building energy analysis report project: project …
TRANSCRIPT
BUILDING ENERGY ANALYSIS REPORT
PROJECT:
Project Designer:
Report Prepared by:
Job Number:
Date:
The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2019 Building Energy Efficiency Standards.
This program developed by EnergySoft Software – www.energysoft.com.
45125 Panorama DriveMcAuliffe & Company
Palm Desert, CA 922627607730709
73-540 El Paseo73-540 El Paseo Bldg C Shell Improvements
Palm Desesrt, 92260
45125 Panorama DriveEquitySpec MEP Consulting Engineers
Dave Celmer
Palm Desert, CA 92260760 834-1537
JN 23021-17
9/26/2021
TABLE OF CONTENTS
HVAC System Heating and Cooling Loads Summary
Cover PageTable of ContentsForm PRF-01-E Certificate of ComplianceForm NRCC-LTO-E Outdoor Lighting
21
123
14
Project Name: 73-540 El Paseo Shell Improvements NRCC-PRF-01-E Page 1 of 11
Project Address: 73-540 El Paseo Palm Desesrt 92260 Calculation Date/Time: 17:42, Sun, Sep 26, 2021
Input File Name: 73-450 El Paseo.cibd19x
CA Building Energy Efficiency Standards- 2019 Nonresidential Compliance Report Version: NRCC-PRF-01-E-09022021-6384 Report Generated at: 2021-09-26 17:43:06
A. GENERAL INFORMATION
1 Project Location (city) Palm Desesrt 8 Standards Version Compliance2019
2 CA Zip Code 92260 9 Compliance Software (version) EnergyPro 8.2
3 Climate Zone 15 10 Weather File PALM-SPRINGS-INTL_722868_CZ2010.epw
4 Total Conditioned Floor Area in Scope 5,930 ft2 11 Building Orientation (deg) (S) 180 deg
5 Total Unconditioned Floor Area 0 ft2 12 Permitted Scope of Work ExistingAdditionAndAlteration
6 Total # of Stories (Habitable Above Grade) 1 13 Building Type(s) Nonresidential
7 Total # of dwelling units 0 14 Gas Type NaturalGas
B. PROJECT SUMMARY
Table Instructions: Table B shows which building components are included in the performance calculation. If indicated as not included, the project must show compliance prescriptively if withinpermit application.
Building Components Complying via Performance Building Components Complying Prescriptively
Envelope (see Table G)
PerformanceCovered Process: CommercialKitchens
Performance The following building components are ONLY eligible for prescriptivecompliance and should be documented on the NRCC form listed if withinthe scope of the permit application (i.e. compliance will not be shownon the NRCC-PRF-E).
Not Included Not Included
Mechanical (see Table H)Performance
Covered Process: Computer RoomsPerformance Indoor Lighting (Unconditioned)§140.6 NRCC-LTI-E
Not Included Not Included Outdoor Lighting §140.7 NRCC-LTO-E
Domestic Hot Water (see Table I)Performance
Covered Process: Laboratory ExhaustPerformance Sign Lighting §140.8 NRCC -LTS-E
Not Included Not Included Mandatory Measures
Lighting ( Indoor Conditioned, seeTable K)
Performance
Electrical power systems, commissioning, solar ready, elevator andescalator requirements are mandatory and should on the NRCC formlisted if applicable (i.e. compliance will not be shown on theNRCC-PRF-E.)
Not Included Electrical Power Distribution S110.11 NRCC-ELC-E
Solar Thermal Water Heating (seeTable I)
Performance Commissioning S120.8 NRCC-CXR-E
Not Included Solar Ready S110.10 NRCC-SRA-E
Project Name: 73-540 El Paseo Shell Improvements NRCC-PRF-01-E Page 2 of 11
Project Address: 73-540 El Paseo Palm Desesrt 92260 Calculation Date/Time: 17:42, Sun, Sep 26, 2021
Input File Name: 73-450 El Paseo.cibd19x
CA Building Energy Efficiency Standards- 2019 Nonresidential Compliance Report Version: NRCC-PRF-01-E-09022021-6384 Report Generated at: 2021-09-26 17:43:06
C1. COMPLIANCE RESULTS FOR PERFORMANCE COMPONENTS (Annual TDV Energy Use, kBtu/ft 2-yr)
COMPLIESEnergy Component Standard Design (TDV) Proposed Design (TDV) Compliance Margin (TDV)1
Space Heating 0.93 1.24 -0.31
Space Cooling 202.53 157.03 45.50
Indoor Fans 137.42 77.83 59.59
Heat Rejection -- -- --
Pumps & Misc. -- -- --
Domestic Hot Water 16.73 16.73 --
Indoor Lighting 103.81 103.81 --
ENERGY STANDARDS COMPLIANCE TOTAL 461.42 356.64 104.78 (22.7%)1 Notes: The number in parenthesis following the Compliance Margin in column 4. represents the Percent Better than Standard.
