building capacity for scaling up pbs heather peshak george, ph.d. donald k. kincaid, ed.d
TRANSCRIPT
![Page 1: Building Capacity for Scaling Up PBS Heather Peshak George, Ph.D. Donald K. Kincaid, Ed.D](https://reader031.vdocument.in/reader031/viewer/2022032803/56649e2d5503460f94b1d7dd/html5/thumbnails/1.jpg)
Building Capacityfor Scaling Up PBS
Heather Peshak George, Ph.D.Donald K. Kincaid, Ed.D.
![Page 2: Building Capacity for Scaling Up PBS Heather Peshak George, Ph.D. Donald K. Kincaid, Ed.D](https://reader031.vdocument.in/reader031/viewer/2022032803/56649e2d5503460f94b1d7dd/html5/thumbnails/2.jpg)
2
Objectives
Review PBIS Blueprint components Describe Florida’s Model for building capacity
at state, district, and school levels Review process, procedures, and tools Identify the critical questions that Texas
needs to answer Build a scalable and sustainable system for
Texas
![Page 3: Building Capacity for Scaling Up PBS Heather Peshak George, Ph.D. Donald K. Kincaid, Ed.D](https://reader031.vdocument.in/reader031/viewer/2022032803/56649e2d5503460f94b1d7dd/html5/thumbnails/3.jpg)
4
Components toSuccessful PBS Implementation
a) a Leadership Team to actively coordinate efforts
b) an organizational umbrella composed of adequate funding, broad visibility, and consistent political support
c) a foundation for sustained and broad-scale implementation established through a cadre of individuals who can provide: coaching support for local implementation a small group of individuals who can train teams on the
practices and processes of school-wide PBS a system for on-going evaluation
d) a small group of demonstration schools that documents the viability of the approach within the local fiscal, political and social climate of the state/district
![Page 4: Building Capacity for Scaling Up PBS Heather Peshak George, Ph.D. Donald K. Kincaid, Ed.D](https://reader031.vdocument.in/reader031/viewer/2022032803/56649e2d5503460f94b1d7dd/html5/thumbnails/4.jpg)
Leadership Team
FundingVisibility Political
Support
Training Coaching Evaluation
Local School Teams/Demonstrations
SWPBS Implementers’ Blueprint Elements
![Page 5: Building Capacity for Scaling Up PBS Heather Peshak George, Ph.D. Donald K. Kincaid, Ed.D](https://reader031.vdocument.in/reader031/viewer/2022032803/56649e2d5503460f94b1d7dd/html5/thumbnails/5.jpg)
6
PBS Systems Implementation LogicPBS Systems Implementation Logic
Leadership Team
Management Team
FundingMarketing
Visibility Political Support
Training Coaching Evaluation
Active Coordination
Braiding Initiatives
1. Phase One: Commitment to School Level Implementation2. Phase Two: Commitment to Capacity Building3. Phase Three: Commitment to Large Scale Implementation
![Page 6: Building Capacity for Scaling Up PBS Heather Peshak George, Ph.D. Donald K. Kincaid, Ed.D](https://reader031.vdocument.in/reader031/viewer/2022032803/56649e2d5503460f94b1d7dd/html5/thumbnails/6.jpg)
7
Leadership Team
SWPBS Implementers’ Blueprint
• Representation from key stakeholders
• Meet regularly with a regular process
• Complete regular self-assessment and long term action planning
• Led by Coordinator with FTE
![Page 7: Building Capacity for Scaling Up PBS Heather Peshak George, Ph.D. Donald K. Kincaid, Ed.D](https://reader031.vdocument.in/reader031/viewer/2022032803/56649e2d5503460f94b1d7dd/html5/thumbnails/7.jpg)
8
FundingVisibility Political
Support
SWPBS Implementers’ Blueprint
• Identify recurring
funding sources
• 3 to 5 yrs. of support
• Disseminate results
to multiple audiences
•Websites
•Newsletters
•Conferences
•Media (TV, etc.)
