A 001 Demolition of brick work in cement motar, bricks stacked and debris cleared away
from second floor level to roof level
PER Cu.m
L 001 Unskilled labour hour 7 22.88 160.16
ALLOW FOR SCAFFOLDING - STEEL 13.25
173.41
38.15
211.56
A 002 Demolition of brick work in cement motar, bricks stacked and debris cleared away
from first floor level to second floor level
PER Cu.m
L 001 Unskilled labour hour 5.7 22.88 130.42
9.45
139.87
30.77
170.64
A 003
from ground floor level to first floor level
PER Cu.m
L 001 Unskilled labour hour 5 22.88 114.40
8.30
122.70
26.99
149.69
Demolition of brick work in cement motar, bricks stacked and debris cleared away
OVER HEAD & PROFITS 22.00%
SUB TOTAL
TOTAL
ALLOW FOR SCAFFOLDING
OVER HEAD & PROFITS 22.00%
SUB TOTAL
TOTAL
ALLOW FOR SCAFFOLDING - STEEL
DEMOLISHER
OVER HEAD & PROFITS 22.00%
TOTAL
SUB TOTAL
-
8/13/2019 Bsr 1999 Colombo
2/486
-
8/13/2019 Bsr 1999 Colombo
3/486
A - DEMOLISHER
A004 Demolition of cadjan roof or wall, timber stacked and debris cleared away, for
single storey building
PER Sq.m.
L001 hour 0.2 22.88 4.58
4.58
1.01
TOTAL 5.59
A005 Demolition of ceiling,materials stacked and debris cleared away, for
single storey building
PER Sq.m.
L002 hour 0.5 22.88 11.44
11.44
2.52
TOTAL 13.96
A006 Demolition of unreiforced concrete in ground floor slab (150mm)
and debris cleared away
PER Sq.m.
L001 hour 4 22.88 91.52
91.52
20.13
111.65
A007 Demolition and removing of reinforced concrete (100mm) in roof or floor slabs
and debris cleared away (first floor level) scaffolding paid seperately
PER Sq.m.
L001 hour 5.6 22.88 128.13
128.13
28.19
TOTAL 156.32
SUB TOTAL
OVER HEAD & PROFITS 22.00%
SUB TOTAL
SUB TOTAL
TOTAL
Unskilled labour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
Unskilled labour
OVER HEAD & PROFITS 22.00%
Unskilled labour
Unskilled labour
OVER HEAD & PROFITS 22.00%
-
8/13/2019 Bsr 1999 Colombo
4/486
-
8/13/2019 Bsr 1999 Colombo
5/486
A -
A008 Removal of Galvanised iron or asbestos or aluminium corrugated sheets from roofs or
wall from a single storey building and stacked. Removal of frame work paid seperately
PRE Sq.m.
L001 hour 0.6 22.88 13.73
ALLOW FOR SCAFFOLDING - STEEL 4.97
18.70
4.11
TOTAL 22.81
A009 Removal of corrugated Galvanised iron or asbestos or aluminium sheets from roof
or walls of two storeyed buildings and stacked. Removal of frame work paid seperately
PER Sq.m.
L001 hour 0.8 22.88 18.30
6.64
24.94
5.49
TOTAL 30.43
A010 Removal of corrugated Galvanised iron or aluminium or asbestos sheets from roof or
walls of 3 storeyed buildings. Removal of frame work paid seperately.
PER Sq.m.
L001 hour 1.0 22.88 22.88
8.30
31.18
6.86
TOTAL 38.04
OVER HEAD & PROFITS 22.00%
Unskilled labour
ALLOW FOR SCAFFOLDING
ALLOW FOR SCAFFOLDING - STE
OVER HEAD & PROFITS 22.00%
DEMOLISHER
Unskilled labour
SUB TOTAL
SUB TOTAL
SUB TOTAL
Unskilled labour
OVER HEAD & PROFITS 22.00%
-
8/13/2019 Bsr 1999 Colombo
6/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except G
Tax.
-
8/13/2019 Bsr 1999 Colombo
7/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except G
Tax.
-
8/13/2019 Bsr 1999 Colombo
8/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except G
Tax.
-
8/13/2019 Bsr 1999 Colombo
9/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except G
Tax.
-
8/13/2019 Bsr 1999 Colombo
10/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except G
Tax.
-
8/13/2019 Bsr 1999 Colombo
11/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except G
Tax.
-
8/13/2019 Bsr 1999 Colombo
12/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except G
Tax.
-
8/13/2019 Bsr 1999 Colombo
13/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except G
Tax.
-
8/13/2019 Bsr 1999 Colombo
14/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except G
Tax.
-
8/13/2019 Bsr 1999 Colombo
15/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except G
Tax.
-
8/13/2019 Bsr 1999 Colombo
16/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except G
Tax.
-
8/13/2019 Bsr 1999 Colombo
17/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except G
Tax.
-
8/13/2019 Bsr 1999 Colombo
18/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except G
Tax.
-
8/13/2019 Bsr 1999 Colombo
19/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except G
Tax.
-
8/13/2019 Bsr 1999 Colombo
20/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except G
Tax.
-
8/13/2019 Bsr 1999 Colombo
21/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except G
Tax.
-
8/13/2019 Bsr 1999 Colombo
22/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except G
Tax.
-
8/13/2019 Bsr 1999 Colombo
23/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except G
Tax.
-
8/13/2019 Bsr 1999 Colombo
24/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except G
Tax.
-
8/13/2019 Bsr 1999 Colombo
25/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except G
Tax.
-
8/13/2019 Bsr 1999 Colombo
26/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except G
Tax.
-
8/13/2019 Bsr 1999 Colombo
27/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except G
Tax.
-
8/13/2019 Bsr 1999 Colombo
28/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except G
Tax.
-
8/13/2019 Bsr 1999 Colombo
29/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except G
Tax.
-
8/13/2019 Bsr 1999 Colombo
30/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except G
Tax.
-
8/13/2019 Bsr 1999 Colombo
31/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except G
Tax.
-
8/13/2019 Bsr 1999 Colombo
32/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except G
Tax.
-
8/13/2019 Bsr 1999 Colombo
33/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except G
Tax.
-
8/13/2019 Bsr 1999 Colombo
34/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except G
Tax.
-
8/13/2019 Bsr 1999 Colombo
35/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except G
Tax.
-
8/13/2019 Bsr 1999 Colombo
36/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except G
Tax.
-
8/13/2019 Bsr 1999 Colombo
37/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except G
Tax.
-
8/13/2019 Bsr 1999 Colombo
38/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except G
Tax.
-
8/13/2019 Bsr 1999 Colombo
39/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except G
Tax.
-
8/13/2019 Bsr 1999 Colombo
40/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
DESCRIPTION UNIT PRICE
Rs. Cts.
Basket day 52.00
Concrete Mixer hour 150.00
Lorry 3 Tonnes hour 200.00
Lorry 5 Tonnes hour 275.00
Tractor 75 Cubes hour 175.00
Vibrator hour 125.00
-
8/13/2019 Bsr 1999 Colombo
41/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
DESCRIPTION UNIT PRICE
Rs. Cts.
Black Smith Hour 37.50
Carpenter Hour 37.50
Glazier Hour 37.50
Mason Hour 37.50
Painter Hour 37.50
Plumber Hour 37.50
Skilled labour Hour 37.50
Skilled Labour * Day 300.00
Terrazzo Mason Hour 37.50
Tinker Hour 37.50
Unskilled Labour Hour 22.88
Unskilled Labour * Day 183.00
Sanitary labour Day 183.00
-
8/13/2019 Bsr 1999 Colombo
42/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Ser
Tax.
DESCRIPTION UNIT PRICE
Rs. Cts.
-
8/13/2019 Bsr 1999 Colombo
43/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except G
Tax.
-
8/13/2019 Bsr 1999 Colombo
44/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except G
Tax.
-
8/13/2019 Bsr 1999 Colombo
45/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except G
Tax.
-
8/13/2019 Bsr 1999 Colombo
46/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except G
Tax.
-
8/13/2019 Bsr 1999 Colombo
47/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except G
Tax.
-
8/13/2019 Bsr 1999 Colombo
48/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
DESCRIPTION UNIT PRICE
Rs. Cts.
1/2" M/s/ rods Kg. 30.75
100mm x 100mm Aluminium grating No. 30.00150mmx150mm Aluminium grating No. 50.00
100mm x100mm Class I timber beams(4" x 4") m 223.00
10mm chip board (8'x4') m2
218.50
10mm chip board (8'x4') * No. 649.91
1125 L, 16 BWG G.I. Tank No. 11,000.00
1150 X 2060 X 32MM
12mm Brass Screws Gauge 6 Nos. 1.00
12mm chip board (8'x4') m2
260.50
12mm chip board (8'x4') * No. 774.84
12mm chromium plated stop cock. No. 410.00
12mm heavy quality brass push tap No. 250.00
12mm light brass push tap No. 200.00
12mm thick class I timber planks m2
743.00
12mm x 12mm class I timber beadings m 11.00
12mm x 12mm imported class I timber fillets Lm. 10.00
12mm x 12mm local class I timber fillets m 11.00
12mm x 12mm local Class II timber fillets. L.M. 7.00
150mm x 150mm Grating Aluminium No. 50.00
16mm Brass Screws Gauge 8 Nos. 2.00
16mm x 16mm Class 1 timber m 25.00
1800 L, 16 BWG G.I. Tank No. 14,300.00
2" x 4" H iron Kg. 44.00
200mm x 200mm ceramic floor tile. No. 29.00
-
8/13/2019 Bsr 1999 Colombo
49/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
DESCRIPTION UNIT PRICE
Rs. Cts.
20mm G.I. Clout nails Kg 132.50
20mm thick class A imported timber planks - Bur m2
8,975.00
20mm thick planks of class I local timber m2
1,022.00
20mm x 20mm Class 1 timber battens m 25.00
25mm brass screws - 8 Nos. 2.05
25mm thick class I imported timber planks m2 940.55
25mm thick planks of Class I local timber m2 600.00
25mm thick planks of Class II local timber m2
470.00
25mm thick Teak timber planks m2
1,540.00
25mm x 20mm imported timber fillets m 26.00
25mm x 25mm class I local timber fillets Lm. 29.00
25mm x 25mm Teak Timber m 76.00
28mm thick Class I timber planks. m2
676.67
28mm x 15mm Class I timber m 32.00
28mm x 28mm Class A timber. m 20.00
28mm x 28mm Class I timber m 20.00
31mm thick imported class I timber planks m2
1,175.69
32mm to 38mm thick (Burma Teak) imported Cla m 850.56
32mm x 12mm local class 1 timber fillets m 29.00
32mm x 32mm Class I timber m 76.00
32mm x 32mm Teak timber m 83.00
38mm x 200mm timber coping in Class 1 m3
27,500.00
-
8/13/2019 Bsr 1999 Colombo
50/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
DESCRIPTION UNIT PRICE
Rs. Cts.
