such expenses are agreed between the parties.

5.2 In respect of the payment of Contractor’s agreed expenses by the Library, the Contractor shall produce such evidence thereof as the Library may reasonably require.

5.3 Unless otherwise agreed by the parties, payment shall be made dependant upon the achievement of the payment milestones set out in Schedule 1 hereto.

5.4 Payment will be made within 30 days of receipt and agreement of an appropriate invoice for work completed to the satisfaction of the Library.

5.5 Value Added Tax, where applicable, shall be shown separately on all invoices as a strictly net extra charge.

5.6 All payments due to be made to the Contractor by the Library shall generally be made by means of a BACS transfer.

6 INSURANCE AND INDEMNITIES

6.1 The Contractor shall be liable for and shall indemnify and keep indemnified the Library against all actions, claims, demands, costs and expenses incurred by or made against the Library in respect of any loss or damage or personal injury (including death) which arises from any advice given or anything done or omitted to be done under the Contract to the extent that such loss, damage or injury is caused by the negligence or other wrongful act of the Contractor, the Personnel, its servants or agents.

6.2 Without prejudice to the indemnity in sub-Clause 6.1, if for any reason, the Library shall become liable to pay, or shall pay, any such taxes or other payments as referred to in 7.2 herein, the Library shall be entitled to deduct from any amounts payable to the Contractor and all amounts so paid or required to be paid by it and, to the extent that any amount of taxes paid or required to be paid by the

Page 29: British Library / Qatar Foundation Partnership Proiect

CONDITIONS OF CONTRACT FOR CONTRACT SERVICES – SMC8220 PAGE 8 OF 24

Contractor shall exceed the amounts payable by the Library to the Contractor, the Contractor shall indemnify the Library in respect of such liability and shall, upon demand, forthwith reimburse the Library such excess.

6.3 The Contractor shall effect with an insurance company or companies acceptable to the Library a policy or policies of insurance in respect of professional indemnity covering all the matters which are the subject of the Contract and undertakings on the part of the Contractor contained in the Contract in the sum of £500,000.00 least in respect of any one incident and unlimited in total, unless otherwise agreed by the Library in writing

6.4 If requested, a certificate evidencing the existence of such policies shall be produced by the Contractor to the Library.

7 NO EMPLOYMENT OR AGENCY

7.1 Nothing contained in this Contract shall be construed or have effect as constituting any relationship of employer and employee between the Library and the Contractor or any of the Personnel.

7.2 The Contractor agrees at all times to pay any and all income tax, national insurance and other contributions required by law to be paid in relation to the Project (including any interest or penalties imposed on the Library in respect of such payments). The Library shall not be liable for any tax, National Insurance, or other contributions arising out of or in connection with payments to the Contractors or the Personnel in connection with the Project.

7.3 Nothing in this Contract shall constitute the Contractor or any of the Personnel including the Key Personnel acting as an agent of the Library. The Contractor and the Personnel shall not have any right or power whatsoever to contract on behalf of the Library or bind the Library in any way in relation to third parties unless specifically authorised to do so.

7.4 Nothing contained in this Agreement shall constitute a partnership or joint venture between the Library and the Contractor.

8 VARIATIONS

8.1 The Library may from time to time during the course of the Contract vary the scope of the Project. Such variations may include, but are not limited to, additions, omissions, substitutions, alterations, changes in quality, form, character, kind and changes in any specified sequence, method, site or timing of the Project.

8.2 If the Contractor considers that any direction of the BLR varies the scope of the Project and will then or later justify a change to the Contract Price, the Contractor shall promptly notify the BLR giving details thereof.

8.3 Any adjustment to the Contract Price shall be determined in accordance with the rates and prices specified in the Contract. If no such rates and prices are specified, then reasonable rates and prices shall be agreed by the parties and the Contractor shall provide such supporting evidence as the BLR may reasonably require to enable such to be determined.

Page 30: British Library / Qatar Foundation Partnership Proiect

CONDITIONS OF CONTRACT FOR CONTRACT SERVICES – SMC8220 PAGE 9 OF 24

8.4 If the Library:

8.4.1 does not agree that the directions of the BLR vary the Project; or

8.4.2 does not agree that such directions will change the Contract Price; or

8.4.3 is unable to agree reasonable rates and prices for a variation;

8.5 Then the BLR shall notify the Contractor in writing of the Library’s reasons.

8.6 Notwithstanding any such disagreement under this Clause the Contractor shall, unless otherwise notified by the BLR, carry out such variations without prejudice to any of its rights under the Contract or at law.

8.7 The Contractor shall when carrying out variations be bound by the Contract.

8.8 The Contractor shall not alter nor vary any of the requirements of the Contract except as directed in writing by the Library.

8.9 Any change to the Contract which is agreed by the Parties shall be subject to the Change Procedure set out in Schedule 3 hereto.

9 TERMINATION

9.1 Either party may terminate the Contract immediately if:

9.1.1 written notice has been given to the other party of a substantial or persistent breach stating the period during which such breach is to be rectified and the party given such notice has failed to satisfactorily remedy such breach within the period stated; or

9.1.2 the other party:

9.1.2.1 becomes bankrupt or insolvent; or

9.1.2.2 makes or attempts to enter into any arrangement or composition with its creditor(s); or

9.1.2.3 agrees to carry out the Contract under a committee of inspection of its creditors; or

9.1.2.4 issues a notice calling a meeting to pass a resolution for its winding up; or

9.1.2.5 is wound up by an order of the Court; or

9.1.2.6 has a provisional liquidator, receiver or manager or administrator appointed; or

9.1.2.7 if there is a change of control of the Contractor within the meaning set out in Section 840 of the Income and Corporation Taxes Act 1988.

9.2 Without prejudice to the rights of the Library to terminate the Contract under Clause 9.1, it shall be a condition of the Contract that the Contractor shall not engage in any activities, whether lawful or unlawful, which may, in the opinion of the Library, bring the reputation of the Library into disrepute. If it comes to the notice of the Library that the Contractor has engaged in such activities, then the Library may terminate the Contract forthwith.

Page 31: British Library / Qatar Foundation Partnership Proiect

CONDITIONS OF CONTRACT FOR CONTRACT SERVICES – SMC8220 PAGE 10 OF 24

9.3 Without prejudice to the rights of the Library to terminate the Contract under Clause 9.1, the Library may for any other reason whatsoever terminate the Contract or part thereof at any time by giving reasonable written notice to the Contractor and specifying the date from which termination shall be effective.

10 CONSEQUENCES OF TERMINATION

10.1 Upon termination of the Contract howsoever caused, the Contractor shall:

10.1.1 immediately deliver to the Library all confidential information, documents, Library Materials and other property of the Library supplied to it in the course of or pursuant to the Contract;

10.1.2 upon notice from the BLR, remove from any premises of the Library any materials or equipment which are the Contractor’s property and which the BLR has requested it to so remove;

10.1.3 submit to the BLR within two weeks of such termination all outstanding invoices together with all such further information as the BLR may require to verify such invoices and, if so requested by the BLR, a reconciliation of such invoices to the records of the Library.

10.2 Failure by the Contractor to comply in all material respects with Clause 10.1 within the time specified, shall extinguish all rights of the Contractor to receive any further payment pursuant to the Contract.

10.3 If the Library terminates:

10.3.1 under Clause 9.1 and Clause 9.2, but without prejudice to any other rights of the Library:

10.3.1.1 the Contractor shall be liable for any additional cost over and above the Contract Price incurred by the Library in completing the Project; and

10.3.1.2 the Contractor shall be liable for the reasonable costs incurred by the Library in letting such contract or contracts as may be necessary to undertake and complete the Project.

