building material prices march 2014 documents/building...bitumen / r c 250 barrel / 200 kg - - -...
TRANSCRIPT
Cement
0.0
0.0
Aggregates and sand
0.0
20.0
Concrete
0.0
-4.4
Steel
-0.2
-4.9
Wood
1.5
9.6
Block
0.0
-1.5
Roofing materials
0.0
0.0
Waterproofing products
-0.3
2.5
Waterproofing bitum
i-nous m
embrane
n.a.
n.a.
Natural stone
0.0
18.0
Tiles and Aprble
0.0
-0.4
Bathroom set w
ithout accessories
0.0
1.6
Bathroom set w
ith ac-cessories
0.0
-5.4
Sink stainless steel with
mixer-single
0.0
-6.0
False ceiling
0.0
-1.5
Paints
-0.5
-1.1
Glass
0.0
0.9
(PVC) pipes
2.2
-4.4
(uPVC) pipes
-1.0
-1.9
Small building
0.0
-2.6
Apartm
ents
0.0
-7.1
Residential towers
0.0
-3.8
Power cable
-3.8
-7.5
Transport equipment
0.0
-2.2
Employm
ent
5.8
1.0
Diesel
0.0
0.0
www.scad.aeFor More Information please Visit:
Feb. 2014 /Mar. 2014
Mar. 2013 /Mar. 2014%
%
During March 2014 the average prices of the “Employment”, “(PVC) Pipes”, and “Wood” groups increased by 5.8%, 2.2%, and 1.5% respectively, compared with February 2014.
This publication provides an analysis of the movement of the average prices of building materials during the month of March 2014 compared with February 2014 and March 2013. The key changes were:
During March 2014 the average prices of the “Power cable” group decreased by 3.8%, “(uPVC) Pipes” by 1.0% and “Paints” by 0.5% compared with February 2014.
During March 2014 the average prices of “Aggregates and sand” increased by 20.0%, “Natural stone” by 18.0%, “Wood” by 9.6% and “Waterproofing products” by 2.5% compared with March 2013.
During March 2014, the average prices of “Power cable”, “Wires for apartments”, and “Sanitary ware- Sink stainless steel with mixer-single” decreased by 7.5%, 7.1% and 6.0% respectively, compared with the same period in the last year.
Building Material Prices
Percentage change in the monthly average prices of building materials for March 2014, compared with February 2014 and March 2013.
March 2014
............................................................................................................................................................................................................................................
............................................................................................................................................................................................................................................
............................................................................................................................................................................................................................................
............................................................................................................................................................................................................................................
............................................................................................................................................................................................................................................
............................................................................................................................................................................................................................................
............................................................................................................................................................................................................................................
............................................................................................................................................................................................................................................
............................................................................................................................................................................................................................................
............................................................................................................................................................................................................................................
............................................................................................................................................................................................................................................
............................................................................................................................................................................................................................................
............................................................................................................................................................................................................................................
............................................................................................................................................................................................................................................
............................................................................................................................................................................................................................................
............................................................................................................................................................................................................................................
............................................................................................................................................................................................................................................
............................................................................................................................................................................................................................................
............................................................................................................................................................................................................................................
............................................................................................................................................................................................................................................
............................................................................................................................................................................................................................................
............................................................................................................................................................................................................................................
............................................................................................................................................................................................................................................
............................................................................................................................................................................................................................................
............................................................................................................................................................................................................................................
............................................................................................................................................................................................................................................
............................................................................................................................................................................................................................................
Key Points
adstatistics
Percentage change of employment during March 2014 to February 2014
%
12
10
8
6
4
2
0%% %%%%%0.00.0 6.35.911.111.16.7
14.380.070.0Aggregates / Crush 3/4 / m3 / U.A.E.25.075.060.0Aggregates / Ordinary 3/4 / m3 / U.A.E.
0.070.070.0Aggregates / Crush 3/8 / m3 / U.A.E.40.070.050.0Aggregates / Ordinary 3/8 / m3 / U.A.E.
-60.0-Aggregates / Material Sand / m3 / U.A.E.9.145.041.3Sand / White / m3 / U.A.E.
26.360.047.5Sand / Black / m3 / U.A.E.14.340.035.0Sand / Red / m3 / U.A.E.