C2. RESULTS FOR 'ABOVE CODE' QUALIFICATIONS1
This project is pursuing CalGreen Tier 1 This project is pursuing CalGreen Tier 2
Miscellaneous Energy Component Standard Design (TDV) Proposed Design (TDV) Compliance Margin (TDV)1
Receptacle 109.42 109.42 --
Process -- -- --
Other Ltg -- -- --
Process Motors -- -- --
COMPLIANCE TOTAL PLUS MISCELLANEOUS COMPONENTS 570.84 466.06 104.8 (18.4%)1Notes: This table is used to document compliance with programs OTHER THAN Title 24 Part 6, if applicable.
Project Name: 73-540 El Paseo Shell Improvements NRCC-PRF-01-E Page 3 of 11
Project Address: 73-540 El Paseo Palm Desesrt 92260 Calculation Date/Time: 17:42, Sun, Sep 26, 2021
Input File Name: 73-450 El Paseo.cibd19x
CA Building Energy Efficiency Standards- 2019 Nonresidential Compliance Report Version: NRCC-PRF-01-E-09022021-6384 Report Generated at: 2021-09-26 17:43:06
C3. ENERGY USE SUMMARY
Energy Component Standard Design Site(MWh)
Proposed Design Site(MWh)
Margin(MWh)
Standard Design Site(MBtu)
Proposed Design Site(MBtu)
Margin(MBtu)
Space Heating -- 0.3 -- 2.6 -- --
Space Cooling 32.8 24.6 8.2 -- -- --
Indoor Fans 27.6 15.6 12.0 -- -- --
Heat Rejection -- -- -- -- -- --
Pumps & Misc. -- -- -- -- -- --
Domestic Hot Water 3.4 3.4 0.0 -- -- --
Indoor Lighting 20.5 20.5 0.0 -- -- --
Compliance Total 84.3 64.4 19.9 2.6 0.0 --
Receptacle 21.6 21.6 0.0 -- -- --
Process -- -- -- -- -- --
Other Ltg -- -- -- -- -- --
Process Motors -- -- -- -- -- --
TOTAL 105.9 86.0 19.9 2.6 0.0 --
D. EXCEPTIONAL CONDITIONS
The building does not include service water heating. Verify that service water heating is not required and is not included in the design.
E. HERS VERIFICATION
This Section Does Not Apply
Project Name: 73-540 El Paseo Shell Improvements NRCC-PRF-01-E Page 4 of 11
Project Address: 73-540 El Paseo Palm Desesrt 92260 Calculation Date/Time: 17:42, Sun, Sep 26, 2021
Input File Name: 73-450 El Paseo.cibd19x
CA Building Energy Efficiency Standards- 2019 Nonresidential Compliance Report Version: NRCC-PRF-01-E-09022021-6384 Report Generated at: 2021-09-26 17:43:06
G1. ENVELOPE GENERAL INFORMATION (conditioned spaces only)
1 2 3 4
Opaque Surfaces & Orientation Total Gross Surface Area (ft2) Total Fenestration Area (ft2) Window to Wall Ratio (%)
North-Facing1 1,440 ft2 0 ft2 00.0%
East-Facing2 440 ft2 164 ft2 37.3%
South-Facing3 1,440 ft2 856 ft2 59.4%
West-Facing4 440 ft2 0 ft2 00.0%
Total 3,760 ft2 1,020 ft2 27.1%
Roof 5,930 ft2 0 ft2 00.0%
Notes:1North-Facing is oriented to within 45 degrees of true north, including 45°00'00" east of north (NE), but excluding 45°00'00" west of north (NW).2East-Facing is oriented to within 45 degrees of true east, including 45°00'00" south of east (SE), but excluding 45°00'00" north of east (NE).3 South-Facing is oriented to within 45 degrees of true south, including 45°00'00" west of south (SW), but excluding 45°00'00" east of south (SE).4West-Facing is oriented to within 45 degrees of true west, including 45°00'00" north of due west (NW), but excluding 45°00'00" south of west (SW).
G3. OPAQUE SURFACE ASSEMBLY SUMMARY
1 2 3 4 5 6 7 8 9 10
Surface Name Surface Type Area (ft2)FramingType
CavityR-Value
ContinuousR-Value Units Value Description of Assembly Layers
Status 1
R-21 Wall6 ExteriorWall 3760 Wood 21 NA U-Factor 0.069
Stucco - 7/8 in.Vapor permeable felt - 1/8 in.
Wood framed wall, 16in. OC, 5.5in.,R-21
Gypsum Board - 1/2 in.