10.4 The Library may deduct such additional costs as stated in 10.3.1.1 and 10.3.1.2 herein from amounts (if any) as are due to the Contractor or otherwise recover such cost as a debt due from the Contractor. Subject to the foregoing however, the Contractor may recover from the Library, by way of full and final satisfaction of all claims, those monies which the Library agrees were accrued due prior to such termination.

10.5 If the Library terminates under Clause 9.3, the Contractor may, without prejudice to any of its other rights or remedies under the Contract, recover from the Library by way of full and final satisfaction of all claims, all monies accrued due prior to such termination plus all reasonable costs actually and necessarily incurred by the Contractor directly and exclusively as the result of such early termination.

10.6 Under Clauses 9.1 or 9.3, the Library may require the Contractor to immediately vacate the Library premises and return any Library materials.

Page 32: British Library / Qatar Foundation Partnership Proiect

CONDITIONS OF CONTRACT FOR CONTRACT SERVICES – SMC8220 PAGE 11 OF 24

10.7 Any sums recoverable by the Contractor under the Contract shall not exceed the Contract Price.

10.8 Clauses 12, 13, 14.1, 17, 20, 21 and 28 shall survive termination of this Contract.

11 ASSIGNMENT AND SUB-CONTRACTING

11.1 The Contractor shall not assign the Contract in whole or in part or any benefit or interest therein without the prior written consent of the BLR.

11.2 The Library may assign or otherwise transfer the Contract in whole or in part or any benefit or interest therein to any party by written notice to the Contractor.

11.3 The Contractor shall not sub-contract the whole or any part of the Contract including Sub-contracting for labour only, without the prior written consent of the BLR. If such consent is given it shall not relieve the Contractor from any liability or obligation under the Contract and the Contractor shall be responsible for the acts, omissions, defaults or negligence of any Sub-contractor, its agents, servants or workmen as fully as if they were the acts, omissions, defaults or negligence of the Contractor.

11.4 If consent is granted under Clause 11.3:

11.4.1 the Contractor shall ensure that all rights, duties and obligations that the Contractor has under the Contract shall be included in any contract that the Contractor has with any Sub-contractor; and

11.4.2 the Contractor shall be responsible for making good any loss suffered or expense incurred by the Library by reason of any default, negligence or failure on the part of any Sub-contractor.

12 INVENTIONS AND OTHER INTELLECTUAL PROPERTY

12.1 The Contractor shall be liable for and shall indemnify and defend the Library from all losses costs, damages and expenses of every kind arising out of any claim in respect of any infringement or alleged infringement of any patent, copyright or other intellectual property rights arising by reason of the use or embodiment in the Services of any articles supplied by the Contractor or which arise out of or in connection with the Contractor’s obligations under the Contract, except that this indemnity shall not apply in respect of any infringement or alleged infringement arising as a result of the correct use by the Contractor of a design supplied by the Library.

12.2 All patents, copyright and other intellectual property rights in all Library Materials or other items created by the Library and supplied to the Contractor for the performance of the Services shall remain the sole property of the Library and the Contractor shall not after the completion, expiry or termination of the Contract question or dispute the Library’s ownership thereof.

12.3 Any inventions or intellectual property which arises out of or is created as a result of the carrying out of the Services shall be subject to the following Clauses:

Page 33: British Library / Qatar Foundation Partnership Proiect

CONDITIONS OF CONTRACT FOR CONTRACT SERVICES – SMC8220 PAGE 12 OF 24

12.3.1 Any Works as defined herein shall forthwith be disclosed to the Library and shall (subject to the provisions of the Patents Act 1977) belong to and be the absolute property of the Library.

12.3.2 The Contractor shall procure that all rights in any Works developed by the Personnel shall accrue to the Contractor in order that the Contractor may comply with its obligations under the provisions of this Clause 12.3.2.

12.3.3 The Contractor if and whenever required so to do by the Library shall at the expense of the Library:

12.3.3.1 apply or join with the Library in applying for letters patent, registered design, trade mark or other protection or registration in the United Kingdom and in any other part of the world for any Works; and

12.3.3.2 execute and do all instruments and things necessary for vesting such patents, registered designs, trade marks or other protection or registration when obtained and all right title and interest to and in the same absolutely and as sole beneficial owner in the Library or in such other person or organisation as the Library may specify; and

12.3.3.3 sign and execute all such documents, and do all such things as the Library may reasonably require in respect of any proceedings in respect of such applications and any publication or application for revocation of such patent, unregistered designs, trade marks or other protection.

12.4 The Contractor hereby irrevocably and unconditionally waives all rights under Chapter IV Copyright, Designs and Patents Act 1988 and any other moral rights which it may have in the Works in connection with its authorship of any existing or future copyright work in the course of the provision of the Services, in whatever part of the world such rights may be enforceable, including, without limitation:

12.4.1 the right conferred by section 77 of that Act to be identified as the author of any such work; and

12.4.2 the right conferred by Section 80 of that Act not to have any such work subjected to derogatory treatment.

12.5 The Contractor hereby irrevocably appoints the Library to be its attorney in its name and on its behalf to execute and do any such instrument or thing and generally to use its name for the purpose of giving to the Library the full benefit of this Clause in favour of any third party. A certificate in writing signed by any director of the Library that any instrument or act falls within the authority hereby conferred shall be conclusive evidence that such is the case.

12.6 Nothing in this Clause shall be construed as restricting the rights of the Contractor or the Library under Sections 39 to 43 of the Patents Act 1977 or its successors in law.

12.7 For the avoidance of doubt, any outcomes which arise out of and in the course of the Contract (including but not limited to draft reports, interim reports and

Page 34: British Library / Qatar Foundation Partnership Proiect

CONDITIONS OF CONTRACT FOR CONTRACT SERVICES – SMC8220 PAGE 13 OF 24

reports) shall vest in and be the sole property of the Library, and may be used by the Library as it sees fit.

13 PROTECTION OF DATA

13.1 The Contractor and the Library shall each take reasonable precautions (having regard to the nature of their other respective obligations under this agreement) to preserve the integrity of the Library’s Data and to prevent any corruption or loss of the Library’s Data.

14 ANTI BRIBERY

14.1 The Contractor shall (and hereby warrants, represents and undertakes that it shall):

14.1.1 comply with, and not act in a manner (in particular when acting as an associated person of the Library ) that constitutes a breach of, all Applicable Laws, regulations, codes and sanctions relating to anti-bribery and anti-corruption including the Bribery Act 2010 (the “Relevant Requirements”);

14.1.2 comply with the Library's anti-bribery and anti-corruption and/or similar policies (as made available to the Contractor upon request and as the Library may update them from time to time (the “Relevant Policies”));

14.1.3 have and shall maintain in place throughout the duration of this Contract (and make available for the Library to inspect) its own policies and procedures, including adequate procedures under the Bribery Act 2010, to ensure compliance with the Relevant Requirements and the Relevant Policies and will enforce them where appropriate;

14.1.4 promptly report to the Library any request or demand for any undue financial or other advantage of any kind received by the Contractor in connection with the performance of this Contract; and

14.1.5 allow the Library on reasonable notice to inspect and assure itself of the measures implemented by the Service Provider in compliance with the Relevant Requirements and this Clause 14.

14.2 The Contractor shall ensure that any person associated with the Contractor who is performing the Project (or any part of them) does so only on the basis of a written contract which imposes on and secures from such person terms equivalent to those imposed on the Contractor in this Clause 14. The Contractor shall be responsible for the observance and performance by such persons of such terms, and shall be directly liable to the Library for any breach by such persons of any of such terms.

