BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: Report Prepared by: Job Number: Date: The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2013 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC www.energysoft.com. 3267 DUTTON AVE SJ CIMINO ELECTRIC INC SANTA ROSA, CA 95407 7075426231 38891 MISSION BLVD GOLDEN GATE BAPTIST THEO SEMINARY FREMONT, CA 94536 3267 DUTTON AVE SJ Cimino Electric Inc. C JONES SANTA ROSA, CA 95407 (707)542-6231 728 7/24/2015 ID: 728 EnergyPro 6.6 by EnergySoft User Number: 6923

Upload: phamminh

Post on 06-May-2018

216 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

BUILDING ENERGY ANALYSIS REPORT

PROJECT:

Project Designer:

Report Prepared by:

Job Number:

Date:

The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2013 Building Energy Efficiency Standards.

This program developed by EnergySoft, LLC – www.energysoft.com.

3267 DUTTON AVESJ CIMINO ELECTRIC INC

SANTA ROSA, CA 954077075426231

38891 MISSION BLVDGOLDEN GATE BAPTIST THEO SEMINARY

FREMONT, CA 94536

3267 DUTTON AVESJ Cimino Electric Inc.

C JONES

SANTA ROSA, CA 95407(707)542-6231

728

7/24/2015

ID: 728EnergyPro 6.6 by EnergySoft User Number: 6923

Page 2: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

Job Number:

TABLE OF CONTENTS

Form LTI-03-E Indoor Lighting Power AllowanceForm LTO-01-E Outdoor Lighting

Cover PageTable of ContentsForm LTI-01-E Indoor LightingForm LTI-02-E Lighting Controls

Form LTO-02-E Outdoor Lighting ControlsForm LTO-03-E Outdoor Lighting Power Allowances

1418

1239

2225

ID: 728EnergyPro 6.6 by EnergySoft User Number: 6923

Page 3: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

STATE OF CALIFORNIA

INDOOR LIGHTING CEC-NRCC-LTI-01-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE NRCC-LTI-01-E Indoor Lighting (Page 1 of 6) Project Name: Date Prepared: A. General Information Climate Zone: Conditioned Floor Area :

Unconditioned Floor Area : Building Type: Nonresidential High-Rise Residential Hotel/Motel Schools Relocatable Public Schools Conditioned Spaces Unconditioned Spaces

Phase of Construction: New Construction Addition Alteration

Method of Compliance: Complete Building Area Category Tailored

Project Address:

B. Lighting Compliance Documents (select yes for each document included)

For detailed instructions on the use of this and all Energy Efficiency Standards compliance documents, refer to the Nonresidential Manual published by the California Energy Commission.

YES NO FORM TITLE

NRCC-LIT-01-E Certificate of Compliance. All Pages required on plans for all submittals.

NRCC-LIT-02-E Lighting Controls, Certificate of Compliance, and PAF Calculation. All Pages required on plans for all submittals.

NRCC-LIT-03-E Indoor Lighting Power Allowance

NRCC-LIT-04-E Tailored Method Worksheets

NRCC-LIT-05-E Line Voltage Track Lighting Worksheets

CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015

GOLDEN GATE BAPTIST THEO SEMINARY 7/24/2015

26,324

03

38891 MISSION BLVD

Page 4: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

STATE OF CALIFORNIA

INDOOR LIGHTING CEC-NRCC-LTI-01-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE NRCC-LTI-01-E Indoor Lighting (Page 2 of 6) Project Name: Date Prepared:

C. Summary of Allowed Lighting Power Conditioned and Unconditioned space Lighting must not be combined for compliance

Indoor Lighting Power for Conditioned Spaces Indoor Lighting Power for Unconditioned Spaces

1. Installed Lighting

NRCC-LTI-01-E, page 4

Watts Installed Lighting

NRCC-LTI-01-E, page 4

Watts

+ +

2. PORTABLE ONLY FOR OFFICES NRCC-LTI-01-E, page 3 +

3. Minus Lighting Control Credits NRCC-LTI-02-E, page 2 - Minus Lighting Control Credits

NRCC-LTI-02-E, page 2 -

4. Adjusted Installed Lighting Power (row 1 plus row 2 minus row 3) = Adjusted Installed Lighting Power

(row 1 minus row 3) =

5. Complies ONLY if Installed ≤ Allowed Complies ONLY if Installed ≤ Allowed

6. Allowed Lighting Power Conditioned NRCC-LTI-03-E, page 1 Allowed Lighting Power

Unconditioned NRCC-LTI-03-E, page 1

D. Declaration of Required Installation Certificates Declare by selecting yes for all Installation Certificates that will be submitted. (Retain copies and verify forms are completed and signed.)

YES NO Form/Title

NRCI-LTI-01-E - Must be submitted for all buildings Field Inspector

NRCI-LTI-02-E - Must be submitted for a lighting control system, or for an Energy Management Control System (EMCS), to be recognized for compliance.

Field Inspector

NRCI-LTI-03-E - Must be submitted for a line-voltage track lighting integral current limiter, or for a supplementary overcurrent protection panel used to energize only line-voltage track lighting, to be recognized for compliance.

Field Inspector

NRCI-LTI-04-E - Must be submitted for two interlocked systems serving an auditorium, a convention center, a conference room, a multipurpose room, or a theater to be recognized for compliance.

Field Inspector

NRCI-LTI-05-E - Must be submitted for a Power Adjustment Factor (PAF) to be recognized for compliance. Field Inspector

NRCI-LTI-06-E - Must be submitted for additional wattage installed in a video conferencing studio to be recognized for compliance.

Field Inspector

E. Declaration of Required Certificates of Acceptance Declare by checking all of the Certificates of Acceptance that will be submitted. (Retain copies and verify forms are completed and signed.)

CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015

0

11,265

2,059

9,207

0

0

7/24/2015GOLDEN GATE BAPTIST THEO SEMINARY

039,486

Page 5: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

STATE OF CALIFORNIA

INDOOR LIGHTING CEC-NRCC-LTI-01-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE NRCC-LTI-01-E Indoor Lighting (Page 3 of 6) Project Name: Date Prepared:

YES NO Form/Title

NRCA-LTI-02-A - Must be submitted for occupancy sensors and automatic time switch controls. Field Inspector

NRCA-LTI-03-A - Must be submitted for automatic daylight controls. Field Inspector

NRCA-LTI-04-A - Must be submitted for demand responsive lighting controls. Field Inspector

A separate Lighting Schedule Must Be Filled Out for Conditioned and Unconditioned Spaces. Installed Lighting Power listed on this Lighting Schedule is only for: CONDITIONED SPACE UNCONDITIONED SPACE F. Indoor Lighting Schedule and Field Inspection Energy Checklist The actual indoor lighting power listed on this page and on the next page includes all installed permanent and planned portable lighting systems. When Complete Building Method is used for compliance, list each different type of luminaire on separate lines. When Area Category Method or Tailored Method is used for compliance, list each different type of luminaire by each different function area on separate lines Also include track lighting in schedule, and submit the track lighting compliance form (NRCC-LTI-05-E) when line-voltage track lighting is installed.

CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015

7/24/2015GOLDEN GATE BAPTIST THEO SEMINARY

Page 6: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

STATE OF CALIFORNIA

INDOOR LIGHTING CEC-NRCC-LTI-01-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE NRCC-LTI-01-E Indoor Lighting (Page 4 of 6) Project Name: Date Prepared:

G. Installed Portable Luminaires in Offices – Exception to Section 140.6(a) This section shall be filled out ONLY for portable luminaires in offices (As defined in §100.1). All other planned portable luminaires shall be documented on next page of

this compliance form. This section is used to determine if greater than 0.3 watts of portable lighting is planned for any office Fill out a separate line for each different office. Small offices that are typical (having the same general and portable lighting) may be grouped together. This allowance

shall not be traded between offices having different lighting systems. Office Portable Luminaire Schedule Office Installed Portable Luminaire Watts Per Square Foot Office Location Field Inspector

1 2 3 4 5 6 7 8 9 10

Complete Luminaire Description (i.e., LED, under cabinet, furniture mounted

direct/indirect) Watts per Luminaire

Num

ber of Lum

inaires

Installed portable luminaire watts in

this office (B x C )

Square feet of this office

Watts per

square foot

(D / E)

If F ≤ 0.3, enter zero;

if F > 0.3,

(F-0.3)

E x G Identify Office area in which these portable

luminaires are installed

Pass

Fail

Total installed portable luminaire watts that are greater than 0.3 watts per square foot per office: Enter sum total of all pages into NRCC-LTI-

01-E; Page 1

CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015

7/24/2015GOLDEN GATE BAPTIST THEO SEMINARY

Page 7: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

STATE OF CALIFORNIA

INDOOR LIGHTING CEC-NRCC-LTI-01-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE NRCC-LTI-01-E Indoor Lighting (Page 5 of 6) Project Name: Date Prepared: A separate Lighting Schedule Must Be Filled Out for Conditioned and Unconditioned Spaces. Installed Lighting Power listed on this Lighting Schedule is only for: CONDITIONED SPACE UNCONDITIONED SPACE

C. INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST Luminaire Schedule Installed Watts Location Field Inspector 1

A B C D E F G H

Nam

e or

Ite

m T

ag

Complete Luminaire Description (i.e, 3 lamp fluorescent troffer,

F32T8, one dimmable electronic ballast) Wat

ts p

er

Lum

inai

re

How wattage was determined

Num

ber

Lum

inai

res

Tota

l Ins

talle

d W

atts

in th

is ar

ea

(C x

E )

Primary Function area in which these luminaires are installed Pass Fail CE

C De

faul

t fr

om N

A8

Acco

rdin

g to

§1

30.0

(c)

INSTALLED WATTS PAGE TOTAL: Enter sum total of all pages into NRCC-LTI-01-E; Page 2

CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015

240

GOLDEN GATE BAPTIST THEO SEMINARY 7/24/2015

6" LED DOWN LIGHT

2X4 LED TROFFER4' LED STRIP

30" LED VANITY2X2 LED TROFFERStandard Allowance: 1046 sqft at 1.200 watt/sf

A

B

C

D

F

40.0

11.031.0

24.0

21.0

619

27019

351,255735

456

8,370209

Classroom, Lecture, Training

Classroom, Lecture, Training

Classroom, Lecture, TrainingClassroom, Lecture, Training

Classroom, Lecture, TrainingClassroom, Lecture, Training

11,265

Page 8: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

STATE OF CALIFORNIA

INDOOR LIGHTING CEC-NRCC-LTI-01-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE NRCC-LTI-01-E Indoor Lighting (Page 6 of 6) Project Name: Date Prepared: DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Documentation Author Signature:

Company: Signature Date:

Address: CEA Certification Identification (if applicable):

City/State/Zip: Phone:

RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. 2. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance

(responsible designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of

Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance

documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the

enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy.

Responsible Designer Name: Responsible Designer Signature:

Company : Date Signed:

Address: License:

City/State/Zip: Phone:

CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015

GOLDEN GATE BAPTIST THEO SEMINARY 7/24/2015

SJ CIMINO

SJ CIMINO ELECTRIC INC

3267 DUTTON AVE 343802

SANTA ROSA, CA 95407 7075426231

C JONES

SANTA ROSA, CA 95407

3267 DUTTON AVE

SJ Cimino Electric Inc.

(707)542-6231

7/24/2015

CathleenJ
Typewritten Text
7/24/2015
Page 9: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

STATE OF CALIFORNIA

INDOOR LIGHTING – LIGHTING CONTROLS CEC-NRCC-LTI-02-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E Indoor Lighting - Lighting Controls (Page 1 of 3) Project Name: Date Prepared:

The NRCC-LTI-02-E shall be used to document all mandatory and prescriptive lighting controls that are applicable to the project.

Mandatory Lighting Control Declaration Statements (Indicate if the measure applies by checking yes or no below.)

YES NO Control Requirements

Lighting shall be controlled by self-contained lighting control devices which are certified to the Energy Commission according to the Title 20 Appliance Efficiency Regulations in accordance with Section 110.9.

Lighting shall be controlled by a lighting control a system or energy management control system in accordance with §110.9. An Installation Certificate shall be submitted in accordance with Section 130.4(b).

One or more Track Lighting Integral Current Limiters shall be installed which have been certified to the Energy Commission in accordance with §110.9 and §130.0. Additionally, an Installation Certificate shall be submitted in accordance with Section 130.4(b).

A Track Lighting Supplementary Overcurrent Protection Panel shall be installed in accordance with Section 110.9 and Section 130.0. Additionally, an Installation Certificate shall be installed in accordance with Section 130.4(b).

All lighting controls and equipment shall comply with the applicable requirements in §110.9 and shall be installed in accordance with the manufacturer's instructions in accordance with Section 130.1.

All luminaires shall be functionally controlled with manually switched ON and OFF lighting controls in accordance with Section 130.1(a).

General lighting shall be separately controlled from all other lighting systems in an area. Floor and wall display, window display, case display, ornamental, and special effects lighting shall each be separately controlled on circuits that are 20 amps or less. When track lighting is used, general, display, ornamental, and special effects lighting shall each be separately controlled; in accordance with Section 130.1(a)4.

The general lighting of any enclosed area 100 square feet or larger, with a connected lighting load that exceeds 0.5 watts per square foot shall meet the multi-level lighting control requirements in accordance with Section 130.1(b).

All installed indoor lighting shall be equipped with controls that meet the applicable Shut-OFF control requirements in Section 130.1(c).

Lighting in all Daylit Zones shall be controlled in accordance with the requirements in Section 130.1(d) and daylit zones are shown on the plans.

Lighting power in buildings larger than 10,000 square feet shall be capable of being automatically reduced in response to a Demand Responsive Signal in accordance with Section 130.1(e).

Before an occupancy permit is granted for a newly constructed building or area, or a new lighting system serving a building, area, or site is operated for normal use, indoor lighting controls serving the building, area, or site shall be certified as meeting the Acceptance Requirements for Code Compliance in accordance with Section 130.4.(a). The controls required to meet the Acceptance Requirements include automatic daylight controls, automatic shut-OFF controls, and demand responsive controls.

CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015

GOLDEN GATE BAPTIST THEO SEMINARY 7/24/2015

Page 10: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

STATE OF CALIFORNIA

INDOOR LIGHTING – LIGHTING CONTROLS CEC-NRCC-LTI-02-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E Indoor Lighting - Lighting Controls (Page 2 of 3) Project Name: Date Prepared:

A separate document must be filled out for Conditioned and Unconditioned Spaces. This page is used only for the following: CONDITIONED SPACES UNCONDITIONED SPACES MANDATORY AND PRESCRIPTIVE INDOOR LIGHTING CONTROL SCHEDULE, PAF CALCULATION, and FIELD INSPECTION CHECKLIST

Lighting Control Schedule Standards Complying With 1

( all that apply, or enter ‘E’ if Exempted)

PAF Credit Calculation 2 if Acceptance Test Required

Field Inspector

Watts of

Controlled Lighting

PAF

Control Credit (K x L)

A B C D E F G H I J K L M N O

Location in Building

Type/ Description of Lighting Control (i.e.: occupancy sensor,

automatic time switch, dimmer, automatic daylight,

etc…)

# of

Units

§130.1(a)

§130.0(b)

§130.1(c)

§130.1(d)

§130.1(e)

§140.6(a)2

§140.6(d)

Pass

Fail

Control Credit PAGE TOTAL (Sum of Column M): IF MULTIPLE PAGES ARE USED, ENTER SUM TOTAL OF Control Credit for all pages HERE (Sum of all Column M):

Enter Control Credit total into NRCC-LTI-01-E; Page 1.

1. §130.1(a) = Manual area controls; §130.0(b) = Multi Level; §130.1(c) = Auto Shut-Off; §130.1(d) = Mandatory Daylight; §130.1(e) = Demand Responsive; §140.6(d) = Additional lighting controls installed to earn a PAF; §140.6(d) = Prescriptive Secondary Sidelit Daylight Controls. 2. Check Table 140.6-A for correct Factor. PAFs shall not be traded between conditioned and unconditioned spaces. As a condition to earn a PAF, an Installation Certificate is also required to be filled out, signed, and submitted.

CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015

Dimming w/Occ Sensor

7/24/2015GOLDEN GATE BAPTIST THEO SEMINARY

LibraryOffices w/ daylight control

Offices w/ daylight control

Offices exempt from daylight control

StorageStorage

Corridor

Occ Sensor - Partial On

Dimming - Multiscene

Dimming w/Occ SensorOcc Sensor - <= 500 sqft

Occ Sensor - <= 250 sqft

Dimming w/Occ Sensor

✔ 735

33

496

248

24

0155

0.20

0.250.20

0.250.20

0.300.25

147

89962

5039

360

2,059

Page 11: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

STATE OF CALIFORNIA

INDOOR LIGHTING – LIGHTING CONTROLS CEC-NRCC-LTI-02-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E Indoor Lighting - Lighting Controls (Page 2 of 3) Project Name: Date Prepared:

A separate document must be filled out for Conditioned and Unconditioned Spaces. This page is used only for the following: CONDITIONED SPACES UNCONDITIONED SPACES MANDATORY AND PRESCRIPTIVE INDOOR LIGHTING CONTROL SCHEDULE, PAF CALCULATION, and FIELD INSPECTION CHECKLIST

Lighting Control Schedule Standards Complying With 1

( all that apply, or enter ‘E’ if Exempted)

PAF Credit Calculation 2 if Acceptance Test Required

Field Inspector

Watts of

Controlled Lighting

PAF

Control Credit (K x L)

A B C D E F G H I J K L M N O

Location in Building

Type/ Description of Lighting Control (i.e.: occupancy sensor,

automatic time switch, dimmer, automatic daylight,

etc…)

# of

Units

§130.1(a)

§130.0(b)

§130.1(c)

§130.1(d)

§130.1(e)

§140.6(a)2

§140.6(d)

Pass

Fail

Control Credit PAGE TOTAL (Sum of Column M): IF MULTIPLE PAGES ARE USED, ENTER SUM TOTAL OF Control Credit for all pages HERE (Sum of all Column M):

Enter Control Credit total into NRCC-LTI-01-E; Page 1.

1. §130.1(a) = Manual area controls; §130.0(b) = Multi Level; §130.1(c) = Auto Shut-Off; §130.1(d) = Mandatory Daylight; §130.1(e) = Demand Responsive; §140.6(d) = Additional lighting controls installed to earn a PAF; §140.6(d) = Prescriptive Secondary Sidelit Daylight Controls. 2. Check Table 140.6-A for correct Factor. PAFs shall not be traded between conditioned and unconditioned spaces. As a condition to earn a PAF, an Installation Certificate is also required to be filled out, signed, and submitted.

CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015

Dimming - Multiscene

7/24/2015GOLDEN GATE BAPTIST THEO SEMINARY

RestroomsClassrooms

Vending

Reception

ReceptionRestrooms

Offices w/ daylight control

Occ Sensor - <= 125 sqft

Dimming w/Occ Sensor

Occ Sensor - Partial OnOcc Sensor - Partial On

Occ Sensor - <= 125 sqft

Dimming - Multiscene

✔ 80

1,023

62

88

248

1602,232

0.40

0.200.25

0.200.20

0.400.20

32

2051618

5064446

830

2,059

Page 12: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

STATE OF CALIFORNIA

INDOOR LIGHTING – LIGHTING CONTROLS CEC-NRCC-LTI-02-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E Indoor Lighting - Lighting Controls (Page 2 of 3) Project Name: Date Prepared:

A separate document must be filled out for Conditioned and Unconditioned Spaces. This page is used only for the following: CONDITIONED SPACES UNCONDITIONED SPACES MANDATORY AND PRESCRIPTIVE INDOOR LIGHTING CONTROL SCHEDULE, PAF CALCULATION, and FIELD INSPECTION CHECKLIST

Lighting Control Schedule Standards Complying With 1

( all that apply, or enter ‘E’ if Exempted)

PAF Credit Calculation 2 if Acceptance Test Required

Field Inspector

Watts of

Controlled Lighting

PAF

Control Credit (K x L)

A B C D E F G H I J K L M N O

Location in Building

Type/ Description of Lighting Control (i.e.: occupancy sensor,

automatic time switch, dimmer, automatic daylight,

etc…)

# of

Units

§130.1(a)

§130.0(b)

§130.1(c)

§130.1(d)

§130.1(e)

§140.6(a)2

§140.6(d)

Pass

Fail

Control Credit PAGE TOTAL (Sum of Column M): IF MULTIPLE PAGES ARE USED, ENTER SUM TOTAL OF Control Credit for all pages HERE (Sum of all Column M):

Enter Control Credit total into NRCC-LTI-01-E; Page 1.

1. §130.1(a) = Manual area controls; §130.0(b) = Multi Level; §130.1(c) = Auto Shut-Off; §130.1(d) = Mandatory Daylight; §130.1(e) = Demand Responsive; §140.6(d) = Additional lighting controls installed to earn a PAF; §140.6(d) = Prescriptive Secondary Sidelit Daylight Controls. 2. Check Table 140.6-A for correct Factor. PAFs shall not be traded between conditioned and unconditioned spaces. As a condition to earn a PAF, an Installation Certificate is also required to be filled out, signed, and submitted.

CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015

Occ Sensor - <= 500 sqft

7/24/2015GOLDEN GATE BAPTIST THEO SEMINARY

Offices exempt from daylight controlStorage

Corridor

Corridor

ClassroomsConference

Conference

Dimming w/Occ Sensor

Occ Sensor - Partial On

Occ Sensor - Partial OnDimming - Multiscene

Occ Sensor - <= 500 sqft

Occ Sensor - <= 500 sqft

✔ 248

288

682

22

2,604

37266

0.25

0.200.20

0.200.20

0.200.20

62

581364

5217413

869

2,059

Page 13: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

STATE OF CALIFORNIA

INDOOR LIGHTING – LIGHTING CONTROLS CEC-NRCC-LTI-02-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E Indoor Lighting - Lighting Controls (Page 3 of 3) Project Name: Date Prepared:

DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Documentation Author Signature:

Company: Signature Date:

Address: CEA Certification Identification (if applicable):

City/State/Zip: Phone:

RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California:

1. The information provided on this Certificate of Compliance is true and correct. 2. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance

(responsible designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of

Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance

documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the

enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy.

Responsible Designer Name: Responsible Designer Signature:

Company : Date Signed:

Address: License:

City/State/Zip: Phone:

CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015

GOLDEN GATE BAPTIST THEO SEMINARY 7/24/2015

343802

7075426231

C JONES

SANTA ROSA, CA 95407

3267 DUTTON AVE

SJ Cimino Electric Inc.

(707)542-6231

7/24/2015

SANTA ROSA, CA 95407

3267 DUTTON AVE

SJ CIMINO

SJ CIMINO ELECTRIC INC

CathleenJ
Typewritten Text
7/24/2015
Page 14: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

STATE OF CALIFORNIA

INDOOR LIGHTING POWER ALLOWANCE CEC-NRCC-LTI-03-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE NRCC-LTI-03-E Certificate of Compliance - Indoor Lighting Power Allowance (Page 1 of 4) Project Name: Date Prepared:

ALLOWED LIGHTING POWER A separate page must be filled out for Conditioned and Unconditioned Spaces. This page is only for: CONDITIONED spaces UNCONDITIONED spaces

A. SUMMARY TOTALS OF LIGHTING POWER ALLOWANCES If using Complete Building Method for compliance, use only the total in column (a) as total allowed building watts. If using Area Category Method, Tailored Method, or a combination of Area Category and Tailored Method for compliance, use only the total in column (b) as the total

allowed building watts

(a) (b) 1. Complete Building Method Allowed Watts. Documented in section B of NRCC-LTI-03-E (below on this page)

2. Area Category Method Allowed Watts. Documented in section C-1 of NRCC-LTI-03-E (below on this page)

3. Tailored Method Allowed Watts. Documented in section A of NRCC-LTI-04-E

TOTAL ALLOWED BUILDING WATTS. Enter number into correct cell on NRCC-LTI-01, Page 2, Row 1

Check here if building contains both conditioned and unconditioned areas.

B. COMPLETE BUILDING METHOD LIGHTING POWER ALLOWANCE A B C D

TYPE OF BUILDING (From §140.6 Table 140.6-B) WATTS

PER (ft2) COMPLETE

BLDG. AREA ALLOWED

WATTS X =

Total Area:

Total Watts. Enter Total Watts into section A, row 1 (Above on this page)

C -1 AREA CATEGORY METHOD TOTAL LIGHTING POWER ALLOWANCES (C-2 plus C-3) Watts Total from section C-2 . Total from section C-3 .

Total Watts. Enter Total Watts into section A, row 2 (Above on this page) .

CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015

GOLDEN GATE BAPTIST THEO SEMINARY 7/24/2015

39,486

39,486

Comp Bldg Auditorium 1.50 26,324 39,486

Page 15: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

STATE OF CALIFORNIA

INDOOR LIGHTING POWER ALLOWANCE CEC-NRCC-LTI-03-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE NRCC-LTI-03-E Certificate of Compliance - Indoor Lighting Power Allowance (Page 2 of 4) Project Name: Date Prepared:

A separate page must be filled out for Conditioned and Unconditioned Spaces. This page is only for: CONDITIONED spaces UNCONDITIONED spaces

C -2 AREA CATEGORY METHOD GENERAL LIGHTING POWER ALLOWANCE Do not include portable lighting for offices. Portable lighting for offices shall be documented only in section B of NRCC-LTI-01-E. Separately list lighting for each primary function area as defined in §100.1 of the Standards.

A B C D AREA CATEGORY (From §140.6 Table 140.6-C) WATTS

PER (ft2) X AREA (ft2) ALLOWED

WATTS Location in Building Primary Function Area per Table 140.6-C =

TOTALS Enter sum total Area Category allowed watts into section C-1 of NRCC-LTI-03-E (this compliance form)

WATTS

CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015

GOLDEN GATE BAPTIST THEO SEMINARY 7/24/2015

0

0

Page 16: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

STATE OF CALIFORNIA

INDOOR LIGHTING POWER ALLOWANCE CEC-NRCC-LTI-03-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE NRCC-LTI-03-E Certificate of Compliance - Indoor Lighting Power Allowance (Page 3 of 4) Project Name: Date Prepared:

A separate page must be filled out for Conditioned and Unconditioned Spaces. This page is only for: CONDITIONED spaces UNCONDITIONED spaces

C-3 AREA CATEGORY METHOD Additional Lighting Wattage Allowance (from Table 140.6-C Footnotes) A B C 2 D E F G

Primary Function

Sq Ft or linear ft 1

Additional Watts

Allowed

Wattage Allowance

(B x C) Description(s) and Quantity of Special

Luminaire Types in each Primary Function Area Total Design

Watts 3

ALLOWED WATTS

Smaller of D or F

TOTALS – Enter into TOTAL AREA CATEGORY METHOD ADDITIONAL ALLOWANCES – Section C-1 .

1. Use linear feet only for additional allowance for white board or chalk board. All other additional Area Category allowances shall use watts per square foot. 2 . Additional watts are available only when allowed according to the footnotes on bottom of Table 146-C, which include: Specialized task work; Ornamental lighting;

Precision commercial and industrial work; Per linear foot of white board or chalk board; Accent, display and feature lighting; and Videoconferencing Studio lighting.. 3. Luminaire classification and wattage shall be determined in accordance with §130.0(c) of the Standards.

CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015

GOLDEN GATE BAPTIST THEO SEMINARY 7/24/2015

0

Page 17: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

STATE OF CALIFORNIA

INDOOR LIGHTING POWER ALLOWANCE CEC-NRCC-LTI-03-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE NRCC-LTI-03-E Certificate of Compliance - Indoor Lighting Power Allowance (Page 4 of 4) Project Name: Date Prepared:

DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Documentation Author Signature:

Company: Signature Date:

Address: CEA Certification Identification (if applicable):

City/State/Zip: Phone:

RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California:

1. The information provided on this Certificate of Compliance is true and correct. 2. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance

(responsible designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of

Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance

documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the

enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy.

Responsible Designer Name: Responsible Designer Signature:

Company : Date Signed:

Address: License:

City/State/Zip: Phone:

CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015

GOLDEN GATE BAPTIST THEO SEMINARY 7/24/2015

C JONES

SANTA ROSA, CA 95407

3267 DUTTON AVE

SJ Cimino Electric Inc.

(707)542-6231

7/24/2015

7075426231

343802

SJ CIMINO

SJ CIMINO ELECTRIC INC

3267 DUTTON AVE

SANTA ROSA, CA 95407

CathleenJ
Typewritten Text
7/24/2015
Page 18: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

STATE OF CALIFORNIA

OUTDOOR LIGHTING CEC-NRCC-LTO-01-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE NRCC-LTO-01-E Outdoor Lighting (Page 1 of 4) Project Name: Date Prepared:

Project Address:

Total Illuminated Hardscape Area

General Information Phase of Construction: New Construction Addition Alteration

Outdoor Lighting Zone (OLZ) OLZ-1 OLZ-2 OLZ-3 OLZ-4 I have confirmed with the AHJ which OLZ applies to this site. For default lighting zone designations, see Title 24 Part 6, §10-114

LIGHTING COMPLIANCE DOCUMENTS (check box for each document included)

For detailed instructions on the use of this and all Energy Efficiency Standards compliance documents, refer to the Nonresidential Manual published by the California Energy Commission.

NRCC-LTO-01-E Certificate of Compliance

NRCC-LTO-02-E Outdoor Lighting Controls Certificate of Compliance

NRCC-LTO-03-E Outdoor Lighting Power Allowance Certificate of Compliance

Summary of Allowed Outdoor Lighting Power Watts

1. Sum Total ALLOWED Outdoor Lighting Wattage from NRCC-LTO-03-E, page 1 = Complies ONLY if Installed ≤ Allowed

2. Sum Total INSTALLED Outdoor lighting Wattage from NRCC-LTO-01-E, page 3

Declaration of Required Installation Certificates – Declare by checking all Installation Certificates that will be submitted. (Retain copies and verify forms are completed and signed.) NRCI-LTO-01-E - Must be submitted for all buildings NRCI-LTO-02-E - Must be submitted for a lighting control system, or for an Energy Management Control System (EMCS), to be recognized for compliance.

Field Inspector Field Inspector

Declaration of Required Certificates of Acceptance – Declare by checking all of the Certificates of Acceptance that will be submitted. (Retain copies and verify forms are completed and signed.) NRCA-LTO-02-A - Must be submitted for outdoor lighting controls. Field Inspector

CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015

GOLDEN GATE BAPTIST THEO SEMINARY 7/24/2015

38891 MISSION BLVD FREMONT, CA 94536

33,685

2,612

4,820

Page 19: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

STATE OF CALIFORNIA

OUTDOOR LIGHTING CEC-NRCC-LTO-01-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE NRCC-LTO-01-E Outdoor Lighting (Page 2 of 4) Project Name: Date Prepared:

Schedule of luminaires exempt from the outdoor lighting power requirements in §140.7 Name or Symbol Description of exempt luminaire in accordance with the exemptions Schedule of luminaires exempt from the cutoff requirements in §130.2(b) Name or Symbol Description of exempt luminaire in accordance with the exemptions Schedule of luminaires exempt from the outdoor lighting control requirements in §130.2(c) Name or Symbol Description of exempt luminaire in accordance with the exemptions

CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015

GOLDEN GATE BAPTIST THEO SEMINARY 7/24/2015

Page 20: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

STATE OF CALIFORNIA

OUTDOOR LIGHTING CEC-NRCC-LTO-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE NRCC-LTO-01-E Outdoor Lighting (Page 3 of 4) Project Name: Date Prepared:

A. OUTDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST

Luminaire Schedule Installed Watts Location Cutoff Field Inspector

A B C D E F G H I

Name or Item Tag Complete Luminaire Description

Watts per

Luminaire

How wattage was determined N

umber of

Luminaires

Total Installed W

atts in this area (C x E )

Primary Function area in which these luminaires are installed

BUG Rating

Pass

Fail

CEC Default from

NA8

According to §130.0(c)

INSTALLED WATTS PAGE TOTAL: Enter sum total of all pages (Sum Total INSTALLED Outdoor lighting wattage) into NRCC-LTO-01-E; Page 1

CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2013

GOLDEN GATE BAPTIST THEO SEMINARY 7/24/2015

E

ALC

LBLA

EXTERIOR WALL FLUOR

6" LED DOWN LIGHTACCENT UP-LIGHTS MH

PEDESTRIAN BOLLARD LEDPARKING LOT LED LIGHT, POLE MT

40.011.070.0

25.0

4

68

201,326

160

66

560500

17 Automotive Hardscape

Automotive Hardscape

Automotive Hardscape

Building Facade

Building Facade

2,612

78.0

2,612

Page 21: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

STATE OF CALIFORNIA

OUTDOOR LIGHTING CEC-NRCC-LTO-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE NRCC-LTO-01-E Outdoor Lighting (Page 4 of 4) Project Name: Date Prepared:

DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Documentation Author Signature:

Company: Signature Date:

Address: CEA Certification Identification (if applicable):

City/State/Zip: Phone:

RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California:

1. The information provided on this Certificate of Compliance is true and correct. 2. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible

designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance

conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents,

worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement

agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy.