• Presentations to:
school boards,
state departments
• Write into policy
• Connect with key
administrators
LEADERSHIP ACTIVITIES
![Page 8: Building Capacity for Scaling Up PBS Heather Peshak George, Ph.D. Donald K. Kincaid, Ed.D](https://reader031.vdocument.in/reader031/viewer/2022032803/56649e2d5503460f94b1d7dd/html5/thumbnails/8.jpg)
9
Training Coaching Evaluation
SWPBS Implementers’ Blueprint
BUILD CAPACITY
(training expertise)
• Support coaches
• Ensure coaches
implement with
fidelity
• Establish community
of learning
BUILD CAPACITY
(implementation
expertise)
• Support school
teams
• Ensure teams
implement with
fidelity
DATA-BASED
DECISION MAKING
• Create data systems
•Fidelity
•Student outcomes
• Design process for
evaluation
• Establish eval. cycles
COORDINATION ACTIVITIES
![Page 9: Building Capacity for Scaling Up PBS Heather Peshak George, Ph.D. Donald K. Kincaid, Ed.D](https://reader031.vdocument.in/reader031/viewer/2022032803/56649e2d5503460f94b1d7dd/html5/thumbnails/9.jpg)
10
Local School Teams/Districts/Regions/ Demonstrations
SWPBS Implementers’ Blueprint
• Support schools/districts/regions implementing SWPBS– Coaching
– Funding
• Showcase schools/districts/regions with high fidelity and positive outcomes– Present data linking fidelity to student outcomes
– Arrange visits from key stakeholders
![Page 10: Building Capacity for Scaling Up PBS Heather Peshak George, Ph.D. Donald K. Kincaid, Ed.D](https://reader031.vdocument.in/reader031/viewer/2022032803/56649e2d5503460f94b1d7dd/html5/thumbnails/10.jpg)
11
Phase One:Phase One: Commitment toCommitment to
School/District/RegionSchool/District/RegionLevel ImplementationLevel Implementation
Will this work here?Will this work here?– Establish Local Sites in Multiple DistrictsEstablish Local Sites in Multiple Districts– Small and LargeSmall and Large– Urban, Suburban and RuralUrban, Suburban and Rural– North, South, East, West, CentralNorth, South, East, West, Central– ES, MS, HS, Alt, JJES, MS, HS, Alt, JJ
![Page 11: Building Capacity for Scaling Up PBS Heather Peshak George, Ph.D. Donald K. Kincaid, Ed.D](https://reader031.vdocument.in/reader031/viewer/2022032803/56649e2d5503460f94b1d7dd/html5/thumbnails/11.jpg)
12
Phase Two:Phase Two:Commitment to Capacity Commitment to Capacity
BuildingBuilding• Demonstrate High Fidelity/High ImpactDemonstrate High Fidelity/High Impact• Demand IncreasesDemand Increases• State Team won’t be able to keep up with State Team won’t be able to keep up with
demanddemand• Create Partnership AgreementsCreate Partnership Agreements
– Recruit local universities, colleges, RSCs, etc.Recruit local universities, colleges, RSCs, etc.– Roles and Responsibilities
![Page 12: Building Capacity for Scaling Up PBS Heather Peshak George, Ph.D. Donald K. Kincaid, Ed.D](https://reader031.vdocument.in/reader031/viewer/2022032803/56649e2d5503460f94b1d7dd/html5/thumbnails/12.jpg)
13
FeaturesFeatures
• Point of Contact (District Coordinator) and Point of Contact (District Coordinator) and Coaches become Local CoordinatorsCoaches become Local Coordinators– Transfer role to local personTransfer role to local person– Use phase of implementation to guide Use phase of implementation to guide