14.3 Breach of Clauses 14.1 and 14.2 shall be deemed a material breach and will entitle the Library to terminate the Contract forthwith in accordance with Clause 9 - Termination.

Page 35: British Library / Qatar Foundation Partnership Proiect

CONDITIONS OF CONTRACT FOR CONTRACT SERVICES – SMC8220 PAGE 14 OF 24

14.4 For the purpose of this Clause 14, the meaning of adequate procedures and whether a person is associated with another person shall be determined in accordance with section 7(2) of the Bribery Act 2010 (and any guidance issued under section 9 of that Act), sections 6(5) and 6(6) of that Act and section 8 of that Act respectively. For the purposes of this Clause 14 a person associated with the Contractor includes any subcontractor of the Contractor.

14.5 The Contractor further agrees, undertakes and warrants that in performing the Project, it will not induce or improperly reward any third party, including any public official, to act improperly (where to act improperly shall also be interpreted in accordance with the Bribery Act 2010).

15 AUDIT AND RECORDS

15.1 The Contractor shall keep and maintain until 2 (two) years after the Contract has been completed full and accurate records to the satisfaction of the Library, including without limitation dockets and receipts evidencing time utilisation, expenditure and other relevant matter performed in connection with the Contract. The Contractor shall on request afford the Library or its representative such reasonable access to those records as may be required by the Library in connection with the Contract.

16 NATIONAL AUDIT OFFICE ACCESS

16.1 For the purpose of:

16.1.1 the examination and certification of British Library accounts; or

16.1.2 any examination pursuant to Section 6(1) of the National Audit Act 1983 or any re-enactment thereof of the economy, efficiency and effectiveness with which the British Library has used its resources;

16.2 The Comptroller and Auditor General may examine such documents as he may reasonably require which are owned, held or otherwise within the control of the Contractor and may require the Contractor to provide such oral and/or written explanations as he considers necessary.

16.3 It is hereby declared that the carrying out of an examination under Section 6(3) (d) of the National Audit Act 1983 or any re-enactment thereof in relation to the Contractor is not a function exercisable under this condition.

17 CONFIDENTIALITY AND DOCUMENTATION

17.1 The Contractor shall keep secret and not disclose and shall procure that the Personnel keep secret and do not disclose any information of a confidential nature which is the property of the Library or which the Library is obliged to keep confidential obtained by them by reason of the Contract except information which is in the public domain otherwise than by reason of a breach of this provision.

17.2 The provisions of Clause 17.1 shall not apply to such information if it is:

17.2.1 in the public domain otherwise than by failure of the Contractor to comply with Clause 17.1; or

Page 36: British Library / Qatar Foundation Partnership Proiect

CONDITIONS OF CONTRACT FOR CONTRACT SERVICES – SMC8220 PAGE 15 OF 24

17.2.2 in the possession of the Contractor before these confidentiality obligations came into effect; or

17.2.3 obtained from a third party who is free to disclose the same.

17.3 The Contractor agree(s) to adopt and to procure that the Personnel adopt all such procedures as the Library may reasonably require in relation to confidential information.

17.4 Any document, including without limitation, notes, memoranda, diaries, correspondence, computer disks, facsimiles, telexes, reports or other documents or data of whatever nature or copies thereof created by the Contractor or the Personnel in connection with the Project shall be and remain the property of the Library and the Library shall be the absolute beneficial of the copyright in any such document.

17.5 The Contractor shall and shall procure that the Personnel shall at any time during the continuance of this Contract if so required by the Library and in the event of the termination of this Contract for whatever reason (whether lawfully or otherwise) surrender to the Library all original and copy documents in its possession, custody or control (including, without limitation, all books, documents, papers, materials) belonging to the Library or relating to the business of the Library together with any other property belonging to the Library.

17.6 The obligations under this Contract apply to all and any confidential information whether the confidential information was in or comes into the possession of the relevant person prior to or following this Contract and such obligations shall be continuing obligations throughout the continuance of this Contract and at all times following its termination but shall cease to apply to information which may come into the public domain otherwise than through unauthorised disclosure by the Contractor or the Personnel.

18 COMPLIANCE WITH DATA PROTECTION ACT 1998

18.1 The Contractor and the Library shall both comply with their respective obligations under the provision of the Data Protection Act 1998.

18.2 The Contractor hereby undertakes to comply with obligations equivalent to those imposed on a "data controller" by the Seventh Data Protection Principle as set out in Schedule 1 to the Data Protection Act 1998, with regard to any personal data processed on behalf of the Library by the Contractor under the Contract.

18.3 In addition, the Contractor:

18.3.1 warrants and undertakes that it has and will have at all times during the term of the Contract appropriate measures in place acceptable to the Library to protect any personal data accessed or processed by the Contractor on the Library's behalf against unauthorised or unlawful processing and against accidental loss or destruction and that it has taken all reasonable steps to ensure the reliability of any of its staff, including but not limited to the Personnel, who will have access to personal data processed under this Contract;

18.3.2 undertakes that it will act only on the BLR's instructions in relation to the processing of any personal data on the Library's behalf;

Page 37: British Library / Qatar Foundation Partnership Proiect

CONDITIONS OF CONTRACT FOR CONTRACT SERVICES – SMC8220 PAGE 16 OF 24

18.3.3 undertakes to allow the Library or the Library's representatives on reasonable notice access to any relevant premises owned or controlled by the Contractor to inspect the Contractor's procedures and will, on request by the Library from time to time, prepare a report for the Library as to the Contractor's then current technical and organisational measures used to protect any such personal data;

18.3.4 undertakes to consider all reasonable suggestions which the Library may put to the Contractor to ensure that the level of protection provided by the Contractor for personal data processed on behalf of the Library is in accordance with this Clause and to make changes suggested thereby unless the Contractor can prove to the Library's reasonable satisfaction that such proposed changes are not necessary to ensure ongoing compliance with the warranty and undertaking given in Clause 18.3.1 herein.

18.4 Breach of any of the warranties or undertakings set out in this Clause 18 will entitle the Library to terminate the Contract forthwith in accordance with Clause 9 - Termination.

19 FREEDOM OF INFORMATION ACT 2000 AND THE ENVIRONMENTAL INFORMATION REGULATIONS 2004

19.1 The Contractor acknowledges that the Library is subject to the requirements of the Code of Practice on Access to Government Information (2nd Edition), the FOIA and the Environmental Information Regulations and shall assist and cooperate with the Library (at the Contractor’s expense) to enable the Library to comply with these Information disclosure requirements.

19.2 The Contractor shall and shall procure that its sub-contractors shall:

19.2.1 transfer the Request for Information to the Library as soon as practicable after receipt and in any event within three Working Days of receiving a Request for Information;

19.2.2 provide the Library with a copy of all Information in its possession or power in the form that the Library requires within five Working Days (or such other period as the Library may specify) of the Library requesting that Information; and

19.2.3 provide all necessary assistance as reasonably requested by the Library to enable the Library to respond to a Request for Information within the time for compliance set out in section 10 of the FOIA or regulation 5 of the Environmental Information Regulations.

19.3 The Library shall be responsible for determining at its absolute discretion whether the Commercially Sensitive Information and/or any other Information:

19.3.1 is exempt from disclosure in accordance with the provisions of the Code of Practice on Access to Government Information (2nd Edition), the FOIA or the Environmental Information Regulations;

19.3.2 is to be disclosed in response to a Request for Information, and

19.4 in no event shall the Contractor respond directly to a Request for Information unless expressly authorised to do so by the Library.