-4.4215.0225.0Concrete Ready Mix / Normal ( neutin 40) / m3/ U.A.E.-4.3220.0230.0Concrete Ready Mix / Sulphate Resistance / m3/ U.A.E.
1.73,000.02,950.0Steel / Flat Steel / Ton / Turkey---Steel / Flat Steel / Ton / Dubai
-9.13,000.03,300.0Steel / Beams Steel / Big / Ton / Korea-9.13,000.03,300.0Steel / Beams Steel / Big / Ton / China
---Steel / Beams Steel / Big / Ton / Ukraine-4.03,000.03,125.0Steel / Beams Steel / Small / Ton / Korea-4.03,000.03,125.0Steel / Beams Steel / Small / Ton / Japan
---Steel / Beams Steel / Small / Ton / Ukraine1.63,150.03,100.0Steel / Steel Angled / Ton / Korea1.63,150.03,100.0Steel / Steel Angled / Ton / China
---Steel / Steel Angled / Ton / Turkey-19.22,625.03,250.0Steel / Bars, 6 - 8 mm / Ton / Turkey-18.62,300.02,825.0Steel / Bars,10-25 mm / Ton / Qatar-18.62,300.02,825.0Steel / Bars,10-25 mm / Ton / U.A.E.-18.62,300.02,825.0Steel / Bars,10-25 mm / Ton / Turkey
-7.02,325.02,500.0Steel / Hightensile Steel / Ton / Qatar-7.52,300.02,485.3Steel / High tensile Steel / Ton / Turkey-7.52,300.02,485.3Steel / High tensile Steel / Ton / U.A.E.12.070.062.5B.R.C. Mesh / 6 mm (142) / Piece / U.A.E.
7.395.088.5B.R.C. Mesh / 7 mm (193) / Piece / U.A.E.3.0118.5115.0B.R.C. Mesh / 8mm (252) / Piece /U.A.E.
17.141.035.0Wire / Binding Wire / Bundle-10Kg / China
-5.0855.0900.0White / White Wood / m3 / Chile0.0875.0875.0White / White Wood / m3 /Romania
-67.0-Red Timber \ Big / Keruing/ sheet / Malaysia-5.873.578.0Red Timber \ Small / Merionti/ sheet / Malaysia
-76.0-Red Timber \ Small / Keruing/ sheet/ Malaysia21.670.558.0Red Timber \ Small / Merionti/ sheet / Malaysia
1.228.328.0White Plywood / 4x8x3.6 mm / Sheet/ Indonesia1.838.738.0White Plywood / 4x8x6 mm / Sheet/ Indonesia3.661.759.5White Plywood / 4x8x9 mm / Sheet/ Indonesia5.780.376.0White Plywood / 4x8x12 mm / Sheet/ Indonesia4.8116.3111.0White Plywood / 4x8x18 mm / Sheet/ Indonesia
25.035.028.0Red Teak Faced Plywood / 3x7x3.6 mm/ Sheet/ Indonesia7.145.042.0Red Teak Faced Plywood / 4x8x3.6 mm / Sheet/ Indonesia6.8117.5110.0Marine Plywood Humidity Resistance / 12 mm /Sheet/ Indonesia
17.4135.0115.0Marine Plywood Humidity Resistance / 18 mm /Sheet/ Indonesia
-5.91,600.01,700.0Hollow / 4” 10x20x40 cm/ Thousand / U.A.E-2.71,800.01,850.0Hollow / 6 « 15x20x40 cm / Thousand U.A.E 0.02,000.02,000.0Hollow / 8 « 20x20x40 cm / Thousand U.A.E4.22,500.02,400.0Solid / 4” 10x20x40 cm/ Thousand / U.A.E1.92,750.02,700.0Solid / 6 « 15x20x40 cm / Thousand / U.A.E
-6.13,100.03,300.0Solid / 8 « 20x20x40 cm / ThouSand / U.A.E---Hourdis Hollow / 20x20x40 cm / Thousand / U.A.E---Clay Tiles / Clay (Pica) / m³ / U.A.E
0.029.029.0Zinc Sheet / Corrugated 8 Feet / Strong / India0.019.019.0Zinc Sheet / Corrugated 8 Feet / Light / India