400 gal round plastic shell Tank No. 11,000.00
400 L , 16 BWG G.I. Tank No. 6,600.00
40mm to 50mm x 12mm class I timber fillets m 22.00
40mm to 50mm x 12mm local class I timber fillets m 29.00
40mm x 40mm class I timber sash bars L.M. 57.00
40mm x 40mm class II timber sash bars L.M. 31.00
50mm brass screws Gauge 8 No. 4.00
50mm iron screws Gauge 10 Nos. 2.00
50mm x 12mm Class A timber. m 24.50
50mm x 12mm Class I timber m 24.50
50mm x 12mm Class II local timber. m 15.00
50mm x 15mm Class A timber. m 28.50
50mm x 15mm Class I timber m 28.50
50mm x 25mm Class A timber m 35.50
50mm x 25mm class I local timber fillets m 22.70
50mm x 25mm class I timber m 38.00
50mm x 25mm Class II local timber. m 22.70
50mm x 25mm class II timber m 15.00
50mm x 50mm thick class 1 timber m 76.00
5mm iron nails Kg 45.00
600mm x 125mm glass shelf with chromium plate No. 337.50
Alkali resisting primer * Lit. 334.00
Aluminium paint Lit. 275.00
-
8/13/2019 Bsr 1999 Colombo
51/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
DESCRIPTION UNIT PRICE
Rs. Cts.
Aluminium Wood Primer * Lit. 275.00
Angle iron 40 x 40 x 6mm * m 122.00
Angle iron 50 x 50 x 7mm * Kg. 21.90
Anti - Corrosive Paint * Lit. 238.00
Asbestos cement riding(pair) Nos. 227.00
Asbestos plain ceiling sheet 1220 x 1220mm No. 200.00
Assistgate valve, heavy quality brass 20mm No. 175.00
Ball only (Plastic) 1" valve No. 60.00
Ball only (Plastic) 1/2" valve No. 30.00
Ball only (Plastic) 3/4" valve No. 50.00
Ball Valve, 12mm (Plastic) No. 55.00
Ball Valve, 20mm No. 85.00
Ball Valve, 25mm No. 115.00
Ball Valve, 32mm No. 137.50
Barbed wire * Kg. 38.14
Basin 360 x 560 with tap waste plug but excluding No. 1,450.00
Bend G.I. 12mm No. 35.00
Bend G.I. 20mm No. 45.00
Bend G.I. 25mm No. 75.00
Bend G.I. 32mm No. 120.00
Bend G.I. 38mm No. 160.00
Bend G.I. 50mm No. 200.00
Bend G.I. 63mm No. 350.00
Bend G.I. 75mm No. 550.00
-
8/13/2019 Bsr 1999 Colombo
52/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
DESCRIPTION UNIT PRICE
Rs. Cts.
Bend PVC 20mm No. 6.60
Bend PVC 25mm No. 8.75
Bend PVC 32mm No. 13.15
Bend PVC 40mm No. 26.25
Bend PVC 50mm No. 42.45
Bend PVC 63mm No. 89.70
Bend PVC 75mm No. 217.00
Bend PVC 90mm No. 363.15
Bib Cock Brass, 12mm - English No. 300.00
Bidets - White No. 4,950.00
Binding wire * Kg. 47.25
Bitumen * Kg. 53.80
Bitumen washers No. 1.00
Boiled Lime Kg 5.00
Bolt and nut iron 125 x 10mm * No. 15.00
Bolt and nut iron 125 x 12mm * No. 18.50
Bolt and nut iron 150 x 12mm * No. 20.00
Bolt and nut iron 225 x 10mm Kg. 110.00
Bolt and nut iron 225 x 10mm * No. 20.00
Bolt and nut iron 45 x 6mm * No. 1.20
Bolt and nut iron 63 x 10mm * No. 6.00
Bolt Barrel Brass 100mm * No. 55.00
Bolt Barrel Brass 125mm * No. 70.00
Bolt Barrel Brass 150mm * No. 85.00
Bolt Barrel Brass 63mm * No. 30.00
-
8/13/2019 Bsr 1999 Colombo
53/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
DESCRIPTION UNIT PRICE
Rs. Cts.
Bolt Barrel Brass 75mm * No. 45.00
Bolt Skeleton Brass 200mm * No. 87.50
Bolt Skeleton Brass 250mm * No. 92.00
Bolt Skeleton Brass 300mm * No. 100.00
Bolt Skeleton Brass 450mm * No. 390.00
Bolt Tower iron 100mm * No. 30.00
Bolt Tower iron 125mm * No. 32.00
Bolt Tower iron 150mm * No. 33.50
Bolt Tower iron 75mm * No. 26.00
Brass door knob No. 35.00
Brick 1000nos 2,250.00
Cabin Hook & Eye Iron 150mm * No. 18.00
Cabin Hook & Eye Iron 200mm * No. 36.00
Cabin Hook & Eye Iron 50mm * No. 4.50
Cabin Hook & Eye Iron 75mm * No. 9.00
Cabin Hook Brass 150mm * No. 55.00
Cabin Hook Brass 200mm * No. 67.50
Cabin Hook Brass 225mm * Nos. 80.00
Cabin Hook Brass 250mm * No. 87.50
Cabin Hook Brass 300mm * No. 105.00
Cabin Hook Brass 50mm * No. 24.50
Cabin Hook Brass 75mm * No. 35.00
Calicut pattern flat tiles No. 10.50
-
8/13/2019 Bsr 1999 Colombo
54/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
DESCRIPTION UNIT PRICE
Rs. Cts.
Calicut pattern ventilator tiles No. 121.00
Cap PVC 20mm No. 4.80
Cap PVC 25mm No. 5.70
Cap PVC 32mm No. 7.70
Cap PVC 40mm No. 10.50
Cap PVC 50mm No. 14.70
Cap PVC 63mm No. 21.25
Cap PVC 75mm No. 68.38
Casement Fastner Brass * No. 55.00
Casement Stay Brass 250mm * No. 55.00
Casement Stay Brass 300mm * No. 70.00
Cement 50kg 300.00
Cement block 100 x 200 x 400mm 1 No. 14.50
Cement block 150 x 200 x 400mm 1 No. 26.50
Cement block 200 x 200 x 400mm 1 No. 30.00
Chromium plated chain for flushing cistern No. 85.00
Cistern Bracket Pair 54.00
Cistern High level C.I. - including 1/2" dia Ball Valv No. 1,805.00
Clay m3
135.00
Close fitting asbestos ridging Pair 210.00
Closet pedestal type No. 3,537.00
Coal Tar Lit. 19.00
Coconut rafters m 52.00
Colour pigment for cement Kg. 282.00
Coloured cement Kg. 282.00
-
8/13/2019 Bsr 1999 Colombo
55/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
DESCRIPTION UNIT PRICE
Rs. Cts.
Conduit Pipe 18mm m 7.55
Conduit Pipe 20mm m 9.55
Conduit Pipe 25mm m 14.80
Conduit Pipe 30mm m 31.40
Conduit Pipe 40mm m 44.85
Conduit Pipe 50mm m 51.40
Connector G.I. 12mm No. 35.00
Connector G.I. 20mm No. 45.00
Connector G.I. 25mm No. 60.00
Connector G.I. 32mm No. 75.00
Connector G.I. 38mm No. 90.00
Connector G.I. 50mm No. 125.00
Connector G.I. 63mm No. 275.00
Connector G.I. 75mm No. 305.00
Corrugated asbestos sheet Sq.m. 209.27
Corrugated G.I. Sheet 24 BWG Sq.m. 252.19
Cove moulding(63mmx40mm)imported classI m 65.62
Cove moulding(63mmx40mm)local class I m 48.00
Door handle Nos. 66.00
Down pipe Clip PVC 89mm No. 6.15
Down pipe Elbow PVC 89mm No. 42.00
Down pipe joiner PVC 89mm No. 28.90
Down pipe PVC 89mm m 62.20
Down spout square PVC 114mm - Large m 206.50
-
8/13/2019 Bsr 1999 Colombo
56/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
DESCRIPTION UNIT PRICE
Rs. Cts.
Down spout square PVC 114mm - Small m 172.40
DPC Tar*
Lit. 66.25
Drainage Bend PVC 110mm 880
No. 169.75
Drainage Tee PVC 110mm 880
No. 252.00
Drainage 'Y' Junction PVC 110mm Inspection -45 No. 314.15
Drive Screws and washers Nos. 10.00
Elbow G.I. 12mm No. 15.00
Elbow G.I. 20mm No. 20.00
Elbow G.I. 25mm No. 30.00
Elbow G.I. 32mm No. 45.00
Elbow G.I. 38mm No. 75.00
Elbow G.I. 50mm No. 90.00
Elbow G.I. 63mm No. 175.00
Elbow G.I. 75mm No. 250.00
Elbow PVC 20mm No. 3.95
Elbow PVC 25mm No. 6.15
Elbow PVC 32mm No. 10.50
Elbow PVC 40mm No. 15.75
Elbow PVC 50mm No. 28.25
Elbow PVC 63mm No. 48.35
Elbow PVC 75mm No. 108.70
Elbow PVC 90mm No. 183.90
Emulsion * Lit. 241.00
Enamel * Lit. 299.00
Equal Tee PVC 20mm No. 5.05
-
8/13/2019 Bsr 1999 Colombo
57/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
DESCRIPTION UNIT PRICE
Rs. Cts.
Equal Tee PVC 25mm No. 8.55
Equal Tee PVC 32mm No. 14.25
Equal Tee PVC 40mm No. 21.25
Equal Tee PVC 50mm No. 37.20
Equal Tee PVC 63mm No. 56.90
Equal Tee PVC 75mm No. 104.15
Fanlight Catch Brass * No. 55.00
Faucet Socket PVC 110mm No. 243.50
Faucet Socket PVC 20mm No. 5.25
Faucet Socket PVC 25mm No. 8.30
Faucet Socket PVC 32mm No. 11.15
Faucet Socket PVC 40mm No. 17.95
Faucet Socket PVC 50mm No. 26.70
Faucet Socket PVC 63mm to smaller size No. 35.00
Faucet Socket PVC 75mm No. 71.05
Faucet Socket PVC 90mm No. 108.70
Fibre glass storage tank 400 gals. No. 12,500.00
Fittings for Bidet - Indian No. 1,900.00
Fittings for Cistern No. 395.00
Floor Paint - Quick drying Lit. 315.00
Floor Paint (Epoxy) * Lit. 446.00
Flush pipe PVC (32mm) No. 80.00
G.I. 18 BWG sheets(plain) m2
656.00
G.I. 22 BWG sheets(plain) m2
420.88
G.I. 24 BWG sheets(plain) m2
252.19
-
8/13/2019 Bsr 1999 Colombo
58/486
-
8/13/2019 Bsr 1999 Colombo
59/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
DESCRIPTION UNIT PRICE
Rs. Cts.