E
Slab On Grade26 UndergroundFloor 5930 NA 0 NA F-Factor 0.73Slab Type = UnheatedSlabOnGradeInsulation Orientation = None
Insulation R-Value = R0E
Project Name: 73-540 El Paseo Shell Improvements NRCC-PRF-01-E Page 5 of 11
Project Address: 73-540 El Paseo Palm Desesrt 92260 Calculation Date/Time: 17:42, Sun, Sep 26, 2021
Input File Name: 73-450 El Paseo.cibd19x
CA Building Energy Efficiency Standards- 2019 Nonresidential Compliance Report Version: NRCC-PRF-01-E-09022021-6384 Report Generated at: 2021-09-26 17:43:06
G3. OPAQUE SURFACE ASSEMBLY SUMMARY
1 2 3 4 5 6 7 8 9 10
Surface Name Surface Type Area (ft2)FramingType
CavityR-Value
ContinuousR-Value Units Value Description of Assembly Layers
Status 1
R-38 Roof Attic28 Roof 5930 Wood 38 NA U-Factor 0.033
Asphalt shingles - 1/4 in.Vapor permeable felt - 1/8 in.
Plywood - 1/2 in.Air - Cavity - Wall Roof Ceiling - 4 in.
or moreWood framed roof, 24in. OC, 3.5in.,
R-38Gypsum Board - 1/2 in.
E
1 Status: N - New, A – Altered, E – Existing
G4. OPAQUE DOOR SUMMARY
1 2 3
Assembly Name Overall U-factor Status1
Metal Door8 0.700 E
G5. FENESTRATION ASSEMBLY SUMMARY
1 2 3 4 5 6 7 8 9
Fenestration Assembly Name / Tagor I.D.
Fenestration Type / Product Type /Frame Type Certification Method1 Assembly Method Area ft2
OverallU-factor
OverallSHGC
OverallVT
Status 2
fixed windowVerticalFenestration
FixedWindowN/A
NFRC Rated Manufactured 780 0.30 0.23 0.50 A
entrance storefrontVerticalFenestration
GlazedDoorN/A
NFRC Rated Manufactured 240 0.30 0.23 0.50 A
1 Newly installed fenestration shall have a certified NFRC Label Certificate or use the CEC default tables found in Table 110.6-A and Table 110.6-B. Center of Glass (COG) values are for the glass-only, determined by the manufacturer, and are shown for easeof verification. Site-built fenestration values are calculated per Nonresidential Appendix NA6 and are used in the analysis.2 Status: N - New, A – Altered, E – Existing
Project Name: 73-540 El Paseo Shell Improvements NRCC-PRF-01-E Page 6 of 11
Project Address: 73-540 El Paseo Palm Desesrt 92260 Calculation Date/Time: 17:42, Sun, Sep 26, 2021
Input File Name: 73-450 El Paseo.cibd19x
CA Building Energy Efficiency Standards- 2019 Nonresidential Compliance Report Version: NRCC-PRF-01-E-09022021-6384 Report Generated at: 2021-09-26 17:43:06
H1. DRY SYSTEM EQUIPMENT (furnaces, air handling units, heat pumps, VRF, economizers etc.)
1 2 3 4 5 6 7 8 9 10 11 12
Equipment Name Equipment Type Qty
Heating Cooling
Economizer Type (ifpresent)
Status 5
Total HeatingOutput(kBtu/h)
Supp HeatOutput(kBtuh)
EfficiencyUnit Efficiency
TotalCoolingOutput(kBtu/h)
Efficiency Unit Efficiency
FC-1 + HP-1 SZHP (Split3Phase) 5 62 0 HSPF 10.90 58 SEEREER
17.1012.50 NoEconomizer N
1 Status: N - New, A – Altered, E – Existing
H2. FAN SYSTEMS SUMMARY1
1 2 3 4 5 6 7 8 9 10 11 12 13
Name or Item TagSystem Type Design OA Supply Fan Return Fan
Economizer Type (ifpresent)
Status 5packaged,DOAS, etc. CFM CFM BHP Watts Control CFM BHP Watts Control
FC-1 + HP-1 SZHP 297 1800 0.676 589.7 ConstantVolume NA NA NA NA NoEconomizer N1 Status: N - New, A – Altered, E – Existing
H3. EXHAUST FAN SUMMARY
This Section Does Not Apply
H4. Wet System Equipment(boilers,chillers,cooling towers,etc.)
This Section Does Not Apply
H5. SYSTEM SPECIAL FEATURES
1 2 3 4 5 6
System Name Optimum Start Window Interlocks per§140.4(n) Evaporative Cooling Heat Recovery Other Controls
FC-1 + HP-1 No Optimum Start NA No Evaporative Cooler No Heat RecoveryNo DCV Controls, No DDC
No EconomizerNo Supply Air Temp. Control
Project Name: 73-540 El Paseo Shell Improvements NRCC-PRF-01-E Page 7 of 11
Project Address: 73-540 El Paseo Palm Desesrt 92260 Calculation Date/Time: 17:42, Sun, Sep 26, 2021
Input File Name: 73-450 El Paseo.cibd19x
CA Building Energy Efficiency Standards- 2019 Nonresidential Compliance Report Version: NRCC-PRF-01-E-09022021-6384 Report Generated at: 2021-09-26 17:43:06
H5. SYSTEM SPECIAL FEATURES
1 2 3 4 5 6
System Name Optimum Start Window Interlocks per§140.4(n) Evaporative Cooling Heat Recovery Other Controls
Notes: This table includes controls related to the performance path only. For projects using the prescriptive path, mandatory and prescriptive controls requirements are documented on the NRCC-MCH-E.