0.0850.0850.0Bitumen / Oxidized Hot(115/15) primer 180 kg / S . Arabia15.4150.0130.0Bitumen / Oxidized Cold (Primer D 41) 20 liter / S . Arabia
--125.0Bitumen / Waterproofing (D540)/ S . Arabia--145.0Bitumen / Waterproofing (D540M) aggregates / S . Arabia
-6.02,200.02,340.0Bitumen / 60/70 / Ton -3.82,310.02,400.0Bitumen / 50/40 / Ton
---Bitumen / S S barrel / 1 inch / 200 kg---Bitumen / M S 70 barrel / 200 kg---Bitumen / R C 250 barrel / 200 kg
4.3120.0115.0False Ceiling / Alumin Luxalon / m² / U.A.E-7.760.065.0False Ceiling / Gypsum Ceiling(9.5 mm) / m² / U.A.E0.060.060.0False Ceiling / Gypsum Printing / m² / U.A.E
-7.165.070.0False Ceiling / CelotexCeiling 60x60 cm- 15 mm / m² / S.Arabian13.6125.0110.0False Ceiling / Acoustic Ceiling 30x30 cm / m² / S.Arabian
-10.090.0100.0False Ceiling / Iron 60x60 , 5 mm / m² / U.A.E
0.025.025.0Terrazzo Tiles / 30x30 cm / m² / U.A.E-2.025.025.5Terrazzo Tiles / 25x25 cm / m² / U.A.E0.0137.5137.5 Marble Tiles / Carrara 30*60*2 cm / m² / Italy0.0480.0480.0 Marble Tiles / 40x40x2 cm,White (Bynco B) / m² / Italy0.0250.0250.0 Marble Tiles / Traventino 40x40x2 cm Beige / m² / Italy0.0400.0400.0 Marble Tiles /Arabskato 40x40x2 cm / m² / Italy0.0500.0500.0 Marble Tiles /Garanite Labrador 60x30x2 cm / m² / Italy
-3.7173.3180.0 Marble Tiles Perlato / Royal 30*60*2 cm / m² / Italy4.2143.3137.5 Marble Tiles Perlato / cecelia 30*60*2 cm / m² / Italy0.022.022.0Ceramic Tiles For Floor / 20x20/ m² /Al Fujaira0.023.023.0Ceramic Tiles For Floor / 20x20/ m² /Ras Al kaima
-11.140.045.0Ceramic Tiles For Floor / 20x20/ m² /Spain-60.0-Ceramic Tiles For Floor / 20x20/ m² /Italy---Ceramic Tiles For Wall / 40*25 / m² / Ras Al kaima---Ceramic Tiles For Wall Granneti / 20 × 20 cm / m² / Ras Al kaima---Ceramic Tiles For Wall Granneti / 30 × 30 cm / m² / Ras Al kaima
4.523.022.0Ceramic Tiles For Wall Granneti /40 × 40 cm / m² / Ras Al kaima-28.333.346.5Porcelain white tiles / 20*30 / m² / Al Fujaira-35.834.053.0Porcelain white tiles /20*30 / m² / Spain
0.025.025.0Porcelain white tiles / 40*40 / m² / Ras Al kaima---Porcelain white tiles / 40*40 / m² / Spain
0.023.023.0Porcelain white tiles / 20*30 / m² / Al Fujaira-65.9-Porcelain white tiles /20*30 / m² / Spain
120.0110.050.0Porcelain color tiles /10*10 / m² / Spain-60.0-Porcelain color tiles / 25*20 / m² / Spain
20.09.07.5PVC Pipes / 1/2” / 6m /U.A.E0.011.611.6PVC Pipes / 3/4” / 6m /U.A.E
-2.815.916.4PVC Pipes / 1” / 6m /U.A.E0.030.530.5PVC Pipes / 1,5 « / 6m /U.A.E
-7.040.043.0PVC Pipes / 2 « / 6m /U.A.E-61.0-PVC Pipes / 2,5 « / 6m /U.A.E-86.0-PVC Pipes / 3 « / 6m /U.A.E
-3.667.468.7uPVC Pipe/ 110mm /PN-10/6 m-3.6144.2147.0uPVC Pipe/ 160mm/ PN-10/6m-3.6223.4227.7uPVC Pipe/ 200mm/ PN-10/6m-3.61,383.41,410.0uPVC Pipe /1500mm /PN-10/6m