Page 38: British Library / Qatar Foundation Partnership Proiect

CONDITIONS OF CONTRACT FOR CONTRACT SERVICES – SMC8220 PAGE 17 OF 24

19.5 The Contractor acknowledges that the Library may, acting in accordance with the Department for Constitutional Affairs’ Code of Practice on the Discharge of Functions of Public Authorities under Part I of the Freedom of Information Act 2000, be obliged under the Code of Practice on Access to Government Information (2nd Edition), the FOIA, or the Environmental Information Regulations to disclose Information:-

19.5.1 without consulting with the Contractor, or

19.5.2 following consultation with the Contractor and having taken its views into account.

19.6 The Contractor shall ensure that all information produced in the course of the Contract or relating to the Contract is retained for disclosure and shall permit the Library to inspect such records as requested from time to time.

19.7 The Contractor acknowledges that any lists or schedules provided by it outlining Confidential Information are of indicative value only and that the Library may nevertheless be obliged to disclose Confidential Information in accordance with Clause 19.5.

20 IDENTIFYING MARK

20.1 The use of any identifying mark of the Library, including its name or any other visual identification is specifically prohibited without the express written permission of the BLR.

20.2 The provision of this Clause 20 shall apply during the continuance of the Contract and after its termination howsoever arising, but if the Contractor has entered into a separate confidentiality agreement with the Library, then the terms of that agreement shall take precedence over this Clause 20.

21 ADVERTISING

21.1 The Contractor shall not take photographs or make publicity releases or announcements regarding either the Contract or the activities of the Contractor relating to its participation in the Contract without obtaining the BLR’s prior written consent.

22 WAIVER

22.1 No term of the Contract shall be considered waived by either party unless executed in writing. No such waiver shall be a waiver of any past or future default, breach or modification of the terms of the Contract unless expressly set forth in such waiver.

22.2 The non-enforcement of any of the terms of the Contract by either party shall not be construed as a waiver of any of that party’s other rights and obligations.

23 NOTICES

23.1 All notices shall be given in writing and be delivered by hand or sent by facsimile or recorded delivery post to the address of the relevant party; in the case of notices

Page 39: British Library / Qatar Foundation Partnership Proiect

CONDITIONS OF CONTRACT FOR CONTRACT SERVICES – SMC8220 PAGE 18 OF 24

sent to the Library, all such notices shall be marked for the attention of the BLR, as stated herein, or to any subsequently notified address. Any notice sent by facsimile shall be deemed to have been served at the time of transmission. A notice sent by post shall be deemed to have been served four days after.

24 FORCE MAJEURE

24.1 Neither party will be liable for delay or failure to perform any of its obligations under the Contract insofar as the performance of such obligations is caused by Force Majeure.

24.2 A party prevented or delayed from performing its obligations under the Contract by Force Majeure shall promptly notify the other party in writing and make every reasonable effort to minimise the effects thereof and shall promptly resume performance as soon as reasonably possible after the Force Majeure ceases.

24.3 The party not affected by Force Majeure may, when the period of non-performance or delay exceeds thirty days from the date of notice of the Forge Majeure event, terminate the Contract at any time by giving written notice to the other party.

25 DISCRIMINATION AND DIVERSITY

25.1 The Contractor shall not unlawfully discriminate within the meaning and scope of any law, enactment, order or regulation relating to discrimination (whether in race, gender, religion, disability, sexual orientation or otherwise) in employment and that equal opportunities are afforded to all persons regardless of the foregoing.

25.2 The Contractor shall take all reasonable steps to secure the observance of Clause 25.1 by all servants, employees or agents of the Contractor and all suppliers and sub-contractors employed in the execution of the Contract or Services.

26 ENTIRETY AND SUPREMACY

26.1 The Contract comprises the entire agreement between the parties to the exclusion of all other terms and conditions and prior or collateral agreements, negotiations, notices of intention and representations and the parties agree that they have not been induced to enter into the Contract on the basis of any representation. Furthermore, the parties shall not be bound by or be liable for any statement, representation, promise, inducement or understanding of any kind or nature not set forth in the Contract and amendment to the Contract, other than variations to the specification in accordance with Clause 8, shall be binding on either party unless in writing and signed by an authorised representative of each party.

26.2 No other document which forms part of the Contract shall override, modify or affect in any way whatsoever the application or interpretation of the Clauses of this document.

Page 40: British Library / Qatar Foundation Partnership Proiect

CONDITIONS OF CONTRACT FOR CONTRACT SERVICES – SMC8220 PAGE 19 OF 24

27 ADJUDICATION

27.1 The parties may by notice ask for adjudication on any dispute, difference or question arising out of, or relating to, the Contract during the course of the Contract, other than any matters on which the Library reserves the right to express a final and conclusive decision, and providing that the dispute, difference or question has been outstanding for at least 3 months.

27.2 The notice shall specify the matter in dispute and shall set out the principal facts and arguments relating to it. Copies of all relevant documents in possession of either party shall be attached to the notice.

27.3 On receipt of a notice the BLR or Contractor Representative as the case may be shall nominate an officer of the Library or Contractor, or a person acting for the Library or Contractor, who has not been associated with the letting or management of the Contract to act as an independent adjudicator, and shall promptly notify the other party of the nomination.

27.4 The adjudicator shall notify his decision not later than 28 days from the receipt of the notice. The decision shall state how the cost of the adjudicator’s fee or salary shall be apportioned between the parties. Each party shall otherwise bear its own costs of adjudication.

27.5 In coming to a decision, the adjudicator shall have regard to how far the parties have complied with any procedures in the Contract relevant to the matter in dispute, and to what extent each of them has acted promptly, reasonably and in good faith.

27.6 The decision of the adjudicator on any matter referred to him will be binding until completion or abandonment of the Contract.

28 CONTRACTS (RIGHTS OF THIRD PARTIES) ACT 1999

28.1 The Contracts (Rights of Third Parties) Act 1999 (‘The Third Parties Act’) shall not apply to this Contract.

28.2 No individual, firm or company who is a third party to this Contract (including any employee, officer, agent, representative or sub-contractor of either party) shall have the right (whether under The Third Parties Act or otherwise) to enforce any part or the whole of this Contract which expressly or by implication confers a benefit on that individual, firm or company without the express prior written agreement of the parties to the Contract which agreement must refer to this Clause 28.2.

28.3 In the event that an individual, firm or company who is not a party to this Agreement (including any employee, officer, agent, representative or sub-contractor of either party) has a right to enforce any term of this Contract by virtue of Section 1 of The Third Parties Act, the parties to the Contract may, not withstanding Section 2(1) of the Third Parties Act, vary or cancel this Contract by agreement between them without the consent of such third party.

Page 41: British Library / Qatar Foundation Partnership Proiect

CONDITIONS OF CONTRACT FOR CONTRACT SERVICES – SMC8220 PAGE 20 OF 24

29 ARBITRATION

29.1 In addition to adjudication, the procedures of arbitration set out in this Clause 29 will be available to the parties with regard to disputes, difference or questions between them arising out of or in relation to the Contract, other than as matter as to which the Library reserves the right to express a final and conclusive decision. The dispute, difference or question shall after notice by either party to the other be referred to a single arbitrator agreed for that purpose or, in default of agreement within a reasonable period, appointed at the request of either party by the Chairman of the Chartered Institute of Arbitrators.

