Content:
1. Description of the lines ..................................................................................................... 3
2. Characteristic data ............................................................................................................ 4 1.1. Unit 1 ........................................................................................................................... 4
1.2. Unit 2 ........................................................................................................................... 6
1.3. Unit 3 ........................................................................................................................... 7
1.4. Unit 4 ........................................................................................................................... 8
3. Technical specification ...................................................................................................... 9
3.1 Installed Power ............................................................................................................. 9
3.2 Utilities ......................................................................................................................... 9
3.3 Staff ............................................................................................................................ 10
3.4 Main equipment for each line ................................................................................... 10
-
8/16/2019 BUHLER BOTTLE GRADE SSP DETAILS
4/16
-
8/16/2019 BUHLER BOTTLE GRADE SSP DETAILS
5/16
-
8/16/2019 BUHLER BOTTLE GRADE SSP DETAILS
6/16
-
8/16/2019 BUHLER BOTTLE GRADE SSP DETAILS
7/16
1.2.
Unit 2
Integrated objects of two steering rooms, two trafo - station, two swiching station for the
lowvoltage and social rooms. These are one level buildings of traditional construction. Buildings
are equipped with central heating, canalization, telephone and ventilation installations.
Data for 6 objects together:
1. Land development area 305 m2
2. Usable area 265 m2
3. Cubic capacity 1168 m3
Steering rooms:
-
8/16/2019 BUHLER BOTTLE GRADE SSP DETAILS
8/16
1.3.
Unit 3
Unit consisted of raw material silo station and two umbrella roofs for storage.
Raw material silo station – Stand for two raw material silo (amorphous) made from stainless steel
of capacity 100m3 each. Support steel structure construction with technological ladders and
platforms. Is equipped with electrical power, pressed air and central heating systems, lighting
protection and ventilation.
1. Land development area 107 m2
2. Usable area 101 m2
3.
Cubic capacity 749 m3
Umbrella roofs for storage - steel structure construction faying to raw material silo station
covered with sheet metal plates, equipped with moving electrical hoist of capacity 1500 kg.
1. Land development area 269 m2
2. Usable area 257 m2
3.
Cubic capacity 1829 m3
Raw material silo station and two umbrella roofs for storage:
-
8/16/2019 BUHLER BOTTLE GRADE SSP DETAILS
9/16
1.4.
Unit 4
Unit consisted from two objects of final product silo stations.
Final product silo station for SSP 45 t/d – stand for two stainless steel silo of 100 m3 capacity
each. Steel structure support construction with ladders and technological platforms. Area is
equipped with pressed air and electrical systems as well as lighting protection and ventilation
installations. Storage capacity of final product is about 140 tones.
Final product silo station for SSP 60 t/d - stand for three stainless steel silo of 125m3 capacity
each. Steel structure support construction with ladders and technological platforms. Equipped
with pressed air and electrical systems as well as lighting protection and ventilation installations.
Storage capacity of final product is about 300 tones.
Data summarized for two buildings:
1. Land development area 113 m2
2. Usable area 104 m2
3. Cubic capacity 552 m3
Final product silo station:
-
8/16/2019 BUHLER BOTTLE GRADE SSP DETAILS
10/16
3.
Technical specification
3.1 Installed Power
Power voltage 220/380 V
Frequency 50HzElectric motors:
Installed motor power
Consumption
Control system
270 kW
175 kW
10kW
Heaters:
Installed heater powerConsumption
480kW335 kW
Power voltage 380 V (10 %)Frequency 50Hz
Electric motors:
Installed motor power
Consumption
Control system
275 kW
179 kW
10kW
Heaters:Installed heater power
Consumption
550kW
380 KW
3.2 Utilities
-
8/16/2019 BUHLER BOTTLE GRADE SSP DETAILS
11/16
Electrical power 0,18 MWh/t
Pressed air 117 m3/t
Pure nitrogen (99,5%) 19,1 m3/t
Cooling water 0,175 m3/t
3.3 Staff
Line crew (technology, steering &
controlling)3/2 operators (1 leader)/shift
Raw material station crew 2 man/shift (one for lift operator)
Big bag station crew 3 man/shift (one fork lit operator)
Supervising the handling crew 1 person/shift
3.4 Main equipment for each line
• Preclystalizer;
• Crystalizer;
• Preheater;
• Reactor;
• Cooler;
• Nitrogen filter;
• Nitrogen dryer;
• Main nitrogen blower;
• Blowers for precrystalisation & crystallization loops , preheater & final product
cooler;
-
8/16/2019 BUHLER BOTTLE GRADE SSP DETAILS
12/16
RAW
MATERIAL
SILO
GROUPE
RAW
MATERIAL
DELIVERY
UNLOADING BIG
BAGS
PRECRYSTALYSATION
CRYSTALISATION
PREHEATING
REACTOR
COOLING
FINAL
PRODUCT
SILO
GROUPE
PROCESS
SSP
FINAL
PRODUKT
NITROGEN
CLEANING LOOP
UNLOADING
SILO TRUCKS
BIG-BAG
LOADING
-
8/16/2019 BUHLER BOTTLE GRADE SSP DETAILS
13/16
-
8/16/2019 BUHLER BOTTLE GRADE SSP DETAILS
14/16
-
8/16/2019 BUHLER BOTTLE GRADE SSP DETAILS
15/16
-
8/16/2019 BUHLER BOTTLE GRADE SSP DETAILS
16/16