Responsible Designer Name: Responsible Designer Signature:

Company : Date Signed:

Address: License:

City/State/Zip: Phone:

CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2013

SJ CIMINO

SJ CIMINO ELECTRIC INC

3267 DUTTON AVE 343802

SANTA ROSA, CA 95407 7075426231

C JONES

SANTA ROSA, CA 95407

3267 DUTTON AVE

SJ Cimino Electric Inc.

(707)542-6231

7/24/2015

GOLDEN GATE BAPTIST THEO SEMINARY 7/24/2015

CathleenJ
Typewritten Text
7/24/2015
Page 22: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

STATE OF CALIFORNIA

OUTDOOR LIGHTING CONTROLS CEC-NRCC-LTO-02-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE NRCC-LTO-02-E Outdoor Lighting Controls (Page 1 of 3) Project Name: Date Prepared:

The NRCC-LTO-02-E shall be used to document all mandatory outdoor lighting controls that are applicable to the project. Mandatory Outdoor Lighting Control Declaration Statements Check all that apply: Lighting shall be controlled by self-contained lighting control devices which are certified to the Energy Commission according to the Title 20 Appliance

Efficiency Regulations in accordance with §110.9(a). Lighting shall be controlled by a lighting control system or energy management control system in accordance with §110.9. An Installation Certificate

shall be submitted in accordance with §130.4(b). All lighting controls and equipment shall comply with the applicable requirements in §110.9 and shall be installed in accordance with the manufacturer's

instructions in accordance with §130.1 Part-Night Outdoor Lighting Controls, as defined in Section 100.1(b), shall meet the requirements in Section 110.9(b)5 All outdoor incandescent luminaires rated over 100 watts, determined in accordance with Section 130.0(c), shall be controlled by a motion sensor. All outdoor luminaires rated for use with lamps greater than 150 lamp watts, determined in accordance with Section 130.0(c), shall comply with

Backlight, Uplight, and Glare (collectively referred to as "BUG") in accordance with Section 130.2(b) All installed outdoor lighting shall be controlled by a photocontrol or outdoor astronomical time-switch control in accordance with Section 130.2(c)1 All installed outdoor lighting shall be circuited and independently controlled from other electrical loads by an automatic scheduling control in

accordance with Section 130.2(c)2 All installed outdoor lighting, where the bottom of the luminaire is mounted 24 feet or less above the ground, shall be controlled with automatic

lighting controls in accordance with Section 130.2(c)3 For Outdoor Sales Frontage, Outdoor Sales Lots, and Outdoor Sales Canopies lighting, an automatic lighting control in accordance with Section

130.2(c)4 For Building Facade, Ornamental Hardscape and Outdoor Dining lighting, an automatic lighting control in accordance with Section 130.2(c)5 Before an occupancy permit is granted for a newly constructed building or area, or a new lighting system serving a building, area, or site is operated for

normal use, indoor lighting controls serving the building, area, or site shall be certified as meeting the Acceptance Requirements for Code Compliance in accordance with §130.4.(a). Outdoor lighting controls shall comply with the applicable requirements of Section 130.2(c) and Reference Nonresidential Appendix NA7.8

CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015

GOLDEN GATE BAPTIST THEO SEMINARY 7/24/2015

Page 23: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

STATE OF CALIFORNIA

OUTDOOR LIGHTING CONTROLS CEC-NRCC-LTO-02-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE NRCC-LTO-02-E Outdoor Lighting Controls (Page 2 of 3) Project Name: Date Prepared:

MANDATORY OUTDOOR LIGHTING CONTROL SCHEDULE and FIELD INSPECTION CHECKLIST

Outdoor Lighting Control Schedule Standards Complying With

( all that apply, or enter ‘E’ if Exempted)

if Acceptance

Test Required

Field Inspector

A B C D E F G H I N O

Location and Application of Luminaires being controlled

Type/ Description of Lighting Control (i.e. motion sensor, photocontrol, outdoor

astronomical time-switch control, centralized time-based zone lighting

control)

# of

Units

§130.2(a)

§130.2(c)1

§130.2(c)2

§130.2(c)3

§130.2(c)4

§130.2(c)5

Pass

Fail

CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015

GOLDEN GATE BAPTIST THEO SEMINARY 7/24/2015

Page 24: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

STATE OF CALIFORNIA

OUTDOOR LIGHTING CONTROLS CEC-NRCC-LTO-02-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE NRCC-LTO-02-E Outdoor Lighting Controls (Page 3 of 3) Project Name: Date Prepared:

DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Documentation Author Signature:

Company: Signature Date:

Address: CEA Certification Identification (if applicable):

City/State/Zip: Phone:

RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California:

1. The information provided on this Certificate of Compliance is true and correct. 2. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance

(responsible designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of

Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance

documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the

enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy.

Responsible Designer Name: Responsible Designer Signature:

Company : Date Signed:

Address: License:

City/State/Zip: Phone:

CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015

GOLDEN GATE BAPTIST THEO SEMINARY 7/24/2015

343802

7075426231

C JONES

SANTA ROSA, CA 95407

3267 DUTTON AVE

SJ Cimino Electric Inc.

(707)542-6231

7/24/2015

SANTA ROSA, CA 95407

3267 DUTTON AVE

SJ CIMINO

SJ CIMINO ELECTRIC INC

CathleenJ
Typewritten Text
7/24/2015
Page 25: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

STATE OF CALIFORNIA

OUTDOOR LIGHTING POWER ALLOWANCES CEC-NRCC-LTO-03-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE NRCC-LTO-03-E Outdoor Lighting Power Allowances (Page 1 of 4) Project Name: Date Prepared:

A. OUTDOOR LIGHTING POWER ALLOWANCE SUMMARY 1. General Hardscape Lighting Power Allowance (Site Total from Section B of NRCC-LTO-03-E) 1. 2. Additional Specific “use it or lose it” Lighting Power Allowances listed in each of these cells shall be identical to total allowed watts determined in Section C-1 to C-4 of NRCC-LTO-03-E.

PER APPLICATION from Section C-1

+

PER UNIT LENGTH (SALES FRONTAGE)

from Section C-2 +

PER HARDSCAPE AREA (ORNAMENTAL LIGHTING)

from Section C-3 +

PER SPECIFIC AREA from Section C-4.

=

2. 3. Sum Total ALLOWED Outdoor Lighting Wattage (add rows 1 and 2) 3.

B. GENERAL HARDSCAPE LIGHTING POWER ALLOWANCE FROM TABLE 140.7-A

Area Wattage Allowance (AWA) Linear Wattage Allowance (LWA) Initial Wattage

Allowance (IWA)

Total General Hardscape Lighting Allowance

A B C D E F G H I

Name of area Illuminated

Hardscape Area

AWA Per

Square Foot AWA (B x C)

Perimeter Length of General Hardscape

LPA per

Linear Foot

LWA

(E x F)

IWA

(Watts)

D + G + H

TOTAL

CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015

GOLDEN GATE BAPTIST THEO SEMINARY 7/24/2015

0 0 0 226 2264,820

4,594

33,685 0.090 3,032 1,321 0.600 793 770 4,594

4,594

Parking Lot

Page 26: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

STATE OF CALIFORNIA

OUTDOOR LIGHTING POWER ALLOWANCES CEC-NRCC-LTO-03-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE NRCC-LTO-03-E Outdoor Lighting Power Allowances (Page 2 of 4) Project Name: Date Prepared:

C. ADDITIONAL “USE IT OR LOSE IT” OUTDOOR LIGHTING POWER ALLOWANCES FOR SPECIFIC APPLICATIONS

The additional specific outdoor lighting power allowance shall be the smaller of the allowed lighting power or the actual lighting power used. Use Outdoor Lighting Zone (OLZ) that is documented on page 1 of NRCC-LTO-01-E to calculate the specific wattage allowances.

C-1. WATTAGE ALLOWANCE PER APPLICATION – Table 140.7-B Available only for qualifying locations, which include Building Entrances or Exits; Primary Entrances to Senior Care Facilities, Police Stations, Hospitals, Fire Stations, and

Emergency Vehicle Facilities; Drive Up Windows; Vehicle Service Station Uncovered Fuel Dispenser If more than one luminaire type is used per location, use multiple rows for that location

A B C D E F G H I J

Name of Location for which allowance is

claimed

ALLOTTED WATTS DESIGN WATTS

Number of qualifying locations

Wattage Allowance per

qualifying location

Allotted Watts (B x C)

Luminaire Code or Symbol Luminaire Description

Luminaire Quantity

Watts per luminaire

Design Watts (G x H)

Allowed Watts (smaller of D or I)

Sum total allowance per application on this site:

C-2. WATTAGE ALLOWANCE PER UNIT LENGTH (Sales Frontage) from Table 140.7-B If more than one luminaire type is used per location, use multiple rows for that location

A B C D E F G H I J

Name of Location for which allowance is

claimed

ALLOTTED WATTS DESIGN WATTS

Linear feet of Sales Frontage

Wattage Allowance per

linear foot

Allotted Watts (B x C)

Luminaire Code or Symbol Luminaire Description

Luminaire Quantity

Watts per luminaire

Design Watts (G x H)

Allowed Watts (smaller of D or I)

Sum total allowance for sales frontage on the site:.

CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015

GOLDEN GATE BAPTIST THEO SEMINARY 7/24/2015

0

0

Page 27: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

STATE OF CALIFORNIA

OUTDOOR LIGHTING POWER ALLOWANCES CEC-NRCC-LTO-03-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE NRCC-LTO-03-E Outdoor Lighting Power Allowances (Page 3 of 4) Project Name: Date Prepared:

C-3. WATTAGE ALLOWANCE PER SQUARE FOOT OF HARDSCAPE AREA (Ornamental Lighting) – Table 140.7-B

Allowance for the total site illuminated hardscape area. Luminaires qualifying for this allowance shall be rated for 100 watts or less as determined in accordance with Section 130.0(c), and shall be post-top luminaires, lanterns, pendant luminaires, or chandeliers.

If more than one luminaire type is used per location, use multiple rows for that location A B C D E F G H I J

Name of area for which ornamental allowance is

claimed

ALLOTTED WATTS DESIGN WATTS

Square feet of Hardscape

Wattage Allowance per

square foot

Allotted Watts (B x C)

Luminaire Code or Symbol Luminaire Description

Luminaire Quantity

Watts per luminaire

Design Watts (G x H)

Allowed Watts (smaller of D or I)

Sum total allowance for ornamental lighting on the site:.

C-4. WATTAGE ALLOWANCE PER SQUARE FOOT OF SPECIFIC AREA - Table 140.7-B Allowances for Building Facades; Outdoor Sales Lots; Vehicle Service Station Hardscape; Vehicle Service Station Canopies; Sales Canopies; Non-sales Canopies; Guard Stations; Student Pick-up/Drop-off zone: Outdoor Dining; Special Security Lighting for Retail Parking and Pedestrian Hardscape. If more than one luminaire type is used per location, use multiple rows for that location

A B C D E F G H I J

Name of Location for which allowance is

claimed

ALLOTTED WATTS DESIGN WATTS

Illuminated Area of Application

Wattage Allowance per

square foot

Allotted Watts (B x C)

Luminaire Code or Symbol Luminaire Description

Luminaire Quantity

Watts per luminaire

Design Watts (G x H)

Allowed Watts (smaller of D or I)

Sum total allowance for specific area on the site:

CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015

6" LED DOWN LIGHT

GOLDEN GATE BAPTIST THEO SEMINARY 7/24/2015

West Exterior StairwellRear EntranceFront Entrance

Est Exterior Stairwell 1,3441,344576576

0.3500.3500.3500.350

470470202202

EEAA

0

EXTERIOR WALL FLUOREXTERIOR WALL FLUOR

6" LED DOWN LIGHT

233

40.040.011.011.0

80803333

226

80803333

2

Page 28: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

STATE OF CALIFORNIA

OUTDOOR LIGHTING POWER ALLOWANCES CEC-NRCC-LTO-03-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE NRCC-LTO-03-E Outdoor Lighting Power Allowances (Page 4 of 4) Project Name: Date Prepared:

DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Documentation Author Signature:

Company: Signature Date:

Address: CEA Certification Identification (if applicable):

City/State/Zip: Phone:

RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California:

1. The information provided on this Certificate of Compliance is true and correct. 2. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance

(responsible designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of

Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance

documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the

enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy.

Responsible Designer Name: Responsible Designer Signature:

Company : Date Signed:

Address: License:

City/State/Zip: Phone:

CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015

SJ CIMINO

SJ CIMINO ELECTRIC INC

3267 DUTTON AVE 343802

SANTA ROSA, CA 95407 7075426231

GOLDEN GATE BAPTIST THEO SEMINARY 7/24/2015

C JONES

SANTA ROSA, CA 95407

3267 DUTTON AVE

SJ Cimino Electric Inc.

(707)542-6231

7/24/2015

CathleenJ
Typewritten Text
7/24/2015
Page 29: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

STATE OF CALIFORNIA

MECHANICAL SYSTEMS CEC-NRCC-MCH-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE   NRCC‐MCH‐01‐E Mechanical Systems  (Page 1 of 3) Project Name:  Date Prepared: 

 

CA Building Energy Efficiency Standards ‐ 2013 Nonresidential Compliance  June 2014 

   

MECHANICAL COMPLIANCE FORMS & WORKSHEETS (check box if worksheet is included)

For detailed instructions on the use of this and all Energy Efficiency Standards compliance forms, refer to the 2013 Nonresidential Manual Note: The Enforcement Agency may require all forms to be incorporated onto the building plans. 

YES  NO  Form/Worksheet #  Title    NRCC‐MCH‐01‐E (Part 1 of 3)  Certificate of Compliance, Declaration. Required on plans for all submittals.    NRCC‐MCH‐01‐E (Part 2 of 3)  Certificate of Compliance, Required Acceptance Tests (MCH‐02A to 11A). Required on plans for all submittals.    NRCC‐MCH‐01‐E (Part 3 of 3)  Certificate of Compliance, Required Acceptance Tests (MCH‐12A to 18A). Required on plans where applicable.    NRCC‐MCH‐02‐E (Part 1 of 2)  Mechanical Dry Equipment Summary is required for all submittals with Central Air Systems. It is optional on plans.     NRCC‐MCH‐02‐E (Part 2 of 2)  Mechanical Wet Equipment Summary is required for all submittals with chilled water, hot water or condenser water 

systems. It is optional on plans.      NRCC‐MCH‐03‐E  Mechanical Ventilation and Reheat is required for all submittals with multiple zone heating and cooling systems.   It is 

optional on plans.   

MECHANICAL HVAC  ACCEPTANCE FORMS  (check box for required forms) Designer: This form is to be used by the designer and attached to the plans.  Listed below are all the acceptance tests for HVAC systems. The designer is required to check the applicable boxes for all acceptance tests that apply and list all equipment that requires an acceptance test. All equipment of the same type that requires a test, list the equipment description and the number of systems.   Installing Contractor:   The contractor who installed the equipment is responsible to either conduct the acceptance test them self or have a qualified entity run the test for them.  If more than one person has responsibility for the acceptance testing, each person shall sign and submit the Certificate of Acceptance applicable to the portion of the construction or installation for which they are responsible.    Enforcement Agency: Plancheck – The NRCC‐MCH‐01‐E form is not considered a completed form and is not to be accepted by the building department unless the correct boxes are checked. Inspector ‐ Before occupancy permit is granted all newly installed process systems must be tested to ensure proper operations.   