H6. MECHANICAL VENTILATION
1 2 3 4 5 6 7 8 9
Zone NameMechanical Ventilation DCV or Occupant
Sensor Controls,or BothVentilation Function # hotel rooms # of people # of
bedrooms Supply OA CFM Exhaust CFM ConditionedArea (sf)
1-retail space Retail - Sales 0 49.43 0 1483 0 5930 NA
Multifamily or Hotel/Motel Occupancy? (if “Yes”, see DOMESTIC/SERVICE HOT WATER SYSTEM SUMMARY ) No
Does the Project include Zonal Systems? No
H7. ZONAL SYSTEM AND TERMINAL UNIT SUMMARY
1 2 3 4 5 6 7 8 9 10 11 12
System ID Zone Name System Type
Rated Capacity(kBtuh) Airflow (cfm) Fan
Heating Cooling Design Min. Min.Ratio BHP Watts Cycles ECM
Motor
1-retail space-Trm 1-retail space Uncontrolled NA NA 9000 NA 0.00 NA NA NA
H8. EVAPORATIVE COOLER SUMMARY
This Section Does Not Apply
Project Name: 73-540 El Paseo Shell Improvements NRCC-PRF-01-E Page 8 of 11
Project Address: 73-540 El Paseo Palm Desesrt 92260 Calculation Date/Time: 17:42, Sun, Sep 26, 2021
Input File Name: 73-450 El Paseo.cibd19x
CA Building Energy Efficiency Standards- 2019 Nonresidential Compliance Report Version: NRCC-PRF-01-E-09022021-6384 Report Generated at: 2021-09-26 17:43:06
K1. INDOOR CONDITIONED LIGHTING GENERAL INFO
1 2 3 4 5 6
Occupancy Type 1 Conditioned Floor Area 2 (ft2)Installed Lighting Power
(Watts)Lighting Control Credits
(Watts)
Additional (Custom) Allowance
Area Category Footnotes(Watts) Tailored Method (Watts)
Retail Sales Area (RetailMerchandise Sales) 5,930 5,930 0 0 0
Building Totals: 5,930 5,930 0 0 0
1 See Table 140.6-C2 See NRCC-LTI-01-E for unconditioned spaces3Lighting information for existing spaces modeled is not included in the table
K4. INDOOR CONDITIONED LIGHTING MANDATORY LIGHTING CONTROLS
Building Level Controls
1 2
Mandatory Demand Response §110.12(c) Shut-Off Controls §130.1(c)
Area Level Controls (includes all lighting controls installed in conditioned space to meet mandatory requirements per §130.1)
4 5 6 7 8 9 10
Area Description Area Category Primary Function Area Area Controls130.1(a)
Multi-LevelControls130.1(b)
Shut-OffControls130.1(c)
PrimaryDaylighting130.1(d)
SecondaryDaylighting140.5(d)
Project Name: 73-540 El Paseo Shell Improvements NRCC-PRF-01-E Page 9 of 11
Project Address: 73-540 El Paseo Palm Desesrt 92260 Calculation Date/Time: 17:42, Sun, Sep 26, 2021
Input File Name: 73-450 El Paseo.cibd19x
CA Building Energy Efficiency Standards- 2019 Nonresidential Compliance Report Version: NRCC-PRF-01-E-09022021-6384 Report Generated at: 2021-09-26 17:43:06
L. DECLARATION OF REQUIRED CERTIFICATES OF INSTALLATION
Table Instructions: Selections shall be made by Documentation Author to indicate which Certificates of Installation must be submitted for the features to be recognized forcompliance. These documents bust be retained and provided to the building inspector during construction and can be found online at:https://www.energy.ca.gov/title24/2019standards/2019_compliance_documents/Nonresidential_Documents/NRCI/
Building Component Form/Title
Envelope NRCI-ENV-01-E - Must be submitted for all buildings
Mechanical NRCI-MCH-01-E - Must be submitted for all buildings
Project Name: 73-540 El Paseo Shell Improvements NRCC-PRF-01-E Page 10 of 11
Project Address: 73-540 El Paseo Palm Desesrt 92260 Calculation Date/Time: 17:42, Sun, Sep 26, 2021
Input File Name: 73-450 El Paseo.cibd19x
CA Building Energy Efficiency Standards- 2019 Nonresidential Compliance Report Version: NRCC-PRF-01-E-09022021-6384 Report Generated at: 2021-09-26 17:43:06
M. DECLARATION OF REQUIRED CERTIFICATES OF ACCEPTANCE
Table Instructions: Selections shall be made by Documentation Author to indicate which Certificates of Acceptance must be submitted for the features to be recognized forcompliance. These documents must be provided to the building inspector during construction and must be completed through an Acceptance Test Technician CertificationProvider (ATTCP). For more information visit:https://www.energy.ca.gov/title24/2019standards/2019_compliance_documents/Nonresidential_Documents/NRCA/
Building Component Form/Title
Envelope NRCA-ENV-02-F - NRFC label verification for fenestration
