Building Operator Certification Level I (BOCI)Principles of Energy Management:
CUNY School of Professional StudiesCUNY Building Performance Lab
The BOC
Energy Rate Structures & Data Interpretation
Lesson 15
2
Topic 1: Energy Rate Structures & Cost Reduction
• Consumption and Demand Charges
• Base Charges
• Fuel Adjustment Charges
• Demand-Response Programs
3
Energy =$• Utility Rate Structures
– Regulated by the NYS Public Service Commission (PSC), set for each utility service area: Charge(s) for power are regulated, with rates and changes approved by the Board of Public Utilities (BPU) subject to public comment
– Elements: Consumption and demand are treated separately • Base charge• Consumption (KWH)
– “Declining Block Rate”• Demand (KW) • Power Factor• Fuel Adjustment
4
• Energy Consumption vs. Demand Charge– Your building doesn’t consume energy at the same rate all the time. Most facilities have a
greater need for power during the day when lights, AC, computers all operate simultaneously. At other times (weekends or early mornings, etc.) you may be operating some lights and a couple of computers.
– Energy as consumed is measured in kilowatt‐hours (kWh)
– When all the equipment is running your facility has a higher rate (volume) of consumption, leading to higher demand. The utility must deliver the volume of energy you require at any time: that volume must provided at any time by any and all customers.
– If demand is large enough, new power plants and larger infrastructure are needed to deliver the power. Demand charges motivate you to manage and reduce your facility’s power consumption.
• The Demand Charge is measured in kilowatts (kW), based on the peak demand: the greatest volume used over any continuous 15 minute in a month. Demand (kW) determines the required size of the wires and transformers needed for your facility. Demand can be up to 40% of billings, at any time of day‐ not the same as “system peak”‐ see ‘Demand Response’.
Utility Rate StructuresEnergy = $
5
• Electricity Consumption KWH – Declining Block Rate Structure $/kwh
• The more electricity you use, the less it costs -“first 10,000 kwh at $0.10 per kwh”; “next 140,000 kwh at $0.08 per kwh”-“over 150,000 kwh at $0.065 per kwh”
– Average Cost of 250,000 kwh =[(10,000)(.1) + (140,000)(.08) + (100,000)(.06)] / 250,000= [ 1,000 + 11,200 + 6,500 ] / 250,000 = $0.075 per kwh
What you use or save on the margin does not equal the average
Utility Rate StructuresEnergy = $
6
• Time-of-Use Rates – Goal of ‘time-of-use’ rates is to shift loads off of system-wide
peaks – Utility offers significantly lower prices for off-peak electricity– Data captured in time blocks by digital meters– Save $$ (but not energy)– Strategies & Technologies
• Thermal Storage• Change in behavior – do things off peak (at night, etc.)
Energy = $Utility Rate Structures
7
– Power Factor: real/apparent power, KW/KVA • Result of induction loads (coils and windings)• Affects power capacity of a given service • Low PF is corrected by using capacitors• Charges for low PF in some places, not in use by Con Ed (YET)
– Fuel Adjustment • Under certain circumstances, the utility is allowed by the
regulator to pass-along the cost of fuel price increases
Energy = $Utility Rate Structures
8
Energy Cost Reduction StrategiesStrategy How it works When to use ?
CHP- Combined Heat & Power
Real-Time monitoring
Thermal Storage
Load Shedding
De-reg market
Greening 9
Examples of Energy Strategies
• CHP (Combined Heat & Power) to control demand; and produce their own power when utility rates are high.
• Waste steam from the generation of electricity is used to heat buildings.
• Energy procurement tracks utility rates in real-time to determine when utility rates are high. (Time-of-Use rates)
• Limit Peak Demand with off-peak generation of cooling, done with Thermal Storage of cold water to level demand when our energy needs are high. This is Load-shedding because cooling capacity needed during the day is created at night.
(CASE STUDY: Princeton University)
10
Gas Turbine
Power Turbine
Gearbox Electric Generator
Hot exhaust Gas
CO Catalyst
AC Electricity
Steam
Air
Feed Water
Heat Recovery Boiler
Exhaust Gas
Fuel &Water
Combined Cycle “Cogen” to control Demand, Time-of-Use charges
What system do they use, how much electricity do they make, how much heat do they need, what if they need extra heat?
The cogeneration plant contains one European Gas Turbines package 15MW General Electric LM-1600 gas turbine operating at a heat rate of 9,750 Btu/kWh: 52,000 pounds of steam is generated with the turbine exhaust in a Heat
Recovery Steam Generator (HRSG). With auxiliary firing, the HRSG can produce 182,000 lb/hr of steam. Augment-ing the HRSG are two Indeck/IBW/Volcano 150,000 lb/hr boilers.