Test Description  MCH‐02A  MCH‐03A  MCH‐04A  MCH‐05A  MCH‐06A  MCH‐07A  MCH‐08A  MCH‐09A  MCH‐10A  MCH‐11A Equipment Requiring Testing or Verification 

# of units 

Outdoor Air 

Single Zone Unitary 

Air Distribution 

Ducts 

Economizer Controls 

Demand Control 

Ventilation (DCV) 

Supply Fan VAV 

Valve Leakage Test 

Supply Water Temp. Reset 

Hydronic System 

Variable Flow Control 

Automatic Demand Shed 

Control 

     

     

     

         

         

         

Golden Gate Baptist Seminary 6/13/2015

Daikin REYQ144PBTJ

Daikin REYQ72PBTJ

3

2

Page 30: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

STATE OF CALIFORNIA

MECHANICAL SYSTEMS CEC-NRCC-MCH-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE   NRCC‐MCH‐01‐E Mechanical Systems  (Page 2 of 3) Project Name:  Date Prepared: 

 

CA Building Energy Efficiency Standards ‐ 2013 Nonresidential Compliance  June 2014 

 

MECHANICAL HVAC ACCEPTANCE FORMS  (check box for required forms) Designer: This form is to be used by the designer and attached to the plans.  Listed below are all the acceptance tests for HVAC systems. The designer is required to check the applicable boxes for all acceptance tests that apply and list all equipment that requires an acceptance test. All equipment of the same type that requires a test, list the equipment description and the number of systems.   Installing Contractor:   The contractor who installed the equipment is responsible to either conduct the acceptance test them self or have a qualified entity run the test for them.  If more than one person has responsibility for the acceptance testing, each person shall sign and submit the Certificate of Acceptance applicable to the portion of the construction or installation for which they are responsible.  The following tests require a   Enforcement Agency: Plancheck – The NRCC‐MCH‐01‐E form is not considered a completed form and is not to be accepted by the building department unless the correct boxes are checked. Inspector ‐ Before occupancy permit is granted all newly installed process systems must be tested to ensure proper operations.   

Test Description  MCH‐12A  MCH‐13A  MCH‐14A  MCH‐15A  MCH‐16A  MCH‐17A  MCH‐18A Equipment Requiring Testing or Verification 

# of units 

Fault Detection & Diagnostics for DX 

Units 

Automatic Fault Detection & 

Diagnostics for Air & Zone 

Distributed Energy Storage DX AC 

Systems 

Thermal Energy Storage (TES) 

Systems 

Supply Air Temperature Reset 

Controls 

Condenser Water Reset Controls 

ECMS 

 

 

 

 

 

 

 

 

 

 

     

Golden Gate Baptist Seminary 6/13/2015

Daikin REYQ144PBTJ

Daikin REYQ72PBTJ

3

2

Page 31: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

STATE OF CALIFORNIA

MECHANICAL SYSTEMS CEC-NRCC-MCH-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE   NRCC‐MCH‐01‐E Mechanical Systems  (Page 3 of 3) Project Name:  Date Prepared: 

 

CA Building Energy Efficiency Standards ‐ 2013 Nonresidential Compliance  June 2014 

 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT1. I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name:  Documentation Author Signature: 

Company:  Signature Date: 

Address:  CEA/ HERS Certification Identification (if applicable): 

City/State/Zip:  Phone: 

RESPONSIBLE PERSON'S DECLARATION STATEMENT   

I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. 2. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible 

designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance 

conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, 

worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement 

agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy.   

Responsible Designer Name:  Responsible Designer Signature: 

Company :  Date Signed: 

Address:  License: 

City/State/Zip:  Phone: 

  

Golden Gate Baptist Seminary 6/13/2015

Nicholas Donzelli

Green Air Heating & Air Conditioning Inc.

5153 C Commercial Circle

Concord, CA 94520

Philip Neumann

Mill Valley, CA 94941

193A W Blithedale

Philip Neumann Energy Design

650-630-4818

6/13/2015

925-28GREEN

Page 32: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

STATE OF CALIFORNIA

HVAC SYSTEM REQUIREMENTS CEC-NRCC-MCH-02-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE   NRCC‐MCH‐02‐E HVAC Dry System Requirements    (Page 1 of 3)Project Name:  Date Prepared: 

 

CA Building Energy Efficiency Standards ‐ 2013 Nonresidential Compliance    June 2014  

 

Equipment Tags and System Description1    

MANDATORY MEASURES  T‐24 Sections Reference to the Requirements in the Contract Documents2 

Heating Equipment Efficiency3  110.1 or 110.2(a)Cooling Equipment Efficiency3  110.1 or 110.2(a)HVAC or Heat Pump Thermostats  110.2(b), 110.2(c)Furnace Standby Loss Control  110.2(d)Low leakage AHUs  110.2(f)Ventilation4  120.1(b)Demand Control Ventilation5  120.1(c)4 Occupant Sensor Ventilation Control6  120.1(c)5, 120.2(e)3Shutoff and Reset Controls7  120.2(e)Outdoor Air and Exhaust Damper Control  120.2(f)Isolation Zones  120.2(g)Automatic Demand Shed Controls  120.2(h)Economizer FDD  120.2(i)Duct Insulation  120.4

PRESCRIPTIVE MEASURES          

Equipment is sized in conformance with 140.4 (a & b) 

140.4(a & b)Y/N  Y/N  Y/N 

Supply Fan Pressure Control  140.4(c) Simultaneous Heat/Cool8  140.4(d)Economizer  140.4(e)Heat and Cool Air Supply Reset  140.4(f)Electric Resistance Heating9  140.4(g)Duct Leakage Sealing and Testing.10  140.4(l)Notes: 1. Provide equipment tags (e.g. AHU 1 to 10) and system description (e.g. Single Duct VAV reheat) as appropriate. Multiple units 

with common requirements can be grouped together. 2. Provide references to plans (i.e. Drawing Sheet Numbers) and/or specifications (including Section name/number and relevant 

paragraphs) where each requirement is specified.  Enter "N/A" if the requirement is not applicable to this system. 3. The referenced plans and specifications must include all of the following information: equipment tag, equipment nominal 

capacity, Title 24 minimum efficiency requirements, and actual rated equipment efficiencies.  Where multiple efficiency requirements are applicable (e.g. full‐ and part‐load) include all.  Where appliance standards apply (110.1), identify where equipment is required to be listed per Title 20 1601 et seq. 

4. Identify where the ventilation requirements are documented for each central HVAC system.  Include references to both central unit schedules and sequences of operation.  If one or more space is naturally ventilated identify where this is documented in the plans and specifications. Multiple zone central air systems must also provide a MCH‐03‐E  form. 

5. If one or more space has demand controlled ventilation identify where it is specified including the sensor specifications and the sequence of operation. 

6. If one or more space has occupant sensor ventilation control identify where it is specified including the sensor specifications and the sequence of operation 

7. If the system is DDC identify the sequences for the system start/stop, optimal start, setback (if required) and setup (if required).  For all systems identify the specification for the thermostats and time clocks (if applicable). 

8. Identify where the heating, cooling and deadband airflows are scheduled for this system.  Include a reference to the specification of the zone controls. Provide a MCH‐03‐E form. 

9.  Enter N/A if there is no electric heating.  If the system has electric heating indicate which exception to 140.4(g) applies. 10. If duct leakage sealing and testing is required, a MCH‐04‐A form must be submitted.  

 

Golden Gate Baptist Seminary 6/13/2015

Y Y Y

First Floor West Second Floor West First Floor East

Hayley
Text Box
Hayley
Text Box
Hayley
Text Box
Hayley
Text Box
Page 33: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

STATE OF CALIFORNIA

HVAC SYSTEM REQUIREMENTS CEC-NRCC-MCH-02-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE   NRCC‐MCH‐02‐E HVAC Dry System Requirements    (Page 1 of 3)Project Name:  Date Prepared: 

 

CA Building Energy Efficiency Standards ‐ 2013 Nonresidential Compliance    June 2014  

 

Equipment Tags and System Description1    

MANDATORY MEASURES  T‐24 Sections Reference to the Requirements in the Contract Documents2 

Heating Equipment Efficiency3  110.1 or 110.2(a)Cooling Equipment Efficiency3  110.1 or 110.2(a)HVAC or Heat Pump Thermostats  110.2(b), 110.2(c)Furnace Standby Loss Control  110.2(d)Low leakage AHUs  110.2(f)Ventilation4  120.1(b)Demand Control Ventilation5  120.1(c)4 Occupant Sensor Ventilation Control6  120.1(c)5, 120.2(e)3Shutoff and Reset Controls7  120.2(e)Outdoor Air and Exhaust Damper Control  120.2(f)Isolation Zones  120.2(g)Automatic Demand Shed Controls  120.2(h)Economizer FDD  120.2(i)Duct Insulation  120.4

PRESCRIPTIVE MEASURES          

Equipment is sized in conformance with 140.4 (a & b) 

140.4(a & b)Y/N  Y/N  Y/N 

Supply Fan Pressure Control  140.4(c) Simultaneous Heat/Cool8  140.4(d)Economizer  140.4(e)Heat and Cool Air Supply Reset  140.4(f)Electric Resistance Heating9  140.4(g)Duct Leakage Sealing and Testing.10  140.4(l)Notes: 1. Provide equipment tags (e.g. AHU 1 to 10) and system description (e.g. Single Duct VAV reheat) as appropriate. Multiple units 

with common requirements can be grouped together. 2. Provide references to plans (i.e. Drawing Sheet Numbers) and/or specifications (including Section name/number and relevant 

paragraphs) where each requirement is specified.  Enter "N/A" if the requirement is not applicable to this system. 3. The referenced plans and specifications must include all of the following information: equipment tag, equipment nominal 

capacity, Title 24 minimum efficiency requirements, and actual rated equipment efficiencies.  Where multiple efficiency requirements are applicable (e.g. full‐ and part‐load) include all.  Where appliance standards apply (110.1), identify where equipment is required to be listed per Title 20 1601 et seq. 

4. Identify where the ventilation requirements are documented for each central HVAC system.  Include references to both central unit schedules and sequences of operation.  If one or more space is naturally ventilated identify where this is documented in the plans and specifications. Multiple zone central air systems must also provide a MCH‐03‐E  form. 

5. If one or more space has demand controlled ventilation identify where it is specified including the sensor specifications and the sequence of operation. 

6. If one or more space has occupant sensor ventilation control identify where it is specified including the sensor specifications and the sequence of operation 

7. If the system is DDC identify the sequences for the system start/stop, optimal start, setback (if required) and setup (if required).  For all systems identify the specification for the thermostats and time clocks (if applicable). 

8. Identify where the heating, cooling and deadband airflows are scheduled for this system.  Include a reference to the specification of the zone controls. Provide a MCH‐03‐E form. 

9.  Enter N/A if there is no electric heating.  If the system has electric heating indicate which exception to 140.4(g) applies. 10. If duct leakage sealing and testing is required, a MCH‐04‐A form must be submitted.  

 

Golden Gate Baptist Seminary 6/13/2015

Y Y

Second Floor East OA Tempered Area

Hayley
Text Box
Hayley
Text Box
Hayley
Text Box
Hayley
Text Box
Page 34: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

STATE OF CALIFORNIA

HVAC SYSTEM REQUIREMENTS CEC-NRCC-MCH-02-E (Revised 06/13) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE   NRCC‐MCH‐02‐E HVAC Wet System Requirements    (Page 3 of 3)Project Name:  Date Prepared: 

  

CA Building Energy Efficiency Standards ‐ 2013 Nonresidential Compliance    June 2014  

 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT1. I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name:  Documentation Author Signature: 

Company:  Signature Date: 

Address:  CEA/ HERS Certification Identification (if applicable): 

City/State/Zip:  Phone: 

RESPONSIBLE PERSON'S DECLARATION STATEMENT   

I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. 2. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design 

identified on this Certificate of Compliance (responsible designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system 

design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 

4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 

5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy.  

Responsible Designer Name:  Responsible Designer Signature: 

Company :  Date Signed: 

Address:  License: 

City/State/Zip:  Phone: 

  

Golden Gate Baptist Seminary 6/13/2015

Nicholas Donzelli

Green Air Heating & Air Conditioning Inc.

5153 C Commercial Circle

Concord, CA 94520

Philip Neumann

Mill Valley, CA 94941

193A W Blithedale

Philip Neumann Energy Design

650-630-4818

6/13/2015

925-28GREEN

Page 35: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

STATE OF CALIFORNIA

MECHANICAL VENTILATION AND REHEAT CEC-NRCC-MCH-03-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE   NRCC‐MCH‐03‐E Mechanical Ventilation & Reheat  (Page 1 of 2) Project Name:  Date Prepared: 

 

CA Building Energy Efficiency Standards ‐ 2013 Nonresidential Compliance      June 2014  

 

ACTUAL DESIGN INFO (FROM EQUIPMENT SCHEDULES, ETC)         AREA BASIS  OCCUPANCY BASIS  MINIMUM 

VAV Reheated Primary Air CFM    

VAV Deadband Primary Air CFM    

A  B  C  D  E  F  G  H  I  J  K  L  M  N  O  P  Q  R  S  T 

ZONE/ SYSTEM

/ VA

V BOX TA

DESIG

N PRIM

ARY 

COOLIN

G AIRFLO

(CFM) 

DESIG

N PRIM

ARY 

DEA

D‐BAN

AIRFLO

W (CFM

DESIG

N PRIM

ARY 

HEA

TING AIRFLO

(CFM) 

CNTRL TYPE D

DC 

(Y/N) 

TRANSFER 

AIRFLO

(CFM) 

CONDI‐TIO

NED

 AREA

  (ft 2) 

MIN CFM

 PER AREA 

MIN CFM

 BY AREA 

NUM. O

F PEOPLE 

CFM PER PERSO

MIN CFM

 BY OCCU

‐PA

NT  

REQ'D VEN

T AIRFLO

W  

(MAX O

F I OR L)  

(CFM)  

COM‐PLIES 

BASED

 DESIG

PRIMARY CO

OLIN

AIR  

(50% DDC,30%

 NON‐DDC) 

(CFM) 

MAXIM

UM REH

EAT 

CFM (M

AX OF M

 OR O

COM‐PLIES? 

AIR   

(20% DDC, N

/A 

NON‐DDC) 

(CFM) 

(larger of M or R, 

N/A for N

ON‐

DDC) 

(CFM) 

COM‐PLIES 

                                                           

                                                           

                                                           

                                                           

                                                           

                                                           

                                                           

                                                           

                                                           

                                                           

                                                           

Yellow shaded cells require user input. Remaining cells are protected and automatic B. The largest amount of primary air supplied by the terminal unit when it's operating in the cooling mode. C. The smallest amount of primary air supplied by the terminal unit in the deadband mode. D. The largest amount of primary air supplied by the terminal unit when it's operating in the heating mode. E. A terminal unit can be controlled with DDC controls, or non‐DDC controls. Each control category has different reheat limitations in code. F. Transfer Air must be provided where Required Ventilation Airflow (Column M) is greater than the Design Primary Deadband Airflow (Column C). H. Minimum ventilation rate per Section §120.1. Table 120.1‐A. J. Based on number of fixed seats where applicable or the greater of the expected number of occupants and 50% of the CBC occupant load for egress purposes for spaces without fixed seating. M. Required Ventilation Airflow (Req'd Ventilation Airflow) is the larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS (Column I or L) N. This column identifies whether or not the Design Primary Deadband Airflow complies or not. It compares the value in column M to the value in column C and column F. O. Design Primary Cooling Airflow * 0.50 for DDC, Design Primary Cooling Airflow * 0.30 for Non‐DDC. If the Design Primary Cooling Airflow is less than 300 cfm, then this is not applicable. P. Maximum of Column M and Column O. If the Design Primary Cooling Airflow is 300 cfm or less, then this is not applicable. Q. This column identifies whether or not the Design Primary Reheat Airflow at the zone level, complies or not. It compares the value in column P to the value in column D. R. Design Primary Cooling Airflow * 0.20 for DDC. Not applicable for Non‐DDC zones or zones where Design Primary Cooling Airflow is  is 300 cfm or less. S. Maximum of Column M and Column R. Not applicable if the Design Primary Cooling Airflow  is 300 cfm or less. T. This column identifies whether or not the Design Primary Deadband Airflow at the zone level, complies or not. It compares the value in column S to the value in column C. 