Gutter Bracket half round (Short Arm Aluminium) No. 16.80
Gutter Bracket Square PVC 114mm No. 14.00
Gutter End Cap square PVC 114mm No. 26.25
Gutter End Cap half round PVC 150mm No. 20.65
Gutter Half round PVC 150mm x 4m m 107.70
Gutter Joiner square PVC 114mm No. 30.65
Gutter Joiner half round PVC 150mm No. 34.00
Gutter square PVC 114mm m 80.60
Hasp and staple Iron 100mm * No. 20.00
Hasp and staple iron 150mm * No. 36.00
Hasp and staple safety type Brass 100mm * No. 90.00
Hasp and staple safety type Brass 150mm * No. 175.00
Hat Hook Brass * No. 47.50
High level plastic - plastic No. 900.00
Hinge butt brass 100mm No. 49.75
Hinge Butt Brass 100mm x 63mm * No. 41.00
Hinge Butt Brass 125mm x 100mm * No. 97.50
Hinge Butt Brass 38mm x 25mm No. 13.50
Hinge Butt Brass 50mm x 38mm * No. 17.50
Hinge Butt Brass 75mm x 38mm * No. 19.00
Hinge Butt Brass 89mm x 63mm No. 36.00
Hinge Butt iron 100mmx63mm No. 33.50
Hinge Butt iron 125mmx100mm No. 38.50
-
8/13/2019 Bsr 1999 Colombo
60/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
DESCRIPTION UNIT PRICE
Rs. Cts.
Hinge Butt Iron 50mmx38mm No. 12.50
Hinge Butt iron 75mmx38mm No. 15.00
Hinge Centre Pivot Brass * Set 52.50
Hinge Gravity Brass No. 200.00
Hinge Parliamentary Brass 100mm No. 100.00
Hinge Parliamentary Brass 125mm No. 125.00
Hinge Parliamentary Brass 150mm No. 150.00
Hinge Spring Double Acting Brass 100mm No. 225.00
Hinge T iron 150mm No. 26.50
Hinge T iron 200mm No. 45.00
Hinge T iron 250mm No. 50.00
Hinge T iron 300mm No. 60.00
Holdfasts Nos. 4.00
Holdfasts - 250 x 25 x 6 Nos. 12.50
Holdfasts - 400 x 25 x 6 Nos. 20.00
Hooks 38mm G.I. Pipes No. 9.00
Hooks for 12mm G.I. Pipes No. 5.00
Hooks for 20mm G.I. Pipes No. 5.00
Hooks for 25mm G.I. Pipes No. 6.00
Hooks for 32mm G.I. Pipes No. 7.00
Hooks for 38mm G.I. Pipes No. 9.00
Imported Timber Cu.m. 41,666.00
Kitchen sink 600 x 375 x 175mm - White No. 1,705.00
Leather washer No. 2.00
Limpet washers Nos. 2.00
Lock Cupboard Four Levers Brass 63mm No. 120.00
-
8/13/2019 Bsr 1999 Colombo
61/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
DESCRIPTION UNIT PRICE
Rs. Cts.
Lock mortice single local made No. 450.00
Lock Mortice Union Double Sash No. 1,912.50
Lock Mortice Union Single Sash No. 1,293.75
Lock Rim Double Lever Brass 150mm No. 450.00
Lock Rim single Lever Brass 150mm No. 250.00
Low level cistern - white No. 1,375.00
Low level cistern - white - plastic No. 1,350.00
Low level closet unit No. 2,218.00
Low level commode with Trap - White No. 1,843.00
Lunumidella 150 x 12mm Sq.m. 168.00
Lunumidella 150 x 20mm Sq.m. 280.00
Manhole Cover 600mm x 600mm with frame No. 2,450.00
Metal 20mm m3 1,200.00
Metal 25mm m3 933.00
Metal 40mm m3 898.00
Metal 50mm m3 816.00
Mild steel * Kg. 30.75
Mild steel flat * Kg. 24.25
Mirror Frame Oval - White (380 x 330) mm No. 396.00
Mirror Frame Square - white (320 x 280) mm No. 327.00
Mirror only, oval (380 x 330) mm No. 144.50
Mirror only, square No. 101.00
Mitre Joint half round PVC 150mm No. 53.75
Mitre Joint square PVC 114mm No. 100.65
-
8/13/2019 Bsr 1999 Colombo
62/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
DESCRIPTION UNIT PRICE
Rs. Cts.
Mould oil Lit. 33.00
Night Latch - China No. 152.00
Nipple G.I. 12mm No. 10.00
Nipple G.I. 20mm No. 18.00
Nipple G.I. 25mm No. 28.00
Nipple G.I. 32mm No. 35.00
Nipple G.I. 38mm No. 60.00
Nipple G.I. 50mm No. 90.00
Nipple G.I. 63mm No. 140.00
Nipple G.I. 75mm No. 160.00
Oil paint (Gloss) * Lit. 321.00
Pillar Cock Chromium Plated 12mm No. 350.00
Pillar Cock Chromium plated 20mm No. 390.00
Pintels and stay hinges 50mm x 6mm x 1m Nos. 176.00
Pipe G.I. 12mm m 57.75
Pipe G.I. 20mm m 80.50
Pipe G.I. 25mm m 117.25
Pipe G.I. 32mm m 131.25
Pipe G.I. 38mm m 161.00
Pipe G.I. 50mm m 218.75
Pipe G.I. 63mm m 306.25
Pipe G.I. 75mm m 393.75
Pipe PVC 110mm type 1000 m 576.65
Pipe PVC 110mm type 400 m 198.65
-
8/13/2019 Bsr 1999 Colombo
63/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
DESCRIPTION UNIT PRICE
Rs. Cts.
Pipe PVC 110mm type 600 m 362.40
Pipe PVC 20mm type 1000 (Anton) m 14.25
Pipe PVC 25mm type 1000 m 27.35
Pipe PVC 32mm type 1000 m 41.05
Pipe PVC 32mm type 600 m 26.25
Pipe PVC 40mm type 1000 m 63.25
Pipe PVC 40mm type 600 m 41.35
Pipe PVC 50mm type 1000 m 93.65
Pipe PVC 50mm type 400 m 51.85
Pipe PVC 50mm type 600 m 60.15
Pipe PVC 63mm type 1000 m 156.85
Pipe PVC 63mm type 400 m 76.60
Pipe PVC 63mm type 600 m 98.45
Pipe PVC 75mm type 1000 m 304.10
Pipe PVC 75mm type 400 m 118.15
Pipe PVC 75mm type 600 m 186.40
Pipe PVC 90mm type 1000 m 385.75
Pipe PVC 90mm type 400 m 167.90
Pipe PVC 90mm type 600 m 247.05
Plaster of paris * Kg. 40.00
Plug G.I. 12mm No. 10.00
Plug G.I. 20mm No. 15.00
Plug G.I. 25mm No. 20.00
Plug G.I. 32mm No. 30.00
-
8/13/2019 Bsr 1999 Colombo
64/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
DESCRIPTION UNIT PRICE
Rs. Cts.
Plug G.I. 38mm No. 40.00
Plug G.I. 50mm No. 50.00
Plug G.I. 63mm No. 75.00
Plug G.I. 75mm No. 175.00
Plugs No. 15.00
Plugs PVC 20mm No. 5.00
Plugs PVC 25mm No. 6.00
Plugs PVC 32mm No. 8.00
Plugs PVC 40mm No. 11.00
Plugs PVC 50mm No. 15.00
Plugs PVC 75mm No. 66.00
Plywood board, 12mm M.R. Sq.m. 317.00
Plywood board, ordinary 25mm Sq.m. 190.00
Plywood board, ordinary M.R. 1150x2060x32mm No. 1,500.00
Plywood board, ordinary M.R. 3mm Sq.m. 125.00
Plywood board, ordinary M.R. 6mm Sq.m. 195.00
Plywood board, ordinary M.R. 9mm Sq.m. 242.00
Plywood door ordinary M.R. 838 x 2060 x 32mm No. 1,120.00
Plywood door, ordinary B.R. 686x2060x32mm No. 1,200.00
Plywood door, ordinary M.R. 686x2060x32mm No. 1,010.00
Polythane Varnish * Lit. 304.00
Props (bamboo) 3 - 4 m No. 50.00
Pudlo Cement Kg. 130.00
PVC 75mm socket No. 52.95
PVC 90mm socket No. 92.75
-
8/13/2019 Bsr 1999 Colombo
65/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
DESCRIPTION UNIT PRICE
Rs. Cts.
PVC Elbow 110mm No. 218.15
PVC Elbow 75mm No. 108.70
PVC Elbow 90mm No. 183.90
Rag bolts No. 26.00
Rawl plugs. No. 15.00
Red lead Kg. 110.00
Red Lead Paint * Lit. 225.00
Reducing Socket G.I. 20mm to smaller No. 25.00
Reducing Socket G.I. 25mm No. 39.00Reducing Socket G.I. 32mm No. 47.00
Reducing Socket G.I. 38mm No. 60.00
Reducing Socket G.I. 50mm No. 75.00
Reducing Socket G.I. 75mm No. 145.00
Reducing Socket PVC 25mm to smaller size No. 5.70
Reducing Socket PVC 32mm to smaller size No. 8.75
Reducing Socket PVC 40mm to smaller size No. 15.10
Reducing Socket PVC 50mm to smaller size No. 22.10
Reducing Socket PVC 63mm to smaller size No. 35.00
Reducing Tee PVC 25mm to smaller size. No. 10.10
Reducing Tee PVC 32mm to smaller size. No. 14.70
Reducing Tee PVC 40mm to smaller size. No. 21.25
Reducing Tee PVC 50mm to smaller size. No. 38.30
Reducing Tee PVC 63 mm to smaller size. No. 65.00
Ridge tile calicut pattern Gr. I No. 29.50
Ring Brass 45mm to 38mm No. 15.00
-
8/13/2019 Bsr 1999 Colombo
66/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
DESCRIPTION UNIT PRICE
Rs. Cts.
Rivets (6.3mm x 10mm) No. 2.00
Robe Hook 100 x 100mm - White No. 109.00
Roofing nails Kg. 77.00
Rubber plug 25mm to 32mm No. 19.00
Rubber plug 32mm to 50mm No. 30.00
Rubble 150mm to 225mm m3 495.00
Running head PVC 150mm No. 61.50
Running Head Square PVC 114mm No. 71.75
Sand m3 390.00
Screws Brass 12mm x Gauge 4 Doz. 4.89
Screws Brass 12mm x Gauge 5 Doz. 8.61
Screws Brass 20mm x Gauge 6 Doz. 13.76
Screws Brass 25mm x Gauge 7 Doz. 20.58
Screws Brass 30mm x Gauge 7 Doz. 23.10
Screws Brass 40mm x Gauge 8 Nos. 2.82
Screws Brass 45mm x Gauge 9 Doz. 44.63
Screws Brass 50mm x Gauge 8 No. 3.48
Screws Brass 16mm x Gauge 7 Nos. 1.22
Screws Brass 20mm x Gauge 8 Doz. 18.90
Screws Brass 25mm x Gauge 8 Doz. 24.57
Screws Brass 30mm x Gauge 8 Doz. 30.56
Screws brass 30mm x guage 8 Doz. 30.56
Screws Brass 40mm x Gauge 8 Doz. 33.84
Screws brass 50mm x Guage 10 Nos. 5.20
Screws Iron 12mm x Gauge 6 * Doz. 3.51
-
8/13/2019 Bsr 1999 Colombo
67/486
-
8/13/2019 Bsr 1999 Colombo
68/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
DESCRIPTION UNIT PRICE
Rs. Cts.