The units burn #2 oil or natural gas. Peak summer steam production is approx. 180,000 lb/hr. Winter demand can reach 244,000 lb/hr.
Non-operating boilers are kept warm and pressurized using main steam in lower drum heaters (another energy saving strategy so boiler water is warm but the boiler is not running and cycling)
Energy StrategiesCHP – Combined Heat & Power
11
Buildings Heated by CHP Plant
Energy StrategiesCHP – Combined Heat & Power
12
Thermal Storage Tank Stratification (at Princeton)
Energy StrategiesLoad-Shedding using Thermal storage to control Peak Demand & Time-of-Use
13
Procurement (purchase plan)• Electric – market based
– We operate our equipment based on the market price
– Grid price changes constantly– Saves $2 to $3.5M per year
• Gas – Transparent pricing system for daily gas
– We pre-purchase our gas and cut out the middle-man
– Saved $50K in gas costs in November
– New legislation has approved the Pre-purchase of gas
Regulatory (new utility rules)• New electric wheeling bill passed in Trenton
– Annual savings around $200K.
Energy StrategiesReal-time monitoring of electric rates to determine Time-of-Use cost
14
15
Electric price rises & turbine output goes up
Princeton buys lots of grid power when it is cheap and make its own power when grid power is expensive
Energy StrategiesTime-of-use & demand are controlled by turbine use
Topic 2: Demand Response, Deregulated Markets & Trending Data
– Managing Electrical Demand
– Deregulated Markets
– Interpreting Data Trends/Diagnostics
– Occupancy Scheduling & Short-Cycling
16
Managing Electric Demand• What causes high electric demand?
– Large but steady load (pretty flat load profile)– Short-duration peaks of 30 minutes or longer– 30 minutes will register with the utility for demand
– Different strategies for each type of demand
– Identify unnecessary simultaneous operation of equipment
• BUT NOT SIMULTANEOUS MOTOR STARTING -starting spike is in mili-seconds, too short to register in the demand.
17
Managing Electric Demand• What causes high electric demand?• What kinds of equipment
– Lighting– Refrigeration– Motors (fans, pumps, burners) – Air Conditioning
• Improved efficiency of equipment will reduce demand: you can implement “load-shedding” to reduce demand
(turn off certain equipment on a prioritized basis)
18 18
Managing Electric Demand
• When do we most often see high electric demand? • May - June - (July - August - ) September • What actions can you take with your motors?
– Control equipment – Avoid running large motors simultaneously:
– Burners for hot water – avoid firing during peak AC use • Ventilation fans – cycle off during peak AC use
– Duty-cycling - On and Off cycling of equipment to meet loadsMorning “pull down” “cool down”
– Pre-cool using pre-occupancy operation of ventilation fans
19 19
Managing Electric Demand• Limiting Demand vs “Demand-Response Program”• What is it?
– Short duration CURTAILMENT (1-4 hrs.) by bldg. operator– Utility requests load reductions at times of severe system
peak; usually no more than 3 - 4 days per year, hottest days– Can be Voluntary or Contract-Commitment
How? Notification by utility (in advance), either;-Load-shedding by staff, IMPLEMENT A PRIORITIZED LOAD
SHED-Remote (by utility)-Back-up generators (sched. times)
20 20
• The De-Regulated Market (electricity and gas)
– Transmission & Distribution (“wires”or gas transportation pipeline) still regulated
– Commodity (“electrons” or gas) de-regulated
The De-Regulated MarketWhy the Energy Sector has the structure it does
21
• Buying Energy (electricity and gas)– “Commodity” can be purchased through
Energy Service Companies ESCOs, or from the Utility (Con Ed)
– Fixed Price vs Monthly-variable• ESCO usually offers a fixed price
– Fixed Price includes projected demand, in price-per-kwh (no separate billing of demand)
The De-Regulated Market
22
– More on ESCO’s• Energy service companies more than help you
negotiate energy pricing.• ESCO’s can help you build and fund projects
– An ESCO will install an ECM and guarantee its performance: the guarantee can help you obtain funding.
– The contract with the ESCO can stretch over 20 years, which can make contracts with longer payback more attractive.
– Contracts with a performance guarantee give the installer incentive to do a good job and not over exaggerate savings.
The De-Regulated Market
23
Greening by Certificate – All electrons are same color – Separate market for “green production attribute”
• Wind farm sells its electricity into the grid at bid-prices just like any other generator- wind farm gets added payment for what it produces, “the green attribute”
• Certification process for how much electricity is produced and where it goes
• When you enter into a contract for “Green Power”, you are purchasing the certified attribute for that amount of power.