decision pointsdecision points• Meet with local team to build action plan- Meet with local team to build action plan-
model after state teammodel after state team
![Page 13: Building Capacity for Scaling Up PBS Heather Peshak George, Ph.D. Donald K. Kincaid, Ed.D](https://reader031.vdocument.in/reader031/viewer/2022032803/56649e2d5503460f94b1d7dd/html5/thumbnails/13.jpg)
14
Phase Three:Phase Three:Commitment to Large Scale Commitment to Large Scale
ImplementationImplementation
• Large number of schools in each Large number of schools in each district/regiondistrict/region
• Sustain and Build Integrated Systems Sustain and Build Integrated Systems Model- Braiding InitiativesModel- Braiding Initiatives– Increase the shelf lifeIncrease the shelf life
• Increased roles and duties within DistrictIncreased roles and duties within District
![Page 14: Building Capacity for Scaling Up PBS Heather Peshak George, Ph.D. Donald K. Kincaid, Ed.D](https://reader031.vdocument.in/reader031/viewer/2022032803/56649e2d5503460f94b1d7dd/html5/thumbnails/14.jpg)
15
Transfer Skill toTransfer Skill toLocal School SystemLocal School System
• Local Team and Coordinator IdentifiedLocal Team and Coordinator Identified– Access to support and technical assistanceAccess to support and technical assistance– ““Fostering the Pipeline of Leadership”Fostering the Pipeline of Leadership”– Develop action plan through blueprintDevelop action plan through blueprint
• model after state with local contextmodel after state with local context
![Page 15: Building Capacity for Scaling Up PBS Heather Peshak George, Ph.D. Donald K. Kincaid, Ed.D](https://reader031.vdocument.in/reader031/viewer/2022032803/56649e2d5503460f94b1d7dd/html5/thumbnails/15.jpg)
16
Phase Four:Phase Four:“Continuous “Continuous
Regeneration”Regeneration”• Innovation Innovation
– Demonstrated impact throughoutDemonstrated impact throughout– Change/Adapt to fit culture every yearChange/Adapt to fit culture every year– Renew CommitmentRenew Commitment– Easier, More Efficient, Cost ReducesEasier, More Efficient, Cost Reduces– Organizational Framework allows for integrationOrganizational Framework allows for integration– Educators as better consumersEducators as better consumers– Sustain and continue scaling upSustain and continue scaling up
![Page 16: Building Capacity for Scaling Up PBS Heather Peshak George, Ph.D. Donald K. Kincaid, Ed.D](https://reader031.vdocument.in/reader031/viewer/2022032803/56649e2d5503460f94b1d7dd/html5/thumbnails/16.jpg)
![Page 17: Building Capacity for Scaling Up PBS Heather Peshak George, Ph.D. Donald K. Kincaid, Ed.D](https://reader031.vdocument.in/reader031/viewer/2022032803/56649e2d5503460f94b1d7dd/html5/thumbnails/17.jpg)
18
Factors to Consider in Developing Comprehensive
Evaluation Systems1) Systems Preparation
– Readiness activities2) Service Provision
– Training and technical assistance3) Evaluation Process
– Timelines4) Evaluation Data
– Implementation Fidelity, Impact on Students, Attrition, Client Satisfaction
5) Products and Dissemination– Reports, materials, presentations, etc.