Socket PVC 20mm No. 3.95
Socket PVC 25mm No. 5.90
Socket PVC 32mm No. 8.30
Socket PVC 40mm No. 12.70
Socket PVC 50mm No. 19.05
Socket PVC 63mm No. 31.50
Socket PVC 75mm No. 52.95
Socket PVC 90mm No. 92.75
Solvent cement 50Grams 37.20
Spur Stones No. 30.00
Squatting Pan (M) with 'P' Trap No. 440.00
Stop cock Brass, 12mm - Italy No. 225.00
Stop cock Brass, 20mm No. 300.00
Stop cock Brass, 25mm No. 425.00
Stop cock Brass, 32mm No. 800.00
Stop cock Brass, 38mm No. 1,250.00
Stop cock Brass, 50mm No. 1,450.00
Straining bolts 16mm dia. No. 18.00
Tap for wash Basin (M) - Malasiyan No. 390.00
Tee equal PVC 75mm No. 104.15
Tee equal PVC 90mm No. 238.00
Thinner * Lit. 86.00
Tile calicut pattern Gr. I No. 10.50
Tile cement pressed 200 x 200mm * No. 12.15
Tile glazed 108 x 108mm * No. 5.50
-
8/13/2019 Bsr 1999 Colombo
69/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
DESCRIPTION UNIT PRICE
Rs. Cts.
Tile half round (asbestos covering) Gr. I No. 5.00
Tile half round Gr.I No. 9.50
Tile Terrazzo 300 x 300mm * No. 61.50
Timber beams Class I Cu.m. 23,400.00
Timber beams Class ii Cu.m. 18,350.00
Timber beams Class iii Cu.m. 11,150.00
Timber plank 25mm class i Sq.m. 600.00
Timber plank 25mm class ii Sq.m. 470.00
Timber plank 25mm class iii Sq.m. 280.00
Timber plank 31mm Class i Sq.m. 750.00
Timber plank 31mm Class ii Sq.m. 587.00
Timber plank 31mm Class iii Sq.m. 343.00
Timber plank 38mm class i Sq.m. 923.00
Timber plank 38mm class ii Sq.m. 720.00
Timber plank 38mm class iii Sq.m. 420.00
Timber planks 25mm class B Sqm. 470.00
Toilet Paper Holder 150 x 150 mm - White No. 294.00
Tooth Brush Holder 200 x 100mm -White No. 175.00
Tor steel * Kg. 33.70
Towel Rack Bar 750 mm No. 265.00
Towel Rack Holder 100 x 100mm - White Pair 159.00
Tower bolts, iron 250mm No. -
Two way tap for wash Basin (L) - Italy No. 2,450.00
Urinal - White No. 1,320.00
-
8/13/2019 Bsr 1999 Colombo
70/486
-
8/13/2019 Bsr 1999 Colombo
71/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
DESCRIPTION UNIT PRICE
Rs. Cts.
Wood Preservative (Black / coloured) * Lit. 54.00
Wood Preservative (clear) * Lit. 71.00
Yellow ochre Kg. 75.00
-
8/13/2019 Bsr 1999 Colombo
72/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
DESCRIPTION UNIT PRICE
Rs. Cts.
Fluorescent lamp, batten type 40W with No. 540.00
enamelled reflector(English make)
Fluorescent lamp, batten type 40W with No. 395.00diffuser(Chinese make)
Fluorescent lamp, batten type 40W with
diffuser(English make) No. 495.00
Incandecent bulb, 25W to 100W No. 25.00
DESCRIPTION UNIT PRICE
Rs. Cts.
Incandecent bulb holder No. 11.00
Incandecent bulb shade No. 23.00
Main switch single phase 15 Amps 250v, MEM No. 625.00
Main switch single 30 Amp 250v, MEM No. 697.00
Distribution Board, 4 way No. 145.00
Distribution Board, 6 way No. 170.00
Distribution Board, 10 way No. 225.00
Distribution Board, 12 way No. 260.00
Helegen lamp 1000w No. 100.00
Fluorescent bulb 20 w or 40 w No. 53.00
Starter for Fluorescent bulb No. 15.00
Choke for fluorescent bulb No. 123.00
R.C.C.B. 40Amp (Crabtree) No. 2,100.00
Round block(PVC) No. 4.00
Ceiling Rose (PVC) No. 13.00
Cable PVC 1mm2 m 5.00
Earth wire PVC 2.5mm2 m 11.00
-
8/13/2019 Bsr 1999 Colombo
73/486
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
DESCRIPTION UNIT PRICE
Rs. Cts.
Socket outlet, surface type, 5 Amps No. 70.00
(Indian or Chinese make)
Socket outlet, surface type, 15 Amps No. 70.00(Indian or Chinese make)
Socket outlet flush type, 5 Amps No. 150.00
(Clipsal , Tenby or Carbtree)
DESCRIPTION UNIT PRICE
Rs. Cts.
Socket outlet flush type, 15 Amps No. 175.00
(Clipsal , Tenby or Carbtree)
Ceiling Fan, sweep 1425 mm(National or KDK) No. 3,100.00
Fluorescent lamp, batten type 40w with No. 335.00
enemelled reflector(Chinese make)
-
8/13/2019 Bsr 1999 Colombo
74/486
A - DEMOLISHER
A011 Removal of a door or a window frame including sashes (size up to 4 sq.m.)
from existing walls and stacked
PER No.
L001 Hour 8.00 22.88 183.04
183.04
40.27
223.31
A012 Removal of a door or a window frame including sashes (size over 4 sq.m.) from
existing wall and stacked
PER No.
L001 Hour 12.00 22.88 274.56
274.56
60.40
334.96
A013 Removal of door or window sash(size upto 4sq.m.)from existing wall and
stacked.
PER No.
L001 Hour 0.5 22.88 11.44
L002 Hour 0.5 37.50 18.75
30.19
6.64
36.83
A014 Removal of door or window sash from existing wall(over 4sq.m.)and stacked.
PER No.
L001 Hour 0.75 22.88 17.16
L002 Hour 0.75 37.50 28.13
45.29
9.96
55.25
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Unskilled labour
Unskilled labour
Skilled labour
Unskilled labour
OVER HEAD & PROFITS 22.00%
SUB TOTAL
Unskilled labour
Skilled labour
TOTAL
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
-
8/13/2019 Bsr 1999 Colombo
75/486
A -
A015 Removal of old or decayed, 100mm to 150mm dia. GI down pipes,
from existing buildings and stacked.
PER L.m.
L001 Unskilled labour Hour 0.30 22.88 6.86
6.86
1.51
8.37
A016 Demolition of brick drains and clearing debries as directed. Rate included to
backfill the drain with the available earth and compacted.
PER L.m.
L001 Unskilled labour Hour 0.90 22.88 20.59
20.59
4.53
25.12
A017 Removal of expanded metal or mesh from existing frames and stacking as
directed.
PER m2
L001 Unskilled labour Hour 1.2 22.88 27.46
27.46
6.04
33.50
A018 Uprooting of fence post, rolling up barbed wire and stacking all material as
directed. (length of the fencing to be measured).
PER L.m.
L001 Unskilled labour Hour 1.25 22.88 28.60
28.60
6.29
34.89
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
SUB TOTAL
OVER HEAD & PROFITS 22.00%
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
DEMOLISHER
TOTAL
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
-
8/13/2019 Bsr 1999 Colombo
76/486
A - DEMOLISHER
A019 Demolition of brick paved cement rendered floors and cleaning debris as directed
(75mm to 100mm thick floor)
PER M2
L001 Unskilled labour Hour 0.70 22.88 16.02
16.02
3.52
19.54
A020 Removing and stacking of gate sash (02 Nos.) after demolishing two cement concrete
columns or removing two posts and seperating pintles.
PER No.
L001 Unskilled labour Hour 8.00 22.88 183.04
183.04
40.27
223.31
A021 Removing glass panes in doors, windows and fanlights and stacking as
directed
PER M2
L002 Skilled labour Hour 2.00 37.50 75.00
75.00
16.50
91.50
A022 Removing eaves gutter from roof of single storeyed buildings and stacking
as directed.
PER L.m.
L001 Hour 0.20 22.88 4.58
1.66
6.24
1.37
7.61
TOTAL
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
SUB TOTAL
OVER HEAD & PROFITS 22.00%
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Unskilled labour
ALLOW FOR SCAFFOLDING
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
-
8/13/2019 Bsr 1999 Colombo
77/486
A - DEMOLISHER
A023 Removing eaves gutter from roof of two storeyed buildings and stacking
as directed.
PER L.m.
L001 Unskilled labour Hour 0.30 22.88 6.86
ALLOW FOR SCAFFOLDING 1.66
8.52
1.88
10.40
A024 Removing eaves gutter from roofs of 3 or more stroyed buildings andstacking as directed.
PER L.m.
L001 skilled labour Hour 0.35 22.88 8.01
LOW FOR SCAFFOLDING 1.99
10.00
2.20
12.20
A025 Removing partition and stacking at site including making good to walls and floors.
Rate to include painting new plaster patches to match existing colour.
Note :- Material cost will cover from the labour cost.
PER M2
L001 Hour 1.60 22.88 36.61
L002 Hour 1.00 37.50 37.50
74.11
16.30
90.41
TOTAL
SUB TOTAL
OVER HEAD & PROFITS 22.00%
Skilled labour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Unskilled labour
TOTAL
-
8/13/2019 Bsr 1999 Colombo
78/486
A- DEMOLISHER
A026 Chipping and removing of lime plaster on Brick walls, cement concrete walls
and clearing debris as directed.
PER M2
L001 Unskilled labour Hour 0.30 22.88 6.86
ALLOW FOR TOOLS 0.97
7.83
1.72
9.55
A027 Chipping and removing of cement rendering on brick walls and floors and
clearing away debries.
PER M2
L001 Unskilled labour Hour 1.0 22.88 22.88
ALLOW FOR TOOLS 1.08
23.96
5.27
29.23
A028 Chipping and removing of cement rendering on cement concrete walls and
floors and clearing away debris
PER M2
L001 Hour 1.35 22.88 30.89
ALLOW FOR TOOLS 1.62
32.51
7.15
39.66
OVER HEAD & PROFITS 22.00%
TOTAL
SUB TOTAL
OVER HEAD & PROFITS 22.00%
OVER HEAD & PROFITS 22.00%
TOTAL
Unskilled labour
TOTAL
SUB TOTAL
SUB TOTAL
-
8/13/2019 Bsr 1999 Colombo
79/486
A- DEMOLISHER
A029 Removing roof tiles and timber and stacking serviceable material at ground and
clearing debris in single storeyed buildings.