 

Golden Gate Baptist Seminary 6/13/2015

Ground Floor West

Library Office & Research - Reading

North Offices

Conference Room

South Offices

Small Classroom

Large Classroom

Seminar Room

Vending Room

0

0

00

0

00

0

0

0

0

0

0

0

0

0

0

0

0

0

0

00

0

0

0

0

606

98

305

248

320

206

369

266

582

Y

Y

Y

YY

Y

Y

YY

4,041

657

2,031

4962,131

5761,033

746388

0.150.15

0.15

0.500.15

0.000.00

0.00

1.50

606

98

305248

320

00

0

582

37.9

5.7

15.85.036.8

20.636.9

26.6

9.7

7.5

7.5

7.5

7.57.5

10.010.0

10.0

7.5

285

43Total

119

37276

Total

206369

26673

606

98

705

305

248

320872

206369

266

582

0

0

00

0

00

0

0

Y

Y

Y

Y

Y

Y

Y

Y

Y

606

98

305

248320

206369

266

582

YY

Y

YY

Y

YY

Y

0

0

0

0

0

00

0

0

606

98

305248

320

206369

266

582

Y

Y

Y

Y

Y

Y

Y

YY

Page 36: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

STATE OF CALIFORNIA

MECHANICAL VENTILATION AND REHEAT CEC-NRCC-MCH-03-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE   NRCC‐MCH‐03‐E Mechanical Ventilation & Reheat  (Page 1 of 2) Project Name:  Date Prepared: 

 

CA Building Energy Efficiency Standards ‐ 2013 Nonresidential Compliance      June 2014  

 

ACTUAL DESIGN INFO (FROM EQUIPMENT SCHEDULES, ETC)         AREA BASIS  OCCUPANCY BASIS  MINIMUM 

VAV Reheated Primary Air CFM    

VAV Deadband Primary Air CFM    

A  B  C  D  E  F  G  H  I  J  K  L  M  N  O  P  Q  R  S  T 

ZONE/ SYSTEM

/ VA

V BOX TA

DESIG

N PRIM

ARY 

COOLIN

G AIRFLO

(CFM) 

DESIG

N PRIM

ARY 

DEA

D‐BAN

AIRFLO

W (CFM

DESIG

N PRIM

ARY 

HEA

TING AIRFLO

(CFM) 

CNTRL TYPE D

DC 

(Y/N) 

TRANSFER 

AIRFLO

(CFM) 

CONDI‐TIO

NED

 AREA

  (ft 2) 

MIN CFM

 PER AREA 

MIN CFM

 BY AREA 

NUM. O

F PEOPLE 

CFM PER PERSO

MIN CFM

 BY OCCU

‐PA

NT  

REQ'D VEN

T AIRFLO

W  

(MAX O

F I OR L)  

(CFM)  

COM‐PLIES 

BASED

 DESIG

PRIMARY CO

OLIN

AIR  

(50% DDC,30%

 NON‐DDC) 

(CFM) 

MAXIM

UM REH

EAT 

CFM (M

AX OF M

 OR O

COM‐PLIES? 

AIR   

(20% DDC, N

/A 

NON‐DDC) 

(CFM) 

(larger of M or R, 

N/A for N

ON‐

DDC) 

(CFM) 

COM‐PLIES 

                                                           

                                                           

                                                           

                                                           

                                                           

                                                           

                                                           

                                                           

                                                           

                                                           

                                                           

Yellow shaded cells require user input. Remaining cells are protected and automatic B. The largest amount of primary air supplied by the terminal unit when it's operating in the cooling mode. C. The smallest amount of primary air supplied by the terminal unit in the deadband mode. D. The largest amount of primary air supplied by the terminal unit when it's operating in the heating mode. E. A terminal unit can be controlled with DDC controls, or non‐DDC controls. Each control category has different reheat limitations in code. F. Transfer Air must be provided where Required Ventilation Airflow (Column M) is greater than the Design Primary Deadband Airflow (Column C). H. Minimum ventilation rate per Section §120.1. Table 120.1‐A. J. Based on number of fixed seats where applicable or the greater of the expected number of occupants and 50% of the CBC occupant load for egress purposes for spaces without fixed seating. M. Required Ventilation Airflow (Req'd Ventilation Airflow) is the larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS (Column I or L) N. This column identifies whether or not the Design Primary Deadband Airflow complies or not. It compares the value in column M to the value in column C and column F. O. Design Primary Cooling Airflow * 0.50 for DDC, Design Primary Cooling Airflow * 0.30 for Non‐DDC. If the Design Primary Cooling Airflow is less than 300 cfm, then this is not applicable. P. Maximum of Column M and Column O. If the Design Primary Cooling Airflow is 300 cfm or less, then this is not applicable. Q. This column identifies whether or not the Design Primary Reheat Airflow at the zone level, complies or not. It compares the value in column P to the value in column D. R. Design Primary Cooling Airflow * 0.20 for DDC. Not applicable for Non‐DDC zones or zones where Design Primary Cooling Airflow is  is 300 cfm or less. S. Maximum of Column M and Column R. Not applicable if the Design Primary Cooling Airflow  is 300 cfm or less. T. This column identifies whether or not the Design Primary Deadband Airflow at the zone level, complies or not. It compares the value in column S to the value in column C. 

 

Golden Gate Baptist Seminary 6/13/2015

Elevator Mechanical Room

Tempered OA Rooms

0

0

0

0

0

0

11

728

Y

Y

72

4,857

0.15

0.15

11

728

0.1

55.5

7.5

7.5

1

TotalTotal

417

Total

11

1,434

951

728

728

0

0

Y

Y

11

728

Y

Y

0

0

11

728

Y

Y

Page 37: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

STATE OF CALIFORNIA

MECHANICAL VENTILATION AND REHEAT CEC-NRCC-MCH-03-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE   NRCC‐MCH‐03‐E Mechanical Ventilation & Reheat  (Page 2 of 2) Project Name:  Date Prepared: 

 

CA Building Energy Efficiency Standards ‐ 2013 Nonresidential Compliance      June 2014  

DOCUMENTATION AUTHOR'S DECLARATION STATEMENT1. I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name:  Documentation Author Signature: 

Company:  Signature Date: 

Address:  CEA/ HERS Certification Identification (if applicable): 

City/State/Zip:  Phone: 

RESPONSIBLE PERSON'S DECLARATION STATEMENT   

I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. 2. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible 

designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance 

conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, 

worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement 

agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy.   

Responsible Designer Name:  Responsible Designer Signature: 

Company :  Date Signed: 

Address:  License: 

City/State/Zip:  Phone: 

 

Golden Gate Baptist Seminary 6/13/2015

925-28GREEN

Philip Neumann

Mill Valley, CA 94941

193A W Blithedale

Philip Neumann Energy Design

650-630-4818

6/13/2015

Concord, CA 94520

5153 C Commercial Circle

Nicholas Donzelli

Green Air Heating & Air Conditioning Inc.

Page 38: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

STATE OF CALIFORNIA

REQUIRED ACCEPTANCE TESTS CEC-NRCC-MCH-04-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE   NRCC‐MCH‐04‐E Required Acceptance Tests  (Page 1 of 3) Project Name:  Date Prepared: 

 

CA Building Energy Efficiency Standards ‐ 2013 Nonresidential Compliance      June 2014  

 

MECHANICAL COMPLIANCE FORMS & WORKSHEETS (indicate if worksheet is included)

For detailed instructions on the use of this and all Energy Efficiency Standards compliance forms, refer to the 2013 Nonresidential Manual Note: The Enforcement Agency may require all forms to be incorporated onto the building plans. Forms NRCC‐MCH‐04‐E and NRCC‐MECH‐05‐E are alternative forms to NRCC‐MCH‐01‐E, NRCC‐MCH‐02‐E and NRCC‐MCH‐03‐E for projects using only single zone packaged HVAC systems. 

YES  NO  Form  Title

    NRCC‐MCH‐04‐E (1 of 2)  Certificate of Compliance. Required on plans when used.

    NRCC‐MCH‐04‐E (2 of 2)  Mechanical Acceptance Tests. Required on plans when used.

    NRCC‐MCH‐05‐E (1 of 2)  HVAC Prescriptive Requirements. It is required on plans when used.

    NRCC‐MCH‐05‐E (2 of 2)  Mechanical SWH Equipment Summary is required for all submittals with service water heating, pools or spas. It is required on plans where applicable. 

 

Golden Gate Baptist Seminary 6/13/2015

Page 39: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

STATE OF CALIFORNIA

REQUIRED ACCEPTANCE TESTS CEC-NRCC-MCH-04-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE   NRCC‐MCH‐04‐E Required Acceptance Tests  (Page 2 of 3) Project Name:  Date Prepared: 

 

CA Building Energy Efficiency Standards ‐ 2013 Nonresidential Compliance      June 2014  

Designer: 

This form is to be used by the designer and attached to the plans.  Listed below are all the acceptance tests for mechanical systems. The designer is required to check the applicable boxes by all acceptance tests that apply and list all equipment that requires an acceptance test.  If all equipment of a certain type requires a test, list the equipment description and the number of systems.  The NA number designates the Section in the Appendix of the Nonresidential Reference Appendices Manual that describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately.  Enforcement Agency: 

Systems Acceptance. Before occupancy permit is granted for a newly constructed building or space, or a new space‐conditioning system serving a building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance.    Systems Acceptance. Before occupancy permit is granted.  All newly installed HVAC equipment must be tested using the Acceptance Requirements. .   

The NRCC‐MCH‐04‐E form is not considered a completed form and is not to be accepted by the building department unless the correct boxes are checked.  The equipment requiring testing, person performing the test (Example: HVAC installer, TAB contractor, controls contractor, PE in charge of project) and what Acceptance test must be conducted.  The following checked‐off forms are required for ALL newly installed and replaced equipment.  In addition a Certificate of Acceptance forms shall be submitted to the building department that certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of Section 10‐103(b) and Title 24 Part 6. The building inspector must receive the properly filled out and signed forms before the building can receive final occupancy. 

Test Description  MCH‐02‐A  MCH‐03‐A  MCH‐04‐A  MCH‐05‐A  MCH‐06‐A  MCH‐07‐A  MCH‐11‐A  MCH‐12‐A  MCH‐14‐A  MCH‐18‐A  Test Performed By: Equipment Requiring Testing or Verification 

# of units 

Outdoor Air 

Single Zone Unitary 

Air Distribution Ducts 

Economizer Controls 

Demand Control Ventilation (DCV) 

Supply Fan VAV 

Automatic Demand Shed Control  

FDD for Packaged DX Units 

Distributed Energy Storage DX AC Systems 

Energy Management Control System 

 

                     

                     

                     

                         

                         

                         

                         

                         

                         

 

   

Golden Gate Baptist Seminary 6/13/2015

Daikin REYQ144PBTJ

Daikin REYQ72PBTJ

3

2

Page 40: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

STATE OF CALIFORNIA

REQUIRED ACCEPTANCE TESTS CEC-NRCC-MCH-04-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE   NRCC‐MCH‐04‐E Required Acceptance Tests  (Page 3 of 3) Project Name:  Date Prepared: 

 

CA Building Energy Efficiency Standards ‐ 2013 Nonresidential Compliance      June 2014  

 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT1. I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name:  Documentation Author Signature: 

Company:  Signature Date: 

Address:  CEA/ HERS Certification Identification (if applicable): 

City/State/Zip:  Phone: 

RESPONSIBLE PERSON'S DECLARATION STATEMENT   

I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. 2. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible 

designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance 

conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, 

worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement 

agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy.   

Responsible Designer Name:  Responsible Designer Signature: 

Company :  Date Signed: 

Address:  License: 

City/State/Zip:  Phone: 

  

Golden Gate Baptist Seminary 6/13/2015

Philip Neumann

Mill Valley, CA 94941

193A W Blithedale

Philip Neumann Energy Design

650-630-4818

6/13/2015

925-28GREENConcord, CA 94520

5153 C Commercial Circle

Nicholas Donzelli

Green Air Heating & Air Conditioning Inc.

Page 41: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

STATE OF CALIFORNIA

REQUIREMENTS FOR PACKAGED SINGLE ZONE UNITS CEC-NRCC-MCH-05-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE   NRCC‐MCH‐05‐E Requirements for Packaged Single‐Zone Units  (Page 1 of 2) Project Name:  Date Prepared: 

 

CA Building Energy Efficiency Standards ‐ 2013 Nonresidential Compliance    June 2014 

Equipment Tag(s)1 MANDATORY MEASURES  T‐24 Sections Requirement3 As Scheduled3  Requirement3 As Scheduled3 Requirement3 As Scheduled3 Heating Equipment Efficiency4  110.1 or 110.2(a)   Cooling Equipment Efficiency4  110.1 or 110.2(a)   Thermostats5  110.2(b), 110.2(c)   Furnace Standby Loss Control6  110.2(d)   Low Leakage AHU  110.2(f)  Ventilation7  120.1(b)   Demand Control Ventilation8  120.1(c)4    Occupant Sensor Ventilation Control8  120.1(c)5, 120.2(e)3   Shutoff and Reset Controls9  120.2(e)   Outdoor Air and Exhaust Damper Control  120.2(f)   Automatic Demand Shed Controls  120.2(h)   Economizer FDD  120.2(i)   Duct Insulation  120.4    PRESCRIPTIVE MEASURES   Equipment is sized in conformance with 140.4 (a & b) 

140.4(a & b)           

Economizer  140.4(e)   Electric Resistance Heating10  140.4(g)   Duct Leakage Sealing and Testing.11  140.4(l)   Notes: 1. Provide equipment tags (e.g. AC1 or AC1 to 10). Multiple units of the same make and model with the same application and accessories can be grouped together. 2. Enter the following information as appropriate: Unit Manufacturer; Unit Model Number (including all accessories); Description of the unit (e.g. gas‐pack or heat pump; rated heating capacity 

(enter "N/A" if no heating); and, rated cooling capacity (enter "N/A" if no cooling).  For unit capacities include the units (e.g. kBtuh or tons). 3. For each requirement, enter the minimum requirement from the Standard In the left column (under "Standard Requirement").  In the right column (under "As Scheduled") enter the value for 

the units as specified.   4. Where there is more than one requirement (e.g. full and part load efficiency) enter both with the appropriate labels (e.g. COP and IEER). 5. In the left column identify the thermostatic requirements from the standard (e.g. programmable setback thermostat or heatpump with electric heat), .  In the right column indicate the 

capabilities of the thermostat as scheduled. 6. If the unit has a furnace which is rated at >=225,000 Btuh of capacity, indicate the rated standby loss and ignition source (e.g. IID).  If there is no furnace or the unit is rated for <225,000 Btuh 

indicate "N/A". 7. In the left column, enter both the required ventilation value from Table 120.1A and for the number of occupants times 15 cfm/person.  In the right column enter the actual minimum 

ventilation as scheduled.  If the space is naturally ventilated enter "N/A" in the left column and "the space is naturally ventilated" in the right column. 8. If the space is required to have either DCV or Occupant Sensor Ventilation Control indicate "required" in the left column (otherwise indicate "N/A" in the left column).  If either DCV or Occupant 

Sensor Ventilation Control is provided indicate "provided" in the right column (otherwise indicate "N/A" in the right column)  9. In the left column indicate the required time controls from the standard.  In the right column identify the device that provides this functionality (e.g. EMCS or programmable timeclock). 10. Enter N/A if there is no electric heating.  If the system has electric heating indicate which exception to 140.4(g) applies. 11. If duct leakage sealing and testing is required, a MCH‐04‐A form must be submitted.