29.2 Unless the parties otherwise agree:

29.2.1 No reference shall be made under Clause 29.1 until after the completion or abandonment of the Contract or the determination of the Contract;

29.2.2 The arbitrator will hold a meeting with the parties forthwith on his acceptance of office and will fix a timetable for the delivery of points of claim and defence or counter claim, for the discovery and inspection of documents, for the inspection of work (if necessary) and for the hearing of any oral evidence (if necessary) which timetable shall not without the consent of the parties exceed a period of 6 months from the date of that preliminary meeting;

29.2.3 The parties shall ensure that any evidence whether oral or written and any document or argument required to be submitted to the arbitrator is submitted to him in accordance with the agreed timetable;

29.2.4 The arbitrator shall give his award not later than 3 months from the end of the period referred to in Clause 29.2.2.

29.2.5 A reference to arbitration in accordance with this Clause shall be a reference to which the Arbitration Acts 1950 and 1979 apply, and those Acts shall have effect subject to the provisions of this Clause 29.

30 GOVERNING LAW AND LANGUAGE

30.1 The construction and performance of the Contract shall be governed solely by the Laws of England, and shall be subject to the jurisdiction of the English courts.

30.2 All documentation provided to the Library by the Contractor and its Sub-contractors and all communications between the Library and the Contractor in connection with the Contract shall be in the English language.

31 HEADINGS

31.1 The headings of Clauses or other parts of the Contract are inserted for convenient reference only and are not to be construed as defining, limiting or extending the meaning of any of their provisions.

Page 42: British Library / Qatar Foundation Partnership Proiect

CONDITIONS OF CONTRACT FOR CONTRACT SERVICES – SMC8220 PAGE 21 OF 24

32 RIGHT TO PUBLISH

32.1 The parties acknowledge that, except for any information which is exempt from disclosure in accordance with the provisions of the FOIA, the content of this Contract is not Confidential Information. The Library shall be responsible for determining in its absolute discretion whether any of the content of the Contract is exempt from disclosure in accordance with the provisions of the FOIA.

32.2 Notwithstanding any other term of this Contract, the Contractor hereby gives his consent for the Library to publish the Contract in its entirety, including from time to time agreed changes to the Contract, to the general public.

32.3 The Library may consult with the Contractor to inform its decision regarding any redactions but the Library shall have the final decision in its absolute discretion.

32.4 The Contractor shall assist and cooperate with the Library to enable the Library to publish this Contract.

Page 43: British Library / Qatar Foundation Partnership Proiect

CONDITIONS OF CONTRACT FOR CONTRACT SERVICES – SMC8220 PAGE 22 OF 24

SCHEDULE 1

FEE STRUCTURE

As set out in the Appointment Letter

SCHEDULE 2

SCOPE OF PROJECT

As set out in the Appointment Letter

SCHEDULE 3

CHANGE CONTROL PROCEDURE

1 General

1.1 Where the parties see a need to amend the Contract, the Library may request and the Contractor may at any time recommend, such change in accordance with the formal Change Control Procedure (CCP) set out below.

1.2 Neither party shall unreasonably withhold its agreement to such change.

1.3 Until the Contract amendment is authorised, the Contractor shall, unless otherwise agreed in writing, continue to supply the Services as if the request or recommendation had not been made.

1.4 Any such request or recommendation shall be without prejudice to the rights of either party.

1.5 Any work undertaken by the Contractor which has not been authorised in advance by the mechanism set out in this Schedule shall be undertaken entirely at the Contractor’s expense.

2 Procedures

2.1 Discussion between the parties concerning an amendment to the Contract will result in one of the following:

2.1.1 No further action being taken, or

2.1.2 A written request to amend the Contract being made by the Library, or

2.1.3 A written request to amend the Contract being made by the Contractor, or

Page 44: British Library / Qatar Foundation Partnership Proiect

CONDITIONS OF CONTRACT FOR CONTRACT SERVICES – SMC8220 PAGE 23 OF 24

2.1.4 A recommendation to amend the Contract being made by the Contractor.

2.2 Where a written request for an amendment is made by the Library the Contractor shall, unless otherwise agreed, submit a Change Control Note (CCN) to the Library within 3 weeks of the date of the request.

2.3 A recommendation to amend shall be made by the Contractor as a CCN direct to the Library at the time of such recommendation.

2.4 Each CCN shall contain:

2.4.1 The title of the change

2.4.2 The originator and date of the request/change recommendation

2.4.3 The reason for the change

2.4.4 Full details of the change including any specifications for additional services other than the Services

2.4.5 The full implications, if any, of the change

2.4.6 A timetable for implementation

2.4.7 A schedule of payments if appropriate

2.4.8 Details of the likely impact, if any, of the change on other aspects of the Contract, including but not limited to:

2.4.8.1 The scope of Services

2.4.8.2 The period of the Contract

2.4.8.3 Any changes to Personnel

2.4.8.4 The Contractor’s payment profile

2.4.8.5 The documentation and information to be provided

2.4.8.6 The Contractor’s performance levels

2.4.8.7 Working arrangements

2.4.8.8 Any contractual issues

2.4.9 The expiry date of validity for the CCN which will, unless otherwise agreed by the parties, be at least 1 (one) calendar month from the date of submission of the CCN

2.4.10 Provision for signature by the parties

2.5 For each CCN submitted, the Library will within the period of the CCN:

2.5.1 Allocate a sequential number to the CCN

2.5.2 Evaluate the CCN and, as appropriate:

2.5.2.1 Request further information; or

2.5.2.2 Approve the CCN as submitted; or

2.5.2.3 Notify the Contractor that the CCN has been rejected, given reasons for the rejection

Page 45: British Library / Qatar Foundation Partnership Proiect

CONDITIONS OF CONTRACT FOR CONTRACT SERVICES – SMC8220 PAGE 24 OF 24

2.5.3 Arrange for 2 copies of an approved CCN to be signed by or on behalf of the parties

2.6 If the parties consider that the preparation of a CCN which has been requested by the Library would necessitate a significant allocation of resources, the Contractor will notify the Library accordingly and, on agreement by the Library, will make a proposal for a paid study of the cost and implications of producing the required CCN. Pending the Library’s acceptance of the proposal, the Contractor will be relieved of his obligations to produce such CCN.