Mechanical
NRCA-MCH-02-A Outdoor Air must be submitted for all newly installed HVAC units. Note: MCH02-A can be performed in conjunction with MCH-07-A Supply Fan VFDAcceptance (if applicable) since testing activities overlap
NRCA-MCH-03-A Constant Volume Single Zone HVAC
NRCA-MCH-20 Multifamily Ventilation
Project Name: 73-540 El Paseo Shell Improvements NRCC-PRF-01-E Page 11 of 11
Project Address: 73-540 El Paseo Palm Desesrt 92260 Calculation Date/Time: 17:42, Sun, Sep 26, 2021
Input File Name: 73-450 El Paseo.cibd19x
CA Building Energy Efficiency Standards- 2019 Nonresidential Compliance Report Version: NRCC-PRF-01-E-09022021-6384 Report Generated at: 2021-09-26 17:43:06
DOCUMENTATION AUTHOR'S DECLARATION STATEMENTI certify that this Certificate of Compliance documentation is accurate and complete.
Documentation Author Name: Dave CelmerSignature:
Company: EquitySpec MEP Consulting Engineers
Address: 45125 Panorama Drive Signature Date: 2021-09-26
City/State/Zip: Palm Desert CA 92260 CEA/ HERS Certification Identification (if applicable): M22768
Phone: 760 834-1537 RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:1. The information provided on this Certificate of Compliance is true and correct.2. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible designer)3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirementsof Title 24, Part 1 and Part 6 of the California Code of Regulations.4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations,plans and specifications submitted to the enforcement agency for approval with this building permit application.5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicableinspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Envelope Designer Name: Michael McAuliffe
Signature:Company: McAuliffe & Company
Address: 45125 Panorama Drive Date Signed:
City/State/Zip: Palm Desert CA 92262
Phone: 7607730709 Title: License #: C-27929 Responsible Lighting Designer Name: Michael McAuliffe
Signature:Company: McAuliffe & Company
Address: 45125 Panorama Drive Date Signed:
City/State/Zip: Palm Desert CA 92262
Phone: 7607730709 Title: License #: C-27929 Responsible Mechanical Designer Name: Dave Celmer
Signature:Company: EquitySpec MEP
Address: 45125 Panorama Drive Date Signed:
City/State/Zip: Palm Springs CA 92262
Phone: 760 834-1537 Title: License #: 22768
Registration Number: Registration Date/Time: Registration Provider: Energysoft
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance Report Version: 2019.1.003Schema Version: rev 20200601
Report Generated: 2021-09-26 17:43:18
STATE OF CALIFORNIA
Outdoor LightingNRCC-LTO-E CALIFORNIA ENERGY COMMISSIONCERTIFICATE OF COMPLIANCE NRCC-LTO-E
Project Name: 73-540 El Paseo Bldg C Shell Improvements Report Page: (Page 1 of 7)Project Address: 73-540 El Paseo Date Prepared: 9/26/2021
A. GENERAL INFORMATION01 Project Location (city) Palm Desesrt
04 Total Illuminated Hardscape Area (ft2) 002 Climate Zone 1503 Outdoor Lighting Zone per Title 24 Part 1 §10.114 or as designated by Authority Having Jurisdiction (AHJ):
LZ-0: Very Low - Undeveloped Parkland LZ-2: Moderate - Rural Areas LZ-4: High - Must be reviewed by CA Energy Commission for ApprovalLZ-1: Low - Developed Parkland LZ-3: Moderately High - Urban Areas
B. PROJECT SCOPEThis table includes outdoor lighting systems that are within the scope of the permit application and are demonstrating compliance using the prescriptive path outlined in §140.7 or§141.0(b)2L for alterations.My Project Consists of:
01 02New Lighting System Must Comply with Allowances from §140.7 Altered Lighting System Is your alteration increasing the connected lighting load (Watts)? Yes No
03 04 05% of Existing Luminaires Being Altered1 Sum Total of Luminaires Being Added or Altered Calculation Method
< 10% >= 10% and < 50% >= 50%Please proceed to Table F. Outdoor Lighting Fixture Schedule to define the project's luminaires.1 FOOTNOTES: % of Existing Luminaires Being Altered = (Sum Total of Luminaires Being Added or Altered / Existing Luminaires within the Scope of the Permit Application) x 100.