Golden Gate Baptist Seminary 6/13/2015

First Floor West Second Floor West First Floor East

12.4 kWn/aSetbackn/aNR705NR

ReqReqNRNR

12.4 kW11.0 kWSetback

none595No

Programmable SwitchAutonone

5.6 kWn/aSetbackn/aNR872NR

ReqReqNRNR

5.6 kW4.5 kWSetback

none1,279No

Programmable SwitchAutonone

12.4 kWn/aSetbackn/aNR1,434NR

ReqReqNRNR

12.4 kW11.0 kWSetback

none915No

Programmable SwitchAutonone

151,158 Btu/hrReqNo

139,221 Btu/hrNo EconomizerYes No

Req134,014 Btu/hr 71,230 Btu/hr

No EconomizerYes

89,117 Btu/hrReqNo

145,416 Btu/hrNo EconomizerYes

n/a

101,068 Btu/hr

none

144,012 Btu/hr

R-8

136,369 Btu/hr

R-8.0

72,006 Btu/hr

R-8

102,330 Btu/hr

R-8.0

144,012 Btu/hr

NR No NR No NR No

Page 42: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

STATE OF CALIFORNIA

REQUIREMENTS FOR PACKAGED SINGLE ZONE UNITS CEC-NRCC-MCH-05-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE   NRCC‐MCH‐05‐E Requirements for Packaged Single‐Zone Units  (Page 1 of 2) Project Name:  Date Prepared: 

 

CA Building Energy Efficiency Standards ‐ 2013 Nonresidential Compliance    June 2014 

Equipment Tag(s)1 MANDATORY MEASURES  T‐24 Sections Requirement3 As Scheduled3  Requirement3 As Scheduled3 Requirement3 As Scheduled3 Heating Equipment Efficiency4  110.1 or 110.2(a)   Cooling Equipment Efficiency4  110.1 or 110.2(a)   Thermostats5  110.2(b), 110.2(c)   Furnace Standby Loss Control6  110.2(d)   Low Leakage AHU  110.2(f)  Ventilation7  120.1(b)   Demand Control Ventilation8  120.1(c)4    Occupant Sensor Ventilation Control8  120.1(c)5, 120.2(e)3   Shutoff and Reset Controls9  120.2(e)   Outdoor Air and Exhaust Damper Control  120.2(f)   Automatic Demand Shed Controls  120.2(h)   Economizer FDD  120.2(i)   Duct Insulation  120.4    PRESCRIPTIVE MEASURES   Equipment is sized in conformance with 140.4 (a & b) 

140.4(a & b)           

Economizer  140.4(e)   Electric Resistance Heating10  140.4(g)   Duct Leakage Sealing and Testing.11  140.4(l)   Notes: 1. Provide equipment tags (e.g. AC1 or AC1 to 10). Multiple units of the same make and model with the same application and accessories can be grouped together. 2. Enter the following information as appropriate: Unit Manufacturer; Unit Model Number (including all accessories); Description of the unit (e.g. gas‐pack or heat pump; rated heating capacity 

(enter "N/A" if no heating); and, rated cooling capacity (enter "N/A" if no cooling).  For unit capacities include the units (e.g. kBtuh or tons). 3. For each requirement, enter the minimum requirement from the Standard In the left column (under "Standard Requirement").  In the right column (under "As Scheduled") enter the value for 

the units as specified.   4. Where there is more than one requirement (e.g. full and part load efficiency) enter both with the appropriate labels (e.g. COP and IEER). 5. In the left column identify the thermostatic requirements from the standard (e.g. programmable setback thermostat or heatpump with electric heat), .  In the right column indicate the 

capabilities of the thermostat as scheduled. 6. If the unit has a furnace which is rated at >=225,000 Btuh of capacity, indicate the rated standby loss and ignition source (e.g. IID).  If there is no furnace or the unit is rated for <225,000 Btuh 

indicate "N/A". 7. In the left column, enter both the required ventilation value from Table 120.1A and for the number of occupants times 15 cfm/person.  In the right column enter the actual minimum 

ventilation as scheduled.  If the space is naturally ventilated enter "N/A" in the left column and "the space is naturally ventilated" in the right column. 8. If the space is required to have either DCV or Occupant Sensor Ventilation Control indicate "required" in the left column (otherwise indicate "N/A" in the left column).  If either DCV or Occupant 

Sensor Ventilation Control is provided indicate "provided" in the right column (otherwise indicate "N/A" in the right column)  9. In the left column indicate the required time controls from the standard.  In the right column identify the device that provides this functionality (e.g. EMCS or programmable timeclock). 10. Enter N/A if there is no electric heating.  If the system has electric heating indicate which exception to 140.4(g) applies. 11. If duct leakage sealing and testing is required, a MCH‐04‐A form must be submitted.

Golden Gate Baptist Seminary 6/13/2015

Second Floor East OA Tempered Area

12.4 kWn/aSetbackn/aNR951NR

ReqReqNRNR

12.4 kW11.0 kWSetback

none951No

Programmable SwitchAutonone

5.6 kWn/aSetbackn/aNR728NR

ReqReqNRNR

5.6 kW4.5 kWSetback

none417No

Programmable SwitchAutonone

72,122 Btu/hrReqNo

145,844 Btu/hrNo EconomizerYes No

Req159,308 Btu/hr 70,313 Btu/hr

No EconomizerYes

R-8

101,558 Btu/hr

R-8.0

144,012 Btu/hr

R-8

102,489 Btu/hr

R-8.0

72,006 Btu/hr

NR No NR No

Page 43: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

STATE OF CALIFORNIA

REQUIREMENTS FOR PACKAGED SINGLE ZONE UNITS CEC-NRCC-MCH-05-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE   NRCC‐MCH‐05‐E Requirements for Packaged Single‐Zone Units  (Page 2 of 2) Project Name:  Date Prepared: 

 

CA Building Energy Efficiency Standards ‐ 2013 Nonresidential Compliance    June 2014 

 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT1. I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name:  Documentation Author Signature: 

Company:  Signature Date: 

Address:  CEA/ HERS Certification Identification (if applicable): 

City/State/Zip:  Phone: 

RESPONSIBLE PERSON'S DECLARATION STATEMENT   

I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. 2. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible 

designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance 

conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, 

worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement 

agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy.   

Responsible Designer Name:  Responsible Designer Signature: 

Company :  Date Signed: 

Address:  License: 

City/State/Zip:  Phone: 

   

Golden Gate Baptist Seminary 6/13/2015

Nicholas Donzelli

Green Air Heating & Air Conditioning Inc.

5153 C Commercial Circle

Concord, CA 94520

Philip Neumann

Mill Valley, CA 94941

193A W Blithedale

Philip Neumann Energy Design

650-630-4818

6/13/2015

925-28GREEN

Page 44: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

STATE OF CALIFORNIA

FAN POWER CONSUMPTION CEC-NRCC-MCH-07-E (Revised 07/14) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE NRCC-MCH-07-E

Power Consumption of Fans Requirements (Page 1 of 2) Project Name: Date Prepared:

CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance July 2014

January 2014

Constant Volume Fans Systems

NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp of Constant Volume Fan Systems when using the Prescriptive Approach. See Power Consumption of fans §140.4(c).

A B C D E F

FAN DESCRIPTION

DESIGN BRAKE HP

EFFICIENCY

NUMBER OF

FANS

PEAK WATTS B x E x 746 /

(C x D) MOTOR DRIVE

Variable Air Volume Fans Systems

NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp of Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fans §140.4(c).

A B C D E F

FAN DESCRIPTION

DESIGN BRAKE HP

EFFICIENCY

NUMBER OF

FANS

PEAK WATTS B x E x 746 /

(C x D) MOTOR DRIVE

Totals and Adjustments

FILTER PRESSURE ADJUSTMENT Equation 140.4-A in §140.4(c) of the Building Energy Efficiency Standards. A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SPf) on Line 5. B) Calculate Fan Adjustment and enter on line 6. C) Calculate Adjusted Fan Power Index and enter on Row 7

1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUMN F)

W

2) SUPPLY DESIGN AIRFLOW CFM

3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2)1

W/CFM

4) SPa in W.C

or Pa

5) SPf in W.C

or Pa

6) Fan Adjustment = 1-(SPa – 1)/SPf

7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1

W/CFM

1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 w/cfm for Constant Volume systems or 1.25 w/cfm for VAV systems.

187

3,435

0.054

0.021

0.000

100.0 %

100.0 %

FXAQ12MVJU

Exhaust Fan

85.5 %

85.5 %

0.021

0.000

85.5 %

85.5 %

100.0 %

100.0 %

112

0

6.0

1.0

4.0

1.0

75

0

FXAQ07MVJU

Exhaust Fan

Golden Gate Baptist Seminary 6/13/2015

Page 45: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

STATE OF CALIFORNIA

FAN POWER CONSUMPTION CEC-NRCC-MCH-07-E (Revised 07/14) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE NRCC-MCH-07-E

Power Consumption of Fans Requirements (Page 1 of 2) Project Name: Date Prepared:

CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance July 2014

January 2014

Constant Volume Fans Systems

NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp of Constant Volume Fan Systems when using the Prescriptive Approach. See Power Consumption of fans §140.4(c).

A B C D E F

FAN DESCRIPTION

DESIGN BRAKE HP

EFFICIENCY

NUMBER OF

FANS

PEAK WATTS B x E x 746 /

(C x D) MOTOR DRIVE

Variable Air Volume Fans Systems

NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp of Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fans §140.4(c).

A B C D E F

FAN DESCRIPTION

DESIGN BRAKE HP

EFFICIENCY

NUMBER OF

FANS

PEAK WATTS B x E x 746 /

(C x D) MOTOR DRIVE

Totals and Adjustments

FILTER PRESSURE ADJUSTMENT Equation 140.4-A in §140.4(c) of the Building Energy Efficiency Standards. A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SPf) on Line 5. B) Calculate Fan Adjustment and enter on line 6. C) Calculate Adjusted Fan Power Index and enter on Row 7

1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUMN F)

W

2) SUPPLY DESIGN AIRFLOW CFM

3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2)1

W/CFM

4) SPa in W.C

or Pa

5) SPf in W.C

or Pa

6) Fan Adjustment = 1-(SPa – 1)/SPf

7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1

W/CFM

1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 w/cfm for Constant Volume systems or 1.25 w/cfm for VAV systems.

345

2,839

0.121

0.176

0.000

100.0 %

100.0 %

FXMQ24PVJU

Exhaust Fan

85.5 %

85.5 %

0.043

0.000

85.5 %

85.5 %

100.0 %

100.0 %

154

0

1.0

1.0

1.0

1.0

38

0

FXZQ12M7VJU

Exhaust Fan

Golden Gate Baptist Seminary 6/13/2015

Page 46: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

STATE OF CALIFORNIA

FAN POWER CONSUMPTION CEC-NRCC-MCH-07-E (Revised 07/14) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE NRCC-MCH-07-E

Power Consumption of Fans Requirements (Page 1 of 2) Project Name: Date Prepared:

CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance July 2014

January 2014

Constant Volume Fans Systems

NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp of Constant Volume Fan Systems when using the Prescriptive Approach. See Power Consumption of fans §140.4(c).

A B C D E F

FAN DESCRIPTION

DESIGN BRAKE HP

EFFICIENCY

NUMBER OF

FANS

PEAK WATTS B x E x 746 /

(C x D) MOTOR DRIVE

Variable Air Volume Fans Systems

NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp of Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fans §140.4(c).

A B C D E F

FAN DESCRIPTION

DESIGN BRAKE HP

EFFICIENCY

NUMBER OF

FANS

PEAK WATTS B x E x 746 /

(C x D) MOTOR DRIVE

Totals and Adjustments

FILTER PRESSURE ADJUSTMENT Equation 140.4-A in §140.4(c) of the Building Energy Efficiency Standards. A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SPf) on Line 5. B) Calculate Fan Adjustment and enter on line 6. C) Calculate Adjusted Fan Power Index and enter on Row 7

1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUMN F)

W

2) SUPPLY DESIGN AIRFLOW CFM

3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2)1

W/CFM

4) SPa in W.C

or Pa

5) SPf in W.C

or Pa

6) Fan Adjustment = 1-(SPa – 1)/SPf

7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1

W/CFM

1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 w/cfm for Constant Volume systems or 1.25 w/cfm for VAV systems.

345

2,839

0.121

0.176 100.0 %FXMQ24PVJU 85.5 % 1541.0

Golden Gate Baptist Seminary 6/13/2015

Page 47: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

STATE OF CALIFORNIA

FAN POWER CONSUMPTION CEC-NRCC-MCH-07-E (Revised 07/14) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE NRCC-MCH-07-E

Power Consumption of Fans Requirements (Page 1 of 2) Project Name: Date Prepared:

CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance July 2014

January 2014

Constant Volume Fans Systems

NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp of Constant Volume Fan Systems when using the Prescriptive Approach. See Power Consumption of fans §140.4(c).

A B C D E F

FAN DESCRIPTION

DESIGN BRAKE HP

EFFICIENCY

NUMBER OF

FANS

PEAK WATTS B x E x 746 /

(C x D) MOTOR DRIVE

Variable Air Volume Fans Systems

NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp of Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fans §140.4(c).

A B C D E F

FAN DESCRIPTION

DESIGN BRAKE HP

EFFICIENCY

NUMBER OF

FANS

PEAK WATTS B x E x 746 /

(C x D) MOTOR DRIVE

Totals and Adjustments

FILTER PRESSURE ADJUSTMENT Equation 140.4-A in §140.4(c) of the Building Energy Efficiency Standards. A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SPf) on Line 5. B) Calculate Fan Adjustment and enter on line 6. C) Calculate Adjusted Fan Power Index and enter on Row 7

1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUMN F)

W

2) SUPPLY DESIGN AIRFLOW CFM

3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2)1

W/CFM

4) SPa in W.C

or Pa

5) SPf in W.C

or Pa

6) Fan Adjustment = 1-(SPa – 1)/SPf

7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1

W/CFM

1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 w/cfm for Constant Volume systems or 1.25 w/cfm for VAV systems.

631

3,053

0.207

0.172

0.332

100.0 %

100.0 %

FXMQ18PVJU

FXMQ36PVJU

85.5 %

85.5 %

0.176

0.021

85.5 %

85.5 %

100.0 %

100.0 %

150

290

1.0

1.0

1.0

1.0

154

19

FXMQ24PVJU

FXAQ12MVJU

Golden Gate Baptist Seminary 6/13/2015

Page 48: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

STATE OF CALIFORNIA

FAN POWER CONSUMPTION CEC-NRCC-MCH-07-E (Revised 07/14) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE NRCC-MCH-07-E

Power Consumption of Fans Requirements (Page 1 of 2) Project Name: Date Prepared:

CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance July 2014

January 2014

Constant Volume Fans Systems

NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp of Constant Volume Fan Systems when using the Prescriptive Approach. See Power Consumption of fans §140.4(c).

A B C D E F

FAN DESCRIPTION

DESIGN BRAKE HP

EFFICIENCY

NUMBER OF

FANS

PEAK WATTS B x E x 746 /

(C x D) MOTOR DRIVE

Variable Air Volume Fans Systems

NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp of Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fans §140.4(c).

A B C D E F

FAN DESCRIPTION

DESIGN BRAKE HP

EFFICIENCY

NUMBER OF

FANS

PEAK WATTS B x E x 746 /

(C x D) MOTOR DRIVE

Totals and Adjustments

FILTER PRESSURE ADJUSTMENT Equation 140.4-A in §140.4(c) of the Building Energy Efficiency Standards. A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SPf) on Line 5. B) Calculate Fan Adjustment and enter on line 6. C) Calculate Adjusted Fan Power Index and enter on Row 7

1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUMN F)

W

2) SUPPLY DESIGN AIRFLOW CFM

3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2)1

W/CFM

4) SPa in W.C

or Pa

5) SPf in W.C

or Pa

6) Fan Adjustment = 1-(SPa – 1)/SPf

7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1

W/CFM

1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 w/cfm for Constant Volume systems or 1.25 w/cfm for VAV systems.

631

3,053

0.207

0.021 100.0 %FXAQ12MVJU 85.5 % 191.0

Golden Gate Baptist Seminary 6/13/2015

Page 49: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

STATE OF CALIFORNIA

FAN POWER CONSUMPTION CEC-NRCC-MCH-07-E (Revised 07/14) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE NRCC-MCH-07-E

Power Consumption of Fans Requirements (Page 1 of 2) Project Name: Date Prepared:

CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance July 2014

January 2014

Constant Volume Fans Systems

NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp of Constant Volume Fan Systems when using the Prescriptive Approach. See Power Consumption of fans §140.4(c).

A B C D E F

FAN DESCRIPTION

DESIGN BRAKE HP

EFFICIENCY

NUMBER OF

FANS

PEAK WATTS B x E x 746 /

(C x D) MOTOR DRIVE

Variable Air Volume Fans Systems

NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp of Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fans §140.4(c).

A B C D E F

FAN DESCRIPTION

DESIGN BRAKE HP

EFFICIENCY

NUMBER OF

FANS

PEAK WATTS B x E x 746 /

(C x D) MOTOR DRIVE

Totals and Adjustments

FILTER PRESSURE ADJUSTMENT Equation 140.4-A in §140.4(c) of the Building Energy Efficiency Standards. A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SPf) on Line 5. B) Calculate Fan Adjustment and enter on line 6. C) Calculate Adjusted Fan Power Index and enter on Row 7

1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUMN F)

W

2) SUPPLY DESIGN AIRFLOW CFM

3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2)1

W/CFM

4) SPa in W.C

or Pa

5) SPf in W.C

or Pa

6) Fan Adjustment = 1-(SPa – 1)/SPf

7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1

W/CFM

1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 w/cfm for Constant Volume systems or 1.25 w/cfm for VAV systems.