(Childs, Kincaid & George, in press)
![Page 18: Building Capacity for Scaling Up PBS Heather Peshak George, Ph.D. Donald K. Kincaid, Ed.D](https://reader031.vdocument.in/reader031/viewer/2022032803/56649e2d5503460f94b1d7dd/html5/thumbnails/18.jpg)
19
Florida’s Service Deliveryand Evaluation Model
District Action PlanDistrict Readiness ChecklistSchoolReadinessChecklistNew School Profile (includes ODR, ISS, OSS)
TrainingOn-going technical assistance
FLPBS↓
Districts↓
Coaches↓
Schools
Mid-YearReports
End-of-YearReports
Impact on StudentsOutcome data (ODR, ISS, OSS)Florida Comprehensive Assessment TestSchool Demographic DataTeam Process Survey
Implementation FidelityBenchmarks of Quality, BATSchool Demographic DataSchool-wide Implementation FactorsTeam Process Survey
AttritionAttrition Survey
Client SatisfactionSchool-Wide Implementation Factors
Annual ReportsRevisions to training and technical assistance processNational, State, district, school dissemination activitiesWebsiteOn-line training modules
Systems Preparation
Service Provision
Evaluation Process
Evaluation Data
Products and Dissemination
(Childs, Kincaid & George, in press)
![Page 19: Building Capacity for Scaling Up PBS Heather Peshak George, Ph.D. Donald K. Kincaid, Ed.D](https://reader031.vdocument.in/reader031/viewer/2022032803/56649e2d5503460f94b1d7dd/html5/thumbnails/19.jpg)
20
The Need forAlternative Training
Formats• Funding
– FLPBS:RtIB Project funding– School/district funding
• Budget cuts• Fewer opportunities to travel
• Increased # of schools/districts• 200+ new schools each year
• Increasing levels of support (up the Tiers)
![Page 20: Building Capacity for Scaling Up PBS Heather Peshak George, Ph.D. Donald K. Kincaid, Ed.D](https://reader031.vdocument.in/reader031/viewer/2022032803/56649e2d5503460f94b1d7dd/html5/thumbnails/20.jpg)
21
Technology Selection
• Blackboard• Adobe ProConnect• Elluminate• Skype
![Page 21: Building Capacity for Scaling Up PBS Heather Peshak George, Ph.D. Donald K. Kincaid, Ed.D](https://reader031.vdocument.in/reader031/viewer/2022032803/56649e2d5503460f94b1d7dd/html5/thumbnails/21.jpg)
22
Content to be Applied
• Courses vs. “meetings”• Topics
– Tier 1 (3-day on site)– Tier 2 (1-day on site)– Coaches (1-day on site)– Classroom (1-2 days on site)– SWIS (2-3 hours on site)– District Coordinators (1-day on site 2-3x/yr)
![Page 22: Building Capacity for Scaling Up PBS Heather Peshak George, Ph.D. Donald K. Kincaid, Ed.D](https://reader031.vdocument.in/reader031/viewer/2022032803/56649e2d5503460f94b1d7dd/html5/thumbnails/22.jpg)
23
Web-based Tier 1Training Concept
• Components– Web-based multi-media modules
• PowerPoint voice-over or videos of PowerPoint presentations
• Integrated video• Case study• Activities• Checkpoints
![Page 23: Building Capacity for Scaling Up PBS Heather Peshak George, Ph.D. Donald K. Kincaid, Ed.D](https://reader031.vdocument.in/reader031/viewer/2022032803/56649e2d5503460f94b1d7dd/html5/thumbnails/23.jpg)
24
Concerns/Issues
• Secure log-in – Who participates– How long they are “logged on”– Completion of modules
• Verify it is a team process• Checkpoints to verify “on track”• Submission of “activity documentation” for
review• Opportunities for Q & A• Training evaluation (APBS: Pollard-Sage & Childs, 2009)
![Page 24: Building Capacity for Scaling Up PBS Heather Peshak George, Ph.D. Donald K. Kincaid, Ed.D](https://reader031.vdocument.in/reader031/viewer/2022032803/56649e2d5503460f94b1d7dd/html5/thumbnails/24.jpg)
25
Feedback from Participants
• Pros:• Works well with quick meetings (DC, SWIS)• Refreshers• Reduces the need for travel• Time efficient
![Page 25: Building Capacity for Scaling Up PBS Heather Peshak George, Ph.D. Donald K. Kincaid, Ed.D](https://reader031.vdocument.in/reader031/viewer/2022032803/56649e2d5503460f94b1d7dd/html5/thumbnails/25.jpg)
26
• Cons:• Hard to monitor completion• Need personal connection/outside expert • Impersonal• Not tech savvy• No opportunities for team sharing/connection• Non-verbal communication loss/confusion• Hard to ask questions/lack of immediate feedback• Previous experience with bad online trainings• Snacks!