STATE OF CALIFORNIA
Outdoor LightingNRCC-LTO-E CALIFORNIA ENERGY COMMISSIONCERTIFICATE OF COMPLIANCE NRCC-LTO-EProject Name: 73-540 El Paseo Bldg C Shell Improvements Report Page: (Page 2 of 7)Project Address: 73-540 El Paseo Date Prepared: 9/26/2021
Registration Number: Registration Date/Time: Registration Provider: Energysoft
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance Report Version: 2019.1.003Schema Version: rev 20200601
Report Generated: 2021-09-26 17:43:18
C. COMPLIANCE RESULTSResults in this table are automatically calculated from data input and calculations in Tables F through I. Note: If any cell on this table says "COMPLIES with Exceptional Conditions" referto Table D. Exceptional Conditions for guidance or see applicable Table referenced below.
Calculations of Total Allowed Lighting Power (Watts) §140.7 or §141.0(b)2L Compliance Results01
+
02
+
03
+
04
+
05
OR
06
=
07
≥
08 09General
HardscapeAllowance§140.7(d)1 (See Table I)
PerApplication§140.7(d)2 (See Table J)
SalesFrontage
§140.7(d)2 (See Table K)
Ornamental§140.7(d)2 (See Table L)
Per SpecificArea
§140.7(d)2 (See Table M)
ExistingPower
Allowance§141.0(b)2L (See Table N)
Total Allowed(Watts)
Total Actual(Watts) 07 must be >= 08
0 + 19 + --- + --- + --- OR --- = 19 ≥ 110 DOES NOTCOMPLY
Cutoff Compliance (See Table G for Details) N/AControls Compliance (See Table H for Details) COMPLIES
D. EXCEPTIONAL CONDITIONSThis table is auto-filled with uneditable comments because of selections made or data entered in tables throughout the form.
E. ADDITIONAL REMARKSThis table includes remarks made by the permit applicant to the Authority Having Jurisdiction.
STATE OF CALIFORNIA
Outdoor LightingNRCC-LTO-E CALIFORNIA ENERGY COMMISSIONCERTIFICATE OF COMPLIANCE NRCC-LTO-EProject Name: 73-540 El Paseo Bldg C Shell Improvements Report Page: (Page 3 of 7)Project Address: 73-540 El Paseo Date Prepared: 9/26/2021
Registration Number: Registration Date/Time: Registration Provider: Energysoft
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance Report Version: 2019.1.003Schema Version: rev 20200601
Report Generated: 2021-09-26 17:43:18
F. OUTDOOR LIGHTING FIXTURE SCHEDULEFor new or altered lighting systems demonstrating compliance with §140.7 all new luminaires being installed and any existing luminaires remaining or being moved within the spacescovered by the permit application are included in the Table below. For altered lighting systems using the Existing Power method per §141.0(b)2L only new luminaires being installed andreplacement luminaires being installed as part of the project scope are included (ie, existing luminaires remaining or existing luminaires being moved are not included).Designed Wattage:
01 02 03 04 05 06 07 08 09 10
Name or ItemTag Complete Luminaire Description Watts per
luminaire1, 2
How isWattage
determined
Total numberluminaires 2
LuminaireStatus3
Excluded per§140.7(a) Design Watts
Cutoff Req. >6,200 initial
lumen output§130.2(b) 4
FieldInspector
Pass Fail
S-1 S-1 entry sconce Linear 13 CEC Default 4 New 52 NA: < 6200lumens
S-2 S-2 sconce Linear 10 CEC Default 1 New 10 NA: < 6200lumens
S-3 S-3 step light Linear 4 CEC Default 2 New 8 NA: < 6200lumens
S-4 S-4 awning light Linear 10 CEC Default 4 New 40 NA: < 6200lumens
Total Design Watts: 110* NOTES: Selections with a * require a note in the space below explaining how compliance is achieved.EX: Luminaire is lighting a statue; EXCEPTION 2 to §130.2(b)
1FOOTNOTES: Authority Having Jurisdiction may ask for Luminaire cut sheets to confirm wattage used for compliance per §130.0(c) 2 For linear luminaires, wattage should be indicated as W/lf instead of Watts/luminaire. Total linear feet should be indicated in column 05 instead of number of luminaires.3 Select "New" for new luminaires in a new outdoor lighting project, or for added luminaires in an alteration. Select "Altered" for replacement luminaires in an alteration. Select "Existing to Remain"for existing luminaires within the project scope that are not being altered and are remaining. Select "Existing Reinstalled" for existing luminaires which are being removed and reinstalled as part ofthe project scope.4 Compliance with mandatory cutoff requirements is required for luminaires with initial lumen output >= 6,200 unless exempted by §130.2(b)