2.7 A CCN signed by both parties shall constitute a formal amendment to this Contract.

SCHEDULE 4

COMMERCIALLY SENSITIVE INFORMATION

Page 46: British Library / Qatar Foundation Partnership Proiect
Page 47: British Library / Qatar Foundation Partnership Proiect
Page 48: British Library / Qatar Foundation Partnership Proiect
Page 49: British Library / Qatar Foundation Partnership Proiect
Page 50: British Library / Qatar Foundation Partnership Proiect
Page 51: British Library / Qatar Foundation Partnership Proiect
Page 52: British Library / Qatar Foundation Partnership Proiect
Page 53: British Library / Qatar Foundation Partnership Proiect
Page 54: British Library / Qatar Foundation Partnership Proiect
Page 55: British Library / Qatar Foundation Partnership Proiect
Page 56: British Library / Qatar Foundation Partnership Proiect
Page 57: British Library / Qatar Foundation Partnership Proiect
Page 58: British Library / Qatar Foundation Partnership Proiect
Page 59: British Library / Qatar Foundation Partnership Proiect
Page 60: British Library / Qatar Foundation Partnership Proiect
Page 61: British Library / Qatar Foundation Partnership Proiect
Page 62: British Library / Qatar Foundation Partnership Proiect
Page 63: British Library / Qatar Foundation Partnership Proiect
Page 64: British Library / Qatar Foundation Partnership Proiect
Page 65: British Library / Qatar Foundation Partnership Proiect
Page 66: British Library / Qatar Foundation Partnership Proiect
Page 67: British Library / Qatar Foundation Partnership Proiect
Page 68: British Library / Qatar Foundation Partnership Proiect
Page 69: British Library / Qatar Foundation Partnership Proiect
Page 70: British Library / Qatar Foundation Partnership Proiect
Page 71: British Library / Qatar Foundation Partnership Proiect
Page 72: British Library / Qatar Foundation Partnership Proiect
Page 73: British Library / Qatar Foundation Partnership Proiect
Page 74: British Library / Qatar Foundation Partnership Proiect
Page 75: British Library / Qatar Foundation Partnership Proiect
Page 76: British Library / Qatar Foundation Partnership Proiect
Page 77: British Library / Qatar Foundation Partnership Proiect
Page 78: British Library / Qatar Foundation Partnership Proiect
Page 79: British Library / Qatar Foundation Partnership Proiect
Page 80: British Library / Qatar Foundation Partnership Proiect
Page 81: British Library / Qatar Foundation Partnership Proiect
Page 82: British Library / Qatar Foundation Partnership Proiect
Page 83: British Library / Qatar Foundation Partnership Proiect
Page 84: British Library / Qatar Foundation Partnership Proiect
Page 85: British Library / Qatar Foundation Partnership Proiect
Page 86: British Library / Qatar Foundation Partnership Proiect
Page 87: British Library / Qatar Foundation Partnership Proiect
Page 88: British Library / Qatar Foundation Partnership Proiect
Page 89: British Library / Qatar Foundation Partnership Proiect
Page 90: British Library / Qatar Foundation Partnership Proiect
Page 91: British Library / Qatar Foundation Partnership Proiect
Page 92: British Library / Qatar Foundation Partnership Proiect
Page 93: British Library / Qatar Foundation Partnership Proiect
Page 94: British Library / Qatar Foundation Partnership Proiect
Page 95: British Library / Qatar Foundation Partnership Proiect
Page 96: British Library / Qatar Foundation Partnership Proiect
Page 97: British Library / Qatar Foundation Partnership Proiect
Page 98: British Library / Qatar Foundation Partnership Proiect
Page 99: British Library / Qatar Foundation Partnership Proiect
Page 100: British Library / Qatar Foundation Partnership Proiect
Page 101: British Library / Qatar Foundation Partnership Proiect
Page 102: British Library / Qatar Foundation Partnership Proiect
Page 103: British Library / Qatar Foundation Partnership Proiect
Page 104: British Library / Qatar Foundation Partnership Proiect
Page 105: British Library / Qatar Foundation Partnership Proiect
Page 106: British Library / Qatar Foundation Partnership Proiect
Page 107: British Library / Qatar Foundation Partnership Proiect
Page 108: British Library / Qatar Foundation Partnership Proiect
Page 109: British Library / Qatar Foundation Partnership Proiect
Page 110: British Library / Qatar Foundation Partnership Proiect
Page 111: British Library / Qatar Foundation Partnership Proiect

LAUNCHING THE BRITISH LIBRARY / QATAR FOUNDATION PARTNERSHIP

PROJECT5 NOV 2012

Page 112: British Library / Qatar Foundation Partnership Proiect

YOUR TEAM TODAY

VIKKI STACECLIENT SERVICES DIRECTOR

LORD CHADLINGTONSPECIAL ADVISOR

PAUL THOMAS PROGRAMME MANAGER

BILLY PARTRIDGEPROGRAMME DIRECTOR

VICTOR BENADYDIGITAL CONTENT &

SOCIAL MEDIA DIRECTOR

SAMANTHA JAYHEAD OF STAKEHOLDER

ENGAGEMENT

Page 113: British Library / Qatar Foundation Partnership Proiect

…AND OUR TEAM IN DOHA

TAMARA BULLOCKPROGRAMME DIRECTOR

MITCHELL PRATHERPROGRAMME MANAGER

RAMI YASHRUTIEXECUTIVE SUPPORT

Page 114: British Library / Qatar Foundation Partnership Proiect

WHY GRAYLING

50%20 years

Page 115: British Library / Qatar Foundation Partnership Proiect

THE SMART WAY TO LAUNCH

Page 116: British Library / Qatar Foundation Partnership Proiect

TWO WORLD CLASS ORGANISATIONS

TWO INSPIRING VISIONS

Transforming Qatar into a knowledge based

economy by unlocking human potential

Making our collections as accessible as possible

Page 117: British Library / Qatar Foundation Partnership Proiect

…AND ONE UNIFIYING MISSION

Nurture & celebrate global

understanding of Arabic cultural heritage and

history in a modern,

accessible way

Academic community

Cultural stakeholders & influencers

Qatari communities

UK Government

Audiences

Social media

Stakeholder engagement

Gulf media

UK & international

media

Channels

Page 118: British Library / Qatar Foundation Partnership Proiect

AUDIENCE INSIGHTS

Page 119: British Library / Qatar Foundation Partnership Proiect

4 PRIMARY AUDIENCE MOTIVATIONS

• ‘stumble’ on content or prompted by others to ‘explore’ a certain theme• demand immersive, media-rich content• targeted via search and media distribution channels

E

• have valued/trusted sources of information• consume their news/views from these sources• targeted via search and media distribution channels

R

• have an existing audience within a certain field• looking for content ideas and material to spread through their channels• targeted via direct channels with content that can be repurposed for their needs

B

• have specific niche content/information needs• actively seeking information and detail on their particular topic• need to find appropriate data quickly: effective search VITAL

S

Page 120: British Library / Qatar Foundation Partnership Proiect

4 PRIMARY AUDIENCE MOTIVATIONS

Academic community

The media

Qatari communities

Cultural opinion formers

UK

UK Government

Qatar

Teachers

Students

Institutions

Individuals

Institutions

Individuals

Explorers & Receivers

Explorers & Receivers

Broadcasters & Seekers

Seekers & Explorers

Receivers & Broadcasters

Broadcasters

Researchers

Page 121: British Library / Qatar Foundation Partnership Proiect

MEDIA INSIGHTS

Modern relevance is seen as the key to unlocking interest in the public

Journalists have high expectations of how the content will stimulate their interest

There is a practical impact to social media and digitisation colliding

“This sounds like a very interesting topic although it is quite niche for western

audiences. The content will need to be presented in a highly engaging and

accessible way if the project is to be a success.”

Will Gompertz, 

Arts Editor, BBC News

“There have been a number of fantastic digitisation projects over the last 10 years. To capture interest, this project will need to make

the content relevant to today’s world.”