PER M2
L001 Unskilled labour Hour 0.90 22.88 20.59
L002 Skilled labour Hour 0.20 37.50 7.50
ALLOW FOR SCAFFOLDING 3.24
31.33
6.89
38.22
A030 Removing roof tiles and timber and stacking serviceable material and
clearing debris in 2 storeyed buildings
PER M2
L001 Unskilled labour Hour 1.30 22.88 29.74
L002 Skilled labour Hour 0.20 37.50 7.50
ALLOW FOR SCAFFOLDING 6.48
43.72
9.62
53.34
A031 Removing roof tiles and timber and staking serviceable material at ground and
clearing debries in 3 storeyed buildings.
PER M2
L001 skilled labour Hour 1.70 22.88 38.90
L002 Skilled labour Hour 0.20 37.50 7.50
ALLOW FOR SCAFFOLDING 9.72
56.12
12.35
68.47
TOTAL
SUB TOTAL
SUB TOTAL
TOTAL
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
OVER HEAD & PROFITS 22.00%
OVER HEAD & PROFITS 22.00%
-
8/13/2019 Bsr 1999 Colombo
80/486
A- DEMOLISHER
A032 Demolition of rubble masonary in cement sand motar and stacking rubble and
clearing debris as directed.
PER M3
L001 Unskilled labour Hour 9.00 22.88 205.92
ALLOW FOR SCAFFOLDING/TOOLS 4.32
210.24
46.25
256.49
A033 Demolition of rubble masonary in lime cement sand motar stacking rubble and
clearing debris.
PER M3
L001 Unskilled labour Hour 6.00 22.88 137.28
ALLOW FOR SCAFFOLDING/TOOLS 4.32
141.60
31.15
172.75
A034 Demolition of glazed/wall/floor tiles and clearing debris as directed
Rate to include removing cement sand bedding
PER M2
L001 Unskilled labour Hour 1.75 22.88 40.04
40.04
8.81
48.85
A035 Removing half round tiles or calicut tiles from roof of single storeyed buildings
and stacking as directed at ground.
PER M2
L001 Unskilled labour Hour 0.40 22.88 9.15
3.24
12.39
2.73
15.12
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
ALLOW FOR SCAFFOLDING.
-
8/13/2019 Bsr 1999 Colombo
81/486
A
A036 Removing of half round tiles or calicut tiles from roof of two storeyed buildings and
stacking as directed at ground.
PER M2
L001 Unskilled labour Hour 0.60 22.88 13.73
4.32
18.05
3.97
22.02
A037 Removing half round tiles or calicut tiles from roof of three storeyed building and
stacking as directed at ground
PER M2
L001 Unskilled labour Hour 0.90 22.88 20.59
ALLOW FOR SCAFFOLDING 5.40
25.99
5.72
31.71
A038 Removing water proof treatment of bitumen from flat roof and clearingdebris as directed
PER M2
L001 Unskilled labour Hour 1.70 22.88 38.90
38.90
8.56
47.46
DEMOLISHER
OVER HEAD & PROFITS 22.00%
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
SUB TOTAL
TOTAL
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
ALLOW FOR SCAFFOLDING
-
8/13/2019 Bsr 1999 Colombo
82/486
A DEMOLISHER
A039 Removing asbestos ceiling including timber frame work, stacking serviceable materials
at ground and clearing debris as directed in single storeyed building.
PER M2
L001 Unskilled labour Hour 0.90 22.88 20.59
L002 Skilled labour Hour 0.90 37.50 33.75
4.32
58.66
12.91
71.57
A040 Removing asbestos ceiling including timber frame work, stacking
serciceable material at ground and clearing debris as directed in two storeyed
buildings
PER M2
L001 Unskilled labour Hour 1.30 22.88 29.74
L002 Skilled labour Hour 0.90 37.50 33.75
4.32
67.81
14.92
82.73
A041 Removing valance barge boarding, stacking materials and clearing awaythe debris in single storeyed buildings.
PER L.M.
L001 Unskilled labour Hour 0.20 22.88 4.58
ALLOW FOR SCAFFOLDING 2.16
6.74
1.48
8.22
OVER HEAD & PROFITS 22.00%
TOTAL
SUB TOTAL
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
ALLOW FOR SCAFFOLDING
ALLOW FOR SCAFFOLDING
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
-
8/13/2019 Bsr 1999 Colombo
83/486
A DEMOLISHER
A042 Removing valance barge boarding, stacking materials and clearing debris
as directed in two storeyed buildings.
PER L.M.
L001 Unskilled labour Hour 0.30 22.88 6.86
ALLOW FOR SCAFFOLDING 3.24
10.10
2.22
12.32
A043 Chipping of cement lime sand plastering in soffit and cleaning debris as directed
PER m2
L001 Unskilled labour Hour 1.50 22.88 34.32
ALLOW FOR SCAFFOLDING 3.24
37.56
8.26
45.82
A044 Cutting down trees girth not exceeding 600mm, grubing uprooting, logging and
stacking and fill in excavation with earth.
PER Nos.
L001 Unskilled labour Hour 16.00 22.88 366.08
366.08
80.54
446.62
SUB TOTAL
TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
SUB TOTAL
SUB TOTAL
OVER HEAD & PROFITS 22.00%
OVER HEAD & PROFITS 22.00%
TOTAL
-
8/13/2019 Bsr 1999 Colombo
84/486
A DEMOLISHER
A045
PER No.
L001 Unskilled labour Hour 20.00 22.88 457.60
457.60
100.67
558.27
A046 Cutting down trees, uprooting and grubbing girth exceeding 900mm but
less than 1200mm excavation filled in earth logging and stacking.
PER No.
L010 Unskilled labour day 5.00 183.00 915.00
915.00
201.30
1,116.30
A047 Cutting down trees, uprooting and grubbing girth exceeding 1200mm but less than
1600mm excavation filled in earth, rate to include logging and stacking
Per No.
L010 Unskilled labour day 7.00 183.00 1,281.00
1,281.00
281.82
1,562.82
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
TOTAL
Cutting down trees, uprooting and grubbing girth exceeding 600mm but
OVER HEAD & PROFITS 22.00%
TOTAL
less than 900mm excavation filled in earth logging and stacking.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
SUB TOTAL
-
8/13/2019 Bsr 1999 Colombo
85/486
B- EXCAVATOR
B001 Excavation of drains in any soil except rock requiring blasting as directed
PER M3
L001 Unskilled labour Hour 4.5 22.88 102.96
E001 Basket day 0.2 52.00 10.40
(Cost of tool include in Basket rate)
113.36
24.94
138.30
B002 Excavation for foundation to a depth not exceeding 1.5 m in any material except rock
requrin blasting part return fill in and ram and surplus disposed within the site as direct
PER M3
L001 Unskilled labour Hour 5.0 22.88 114.40
E001 Basket day 0.2 52.00 10.40
(Cost of tool include in Basket rate)
124.80
27.46
152.26
B003
levelling
PER M3
L001 Unskilled labour Hour 3.0 22.88 68.64
E001 Basket day 0.2 52.00 10.40
E002 Tractor 75 Cubes Hour 0.4 175.00 70.00
149.04
32.79
181.83
OVER HEAD & PROFITS 22.00%
TOTAL
SUB TOTAL
OVER HEAD & PROFITS 22.00%
SUB TOTAL
blasting surplus disposed including transport upto 0.4Km depositing and
Excavation and levelling site in any material except rock requiring
TOTAL
OVER HEAD & PROFITS 22.00%
by the engineer and soil deposited within site.
SUB TOTAL
TOTAL
-
8/13/2019 Bsr 1999 Colombo
86/486
B- EXCAVATOR
B004 Filling under floors with gravel or other approved quality of filling spread,
watered and well rammed in 75mm layers (material avialable at site)
PER M3
L001 Unskilled labour Hour 5.0 22.88 114.40
E001 Basket day 0.2 52.00 10.40
124.80
27.46
152.26
B005 Filling under floors with gravel or other approved quality filling spread
and well rammed in75mm layers with imported earth (1.6Km transport)
PER m3
L001 Unskilled labour Hour 5.6 22.88 128.13
M001 Gravel Cu.m. 1.1 176.75 194.43
P001 Basket No. 0.1 52.00 5.20
327.75
72.11
399.86
B006
PER M3
L001 Unskilled labour Hour 5.6 22.88 128.13
M001 Gravel Cu.m. 1.1 176.75 194.43
P001 Basket No. 0.1 52.00 5.20
37.10
364.86
80.27
445.13TOTAL
watered and rammed in 75mm layers(6Km transport).
OVER HEAD & PROFITS 22.00%
ALLOW FOR EXTRA TRANSPORT
SUB TOTAL
Filling under floors with gravel or other approved quality of filling spread
OVER HEAD & PROFITS 22.00%
TOTAL
SUB TOTAL
TOTAL
OVER HEAD & PROFITS 22.00%
SUB TOTAL
-
8/13/2019 Bsr 1999 Colombo
87/486
C- CONCRETOR
C001 1:3:6 (40mm) cement concrete for volumes exceedings 3 cu.m.
PER M3
L001 Unskilled labour Hour 22.60 22.88 517.09
L002 Skilled labour Hour 2.80 37.50 105.00
M014 Cement 50 Kg. 4.70 300.00 1,410.00
M007 Sand Cum 0.23 390.00 89.70
M004 Metal 40mm Cu.m. 1.00 898.00 898.00
E0010 Basket day 0.30 52.00 15.60
3,035.39
667.79
3,703.18
C002
PER M3
L001 Unskilled labour Hour 28.50 22.88 652.08
L002 Skilled labour Hour 3.50 37.50 131.25
M014 Cement 50 Kg. 4.70 300.00 1,410.00
M007 Sand Cum 0.23 390.00 89.70
M004 Metal 40mm Cu.m. 1.00 898.00 898.00
E001 Basket day 0.30 52.00 15.60
3,196.63
703.263,899.89
C003
PER M3
L001 Unskilled labour Hour 22.60 22.88 517.09
L002 Skilled labour Hour 2.80 37.50 105.00
M014 Cement 50 Kg. 5.50 300.00 1,650.00
M007 Sand Cum 0.23 390.00 89.70
M005 Metal 25mm Cu.m. 1.00 933.00 933.00
E001 Basket day 0.30 52.00 15.60
3,310.39
728.29
4,038.68
OVER HEAD & PROFITS 22.00%
SUB TOTAL
1:2 1/2:5 (25mm) cement concrete for volumes exceeding 3 cu.m.
SUB TOTAL
TOTAL
TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
1:3:6(40mm) cement concrete for volumes upto 3 cu.m.