G. CUTOFF REQUIREMENTS (BUG)This section does not apply to this project.
STATE OF CALIFORNIA
Outdoor LightingNRCC-LTO-E CALIFORNIA ENERGY COMMISSIONCERTIFICATE OF COMPLIANCE NRCC-LTO-EProject Name: 73-540 El Paseo Bldg C Shell Improvements Report Page: (Page 4 of 7)Project Address: 73-540 El Paseo Date Prepared: 9/26/2021
Registration Number: Registration Date/Time: Registration Provider: Energysoft
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance Report Version: 2019.1.003Schema Version: rev 20200601
Report Generated: 2021-09-26 17:43:18
H. OUTDOOR LIGHTING CONTROLSThis table demonstrates compliance with controls requirements for all new or altered luminaires installed as part of the permit application. For alteration projects, luminaires which areexisting to remain (ie untouched) and luminaires which are removed and reinstalled (wiring only) do not need to be included in this table even if they are within the spaces covered bythe permit application.When an option having a * is selected, the notes section of this table must be completed. The lighting controls section of the Compliance Summary Table on the first page will show"DOES NOT COMPLY" if the notes are left blank.Mandatory Controls
01 02 03 04 05
Area Description Shut-Off§130.2(c)1
Auto-Schedule§130.2(c)2
Motion Sensor§130.2(c)3
Field Inspector
Pass Fail* NOTES: Controls with a * require a note in the space below explaining how compliance is achieved.EX: Not permitted by health & safety to be turned off; EXCEPTION 1 to §130.2(c)
I. LIGHTING POWER ALLOWANCE (per §140.7 )This table includes areas using allowance calculations per §140.7. General HardscapeAllowance is per Table 140.7-A while "Use it or lose it" Allowances are per Table 140.7-B .Indicate which allowances are being used to expand sections for user input. Luminairesthat qualify for one of the "Use it or lose it" allowances shall not qualify for another "Useit or lose it" allowance.
01 General
HardscapeAllowance
Table I (below)
"Use it or lose it" Allowance (select all that apply) (select all that apply) Per
ApplicationTable J
Sales FrontageTable K
OrnamentalTable L
Per SpecificArea
Table MCalculated General Hardscape Lighting Power Allowance per Table 140.7-A (LZ 0, 1 & 4)This section does not apply to this project.Calculated General Hardscape Lighting Power Allowance per Table 140.7-A (LZ 2 & 3)This section does not apply to this project.
STATE OF CALIFORNIA
Outdoor LightingNRCC-LTO-E CALIFORNIA ENERGY COMMISSIONCERTIFICATE OF COMPLIANCE NRCC-LTO-EProject Name: 73-540 El Paseo Bldg C Shell Improvements Report Page: (Page 5 of 7)Project Address: 73-540 El Paseo Date Prepared: 9/26/2021
Registration Number: Registration Date/Time: Registration Provider: Energysoft
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance Report Version: 2019.1.003Schema Version: rev 20200601
Report Generated: 2021-09-26 17:43:18
J. LIGHTING ALLOWANCE: PER APPLICATIONThis table includes areas using the wattage allowance per application from Table 140.7-B .
01 02 03 04 05 06 07 08 09 10
Area Description Application per Table 140.7-B1
CALCULATED ALLOWANCE (Watts) DESIGN WATTSAdditionalAllowance
(Watts)# of
Locations
Allowanceper
Location2
ExtraAllowance
(Watts)
LuminaireName orItem Tag
Watts perLuminaire
# ofLuminaires Design Watts
retail entrances Building Entrance/Exit 1 19 19
S-1 13 4 52
S-2 10 1 10
S-3 4 2 8
S-4 10 4 40
19
Total Design Watts for this Area: 110Total Allowance (Watts) All Areas: 19
1 FOOTNOTES: Primary entrance applications are only available for senior care facilities, healthcare facilities, police stations, hospitals, fire stations, and emergency vehicle facilities.2 The Allowance per Location for ATMs is 100W for the first ATM and 35W for each additional per Table 140.7-B .3 For luminaires indicated in Table F as linear, wattage in column 07 is W/lf instead of Watts/luminaire. Total linear feet should be indicated in column 08 instead of number of luminaires.
K. LIGHTING ALLOWANCE: SALES FRONTAGEThis section does not apply to this project.
L. LIGHTING ALLOWANCE: ORNAMENTALThis section does not apply to this project.
M. LIGHTING ALLOWANCE: PER SPECIFIC AREAThis section does not apply to this project.
STATE OF CALIFORNIA
Outdoor LightingNRCC-LTO-E CALIFORNIA ENERGY COMMISSIONCERTIFICATE OF COMPLIANCE NRCC-LTO-EProject Name: 73-540 El Paseo Bldg C Shell Improvements Report Page: (Page 6 of 7)Project Address: 73-540 El Paseo Date Prepared: 9/26/2021
Registration Number: Registration Date/Time: Registration Provider: Energysoft
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance Report Version: 2019.1.003Schema Version: rev 20200601
Report Generated: 2021-09-26 17:43:18
N. EXISTING CONDITIONS POWER ALLOWANCE (alterations only)This section does not apply to this project.
O. DECLARATION OF REQUIRED CERTIFICATES OF INSTALLATIONSelections have been made based on information provided in this document. If any selection have been changed by permit applicant, an explanation should be included in Table E.Additional Remarks. These documents must be provided to the building inspector during construction and can be found online athttps://www.energy.ca.gov/title24/2019standards/2019_compliance_documents/Nonresidential_Documents/NRCI/
Yes No Form/Title Field InspectorPass Fail
NRCI-LTO-01-E - Must be submitted for all buildingsNRCI-LTO-02-E- Must be submitted for a lighting control system, or for an Energy Management Control System (EMCS), to berecognized for compliance.