733

2,948

0.249

0.176

0.332

100.0 %

100.0 %

FXMQ24PVJU

FXMQ36PVJU

85.5 %

85.5 %

0.332 85.5 % 100.0 %

154

290

1.0

1.0

1.0 290FXMQ36PVJU

Golden Gate Baptist Seminary 6/13/2015

Page 50: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

STATE OF CALIFORNIA

FAN POWER CONSUMPTION CEC-NRCC-MCH-07-E (Revised 07/14) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE NRCC-MCH-07-E

Power Consumption of Fans Requirements (Page 1 of 2) Project Name: Date Prepared:

CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance July 2014

January 2014

Constant Volume Fans Systems

NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp of Constant Volume Fan Systems when using the Prescriptive Approach. See Power Consumption of fans §140.4(c).

A B C D E F

FAN DESCRIPTION

DESIGN BRAKE HP

EFFICIENCY

NUMBER OF

FANS

PEAK WATTS B x E x 746 /

(C x D) MOTOR DRIVE

Variable Air Volume Fans Systems

NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp of Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fans §140.4(c).

A B C D E F

FAN DESCRIPTION

DESIGN BRAKE HP

EFFICIENCY

NUMBER OF

FANS

PEAK WATTS B x E x 746 /

(C x D) MOTOR DRIVE

Totals and Adjustments

FILTER PRESSURE ADJUSTMENT Equation 140.4-A in §140.4(c) of the Building Energy Efficiency Standards. A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SPf) on Line 5. B) Calculate Fan Adjustment and enter on line 6. C) Calculate Adjusted Fan Power Index and enter on Row 7

1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUMN F)

W

2) SUPPLY DESIGN AIRFLOW CFM

3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2)1

W/CFM

4) SPa in W.C

or Pa

5) SPf in W.C

or Pa

6) Fan Adjustment = 1-(SPa – 1)/SPf

7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1

W/CFM

1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 w/cfm for Constant Volume systems or 1.25 w/cfm for VAV systems.

579

2,260

0.256

0.332 100.0 %FXMQ36PVJU 85.5 % 5792.0

Golden Gate Baptist Seminary 6/13/2015

Page 51: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

STATE OF CALIFORNIA

FAN POWER CONSUMPTION CEC-NRCC-MCH-07-E (Revised 07/14) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE NRCC-MCH-07-E

Power Consumption of Fans Requirements (Page 2 of 2) Project Name: Date Prepared:

CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance July 2014

January 2014

DOCUMENTATION AUTHOR'S DECLARATION STATEMENT

1. I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Documentation Author Signature:

Company: Signature Date:

Address: CEA/ HERS Certification Identification (if applicable):

City/State/Zip: Phone:

RESPONSIBLE PERSON'S DECLARATION STATEMENT

I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. 2. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design

identified on this Certificate of Compliance (responsible designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system

design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations.

4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application.

5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy.

Responsible Designer Name: Responsible Designer Signature:

Company : Date Signed:

Address: License:

City/State/Zip: Phone:

Golden Gate Baptist Seminary 6/13/2015

Nicholas Donzelli

Green Air Heating & Air Conditioning Inc.

5153 C Commercial Circle

Concord, CA 94520

Philip Neumann

Mill Valley, CA 94941

193A W Blithedale

Philip Neumann Energy Design

650-630-4818

6/13/2015

925-28GREEN

Page 52: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

BUILDING ENERGY ANALYSIS REPORT

PROJECT:

Project Designer:

Report Prepared by:

Job Number:

Date: 7/24/15

The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2013 Building Energy Efficiency Standards.

This program developed by EnergySoft, LLC – www.energysoft.com.

990 A Street, Suite KRussell Architects

San Rafael, Ca. 94901(415) 671-8892

38891 Mission Blvd.Golden Gate Baptist Theological Seminary (ENV)

Fremont, Ca.

45 Mitchell Blvd. #16Energy Calc Company

Chuck Clemons

San Rafael, Ca. 94903(415) 457-0990

0901GGB

ID: 0901GGBEnergyPro 6.7 by EnergySoft User Number: 1005

Page 53: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

Project Name: Golden Gate Baptist Theological Seminary NRCC-PRF-01-E Page 1 of 14

Project Address: 38891 Mission Blvd. Fremont Calculation Date/Time: 07:50, Fri, Jul 24, 2015

Compliance Scope: NewEnvelope Input File Name: 0901GGB.xml

CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-09012015-760 Report Generated at: 2015-07-24 07:51:06

A. PROJECT GENERAL INFORMATION

1. Project Location (city) Fremont 7. # of dwelling units 0

2. CA Zip Code 8. Compliance Software (version) EnergyPro 6.7

3. Climate Zone 3 9. Building Orientation (deg) (E) 50 deg

4. Total Conditioned Floor Area 19,868 ft2 10. Permitted Scope of Work NewEnvelope

5. Total Unconditioned Floor Area 0 ft2 11. Building Type(s) Nonresidential

6. # of Stories (Habitable Above Grade) 1

B. COMPLIANCE RESULTS FOR PERFORMANCE COMPONENTS § 140.1

BUILDING COMPLIES1. Energy Component 2. Standard Design (TDV) 3. Proposed Design (TDV) 4. Compliance Margin (TDV) 5. Percent Better than Standard

Space Heating 5.6 6.9 -1.3 -23.2%

Space Cooling 70.6 68.0 2.6 3.7%

Indoor Fans 36.0 34.6 1.4 3.9%

Heat Rejection -- -- -- --

Pumps & Misc. 0.5 0.6 -0.1 -20.0%

Domestic Hot Water -- -- -- --

Indoor Lighting 61.4 61.4 -- 0.0%

COMPLIANCE TOTAL 174.1 171.5 2.6 1.5%

Receptacle 67.6 67.6 0.0%

Process -- -- --

Process Ltg -- -- --

TOTAL 241.7 239.1 1.1%

Page 54: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

Project Name: Golden Gate Baptist Theological Seminary NRCC-PRF-01-E Page 2 of 14

Project Address: 38891 Mission Blvd. Fremont Calculation Date/Time: 07:50, Fri, Jul 24, 2015

Compliance Scope: NewEnvelope Input File Name: 0901GGB.xml

CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-09012015-760 Report Generated at: 2015-07-24 07:51:06

C. PRIORITY PLAN CHECK/ INSPECTION ITEMS (in order of highest to lowest TDV energy savings)

1st Space Cooling: Check envelope and mechanical Compliance Margin By Energy Component (from Table B column 4)

Space CoolingIndoor Fans

Heat RejectionDomestic Hot Water

Indoor LightingPumps & Misc.Space Heating

Penalty Energy Credit

2nd Indoor Fans: Check envelope and mechanical

3rd Heat Rejection: Check envelope and mechanical

4th Domestic Hot Water: Check mechanical

5th Indoor Lighting: Check lighting

6th Pumps & Misc.: Check mechanical

7th Space Heating: Check envelope and mechanical

D. EXCEPTIONAL CONDITIONS

The project shows partial compliance, using envelope-only compliance. The building must show either lighting and mechanical partial compliance or full new building compliance before operation.

The project shows partial compliance, either envelope only or mechanical only, excluding lighting systems. The building must show partial compliance including lighting or full new buildingcompliance or show prescriptive lighting compliance before operation

The aged solar reflectance and aged thermal emittance must be listed in the Cool Roof Rating Council database of certified products. For projects where initial reflectance is used, the initialreflectance must be listed, and the aged reflectance is calculated by the software program and used in the compliance model.

The building does not include service water heating. Verify that service water heating is not required and is not included in the design.

E. HERS VERIFICATION

This Section Does Not Apply

F. ADDITIONAL REMARKS

None Provided

Page 55: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

Project Name: Golden Gate Baptist Theological Seminary NRCC-PRF-01-E Page 3 of 14

Project Address: 38891 Mission Blvd. Fremont Calculation Date/Time: 07:50, Fri, Jul 24, 2015

Compliance Scope: NewEnvelope Input File Name: 0901GGB.xml

CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-09012015-760 Report Generated at: 2015-07-24 07:51:06

G. COMPLIANCE PATH & CERTIFICATE OF COMPLIANCE SUMMARY

Identify which building components use the performance or prescriptive path for compliance. “NA”= not in project

For components that utilize the performance path, indicate the sheet number that includes mandatory notes on plans.

Building Component Compliance Path Compliance Forms (required for submittal)Location of Mandatory Notes onPlans

Envelope

Performance NRCC-PRF-ENV-DETAILS (section of the NRCC-PRF-01-E)

Prescriptive NRCC-ENV-01 / 02 / 03 / 04 / 05 / 06-E

NA

Mechanical

Performance NRCC-PRF-MCH-DETAILS (section of the NRCC-PRF-01-E)

Prescriptive NRCC-MCH-01 / 02 / 03 / 04 / 05 / 06 / 07-E

NA

Domestic Hot Water

Performance NRCC-PRF-PLB-DETAILS (section of the NRCC-PRF-01-E)

Prescriptive NRCC-PLB-01-E

NA

Lighting (Indoor Conditioned)

Performance NRCC-PRF-LTI-DETAILS (section of the NRCC-PRF-01-E)

Prescriptive NRCC-LTI-01 / 02 / 03 / 04 / 05-E

NA

Covered Process:Commercial Kitchens

Performace S2 (section of the NRCC-PRF-01-E)

Prescriptive NRCC-PRC-01/ 03-E

NA

Covered Process:Computer Rooms

Performance S3 (section of the NRCC-PRF-01-E)

Prescriptive NRCC-PRC-01/ 04-E

NA

Covered Process:Laboratory Exhaust

Performace S4 (section of the NRCC-PRF-01-E)

Prescriptive NRCC-PRC-01/ 09-E

NA

Page 56: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

Project Name: Golden Gate Baptist Theological Seminary NRCC-PRF-01-E Page 4 of 14

Project Address: 38891 Mission Blvd. Fremont Calculation Date/Time: 07:50, Fri, Jul 24, 2015

Compliance Scope: NewEnvelope Input File Name: 0901GGB.xml

CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-09012015-760 Report Generated at: 2015-07-24 07:51:06

G. COMPLIANCE PATH & CERTIFICATE OF COMPLIANCE SUMMARY

The following building components are only eligible for prescriptive compliance. Indicate which arerelevant to the project.

The following building components may have mandatory requirements per Part 6. Indicatewhich are relevant to the project.

Yes NA Prescriptive Requirement Compliance Forms Yes NA Mandatory Requirement Compliance Forms

Lighting (IndoorUnconditioned) §140.6

NRCC-LTI-01 / 02 / 03 / 04 / 05-ECommissioning: §120.8

Simple SystemsComplex Systems

NRCC-CXR-01 / 02 / 03 / 05-ENRCC-CXR-01 / 02 / 04 / 05-E

Lighting (Outdoor) §140.7 NRCC-LTO-01 / 02 / 03-E Electrical: §130.5 NRCC-ELC-01-E

Lighting (Sign) §140.8 NRCC-LTS-01-E Solar Ready: §110.10 NRCC-SRA-01 / 02-E

Solar Thermal WaterHeating: §140.5

NRCC-STH-01-E

Covered Process: §120.6Parking Garage

Commercial RefrigerationWarehouse Refrigeration

Compressed AirProcess Boilers

NRCC-PRC-01-ENRCC-PRC-02-ENRCC-PRC-05-ENRCC-PRC-06/07/08-ENRCC-PRC-10-ENRCC-PRC-11-E

Page 57: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

Project Name: Golden Gate Baptist Theological Seminary NRCC-PRF-01-E Page 5 of 14

Project Address: 38891 Mission Blvd. Fremont Calculation Date/Time: 07:50, Fri, Jul 24, 2015

Compliance Scope: NewEnvelope Input File Name: 0901GGB.xml

CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-09012015-760 Report Generated at: 2015-07-24 07:51:06

H. CERTIFICATE OF INSTALLATION, CERTIFICATE OF ACCEPTANCE & CERTIFICATE OF VERIFICATION SUMMARY (NRCI/NRCA/NRCV) –Documentation Author to indicate which Certificates must be submitted for the features to be recognized for compliance(Retain copies and verify forms are completed and signed to post in field for Field Inspector to verify).See Tables G. and H. in MCH and LTI Details Sections for Acceptance Tests and forms by equipment.

Confirmed

Building Component Compliance Forms (required for submittal) Pass Fail

Envelope NRCI-ENV-01-E - For all buildings

NRCA-ENV-02-F- NFRC label verification for fenestration

Mechanical

 NRCI-MCH-01-E - For all buildings with Mechanical Systems

NRCA-MCH-02-A- Outdoor Air

NRCA-MCH-03-A – Constant Volume Single Zone HVAC

NRCA-MCH-04-H- Air Distribution Duct Leakage

NRCA-MCH-05-A- Air Economizer Controls

NRCA-MCH-06-A- Demand Control Ventilation

NRCA-MCH-07-A – Supply Fan Variable Flow Controls

NRCA-MCH-08-A- Valve Leakage Test

NRCA-MCH-09-A – Supply Water Temp Reset Controls

NRCA-MCH-10-A- Hydronic System Variable Flow Controls

NRCA-MCH-11-A – Auto Demand Shed Controls

NRCA-MCH-12-A- Packaged Direct Expansion Units

NRCA-MCH-13-A- Air Handling Units and Zone Terminal Units

NRCA-MCH-14-A- Distributed Energy Storage

NRCA-MCH-15-A – Thermal Energy Storage

NRCA-MCH-16-A- Supply Air Temp Reset Controls

NRCA-MCH-17-A – Condensate Water Temp Reset Controls

NRCA-MCH-18-A- Energy Management Controls Systems

NRCV-MCH-04-H- Duct Leakage Test

Page 58: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

Project Name: Golden Gate Baptist Theological Seminary NRCC-PRF-01-E Page 6 of 14

Project Address: 38891 Mission Blvd. Fremont Calculation Date/Time: 07:50, Fri, Jul 24, 2015

Compliance Scope: NewEnvelope Input File Name: 0901GGB.xml

CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-09012015-760 Report Generated at: 2015-07-24 07:51:06

H. CERTIFICATE OF INSTALLATION, CERTIFICATE OF ACCEPTANCE & CERTIFICATE OF VERIFICATION SUMMARY (NRCI/NRCA/NRCV) –Documentation Author to indicate which Certificates must be submitted for the features to be recognized for compliance(Retain copies and verify forms are completed and signed to post in field for Field Inspector to verify).See Tables G. and H. in MCH and LTI Details Sections for Acceptance Tests and forms by equipment.

Confirmed

Building Component Compliance Forms (required for submittal) Pass Fail

Plumbing

 NRCI-PLB-01-E - For all buildings with Plumbing Systems

NRCI-PLB-02-E - required on central systems in high‐rise residential, hotel/motel application.

NRCI-PLB-03-E - Single dwelling unit systems in high‐rise residential, hotel/motel application.

NRCI-PLB-21-E - HERS verified central systems in high‐rise residential, hotel/motel application.

NRCI-PLB-22-E - HERS verified single dwelling unit systems in high‐rise residential, hotel/motel application.

NRCV-PLB-21-H- HERS verified central systems in high‐rise residential, hotel/motel application.

NRCV-PLB-22-H - HERS verified single dwelling unit systems in high‐rise residential, hotel/motel application.

NRCI-STH-01-E - Any solar water heating

Indoor Lighting

 NRCI-LTI-01-E - For all buildings

NRCI-LTI-02-E - Lighting control system, or for an Energy Management Control System (EMCS)

  NRCI-LTI-03-E - Line-voltage track lighting integral current limiter, or for a supplementary overcurrent protection panel used toenergize only line-voltage track lighting

NRCI-LTI-04-E - Two interlocked systems serving an auditorium, a convention center, a conference room, or a theater

NRCI-LTI-05-E - Lighting Control Credit Power Adjustment Factor (PAF)

NRCI-LTI-06-E - Additional wattage installed in a video conferencing studio

NRCA-LTI-02-A - Occupancy sensors and automatic time switch controls.