OVER HEAD & PROFITS 22.00%
SUB TOTAL
-
8/13/2019 Bsr 1999 Colombo
88/486
C- CONCRETOR
C004 1:2 1/2:5 (25mm) cement concrete for volumes upto 3 cu.m
PER M3
L001 Unskilled labour Hour 28.25 22.88 646.36
L002 Skilled labour Hour 3.50 37.50 131.25
M014 Cement 50 Kg. 5.50 300.00 1,650.00
M007 Sand Cum 0.23 390.00 89.70
M005 Metal 25mm Cu.m. 1.00 933.00 933.00
E001 Basket day 0.30 52.00 15.60
3,465.91
762.50
4,228.41
C005 1:2:4 (20mm) cement concrete for volumes exceeding 3 cu.m.
PER M3
L001 Unskilled labour Hour 22.60 22.88 517.09
L002 Skilled labour Hour 2.80 37.50 105.00
M014 Cement 50 Kg. 7.00 300.00 2,100.00
M007 Sand Cum 0.23 390.00 89.70
M006 Metal 20mm Cu.m. 1.00 1,200.00 1,200.00
E001 Basket day 0.30 52.00 15.60
4,027.39
886.034,913.42
C006 1:2:4 (20mm) cement concrete for volumes upto 3 cu.m.
PER M3
L001 Unskilled labour Hour 28.25 22.88 646.36
L002 Skilled labour Hour 3.50 37.50 131.25
M014 Cement 50 Kg. 7.00 300.00 2,100.00
M007 Sand Cum 0.23 390.00 89.70
M006 Metal 20mm Cu.m. 1.00 1,200.00 1,200.00
E001 Basket day 0.30 52.00 15.60
4,182.91
920.24
5,103.15
OVER HEAD & PROFITS 22.00%
SUB TOTAL
TOTAL
TOTAL
TOTALOVER HEAD & PROFITS 22.00%
OVER HEAD & PROFITS 22.00%
SUB TOTAL
SUB TOTAL
-
8/13/2019 Bsr 1999 Colombo
89/486
-
8/13/2019 Bsr 1999 Colombo
90/486
C- CONCRETOR
C010 225mm high 75mm thick curb in cement concrete including and 15mm
thick 1:2 cement rendering Rate to include excavation.
PER L.M.
L001 Unskilled labour Hour 2.60 22.88 59.49
L002 Skilled labour Hour 2.60 37.50 97.50
M014 Cement 50 Kg. 0.14 300.00 42.00
M007 Sand Cum 0.01 390.00 3.90
M006 Metal 20mm Cu.m. 0.02 1,200.00 24.00
ALLOW FOR SHUTTERING EXCAVATION CURING ETC. 15.70
242.59
53.37
295.96
C011
PER L.M
L001 Unskilled labour Hour 4.00 22.88 91.52
L002 Skilled labour Hour 2.60 37.50 97.50
M014 Cement 50 Kg. 0.50 300.00 150.00
M007 Sand Cum 0.06 390.00 23.40
M005 Metal 25mm Cu.m. 0.07 933.00 65.31
ALLOW FOR SHUTTERING, BRACKETS ETC. 21.50
449.23
98.83
548.06
base rate to include for excavation & return fill of earth.
225mm wide and 225mm avarage depth, with 75mm thick sides and
OVER HEAD & PROFITS 22.00%
SUB TOTAL
OVER HEAD & PROFITS 22.00%
SUB TOTAL
TOTAL
TOTAL
Semicircular drains without ramps in cement concrete 1:3:6(25mm)
-
8/13/2019 Bsr 1999 Colombo
91/486
-
8/13/2019 Bsr 1999 Colombo
92/486
C CONCRETOR
C014
PER L.m.
L001 Unskilled labour Hour 2.40 22.88 54.91
L002 Skilled labour Hour 1.50 37.50 56.25
M014 Cement 50 Kg. 0.30 300.00 90.00
M007 Sand Cum 0.02 390.00 7.80
M006 Metal 20mm Cu.m. 0.05 1,200.00 60.00
M048 Sq.m. 0.45 280.00 126.00
33.00
427.96
94.15
522.11
C015
PER L.M.
L001 Unskilled labour Hour 2.60 22.88 59.49
L002 Skilled labour Hour 1.70 37.50 63.75
M014 Cement 50 Kg. 0.40 300.00 120.00
M007 Sand Cum 0.03 390.00 11.70
M006 Metal 20mm Cu.m. 0.07 1,200.00 84.00M048 Sq.m. 0.60 280.00 168.00
41.75
548.69
120.71
669.40
ALLOW FOR NAILS AND PROPS
OVER HEAD & PROFITS 22.00%
Timber plank 25mm Class iii
225mmX225mm size lintol of 1:2:4(20mm) cement concrete
including shuttering (Reinforcement paid separately)
ALLOW FOR NAILS AND PROPS
300mm x 225mm size beam in 1:2:4 (20mm)cement concrete including
shuttering (reinforcement paid separately.)
Timber plank 25mm class iii
SUB TOTAL
SUB TOTAL
TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
-
8/13/2019 Bsr 1999 Colombo
93/486
C- CONCRETOR
C016 340mm x 150mm size beam in 1:2:4(20mm) cement concrete including
shuttering (reinforcement paid separately)
PER L.M.
L001 Unskilled labour Hour 2.60 22.88 59.49
L002 Skilled labour Hour 1.75 37.50 65.63
M014 Cement 50 Kg. 0.30 300.00 90.00
M007 Sand Cum 0.02 390.00 7.80
M006 Metal 20mm Cu.m. 0.05 1,200.00 60.00
M048 Timber plank 25mm Class iii Sq.m. 0.10 280.00 28.00
ALLOW FOR PROPS AND NAILS 29.50
340.41
74.89
415.30
C017
PER L.M
L001 Unskilled labour Hour 3.10 22.88 70.93
L002 Skilled labour Hour 2.00 37.50 75.00
L003 Cement 50 Kg. 0.50 300.00 150.00
L004 Sand Cum 0.03 390.00 11.70
L005 Metal 20mm Cu.m. 0.08 1,200.00 96.00
L006 Sq.m. 0.45 280.00 126.00L007
ALLOW FOR PROPS AND NAILS 46.17
575.80
126.68
702.48
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
OVER HEAD & PROFITS 22.00%
340mm x 225mm size beam in 1:2:4(20mm) cement concrete including
Timber plank 25mm Class iii
shuttering (reinforcement paid for separately.)
SUB TOTAL
TOTAL
-
8/13/2019 Bsr 1999 Colombo
94/486
C CONCRETOR
C018 340mm x 300mm size beam in 1:2:4 (20mm) cement concrete including
shuttering (reinforcement paid for separately.)
PER L.m
L001 Unskilled labour Hour 4.00 22.88 91.52
L002 Skilled labour Hour 3.00 37.50 112.50
M014 Cement 50 Kg. 0.70 300.00 210.00
M007 Sand Cum 0.03 390.00 11.70
M006 Metal 20mm Cu.m. 0.10 1,200.00 120.00
M048 Timber plank 25mm class iii Sq.m. 0.60 280.00 168.00
ALLOW FOR NAILS AND PROPS 62.30
776.02
170.72
946.74
C019 450mm x 340mm x 150mm padstones in 1:2:4(20mm) cement concrete
precast or insitu
PER No.
L001 Unskilled labour Hour 1.000 22.88 22.88
L002 Skilled labour Hour 0.500 37.50 18.75
M014 Cement 50 Kg. 0.145 300.00 43.50
M007 Sand Cum 0.014 390.00 5.46
M006 Metal 20mm Cu.m. 0.025 1,200.00 30.00M048 Sq.m. 0.240 280.00 67.20
187.79
41.31
229.10TOTAL
TOTAL
OVER HEAD & PROFITS 22.00%
SUB TOTAL
OVER HEAD & PROFITS 22.00%
Timber plank 25mm class iii
SUB TOTAL
-
8/13/2019 Bsr 1999 Colombo
95/486
C CONCRETOR
C020 100mm thick flat roof in 1:2:4 (20mm) cement concrete and reinforced
with expanded metal, 12mm thick 1:2 cement rendering with 5% pudllo
cement and lime puttying soffit complete (reinforced paid seperately)
PER M2
L001 Unskilled labour Hour 8.75 22.88 200.20
L002 Skilled labour Hour 3.50 37.50 131.25
M014 Cement 50 Kg. 0.70 300.00 210.00
M007 Sand Cum 0.08 390.00 31.20
M006 Metal 20mm Cum 0.10 1,200.00 120.00
M008 Boiled lime Kg. 0.65 5.00 3.25
M012 Pudlo Cement Kg. 0.40 130.00 52.00
747.90
164.54
912.44
C021 75mm thick slabs over drains in 1:2:4(20mm) cement concrete reinforced
12mm 1:2 cement sand rendered (reinforcement paid seperately)
PER m2
L001 Unskilled labour Hour 3.60 22.88 82.37
L002 Skilled labour Hour 2.20 37.50 82.50
L014 Cement 50 Kg. 0.60 300.00 180.00
L007 Sand Cum 0.05 390.00 19.50
L006 Metal 20mm Cu.m. 0.08 1,200.00 96.00
L048 Timber plank 25mm class iii Sq.m. 0.50 280.00 140.00
600.37
132.08
732.45
TOTAL
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
SUB TOTAL
OVER HEAD & PROFITS 22.00%
-
8/13/2019 Bsr 1999 Colombo
96/486
C- CONCRETOR
C022 200mm x 200mm x 150mm spur stones in 1:2:4 (20mm) cement
concrete for verandah posts supplied and fixed.
PER No.
L001 Unskilled labour Hour 0.600 22.88 13.73
L002 Skilled labour Hour 0.600 37.50 22.50
M014 Cement 50 Kg. 0.040 300.00 12.00
M007 Sand Cum 0.002 390.00 0.78
M006 Metal 20mm Cu.m. 0.010 1,200.00 12.00
ALLOW FOR MOULDS 5.62
66.63
14.66
81.29TOTAL
SUB TOTAL
OVER HEAD & PROFITS 22.00%
-
8/13/2019 Bsr 1999 Colombo
97/486
C- CONCRETOR
C023 100mm x75mm x 50mm spur stones in 1:2:4 (20mm) cement concrete
for door posts supplied and fixed
PER No.
L001 Unskilled labour Hour 0.2000 22.88 4.58
L002 Skilled labour Hour 0.2000 37.50 7.50
M014 Cement 50 Kg. 0.0024 300.00 0.72
M007 Sand Cum 0.0002 390.00 0.08
M006 Metal 20mm Cu.m. 0.0004 1,200.00 0.48
ALLOW FOR MOULDS 1.35
14.70
3.23
17.93
C024 Squatting plates for latrines in 1:2:4(20mm) cement concrete with mild steel
reinforcements 225mm centres both ways.