Catherine W Gichuki, Qatar Tribune 

“When a query popped up from a doctoral student in Australia looking for a link to a court decision issued by King Henry III, I thought of a colleague in Texas who had

digitized that 13th-century scroll. I sent it to her, and in minutes she could move on with

her research.”Prof. Guy Geltner (Medieval Studies 

University of Amsterdam)

Page 122: British Library / Qatar Foundation Partnership Proiect

INTERNATIONAL LIBRARY RESEARCH

• The world’s leading libraries are not constrained by their physical location or by country borders

• Their digital initiatives are highly interactive and engaging

• They focus on creating an experience for visitors• They campaign and take a thought leadership

position on literacy and other relevant issues

Page 123: British Library / Qatar Foundation Partnership Proiect

STRATEGY & CREATIVE

PLATFORM

Page 124: British Library / Qatar Foundation Partnership Proiect

OUR STRATEGIC PRINCIPLES

moderninnovativepersonality

relevantsocial

Page 125: British Library / Qatar Foundation Partnership Proiect

STRATEGY

CHAMPION THE CONTENT CELEBRATE THE PROCESS

Page 126: British Library / Qatar Foundation Partnership Proiect

CONSIDERATIONS

Maximise synergies Create focus and impact

The brief is extensive and the budget is tight

Page 127: British Library / Qatar Foundation Partnership Proiect

A REMINDER: THE SMART WAY TO LAUNCH

TIME

Page 128: British Library / Qatar Foundation Partnership Proiect

YOUR PROGRAMMEPhase 1 Phase 2 Phase 3 Phase 4

Lay the foundations

Pre-promotion & building advocacy

LAUNCH & Consolidation

Review & Analysis of PHASE 1

of Project

Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May

UK/Qatar Year of Culture

Page 129: British Library / Qatar Foundation Partnership Proiect

DEVELOP A CREATIVE PLATFORM

EXPLORING THE PAST INSPIRING THE FUTURE

Page 130: British Library / Qatar Foundation Partnership Proiect

PHASE 1 LAYING THE FOUNDATIONS

Page 131: British Library / Qatar Foundation Partnership Proiect

INTERNAL AUDIENCES: IMMERSION

Interviews with all key British Library personnel to fully understand the background to the project

Hold a series of workshops with staff designed to create internal advocates for the project

Start each workshop with an upbeat video showing interviews with Qataris explaining what the project means to them – let’s inspire from the outset!

Unearth potential media stories

Detect potential weaknesses / issues

Familiarisation

Page 132: British Library / Qatar Foundation Partnership Proiect

KEY PREPARATION

• Focus on making content searchable, linkable and engaging for social media – ways to achieve this

• Develop milestones calendar

• Prepare a plan – collaborative, engaging process

• Explore potential for documentaries with production teams

Stakeholder Engagement Media• Review existing

relationships

• Comprehensive stakeholder map and identify key targets

• Develop key messaging and briefing materials

Page 133: British Library / Qatar Foundation Partnership Proiect

SET UP AN INTELLIGENT PRESS OFFICE

SECURING & 

MANAGING INTERVIEWS

RAPID RESPONSE & CHAMPIONING 

NEW CONTENT

MEETINGS WITH INFLUENCERS, 

STAKEHOLDERS & PARTNERS

SPOKESPERSON 

PROFILING

CONTRIBUTING 

TO FEATURES

DIGITAL OUTREACH

Page 134: British Library / Qatar Foundation Partnership Proiect

REPORTING:

WE’LL DO IT YOUR WAY

Daily

Conversations and emails via dedicated

phone line and central email

address

Weekly

Friday Flash update, full team (client and agency) conference

calls

Monthly

Full status reporting, coverage achieved, analysis dashboard

Per

Phase

Strategic Reviews, performance against

KPIs

Page 135: British Library / Qatar Foundation Partnership Proiect

PHASE 2 CREATIVE PRE-

PROMOTION

Page 136: British Library / Qatar Foundation Partnership Proiect

MULTIPLE AUDIENCES:

BUILDING ADVOCACY

Page 137: British Library / Qatar Foundation Partnership Proiect

THE GULF

CHRONICLE

Page 138: British Library / Qatar Foundation Partnership Proiect

THE

GULF CHRONICLE

• Encourage submissions before the portal launches as part of our pre-promotion strategy

• Unearth interesting news content in its own right• Run a competition to incentivise contributions in

partnership with local authorities and Gulf community groups – replicate in Qatar for school children

• Use social media to spread word of the initiative globally and to encourage others to share their ideas

• Celebrate milestones – e.g. 1,000th upload

Page 139: British Library / Qatar Foundation Partnership Proiect

THE GULF

CHRONICLE

Multi-media

Content rich

Multi-national

Social

Immersive

Relevant

Page 140: British Library / Qatar Foundation Partnership Proiect

Immersive and interactive experience that brings “Exploring the past – inspiring the future” to life.

Page 141: British Library / Qatar Foundation Partnership Proiect

THE GULF CHRONICLE:

ENGAGING CULTURAL INFLUENCERS

Launch with major media events in London & Doha – explain how the project intends to engender a better understanding of the Gulf’s rich history through modern methods

At the event, all attendees (including journalists) will be invited to create entries of their own and mark the launch in history

Comparisons will be made between modern historical entries and those from the archives

Ask five leading academics on modern Gulf history to create video journals of their experiences as part of the process of ensuring the Gulf Chronicle is relevant to different audiences

Page 142: British Library / Qatar Foundation Partnership Proiect

THE GULF CHRONICLE:

IMPACT & BENEFITS

Active participation from multiple audiences in UK and Qatar

Engagement from academic and cultural stakeholders

Media coverage generated across international and Middle-Eastern outlets

Boost in traffic and levels of engagement on the British Library website

Creation of a project that successfully connects Qatar’s heritage with the future

Social engagement will ensure project’s longevity

Page 143: British Library / Qatar Foundation Partnership Proiect

…MEANWHILE YOUR PRESS OFFICE WILL MAKE THE MOST OF EVERY OPPORTUNITY

SECURING & 

MANAGING INTERVIEWS

RAPID RESPONSE & CHAMPIONING 

NEW CONTENT

MEETINGS WITH INFLUENCERS, 

STAKEHOLDERS & PARTNERS

SPOKESPERSON 

PROFILING

CONTRIBUTING 

TO FEATURES

DIGITAL OUTREACH

Page 144: British Library / Qatar Foundation Partnership Proiect

CHAMPIONING NEW CONTENT

SECURING & 

MANAGING INTERVIEWS

RAPID RESPONSE & CHAMPIONING 

NEW CONTENT

MEETINGS WITH INFLUENCERS, 

STAKEHOLDERS & PARTNERS

SPOKESPERSON 

PROFILING

CONTRIBUTING 

TO FEATURES

DIGITAL OUTREACH

Page 145: British Library / Qatar Foundation Partnership Proiect

10 ARABIC DISCOVERIES THAT TRANSFORMED OUR LIVES

• We will work with your experts to compile a list of the 10 most influential Arabic discoveries that have impacted the way we live today – make the link between the past and the present

• Create a media event for international journalists at the British Library that showcases the key manuscripts that relate to each discovery

• Work with a media partner in Qatar (e.g. Gulf Times) to profile each of the 10 discoveries and release details of the key archives

• Create micro content for each invention and encourage an active debate from viewers about whether the inventions chosen are the right ones

The eye according to Hunain ibn 

Ishaq. From a manuscript dated 

circa 1200

Page 146: British Library / Qatar Foundation Partnership Proiect

10 ARABIC DISCOVERIES:

BENEFITS & IMPACT

Educate audiences and stimulate curiosity in Qatar and internationally for the subject matter without “dumbing down”

Generation of international and Gulf regional media coverage

Social media buzz surrounding the debate about whether the inventions chosen are the right ones