NRCA-LTI-03-A - Automatic daylighting controls

NRCA-LTI-04-A - Demand responsive lighting controls

Outdoor Lighting

 NRCI-LTO-01-E – Outdoor Lighting

NRCI-LTO-02-E- EMCS Lighting Control System

NRCA-LTO-02-A - Outdoor Lighting Control

Sign Lighting  NRCI-LTS-01-E – Sign Lighting

Electrical  NRCI-ELC-01-E - Electrical Power Distribution

Photovoltaic  NRCI-SPV-01-E Photovoltaic Systems

Page 59: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

Project Name: Golden Gate Baptist Theological Seminary NRCC-PRF-01-E Page 7 of 14

Project Address: 38891 Mission Blvd. Fremont Calculation Date/Time: 07:50, Fri, Jul 24, 2015

Compliance Scope: NewEnvelope Input File Name: 0901GGB.xml

CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-09012015-760 Report Generated at: 2015-07-24 07:51:06

H. CERTIFICATE OF INSTALLATION, CERTIFICATE OF ACCEPTANCE & CERTIFICATE OF VERIFICATION SUMMARY (NRCI/NRCA/NRCV) –Documentation Author to indicate which Certificates must be submitted for the features to be recognized for compliance(Retain copies and verify forms are completed and signed to post in field for Field Inspector to verify).See Tables G. and H. in MCH and LTI Details Sections for Acceptance Tests and forms by equipment.

Confirmed

Building Component Compliance Forms (required for submittal) Pass Fail

Covered Process

 NRCI-PRC-01-E Refrigerated Warehouse

NRCA-PRC-01-F- Compressed Air Systems

NRCA-PRC-02-F- Kitchen Exhaust

NRCA-PRC-03-F- Garage Exhaust

NRCA-PRC-04-F- Refrigerated Warehouse- Evaporator Fan Motor Controls

NRCA-PRC-05-F- Refrigerated Warehouse- Evaporative Condenser Controls

NRCA-PRC-06-F- Refrigerated Warehouse- Air Cooled Condenser Controls

NRCA-PRC-07F- Refrigerated Warehouse- Variable Speed Compressor

NRCA-PRC-08-F- Electrical Resistance Underslab Heating System

I. ENVELOPE GENERAL INFORMATION (See NRCC-PRF-ENV-DETAILS for more information)

1. Total Conditioned Floor Area 19,868 ft2 5. Number of Floors Above Grade 1 Confirmed

2. Total Unconditioned Floor Area 0 ft2 6. Number of Floors Below Grade 0

Pass

Fail

3. Addition Conditioned Floor Area 0 ft2

4. Addition Unconditioned Floor Area 0 ft2

7. Opaque Surfaces & Orientation 8. Total Gross Surface Area 9. Total Fenestration Area 10. Window to Wall Ratio

North Wall 1,520 ft2 414 ft2 27.2%

East Wall 4,872 ft2 2,210 ft2 45.4%

South Wall 1,520 ft2 414 ft2 27.2%

West Wall 5,184 ft2 2,076 ft2 40.0%

Total 13,096 ft2 5,114 ft2 39.0%

Roof 10,377 ft2 0 ft2 00.0%

Page 60: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

Project Name: Golden Gate Baptist Theological Seminary NRCC-PRF-01-E Page 8 of 14

Project Address: 38891 Mission Blvd. Fremont Calculation Date/Time: 07:50, Fri, Jul 24, 2015

Compliance Scope: NewEnvelope Input File Name: 0901GGB.xml

CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-09012015-760 Report Generated at: 2015-07-24 07:51:06

J. FENESTRATION ASSEMBLY SUMMARY § 110.6 Confirmed

1. 2. 3. 4. 5. 6. 7. 8. 9. Pass

FailFenestration Assembly Name /Tag or I.D.

Fenestration Type Certification Method1 Assembly Method Area ft2OverallU-factor

OverallSHGC

OverallVT

Status2

Milgard Low-E Vinyl VerticalFenestration NFRCRated Manufactured 3382 0.36 0.32 0.50 N

NFRC Curtain Wall VerticalFenestration NFRCRated Manufactured 1732 0.38 0.35 0.63 N1 Newly installed fenestration shall have a certified NFRC Label Certificate or use the CEC default tables found in Table 110.6-A and Table 110.6-B. Site-built fenestration less than 1,000 ft2, or more than or equal to 1,000 ft2 see Reference NonresidentialAppendix NA6.2 Status: N - New, A – Altered, E – Existing

Taking compliance credit for fenestration shading devices? (if "Yes", see NRCC-PRF-ENV-DETAILS for more information)

K. OPAQUE SURFACE ASSEMBLY SUMMARY § 120.7/ § 140.3 Confirmed

1. 2. 3. 4. 5. 6. 7. 8. Pass

Fail

Surface Name Surface Type Area (ft2)FramingType

CavityR-Value

ContinuousR-Value

U-Factor / F-Factor/ C-Factor

Status1

R-30 Roof4 Roof 10377 NA 0 30 U-Factor: 0.031 N

R-19 Wall6 ExteriorWall 13096 Wood 19 NA U-Factor: 0.072 N

Slab On Grade21 UndergroundFloor 10377 NA 0 NA F-Factor: 0.730 N

R-0 Floor No Crawlspace34 InteriorFloor 9551 NA 0 NA U-Factor: 0.220 N1 Status: N - New, A – Altered, E – Existing

L. ROOFING PRODUCT SUMMARY § 140.3 Confirmed

1. 2. 3. 4. 5. 6. 7. Pass

Fail

Product Type Product ≥25 lb ft2Aged SolarReflectance

ThermalEmittance

SRICool RoofCredit

CRRC Product ID Number

R-30 Roof4 No 0.68 0.84 Not Provided Yes CRRC Prod. ID: R-30 Roof

M. HVAC SYSTEM SUMMARY (see NRCC-PRF-MCH-DETAILS for more information)

This Section Does Not Apply

N. ECONOMIZER & FAN SYSTEMS SUMMARY1 § 140.4

This Section Does Not Apply

Page 61: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

Project Name: Golden Gate Baptist Theological Seminary NRCC-PRF-01-E Page 9 of 14

Project Address: 38891 Mission Blvd. Fremont Calculation Date/Time: 07:50, Fri, Jul 24, 2015

Compliance Scope: NewEnvelope Input File Name: 0901GGB.xml

CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-09012015-760 Report Generated at: 2015-07-24 07:51:06

1 Mechanical ventilation calculations and exhaust fans are included in the NRCC-PRF-MCH-DETAILS section

O. EQUIPMENT CONTROLS § 120.2

This Section Does Not Apply

P. SYSTEM DISTRIBUTION SUMMARY § 120.4/ § 140.4(i)

This Section Does Not Apply

Multifamily or Hotel/ Motel Occupancy? (if "Yes", see NRCC-PRF-MCH-DETAILS for DHW system information) No

Q. INDOOR CONDITIONED LIGHTING GENERAL INFO (see NRCC-PRF-LTI-DETAILS for more info)

This Section Does Not Apply

R. INDOOR CONDITIONED LIGHTING SCHEDULE (Adapted from NRCC-LTI-01-E)1 § 130.0

This Section Does Not Apply1If lighting power densities were used in the compliance model Building Departments will need to check prescriptive forms for Luminaire Schedule details.

S1. COVERED PROCESS SUMMARY – ENCLOSED PARKING GARAGES § 140.9

This Section Does Not Apply

S2. COVERED PROCESS SUMMARY – COMMERCIAL KITCHENS § 140.9

This Section Does Not Apply

S3. COVERED PROCESS SUMMARY – COMPUTER ROOMS § 140.9

This Section Does Not Apply

S4. COVERED PROCESS SUMMARY – LABORATORY EXHAUSTS § 140.9

This Section Does Not Apply

T. UNMET LOAD HOURS

This Section Does Not Apply

Page 62: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

Project Name: Golden Gate Baptist Theological Seminary NRCC-PRF-01-E Page 10 of 14

Project Address: 38891 Mission Blvd. Fremont Calculation Date/Time: 07:50, Fri, Jul 24, 2015

Compliance Scope: NewEnvelope Input File Name: 0901GGB.xml

CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-09012015-760 Report Generated at: 2015-07-24 07:51:06

U. ENERGY USE SUMMARY

Electric(kWh/yr)

Natural Gas(therms/yr)

Total Annual Baseline 155337 599.865

Total Annual Proposed 153613 756.915

Page 63: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

Project Name: Golden Gate Baptist Theological Seminary NRCC-PRF-01-E Page 11 of 14

Project Address: 38891 Mission Blvd. Fremont Calculation Date/Time: 07:50, Fri, Jul 24, 2015

Compliance Scope: NewEnvelope Input File Name: 0901GGB.xml

CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-09012015-760 Report Generated at: 2015-07-24 07:51:06

DOCUMENTATION AUTHOR'S DECLARATION STATEMENT § 10-103

I certify that this Certificate of Compliance documentation is accurate and complete.

Documentation Author Name: Chuck ClemonsSignature:

Company: Energy Calc Company

Address: 45 Mitchell Blvd. #16 Signature Date:

City/State/Zip: San Rafael Ca. 94903 CEA Identification (If applicable):

Phone: (415) 457-0990

RESPONSIBLE PERSON'S DECLARATION STATEMENT

I certify the following under penalty of perjury, under the laws of the State of California:

1I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I amlicensed in the State of California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect.

2I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code by section 5537.2 or 6737.3 to sign this document as the person responsible for itspreparation; and that I am a licensed contractor performing this work.

3I affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document because it pertains to a structure or type of work described as exempt pursuant toBusiness and Professions Code Sections 5537, 5538 and 6737.1.

Responsible Envelope Designer Name:Signature:

Company: Russell Architects

Address: 990 A Street, Suite K Date Signed:

City/State/Zip: San Rafael Ca. 94901 Declaration Statement Type:

Phone: (415) 671-8892 Title: License #:

Responsible Lighting Designer Name:Signature:

Company:

Address: Date Signed:

City/State/Zip: Declaration Statement Type:

Phone: Title: License #:

Responsible Mechanical Designer Name: - specify -Signature:

Company:

Address: Date Signed:

City/State/Zip: Declaration Statement Type:

Phone: Title: License #:

Chuck Clemons
Typewritten Text
9-3-15
Chuck Clemons
Stamp
irishaubert
Text Box
7-24-15
Page 64: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

Project Name: Golden Gate Baptist Theological Seminary NRCC-PRF-01-E Page 12 of 14

Project Address: 38891 Mission Blvd. Fremont Calculation Date/Time: 07:50, Fri, Jul 24, 2015

Compliance Scope: NewEnvelope Input File Name: 0901GGB.xml

CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-09012015-760 Report Generated at: 2015-07-24 07:51:06

NRCC-PRF-ENV-DETAILS -SECTION START-

A. OPAQUE SURFACE ASSEMBLY DETAILS Confirmed

1. 2. 3. 4. Pass

Fail

Surface Name Surface Type Description of Assembly Layers Notes

R-30 Roof4 Roof

Built-up roofing - 3/8 in.Plywood - 1/2 in.

Air - Cavity - Wall Roof Ceiling - 4 in. or moreMetal Deck - 1/16 in.

Extruded Polystyrene - XPS - 6 in. R30.00

R-19 Wall6 ExteriorWall

Stucco - 7/8 in.Vapor permeable felt - 1/8 in.

Wood framed wall, 16in. OC, 5.5in., R-19Gypsum Board - 1/2 in.

Slab On Grade21 UndergroundFloor

R-0 Floor No Crawlspace34 InteriorFloorPlywood - 1/2 in.Carpet - 3/4 in.

B. OVERHANG DETAILS (Adapted from NRCC-ENV-02-E)

This Section Does Not Apply

C. OPAQUE DOOR SUMMARY Confirmed

1. 2. 3. 4. 5.

Pass FailOpaque Door Assembly Name / Tagor I.D.

Door Type Certification Method Operation Overall U-factor

NRCC-PRF-MCH-DETAILS -SECTION START-

A. MECHANICAL VENTILATION AND REHEAT (Adapted from 2013-NRCC-MCH-03-E)

This Section Does Not Apply

B. ZONAL SYSTEM AND TERMINAL UNIT SUMMARY

This Section Does Not Apply

Page 65: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

Project Name: Golden Gate Baptist Theological Seminary NRCC-PRF-01-E Page 13 of 14

Project Address: 38891 Mission Blvd. Fremont Calculation Date/Time: 07:50, Fri, Jul 24, 2015

Compliance Scope: NewEnvelope Input File Name: 0901GGB.xml

CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-09012015-760 Report Generated at: 2015-07-24 07:51:06

C. EXHAUST FAN SUMMARY

This Section Does Not Apply

D. DHW EQUIPMENT SUMMARY – (Adapted from NRCC-PLB-01)

This Section Does Not Apply

E. MULTI-FAMILY CENTRAL DHW SYSTEM DETAILS

This Section Does Not Apply

F. SOLAR HOT WATER HEATING SUMMARY (Adapted from NRCC-STH-01)

This Section Does Not Apply

G. MECHANICAL HVAC ACCEPTANCE TESTS & FORMS (Adapted from 2013-NRCC-MCH-01-E) § RA4

This Section Does Not Apply

NRCC-PRF-LTI-DETAILS -SECTION START-

A. INDOOR CONDITIONED LIGHTING CONTROL CREDITS (Adapted from NRCC-LTI-02-E) § 140.6

This Section Does Not Apply

B. INDOOR CONDITIONED LIGHTING MANDATORY LIGHTING CONTROLS (Adapted from NRCC-LTI-02-E) § 130.1

This Section Does Not Apply

C. TAILORED METHOD LIGHTING POWER ALLOWANCE SUMMARY AND CHECKLIST (Adapted from NRCC-LTI-04-E) § 140.6

This Section Does Not Apply

D. GENERAL LIGHTING POWER (Adapted from NRCC-LTI-04-E) § 140.6-D

This Section Does Not Apply

E. GENERAL LIGHTING FROM SPECIAL FUNCTION AREAS (Adapted from NRCC-LTI-04-E) § 140.6(c) 3H

This Section Does Not Apply

Page 66: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

Project Name: Golden Gate Baptist Theological Seminary NRCC-PRF-01-E Page 14 of 14

Project Address: 38891 Mission Blvd. Fremont Calculation Date/Time: 07:50, Fri, Jul 24, 2015

Compliance Scope: NewEnvelope Input File Name: 0901GGB.xml

CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-09012015-760 Report Generated at: 2015-07-24 07:51:06

F. ROOM CAVITY RATIO (Adapted from NRCC-LTI-04-E)

This Section Does Not Apply

G. ADDITIONAL "USE IT OR LOSE IT" (Adapted from NRCC-LTI-04-E)

This Section Does Not Apply

H. INDOOR & OUTDOOR LIGHTING ACCEPTANCE TESTS & FORMS (Adapted from NRCC-LTI-01-E and NRCC-LTO-01-E) § 130.4

This Section Does Not Apply

Page 67: BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer - Title 24... · BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: SANTA ROSA, CA 95407 Report Prepared by: Job

ENVELOPE MANDATORY MEASURES: NONRESIDENTIAL ENV-MM Project Name Date

DESCRIPTION Building Envelope Measures:

§110.8(a):Installed insulating material shall have been certified by the manufacturer to comply with the California Quality Standards for insulating material, Title 20 Chapter 4, Article 3.

§110.8(c):All Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of Sections 2602 and 707 of Title 24, Part 2.

§110.8(f):The opaque portions of framed demising walls in nonresidential buildings shall have insulation with an installed R-value of no less than R-13 between framing members.

§110.7(a):All Exterior Joints and openings in the building that are observable sources of air leakage shall be caulked, gasketed, weatherstripped or otherwise sealed.

§110.6(a):Manufactured fenestration products and exterior doors shall have air infiltration rates not exceeding 0.3 cfm/ft.² of window area, 0.3 cfm/ft.² of door area for residential doors, 0.3 cfm/ft.² of door area for nonresidential single doors (swinging and sliding), and 1.0 cfm/ft.² for nonresidential double doors (swinging).

§110.6(a): Fenestration U-factor shall be rated in accordance with NFRC 100, or the applicable default U-factor.

§110.6(a) :Fenestration SHGC shall be rated in accordance with NFRC 200, or NFRC 100 for site-built fenestration, or the applicable default SHGC.

§110.6(b):Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be weatherstripped (except for unframed glass doors and fire doors).

Golden Gate Baptist Theological Seminary (ENV) 7/24/2015