P. DECLARATION OF REQUIRED CERTIFICATES OF ACCEPTANCESelections have been made based on information provided in this document. If any selection have been changed by permit applicant, an explanation should be included in Table E.Additional Remarks. These documents must be provided to the building inspector during construction and must be completed through an Acceptance Test Technician CertificationProvider (ATTCP). For more information visit: http://www.energy.ca.gov/title24/attcp/providers.html
Yes No Form/Title Field InspectorPass Fail
NRCA-LTO-02-A - Must be submitted for all outdoor lighting controls except for alterations where controls are added to <= 20luminaires.
STATE OF CALIFORNIA
Outdoor LightingNRCC-LTO-E CALIFORNIA ENERGY COMMISSIONCERTIFICATE OF COMPLIANCE NRCC-LTO-EProject Name: 73-540 El Paseo Bldg C Shell Improvements Report Page: (Page 7 of 7)Project Address: 73-540 El Paseo Date Prepared: 9/26/2021
Registration Number: Registration Date/Time: Registration Provider: Energysoft
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance Report Version: 2019.1.003Schema Version: rev 20200601
Report Generated: 2021-09-26 17:43:18
DOCUMENTATION AUTHOR'S DECLARATION STATEMENTI certify that this Certificate of Compliance documentation is accurate and complete.Documentation Author Name:Dave Celmer
Documentation Author Signature:
Company:EquitySpec MEP Consulting Engineers
Signature Date:
Address:45125 Panorama Drive
CEA/ HERS Certification Identification (if applicable):M22768
City/State/Zip:Palm Desert CA 92260
Phone:760 834-1537
RESPONSIBLE PERSON'S DECLARATION STATEMENTI certify the following under penalty of perjury, under the laws of the State of California:
1. The information provided on this Certificate of Compliance is true and correct.2. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible designer)3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements
of Title 24, Part 1 and Part 6 of the California Code of Regulations.4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations,
plans and specifications submitted to the enforcement agency for approval with this building permit application.5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable
inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy.Responsible Designer Name:Michael McAuliffe
Responsible Designer Signature:
Company:McAuliffe & Company
Date Signed:2021-09-26
Address:45125 Panorama Drive
License:C-27929
City/State/Zip:Palm Desert CA 92262
Phone:7607730709
HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Date System Name Floor Area
ENGINEERING CHECKS SYSTEM LOAD
Number of Systems COIL COOLING PEAK COIL HTG. PEAK
Heating System CFM Sensible Latent CFM Sensible
Output per System Total Room Loads
Total Output (Btuh) Return Vented Lighting
Output (Btuh/sqft) Return Air Ducts
Cooling System Return Fan
Output per System Ventilation
Total Output (Btuh) Supply Fan
Total Output (Tons) Supply Air Ducts
Total Output (Btuh/sqft)
Total Output (sqft/Ton) TOTAL SYSTEM LOAD
Air System
CFM per System HVAC EQUIPMENT SELECTION
Airflow (cfm)
Airflow (cfm/sqft)
Airflow (cfm/Ton)
Outside Air (%) Total Adjusted System Output
Outside Air (cfm/sqft) (Adjusted for Peak Design conditions)
Note: values above given at ARI conditions TIME OF SYSTEM PEAK
HEATING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Heating Peak)
COOLING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Cooling Peak)
73-540 El Paseo Bldg C Shell Improvements 9/26/2021
FC-1 + HP-1 5,930
5
60,000
300,000
50.6
60,000
300,000
25.0
50.6
237.2
1,800
9,000
1.52
360.0
0.0%
0.00
4,943
98,866
0
0
0
10,068
0
1,589
31,783
0
-10,068
00
1,589
0
4,943
0246,474
9,192118,821
246,474
187,372
0 187,372
Samsumg 5 ton split heat pump
Sep 2 PM Jan 1 AM
5,000 9,192 783
26 ºF
Outside Air
0 cfm
68 ºF 105 ºF 106 ºF
106 ºF
68 ºF 68 ºF
106 / 68 ºF 76 / 58 ºF 55 / 50 ºF
57 / 50 ºF
75 / 58 ºF76 / 58 ºF
0 cfm
Outside Air
9,000 cfmSupply Fan
34.7%
9,000 cfm
Supply FanHeating Coil
24,893
56 / 50 ºF
Cooling Coil