Boost in traffic and levels of engagement on the British Library website

Page 147: British Library / Qatar Foundation Partnership Proiect

DIGITAL OUTREACH

SECURING & 

MANAGING INTERVIEWS

RAPID RESPONSE & CHAMPIONING 

NEW CONTENT

MEETINGS WITH INFLUENCERS, 

STAKEHOLDERS & PARTNERS

SPOKESPERSON 

PROFILING

CONTRIBUTING 

TO FEATURES

DIGITAL OUTREACH

Page 148: British Library / Qatar Foundation Partnership Proiect

DIGITAL AMPLIFICATION & DRIVING TRAFFIC

PORTALSearch Traffic

Qatar 

Foundation

participation

British Library

Secondary 

Content British LibraryQatar 

National 

Library

Qatar 

Foundation

Qatar 

FoundationBritish 

Library

Influencer 

engagement

3rd

Party Blogs

SEO

Referral Traffic

Referral 

Traffic

Outreach

SOCIAL

Campaign 

ContentDeploy 

& Share

Infographics

Page 149: British Library / Qatar Foundation Partnership Proiect

BUILDING AN OWNED COMMUNITY

Level 1:Entry to Social 

Media

Level 2:Social Media 

Broadcasting & 

feedback

Level 4:Activation 

campaigns

Level 3: Community 

managed 

engagement

Level 5: Co‐created 

content & 

predictive 

communication

Maturity

Insight

Awareness

Appreciation

Action

Advocacy

CONNEC

TING SOC

IAL MEDIA

 ACROSS

 THE BO

ARD

Relation

ship

Devotion

Page 150: British Library / Qatar Foundation Partnership Proiect

STAKEHOLDER ENGAGEMENT

SECURING & 

MANAGING INTERVIEWS

RAPID RESPONSE & CHAMPIONING 

NEW CONTENT

MEETINGS WITH INFLUENCERS, 

STAKEHOLDERS & PARTNERS

SPOKESPERSON 

PROFILING

CONTRIBUTING 

TO FEATURES

DIGITAL OUTREACH

Page 151: British Library / Qatar Foundation Partnership Proiect

STAKEHOLDER ENGAGEMENT

Utilise our established relationships to broker meetings with opinion leaders from the academic / cultural community and influential political figures

This contact programme will be focussed on:• Gathering feedback to inform our approach

• Securing support and third party endorsement for the project

• Mitigating against potential criticism

We will focus on those individuals / groups that have the greatest power to influence

Page 152: British Library / Qatar Foundation Partnership Proiect

ADVOCATES PROGRAMME:

PARTICIPATIVE PROCESSGo beyond traditional “stakeholder engagement”

Appoint special Qatar Foundation Advocates – a special role whereby the appointed individual gains VIP access to the British Library project, and in return:Eulogises about the impact of the project at eventsSpreads the word while networking Influences the opinions of othersAttracts potential partners to contact us to get involved

Appointments in spheres of culture, history, society & science

Creates media milestones

Page 153: British Library / Qatar Foundation Partnership Proiect

PHASE 3 LAUNCH & CONSOLIDATION

Page 154: British Library / Qatar Foundation Partnership Proiect

LAUNCH APPROACH MAKING AN INTERNATIONAL IMPACT

Dual ap

proac

h:

even

ts in

Doha and

London

Authentic

tone

:

embrac

e audien

ces

most lik

ely to

use

the res

ourceStic

k to our s

trateg

y:

cham

pion the c

ontent,

celeb

rate t

he pro

cess

Link the p

ast a

nd

the pres

ent th

rough

Advoca

tes

program

me

Arabic

Roots

Interna

tional

Summit

Invite a

cadem

ics

and cu

ltural

influen

cers

Focus o

n the

benefi

ts & in

fluen

ce

of the c

onten

t

Integrat

e your

stake

holder

program

me with

your P

R

Page 155: British Library / Qatar Foundation Partnership Proiect

PRE-SUMMIT DINNER

PROVIDING MEDIA OPPORTUNITIES

Staged under the patronage of H.H.Sheikha Mozah

Keynote speech from Ed Vaizey, UK Minister for Culture, Communications and Creative Industries

Key stakeholder invitees

Focus for media interviews

Works to the media’s timetable

Celebration of launch

Page 156: British Library / Qatar Foundation Partnership Proiect

CORPORATE PROFILING

Page 157: British Library / Qatar Foundation Partnership Proiect

INTERNATIONAL SUMMIT

“ARABIC ROOTS”

Staged in parallel at the British Library and the Qatar National Library

Partnership approach: a credible, authentic intellectual exchange

Investigate innovative new approaches to promoting greater understanding of Arabic and Islamic cultural heritage across the world

Key insights from the summit would be distilled into a communiqué and issued to media alongside details of the new platform

‘Exploring the past – inspiring the future’ will be infused into the look and feel of the event – emphasising its modern relevance

Page 158: British Library / Qatar Foundation Partnership Proiect

PHASE 4 REVIEW & ANALYSE

Page 159: British Library / Qatar Foundation Partnership Proiect

PROGRAMME AUDIT

MEASURE, EVALUATE, RECOMMEND

Collate and analyse data to provide overall picture of outputs, outcomes and impacts with target audience

Assess impact of specific communications activity on key audiences

Secure feedback from a key set of influential groups through a formal stakeholder audit

Create a campaign report which consolidates the findings from the campaign and creates a set of recommendations for the next iteration of the project

Page 160: British Library / Qatar Foundation Partnership Proiect

Chairman of Grayling &CEO of Huntsworth plc.,founder of Shandwick PRin 1976, lecturer incommunications

GLOBAL COMMUNICATIONS ADVISORY BOARD

A proven way of attracting the best thinking from around the worldDr Chris Chia and Peter Chadlington are two participantsMeet twice a year to support strategy formulationMembers would also act as senior ambassadors for British Library at key events

Former CEO of the National Library Board in Singapore, Dr Chia is now a senior corporate advisor/director to private/public sector organisations in transformation management, ICT applications and strategic relations.

DR CHRIS CHIAINT’L ADVISOR

LORD CHADLINGTONCOMMUNICATIONS

Page 161: British Library / Qatar Foundation Partnership Proiect

Objectives & Strategy

IMPACT

Response:Attitudes

Action/Advocacy

OUTCOMES

OUTPUTSReach:Awareness

Appreciation

Target audience

The social media cycle

Continuous tracking, analysis

and feedback

Other influences Benchmarking

ROI

KPIs

EVALUATION & RETURN ON INVESTMENT

Page 162: British Library / Qatar Foundation Partnership Proiect

KEY PERFORMANCE INDICATORSPhase 1 LAYING THE FOUNDATIONS•Development of a coherent communications strategy •The establishment of consistent, tailored messages for all channels & audiences•Inform / raise awareness of project amongst key internal and external stakeholders

Phase 2 CREATIVE PRE-PROMOTION•50 high impact, on message pieces of media coverage •12 influential stakeholder visits to British Library digitisation suite•85% message penetration through all media coverage•Minimum negative press coverage about the partnership•3 million opportunities to see

Phase 3 LAUNCH AND CONSOLIDATION•12 pieces of significant launch coverage•Engagement and active participation from key audiences•Visits to online portal – this metric is still to be defined

Phase 4 REVIEW & ANALYSIS OF FIRST PHASE OF PROJECT•Audience perception report•Key messaging established for next iteration of project•Strategic approach and PR plan created•Measurable increase in the profile of the British Library amongst key stakeholders

Page 163: British Library / Qatar Foundation Partnership Proiect

WHAT SUCCESS WILL LOOK LIKE

Page 164: British Library / Qatar Foundation Partnership Proiect

THANK YOU & WE’D LOVE TO

WORK WITH YOUشكرا لك، ونتشرف بالعمل معكم

Page 165: British Library / Qatar Foundation Partnership Proiect
Page 166: British Library / Qatar Foundation Partnership Proiect
Page 167: British Library / Qatar Foundation Partnership Proiect
Page 168: British Library / Qatar Foundation Partnership Proiect
Page 169: British Library / Qatar Foundation Partnership Proiect
Page 170: British Library / Qatar Foundation Partnership Proiect
Page 171: British Library / Qatar Foundation Partnership Proiect
Page 172: British Library / Qatar Foundation Partnership Proiect
Page 173: British Library / Qatar Foundation Partnership Proiect
Page 174: British Library / Qatar Foundation Partnership Proiect