PER No. say - 1.25 x 1.25 x 0.10 m
L001 Unskilled labour Hour 4.000 22.88 91.52
L002 Skilled labour Hour 2.000 37.50 75.00
L003 Black smith Hour 0.500 37.50 18.75
M014 Cement 50 Kg. 0.104 300.00 31.20
M007 Sand Cum 0.004 390.00 1.56
M006 Metal 20mm Cu.m. 0.005 1,200.00 6.00
M031 Mild Steel * 10 mm dia Kg. 9.065 30.75 278.75
ALLOW FOR BINDING AND MOULDS 25.15
527.93
116.14
644.07
TOTAL
SUB TOTAL
OVER HEAD & PROFITS 22.00%
SUB TOTAL
TOTAL
OVER HEAD & PROFITS 22.00%
-
8/13/2019 Bsr 1999 Colombo
98/486
C - CONCRETOR
C025 1:2:4 (20mm) cement concrete using concrete mixer and vibrator
(shuttering, reinforcement finishes paid separately)
PER m3
L001 Unskilled labour Hour 17.00 22.88 388.96
L002 Skilled labour Hour 2.80 37.50 105.00
M014 Cement 50 Kg. 6.50 300.00 1,950.00
M007 Sand Cum 0.21 390.00 81.90
M005 Metal 25mm Cu.m. 1.00 933.00 933.00
E001 Basket day 0.30 52.00 15.60
ALLOW FOR WATER AND CONCRETE MIXER VIBRATOR ETC. 177.05
3,651.51
803.33
4,454.84
C026 1:2:4(20mm)cement concrete in column shafts (reinforcements shuttering
and finishes paid for separately) in ground floor using mixer and vibrator
PER m3
L001 Unskilled labour Hour 17.00 22.88 388.96
L002 Skilled labour Hour 2.80 37.50 105.00
M014 Cement 50 Kg. 6.40 300.00 1,920.00
M007 Sand Cum 0.21 390.00 81.90
M006 Metal 20mm Cu.m. 1.00 1,200.00 1,200.00E001 Basket day 0.30 52.00 15.60
ALLOW FOR WATER & MIXER VIB. OPERATORS FUEL ECT. 190.50
3,901.96
858.43
4,760.39
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
-
8/13/2019 Bsr 1999 Colombo
99/486
C CONCRETOR
C027 1:2:4(20mm) cement concrete in column shafts in 1st floor (reinforcement,
shuttering and finishes paid for seperately)
PER m3
L001 Unskilled labour Hour 22.60 22.88 517.09
L002 Skilled labour Hour 2.80 37.50 105.00
M014 Cement 50 Kg. 6.40 300.00 1,920.00
M007 Sand Cum 0.21 390.00 81.90
M006 Metal 20mm Cu.m. 1.00 1,200.00 1,200.00
E001 Basket day 0.30 52.00 15.60
ALLOW FOR WATER & MIXER VIB. OPERATORS FUEL ECT. 190.50
4,030.09
886.62
4,916.71TOTAL
SUB TOTAL
OVER HEAD & PROFITS 22.00%
-
8/13/2019 Bsr 1999 Colombo
100/486
C CONCRETOR
C028 1:2:4(20mm) cement concrete in column shafts in 2nd floor (reinforcement,
shuttering and finishes paid for separately).
PER m3
L001 Unskilled labour Hour 31.10 22.88 711.57
L002 Skilled labour Hour 2.80 37.50 105.00
M014 Cement 50 Kg. 6.40 300.00 1,920.00
M007 Sand Cum 0.21 390.00 81.90
M006 Metal 20mm Cum 1.00 1,200.00 1,200.00
E001 Basket day 0.30 52.00 15.60
ALLOW FOR WATER & MIXER VIB. OPERATORS FUEL ECT. 215.00
4,249.07
934.79
5,183.86
C029 1:2:4(20mm) cement concrete in beams in ground floor (reinforcement,
shuttering and finishes paid for separately) using mixer and vibrator.
PER m3
L001 Unskilled labour Hour 22.60 22.88 517.09
L002 Skilled labour Hour 3.50 37.50 131.25
M014 Cement 50 Kg. 6.40 300.00 1,920.00
M007 Sand Cum 0.21 390.00 81.90
M006 Metal 20mm Cu.m. 1.00 1,200.00 1,200.00
E001 Basket day 0.24 52.00 12.48
ALLOW FOR CURING, WATER, MIXER, VIBRATOR, FUEL, 190.47
OPERATORS
4,053.19891.70
4,944.89
C030 1:2:4(20mm) cement concrete in beams in 1st floor (reinforcement,
shuttering and finishes paid for separately)
PER M3
L001 Unskilled labour Hour 28.20 22.88 645.22
L002 Skilled labour Hour 3.50 37.50 131.25
M014 Cement 50 Kg. 6.40 300.00 1,920.00
M007 Sand Cum 0.21 390.00 81.90
M006 Metal 20mm Cu.m. 1.00 1,200.00 1,200.00
E001 Basket day 0.24 52.00 12.48
ALLOW FOR WATER & MIXER VIB. OPERATORS FUEL ECT. 190.47
4,181.32
919.89
5,101.21
OVER HEAD & PROFITS 22.00%
OVER HEAD & PROFITS 22.00%
TOTAL
SUB TOTALOVER HEAD & PROFITS 22.00%
TOTAL
SUB TOTAL
TOTAL
SUB TOTAL
-
8/13/2019 Bsr 1999 Colombo
101/486
-
8/13/2019 Bsr 1999 Colombo
102/486
C CONCRETOR
C033 Shuttering for 225mm x 225mm column shafts including class ii timber
joists and necessary props. ( rate to include for removal).
PER m2
L001 Unskilled labour Hour 2.700 22.88 61.78
L002 Skilled labour Hour 2.700 37.50 101.25
M048 Sq.m. 0.350 280.00 98.00
M044 Timber beams Class ii Cu.m. 0.003 18,350.00 55.05
M065 No. 0.600 20.00 12.00
M363 Props (bamboo) 3 - 4 m No. 1.700 50.00 85.00
ALLOW FOR SCREWS AND NAILS 4.71
417.79
91.91509.70
C034 Shuttering for beams sides, soffit including class ii timber joists and
necessary props (rate include for removal)
PER m2
L001 Unskilled labour Hour 1.100 22.88 25.17
L002 Skilled labour Hour 1.100 37.50 41.25
M048 Timber plank 25mm class iii Sq.m. 1.100 280.00 308.00
M041 G.I. Sheet 18 B.W.G. Sq.m. 0.005 656.00 3.28M363 Props (bamboo) 3 - 4 m No. 0.500 50.00 25.00
M037 Wire nail S.W.G. 4 to 18 * Kg. 0.400 30.10 12.04
M364 Mould oil Lit. 0.300 33.00 9.90
424.64
93.42
518.06TOTAL
OVER HEAD & PROFITS 22.00%
SUB TOTAL
Bolt and nut iron 225 x 10mm *
Timber plank 25mm class iii
TOTAL
SUB TOTAL
OVER HEAD & PROFITS 22.00%
-
8/13/2019 Bsr 1999 Colombo
103/486
C CONCRETOR
C035 1:2:4 (20mm) cement concrete in lintol and beams in ground floor using
mixer and vibrator (reinforcement and shuttering paid for separately)
PER m3
L001 Unskilled labour Hour 45.20 22.88 1,034.18
L002 Skilled labour Hour 5.60 37.50 210.00
M014 Cement 50 Kg. 6.40 300.00 1,920.00
M007 Sand Cum 0.22 390.00 85.80
E001 Basket day 0.20 52.00 10.40
M006 Metal 20mm Cu.m. 1.00 1,200.00 1,200.00
ALLOW FOR WATER, CURY, MIXER, VIBRATOR, FUEL, 190.47
OPERATORS
4,650.85
1,023.19
5,674.04
C036 1:2:4(20mm) cement concrete in lintol and beams as per item co35 in 1st floor
PER m3
L001 Unskilled labour Hour 50.80 22.88 1,162.30L002 Skilled labour Hour 5.60 37.50 210.00
M014 Cement 50 Kg. 6.40 300.00 1,920.00
M007 Sand Cum 0.22 390.00 85.80
M006 Metal 20mm Cu.m. 1.00 1,200.00 1,200.00
E001 Basket day 0.20 52.00 10.40
ALLOW FOR WATER, MIXER & VIBRATOR 190.47
4,778.97
1,051.37
5,830.35
TOTAL
SUB TOTAL
TOTAL
SUB TOTAL
OVER HEAD & PROFITS 22.00%
OVER HEAD & PROFITS 22.00%
-
8/13/2019 Bsr 1999 Colombo
104/486
C037 100mm thick 1:2:4(20mm) cement concrete in 1st floor slab using mixer
and vibrator (reinforcement and shuttering paid for separately)
PER m2
L001 Unskilled labour Hour 2.600 22.88 59.49
L002 Skilled labour Hour 0.430 37.50 16.13
M014 Cement 50 Kg. 0.650 300.00 195.00
M006 Metal 20mm Cu.m. 0.031 1,200.00 37.20
M007 Sand Cum 0.025 390.00 9.75
ALLOW FOR WATER ANY MIXER, OPERATOR FUEL ECT. 114.55
432.11
95.06
527.17
C038 125mm thick 1:2:4(20mm) cement concrete in 1st floor slab
reinforcemnet and shuttering paid for separately) using mixer and vibrator.
PER m2
L001 Unskilled labour Hour 2.70 22.88 61.78
L002 Skilled labour Hour 0.43 37.50 16.13
M014 Cement 50 Kg. 0.80 300.00 240.00
M006 Metal 20mm Cu.m. 0.04 1,200.00 48.00
M007 Sand Cum 0.03 390.00 11.70
ALLOW FOR WATER, CURING, MIXER, VIBRATOR, FUEL, 177.05
OPERATOR ETC.
554.65122.02
676.67TOTAL
SUB TOTAL
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
OVER HEAD & PROFITS 22.00%
-
8/13/2019 Bsr 1999 Colombo
105/486
D- BRICKLAYER
D001 Segmental brick arch in 1:3 cement sand mortar including centering
PER m3
L001 Unskilled labour Hour 22.60 22.88 517.09
L002 Skilled labour Hour 17.00 37.50 637.50
M010 Brick 1000 Nos 0.51 2,250.00 1,147.50
M014 Cement 50 Kg. 2.20 300.00 660.00
M007 Sand Cu.m. 0.15 390.00 58.50
ALLOW FOR WATER AND SCAFFOLDING 30.20
3,050.79
671.17
3,721.96
D002 225mm Brick work in 1:5 cement sand mortar (above 3 cu.m) upto 1st floor level
PER m3
M010 Brick 1000 Nos 0.512 2,250.00 1,152.00
M007 Sand Cum 0.100 390.00 39.00
M014 Cement 50 kg. 1.300 300.00 390.00
L001 Unskilled labour Hour 14.100 22.88 322.61
L002 Skilled labour Hour 8.500 37.50 318.75
ALLOW FOR WATER AND SCAFFOLDING 22.20
2,244.56493.80
2,738.36
D003 225mm brick work in 1:5 cement sand mortar upto 1st floor level (upto 3cu.m)
PER m3
L001 Unskilled labour Hour 16.200 22.88 370.66
L002 Skilled labour Hour 10.600 37.50 397.50
M010 Brick 1000 Nos 0.512 2,250.00 1,152.00
M007 Sand Cum 0.100 390.00 39.00
M014 Cement 50 kg. 1.300 300.00 390.00
ALLOW FOR WATER AND SCAFFOLDING 23.50
2,372.66
521.98
2,894.64
SUB TOTALOVER HEAD & PROFITS 22.00%
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
TOTAL
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
-
8/13/2019 Bsr 1999 Colombo
106/486
-
8/13/2019 Bsr 1999 Colombo
107/486
D- BRICKLAYER
D007 112mm brick work in 1:5 cement sand mortar upto 1st floor level(upto 10 sq.m.)