Feedback from Participants
![Page 26: Building Capacity for Scaling Up PBS Heather Peshak George, Ph.D. Donald K. Kincaid, Ed.D](https://reader031.vdocument.in/reader031/viewer/2022032803/56649e2d5503460f94b1d7dd/html5/thumbnails/26.jpg)
27
Tier 1 Technology
• Blackboard Course– Upload all modules, activities– Participant access granted incrementally
• Some modules may be password protected• Sign-in and evaluations
– Upload completed activities for review by Project staff
• Elluminate Live – for “check in” sessions w/Project
• Opportunity for interactive feedback• Redirection and re-teaching if necessary
![Page 27: Building Capacity for Scaling Up PBS Heather Peshak George, Ph.D. Donald K. Kincaid, Ed.D](https://reader031.vdocument.in/reader031/viewer/2022032803/56649e2d5503460f94b1d7dd/html5/thumbnails/27.jpg)
28
Technology for TA Meetings
• Coaches– Adobe Pro Connect:
• mini-modules (prerecorded) for use at district monthly coaches meetings
• new Coaches• previous on-site training• coaches who come on during year/miss initial training
– Technical Assistance at a distance
• District Coordinators– Adobe Pro Connect: http://flpbs.fmhi.usf.edu
![Page 28: Building Capacity for Scaling Up PBS Heather Peshak George, Ph.D. Donald K. Kincaid, Ed.D](https://reader031.vdocument.in/reader031/viewer/2022032803/56649e2d5503460f94b1d7dd/html5/thumbnails/28.jpg)
29
Texas’
State Leadership Team
Mission
![Page 29: Building Capacity for Scaling Up PBS Heather Peshak George, Ph.D. Donald K. Kincaid, Ed.D](https://reader031.vdocument.in/reader031/viewer/2022032803/56649e2d5503460f94b1d7dd/html5/thumbnails/29.jpg)
30
What Questions Does Texas Need to Answer?
![Page 30: Building Capacity for Scaling Up PBS Heather Peshak George, Ph.D. Donald K. Kincaid, Ed.D](https://reader031.vdocument.in/reader031/viewer/2022032803/56649e2d5503460f94b1d7dd/html5/thumbnails/30.jpg)
31
Get ReadyGet Ready
![Page 31: Building Capacity for Scaling Up PBS Heather Peshak George, Ph.D. Donald K. Kincaid, Ed.D](https://reader031.vdocument.in/reader031/viewer/2022032803/56649e2d5503460f94b1d7dd/html5/thumbnails/31.jpg)
32
Resources
• Childs, K., Kincaid, D., & George, H.P. (in press). A Model for Statewide Evaluation of a Universal Positive behavior Support Initiative. Journal of Positive Behavior Interventions.
• George, H.P. & Kincaid, D. (2008). Building District-wide Capacity for Positive Behavior Support. Journal of Positive Behavioral Interventions, 10(1), 20-32.
• Sugai, G., Horner, R.H., Sailor, W., Dunlap, G., Eber, L., Lewis, T., Kincaid, D., Scott, T., Barrett, S., Algozzine, R., Putnam, R., Massanari, C., & Nelson, M. (2005). School-wide positive behavior support: Implementers’ blueprint and self-assessment. Eugene, OR: University of Oregon.
![Page 32: Building Capacity for Scaling Up PBS Heather Peshak George, Ph.D. Donald K. Kincaid, Ed.D](https://reader031.vdocument.in/reader031/viewer/2022032803/56649e2d5503460f94b1d7dd/html5/thumbnails/32.jpg)
33
![Page 33: Building Capacity for Scaling Up PBS Heather Peshak George, Ph.D. Donald K. Kincaid, Ed.D](https://reader031.vdocument.in/reader031/viewer/2022032803/56649e2d5503460f94b1d7dd/html5/thumbnails/33.jpg)
34
Contact
Heather Peshak George, Ph.D.Co-PI, Co-Director & PBIS Research Partner
Phone: (813) 974-6440
Fax: (813) 974-6115
Email: [email protected]
Website: http://flpbs.fmhi.usf.edu