The De-Regulated Market
24
Feedback: Monitoring Energy Project Performance
• Create a baseline from historical use data– characterize the relationship between energy use
and an independent variable (weather, production)
– Use the baseline characterization to calculate what would have happened under original operating conditions
How We Use Energy Data - Trends
25
Sudden, sharp increase within a monthStart of major leak, change of schedule or settings, weather event
Steadily increasing normalized energy useGradual failure -- worsening leak, deteriorating controls, traps
Natural gas increasing & plateauing November to FebruaryWinter is a-comin’ on
Normalized energy sharpleveling out
Schedule change
How would you interpret changes in your energy use such as:
26
Economizer Operation : Example use of Graphs – 1 Day
Outdoor/Return/Mixed/Discharge vs. Time
0
10
20
30
40
50
60
70
80
3/12/077:12 PM
3/13/0712:00 AM
3/13/074:48 AM
3/13/079:36 AM
3/13/072:24 PM
3/13/077:12 PM
3/14/0712:00 AM
3/14/074:48 AM
Time
Tem
pera
ture
(oF)
Outdoor Retrun Mixed Discharge
Return
Discharge
Outdoor
Mixed
27
Trends for Data Driven Diagnostics
Source: PNNL Building Re-tuning Program
Economizer Operation : Example use of Graphs – 1 Day • Outdoor-Air Damper Stuck Fully Open• Example of Bad Operation
28
Outdoor/Return/Mixed/Discharge vs. Time
30
35
40
45
50
55
60
65
70
75
80
3/12/077:12 PM
3/13/0712:00 AM
3/13/074:48 AM
3/13/079:36 AM
3/13/072:24 PM
3/13/077:12 PM
3/14/0712:00 AM
3/14/074:48 AM
Time
Tem
pera
ture
(oF)
Outdoor Return Mixed Discharge
Return
Discharge
Outdoor
Mixed
Source: PNNL Building Re-tuning Program
Trends for Data Driven Diagnostics
Heating waste
Economizer Operation : Example use of Graphs – 1 Day• Outdoor-Air Damper Stuck Fully Closed• Example of Bad Operation
29
Outdoor/Return/Mixed/Discharge vs. Time
0
10
20
30
40
50
60
70
80
3/12/077:12 PM
3/13/0712:00 AM
3/13/074:48 AM
3/13/079:36 AM
3/13/072:24 PM
3/13/077:12 PM
3/14/0712:00 AM
3/14/074:48 AM
Time
Tem
pera
ture
(oF)
Outdoor Return Mixed Discharge
Return
Mixed
Discharge
Outdoor
Source: PNNL Building Re-tuning Program
Outdoor air temperature is perfect for economizer
Trends for Data Driven Diagnostics
Occupancy Scheduling
Equipment Use should match Occupancy
•Match operations of equipment & systems to actual need
•Turn off, or turn down, equipment & systems during unoccupied hours.
•AHU’s & Lighting are a major energy users
•Graphs can be simple – Use v Time
30
Occupancy Scheduling - AHU Static Pressure Control
Source: PNNL Building Re-tuning Program
• Continuously Operation, 24 hours a day, 7 days a week• Operating Hours are 6am – 6pm, Mon-Fri
31
Source: PNNL Building Re-tuning Program
• Equipment with Night and Weekend Setback• Easy to see the energy savings
Occupancy Scheduling - AHU Static Pressure Control
32
33
Occupancy Scheduling - AHU Static Pressure Control
Occupancy Scheduling – Electric Load Profile
Source: PNNL Building Re-tuning Program
• 1 Day / 24 Hours of Energy Meter Data - Electric Load Profile• How does our Energy Use match our Occupancy Schedule
34
Source: PNNL Building Re-tuning Program
• Occupancy 6am – 6pm • Baseload is High• Weekend load Increases • Shutdown period long
Occupancy Scheduling – Electric Load Profile
35
Source: PNNL Building Re-tuning Training
• Baseload reduced / Peak load reduced• Weekend load flat • Shutdown period matches occupancy
Occupancy Scheduling – Electric Load Profile
36
Equipment Short-Cycling
Source: PNNL Building Re-tuning Program
• Identify & Correct – Compressor cycling – short cycling
37
Equipment Short-Cycling
Source: PNNL Building Re-tuning Program
• Identify & Correct – Compressor cycling – correct
38
Equipment Short-Cycling
• Chiller – Cycling On during Unoccupied hours• Chiller Operation, 24-hour Period
Source: Virtjoule.com company blog, 10/13/11
12am 5am
10am 3p
m
8pm
12am
39
Class Review and Reading Assignment
• Energy Rate Structures• Cost Reduction Strategies: Case Study• Demand Response and De-regulated Markets • Trending Energy Data• Occupancy Scheduling• Equipment Short-Cycling