0.060.060.0Paints / Jollofex normal emulsion / dram/ U.A.E-60.0-Paints / Durosan matt emulsion /Gallon /U.A.E
0.085.085.0Mamorex Paint / Fenomastic plastic emulsion /Gallon /U.A.E-7.760.065.0Mamorex Paint / Bangalac glos /Gallon /U.A.E0.0200.0200.0Mamorex Paint / Heavy tex with arbl / dram/ U.A.E0.0230.0230.0Mamorex Paint / Heavy tex w/o Marbl clips / dram / U.A.E
-8.5306,710.0335,350.0CU 11kv, 3*24 mm²-7.7354,210.0383,830.0CU 33kv, 3*24 mm²-6.3594,380.0634,330.0CU 132kv, 1*800 mm²
March 2014
Prices of Building Materials
Sulphate Resistance /Al- Etihad /Ton/ U.A.E. 300.0 300.0 0.0Sulphate Resistance /E Marate /Ton/ U.A.E." - - -Portland Cement / Al- Ethad / Ton / U.A.E." 260.0 260.0 0.0White Cement / Al- Ethad / Ton / U.A.E." 700.0 700.0 0.0Lime / Oman / Ton / Oman" 1,250.0 1,250.0 0.0Gypsum / Oman / Ton / Oman" 442.0 442.0 0.0
Cement
Block
0.075.075.0Natural Stone/ Width 25 cm. height 3 cm kattran / White - Kattran /m² / Jordan23.1160.0130.0Natural Stone/ Width 25 cm. height 3 cm kattran / Agloon / m² Jordan33.3180.0135.0Natural Stone/Width 25 cm. height 3 cm kattran / Maan/ m² / Jordan
Sanitary Ware
Bathroom Set without Accessories3.41,006.3973.0Bathroom White Set / Oreint /Set / Ras Al kaima
-8.91,663.01,826.0Bathroom White Set /Prime / Set / Ras Al kaima -2,578.0-Bathroom White Set /Star/ Set / Ras Al kaima
3.41,023.0989.7Bathroom Colored Set /Liwa / Set / Ras Al kaima1.8938.3921.7Bathroom Colored Set / Flora / Set / Ras Al kaima
-1,927.0-Bathroom Colored Set / Venees / Set / Ras Al kaima
Bathroom Set with Accessories-10.53,400.03,800.0Bathroom Colored Set / Globo/ Set / Italy
0.018,000.018,000.0Bathroom Colored Set / Ideal Standred / Set / Italy
Sink Stainless Steel With Mixer-Single - --Single Drainer&bowl / ‘”Bland” - 100x60 cm /Set / UK - --Single Bowl& Double Drainer / ‘”Bland” - 150x50 cm / Set / UK - --Double Bowel&Double Drainer / ‘”Bland” - 200x60 cm / Set / UK
-5.7250.0265.0Water Heater (12) Gallons / Chaffotean / Set / S . Arabia-3.3290.0300.0Water Heater (16) Gallons / Chaffotean / Set / S . Arabia-6.72,800.03,000.0Water Tank Fiberglass / 2000 Gallons / Set/ U.A.E0.01,500.01,500.0Water Tank Fiberglass / 1000 Gallons / Set/ U.A.E
-14.02,150.02,500.0Water Tank Fiberglass / 1500 Gallons / Set/ U.A.E
0.010.6810.68Diesel/ ADNOC / Gallon
-6.820,500.022,000.0Truck capacity of 30 m3-4.414,333.315,000.0Truck capacity of 20 m30.013,000.013,000.0Water tank capacity of 5000 gallons0.026,125.026,125.0Bulldozer d6
-7.433,333.336,000.0Bulldozer d8---Bulldozer d9
-2.426,666.727,333.3Excavator capacity of 330-290 cubic meters0.022,000.022,000.0Cranes 20 tons
--- Asphalt finisher--- Asphalt steel roller
-2.618,500.019,000.0 Loader 9660.017,500.017,500.0 Loader 962
-2.718,187.518,687.5 Loader 950 ---Grader GR 01
