bryan station middle – renovation architect: clotfelter-samokar architects general contractor:...

4
Bryan Station Middle – Renovation • Architect: Clotfelter-Samokar Architects • General Contractor: Preston Construction Group • Substantial Completion Date: August, 2010 • Contract Sum: $10,769,400 • Change Orders to Date (1): $8,667 • Current Phase: 1A (On Schedule) • Estimated Completion: 29% August 2009

Upload: rudolph-garrison

Post on 17-Dec-2015

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Bryan Station Middle – Renovation Architect: Clotfelter-Samokar Architects General Contractor: Preston Construction Group Substantial Completion Date:August,

Bryan Station Middle – Renovation

• Architect: Clotfelter-Samokar Architects

• General Contractor: Preston Construction Group

• Substantial Completion Date: August, 2010

• Contract Sum: $10,769,400

• Change Orders to Date (1): $8,667

• Current Phase: 1A (On Schedule)

• Estimated Completion: 29%

August 2009

Page 2: Bryan Station Middle – Renovation Architect: Clotfelter-Samokar Architects General Contractor: Preston Construction Group Substantial Completion Date:August,

Bryan Station Middle – Renovation

Rendering of Final Façade

August 2009

Page 3: Bryan Station Middle – Renovation Architect: Clotfelter-Samokar Architects General Contractor: Preston Construction Group Substantial Completion Date:August,

Bryan Station Middle – Renovation

•Work Completed in Last 30 Days:•Cafeteria prepared for student use. Finishes and HVAC completed in this area.

•Corridors barricaded from construction areas and safe egress signs put in place.

•New sanitary sewer lines nearly complete.

•New kitchen and kitchen dock work progressing.

•Current Work Effort (August):•Installing new HVAC rooftop equipment.

•Installing footers for new Music Suite addition at rear of building.

•Concentrate on library renovation for turnover to owner as soon as possible.

•Repair Wood gym floor.

August 2009

Page 4: Bryan Station Middle – Renovation Architect: Clotfelter-Samokar Architects General Contractor: Preston Construction Group Substantial Completion Date:August,

Bryan Station Middle – Renovation

Foundations for New Addition Earthwork Prep for New Addition

August 2009

Concrete Poured at New Dock

Café Prior to New Floor