PER m2
M010 Brick 1000 Nos 0.060 2,250.00 135.00
M007 Sand Cum 0.015 390.00 5.85
M014 Cement 50Kg. 0.140 300.00 42.00
L001 Unskilled labour Hour 2.150 22.88 49.19
L002 Skilled labour Hour 1.610 37.50 60.38
ALLOW FOR SCAFFOLDING AND WATER 23.50
315.92
69.50
385.42
D008
PER m2
M007 Sand Cum 0.015 390.00 5.85
M014 Cement 50 Kg. 0.140 300.00 42.00
L001 Unskilled labour Hour 2.250 22.88 51.48
L002 Skilled labour Hour 1.610 37.50 60.38
ALLOW FOR WATER AND SCAFFOLDING 23.50
183.21
40.31
223.51
D009 225mm brick work in 2.5 lime sand mortar upto first floor level (above 3cu.m)
PER m3
M010 Brick 1000 Nos 0.512 2,250.00 1,152.00
M007 Sand Cum 0.100 390.00 39.00
M009 Boiled lime Kg. 66.250 5.00 331.25
L001 Unskilled labour Hour 14.100 22.88 322.61
L002 Skilled labour Hour 8.500 37.50 318.75
ALLOW FOR WATER AND SCAFFOLDING 23.50
2,187.11
481.16
2,668.27
112mm brick work in 1:5 cement sand mortar using available bricks including
TOTAL
SUB TOTAL
OVER HEAD & PROFITS 22.00%
sorting and cleaning upto 1st floor level.
OVER HEAD & PROFITS 22.00%
TOTAL
SUB TOTAL
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
-
8/13/2019 Bsr 1999 Colombo
108/486
D- BRICKLAYER
D010 225mm brick work in 2:5 lime sand mortar upto 1st floor level (upto 3Cu.m.)
PER m3
M010 Brick 1000 Nos 0.512 2,250.00 1,152.00
M007 Sand Cum 0.100 390.00 39.00
M009 Boiled lime Kg. 66.250 5.00 331.25
L001 Unskilled labour Hour 16.200 22.88 370.66
L002 Skilled labour Hour 10.600 37.50 397.50
ALLOW FOR WATER AND SCAFFOLDING 23.50
2,313.91
509.06
2,822.97
D011 225mm brick work in 2:5 lime sand mortar with bricks available at site,
including sorting out and cleaning bricks.
PER m3
M007 Sand Cum 0.10 390.00 39.00
M009 Boiled lime Kg. 66.25 5.00 331.25
L001 Unskilled labour Hour 19.70 22.88 450.74
L002 Skilled labour Hour 8.50 37.50 318.75
ALLOW FOR WATER AND SCAFFOLDING 23.50
1,163.24
255.91
1,419.15
D012 Extra over item D002 to D005 and D009 to D011 for brick work from
first floor level to seconed floor level
PER m3
L001 Unskilled labour Hour 4.2 22.88 96.10
ALLOW FOR SCAFFOLDING 18.84
114.94
25.29
140.23
TOTAL
SUB TOTAL
SUB TOTAL
OVER HEAD & PROFITS 22.00%
OVER HEAD & PROFITS 22.00%
TOTAL
OVER HEAD & PROFITS 22.00%
SUB TOTAL
TOTAL
-
8/13/2019 Bsr 1999 Colombo
109/486
D- BRICKLAYER
D013 Extra over item D002 to D005 and D009 to D011 for brick work above second
floor level
PER m3
L001 Unskilled labour Hour 12.7 22.88 290.58
ALLOW FOR SCAFFOLDING 19.07
309.65
68.12
377.77
D014
PER m2
L001 Unskilled labour Hour 1.4 22.88 32.03
14.58
46.61
10.25
56.86
D015 Extra over item D006 to D008 for brick work above 2nd floor level
PER m2
L001 Unskilled labour Hour 4.2 22.88 96.10
ALLOW FOR SCAFFOLDING 19.07
115.17
25.34
140.51
OVER HEAD & PROFITS 22.00%
TOTAL
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Extra over item D006 to D008 for brick work from first floor level to
seconed floor level
ALLOW FOR SCAFFOLDING
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
SUB TOTAL
-
8/13/2019 Bsr 1999 Colombo
110/486
D- BRICKLAYER
D019 Weathered and throated brick coping in 1:5 cement sand mortar on 112mm thick
walls complete with 12mm thick 1:3 sand cement rendering and cement floating
coat.
PER L.m.
M010 Brick 1000 Nos 0.013 2,250.00 29.25
M007 Sand Cum 0.020 390.00 7.80
M014 Cement 50 Kg. 0.330 300.00 99.00
L001 Unskilled labour Hour 1.600 22.88 36.61
L002 Skilled labour Hour 1.600 37.50 60.00
232.66
51.18
283.84
D020
thick walls complete with 12mm thick 1:3 cement sand rendering and cement
floating coat.
PER L.m
M010 Brick 1000 Nos 0.04 2,250.00 90.00
M007 Sand Cum 0.06 390.00 23.40
M014 Cement 50 Kg. 1.00 300.00 300.00
L001 Unskilled labour Hour 2.00 22.88 45.76
L002 Skilled labour Hour 2.00 37.50 75.00
534.16117.52
651.68
D021
thick walls complete with 12mm thick 1:3 cement sand rendering and cement
floating coat.
PER L.m
M010 Brick 1000 Nos 0.03 2,250.00 67.50
M007 Sand Cum 0.04 390.00 15.60
M014 Cement 50 Kg. 0.70 300.00 210.00
L001 Unskilled labour Hour 2.60 22.88 59.49
L002 Skilled labour Hour 2.60 37.50 97.50
450.09
99.02
549.11
Weathered and throated brick coping in 1:5 cement sand mortar on 340mm
Wheathered and throated brick coping in 1:5 cement sand mortar on 225mm
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
SUB TOTAL
SUB TOTAL
TOTAL
OVER HEAD & PROFITS 22.00%
OVER HEAD & PROFITS 22.00%
TOTAL
-
8/13/2019 Bsr 1999 Colombo
111/486
D BRICKLAYER
D022 Weathered and throated brick coping in 1:5 cement sand mortar on 225mm
thick walls using available bricks complete with 12mm thick 1:3 cement sand
rendering and cement floating coat.
PER L.m
M007 Sand Cum 0.04 390.00 15.60
M014 Cement 50 Kg. 0.70 300.00 210.00
L001 Unskilled labour Hour 2.60 22.88 59.49
L002 Skilled labour Hour 2.60 37.50 97.50
382.59
84.17
466.76
D023
PER L.m
M010 Brick 1000 Nos 0.102 2,250.00 229.50
M007 Sand Cum 0.020 390.00 7.80
M014 Cement 50 Kg. 0.300 300.00 90.00
L001 Unskilled labour Hour 5.200 22.88 118.98
L002 Skilled labour Hour 5.200 37.50 195.00
641.28141.08
782.36
D024
separately). up to 3m2
PER No.
L001 Unskilled labour Hour 16.00 22.88 366.08L002 Skilled labour Hour 12.00 37.50 450.00
M010 Brick 1000 Nos 0.10 2,250.00 225.00
M007 Sand Cum 0.03 390.00 11.70
M014 Cement 50 Kg. 0.52 300.00 156.00
M009 Boiled lime Kg. 8.70 5.00 43.50
SUB TOTAL 1,252.28
275.50
1,527.78TOTAL
cement rendering up to 225mm projection and 225mm depth
OVER HEAD & PROFITS 22.00%
SUB TOTAL
TOTAL
Inserting of door or window in existing walls including making opening
and making good to floor and wall (lintol,arch.door & window paid for
OVER HEAD & PROFITS 22.00%
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Brick cornices in 1:5 cement mortar complete with 12mm thick 1:3
-
8/13/2019 Bsr 1999 Colombo
112/486
-
8/13/2019 Bsr 1999 Colombo
113/486
D- BRICKLAYER
D025 300mm wide 225mm to 300mm deep, brick drains in with 112mm thick side walls
in 1:5 cement motar complete with 12mm thick 1:2 cement sand rendering with
smooth finish and necessary expansion joints(rate to included for excavation)
& backfilling.
PER L.m
L001 Unskilled labour Hour 4.000 22.88 91.52
L002 Skilled labour Hour 3.280 37.50 123.00
M010 Brick 1000 Nos 0.065 2,250.00 146.25
M014 Cement 50 Kg. 0.160 300.00 48.00
M007 Sand Cum 0.020 390.00 7.80
416.57
91.65
508.22
D026
backfilling) side walls should be 112mm thick.
PER L.m
L001 Unskilled labour Hour 3.050 22.88 69.78
L002 Skilled labour Hour 2.440 37.50 91.50
M010 Brick 1000 Nos 0.055 2,250.00 123.75
M014 Cement 50 Kg. 0.100 300.00 30.00
M007 Sand Cum 0.010 390.00 3.90
318.9370.17
389.10
D027
and necessary expansion joints ( rate to include necessary excavation)
PER L.m
M010 Brick 1000 Nos 0.05 2,250.00 112.50
M014 Cement 50 Kg. 0.36 300.00 108.00
M007 Sand Cum 0.02 390.00 7.80
L001 Unskilled labour Hour 3.66 22.88 83.74
L002 Skilled labour Hour 3.66 37.50 137.25
449.29
98.84
548.13
masonary in 1:5 cement mortar and 12mm thick 1:2 cement sand rendering
TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Scott's pattern drains including apron of overall width 750mm brick
SUB TOTAL
SUB TOTALOVER HEAD & PROFITS 22.00%
necessary expansion joints (rate to included for necessary excavation and
complete with 12mm thick 1:2 cement sand rendering with smooth finish and
SUB TOTAL
225mm wide 150mm to 225mm deep brick drains in 1:5 cement sand mortar
OVER HEAD & PROFITS 22.00%
TOTAL
-
8/13/2019 Bsr 1999 Colombo
114/486
D- BRICKLALYER
D028