0.026,000.026,000.0Grader GR 14 g0.012,000.012,000.0JCB Excavator
6.38.58.0Helper / Hourly rates5.99.08.5Semi-skilled / Hourly rates0.010.010.0Carpenter / Hourly rates0.010.010.0Steel Fixer / Hourly rates6.716.015.0Electrician / Hourly rates0.025.025.0Surveyor/ Hourly rates
-10.725.028.0Driver / Hourly rates
Employment / with all services
-7.053.057.0Electrical wire / Sinjil CORPS / 1.5 mm lap / Ducab /U.A.E-8.982.090.0Electrical wire / Sinjil CORPS / 2.5 mm lap / Ducab /U.A.E-5.7132.0140.0Electrical wire / Sinjil CORPS / 4 mm lap / Ducab /U.A.E-6.7196.0210.0Electrical wire / Sinjil CORPS / 6 mm lap / Ducab /U.A.E
-5.047.550.0Glass / 4 mm / m² / S.Arabian-7.462.567.5Tinted Glass / 6mm / m² / S.Arabian
---Tinted Glass / 4mm / m² / S.Arabian-3.372.575.0Tinted Glass / 6mm / m² / S.Arabian9.190.082.5Mirror Glass / 4 mm / m² / S.Arabian
12.5112.5100.0Mirror Glass / 6 mm / m² / S.Arabian
Increased rate % Marreased rate % Stable rate %
Prices on AED Currency
Mar. 2014
Mar. 2014
Mar. 2014
Mar. 2014
Mar. 2014
Change%
Change%
Change%
Change%
Change%
Change%
Mar. 2013
Mar. 2013
Mar. 2013
Mar. 2013
Mar. 2013
Aggregates & Sand
Concrete
Steel
Wood
Roofing Materials
Water proofing Products
Change%
Change%
Change%
Change%
Natural Stone Mar. 2014 Change%Mar. 2013
Tiles and Marble
False ceiling
Mar. 2014 Change%Mar. 2013
Paints
Change%
Change%
Water And Sewage Pipes
WiresApartments
Small Building
Residential Towers-3.9173.0180.0Electrical wire / 4 Corps / 120 mm / Oman-3.6132.0137.0Electrical wire / 4-Cours / 95 mm / Oman
-204.0-Electrical wire / 4 Corps / 150 mm / Oman--262.0Electrical wire / 4 Corps / 185 mm / Oman---Electrical wire / 4 Corps / 240 mm / Oman
-3.024.024.8Electrical wire / 4-Cours / 10 m / Ducab /U.A.E4.932.030.5Electrical wire / 4-Cours / 16 m / Ducab /U.A.E
-2.244.045.0Electrical wire / 4-Cours / 25 m / Ducab /U.A.E-6.657.061.0Electrical wire / 4-Cours / 35 m / Ducab /U.A.E0.080.080.0Electrical wire / 4-Cours / 50 m / Ducab /U.A.E
-8.7105.0115.0Electrical wire / 4-Cours / 70 m / Ducab /U.A.E-3.627.028.0Electrical wire / 4-Cours / 18 mm / Oman-2.440.041.0Electrical wire / 4 Corps / mm to 25 / Oman-1.952.053.0Electrical wire / 4-Cours / 36 mm / Oman-2.870.072.0Electrical wire / 4-Cours / 42 mm / Oman-2.098.0100.0Electrical wire / 4-Cours / 60 mm / Oman
---Electrical wire / 4-Cours / 77 mm / Oman
Change%
Change%
DieselChange%
Power cable
(uPVC) PipesTransport equipment/monthly
Change%
Mar. 2014 Change%
Change%Mar. 2013
Glass Change%
Mar. 2014 Mar. 2013
Mar. 2014 Mar. 2013
Mar. 2014 Mar. 2013
Mar. 2014 Mar. 2013
Mar. 2014 Mar. 2013
Mar. 2014 Mar. 2013
Mar. 2014 Mar. 2013
Mar. 2014 Mar. 2013
Mar. 2014 Mar. 2013
Mar. 2014 Mar. 2013
Mar. 2014 Mar. 2013
Mar. 2014 Mar. 2013
Mar. 2014 Mar. 2013