building schools and educating children since 1934€¦ · 2005 10% maintenance & operations...

52
8/27/2019 Building Schools and Educating Children since 1934

Upload: others

Post on 26-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Building Schools and Educating Children since 1934€¦ · 2005 10% Maintenance & Operations Override Election Local Support for an additional 10% 2008 Bond Election $148 million

8/27/2019

Building Schools and

Educating Children since 1934

Page 2: Building Schools and Educating Children since 1934€¦ · 2005 10% Maintenance & Operations Override Election Local Support for an additional 10% 2008 Bond Election $148 million

8/27/2019

November 5, 2019 Elections

“B” Bond

$175,000,000and

M&O Override Renewal

Factual Election Information Only

Consult website for comprehensive plans district-wide.

www.dvusd.org

Page 3: Building Schools and Educating Children since 1934€¦ · 2005 10% Maintenance & Operations Override Election Local Support for an additional 10% 2008 Bond Election $148 million

District Accolades

95% of schools are A or B rated by ADE(65% are A Rated)

41% of schools are A+ Schools of Excellence

Ranked #2 District in State by KTAR

Ranked 3rd in State for percent of Dollars Spent in

Instruction

Forbes Top 50 Best Employer in Arizona

(and the only school district on the list)

ASBO Certificate of Excellence in Financial Reporting

GFOA Certificate of Achievement for Excellence in Financial

Reporting

Fitch (AA) and Moody’s (Aa2) Ratings

8/27/2019

Page 4: Building Schools and Educating Children since 1934€¦ · 2005 10% Maintenance & Operations Override Election Local Support for an additional 10% 2008 Bond Election $148 million

Bond/Override Citizen Advisory

Committee MembersNo. Name Position *Stakeholder Group

1 Jim Migliorino Deputy Superintendent District Employee

2 Michelle Ricart Parent – BGHS Region Parent

3 Isaac Sweilem Parent – BGHS Region Parent

4 Myong Covert Parent – BCHS Region Parent

5 TBD Parent – BCHS Region Parent

6 Robyn Meade Parent – DVHS Region Parent

7 TBD Parent – DVHS Region Parent

8 Lisa Best Parent – MRHS Region Parent

9 TBD Parent – MRHS Region Parent

10 Stefanie Calens Parent – SDOHS Region Parent

11 Ric Traeger Parent – SDOHS Region Parent

12 Courtney Fredlund DVBLT District Employee

13 TBD Adminstrator At Large District Employee

14 Nicholas Martin DVEA District Employee

15 Rick Weyker Certified Staff At Large District Employee

16 Joe Davis DVESPA District Employee

17 TBD Classified Staff At Large District Employee

18 Marie Brennan DVEF Community

19 Joe Holcombe Parent Organization Rep Parent

20 Dennis Lehan Parent Organization Rep Parent

21 Tara Grenier Business Partner Community

22 Pam Edwards Interfaith Representative Community

Committee Meetings

April 10, 2019

April 17, 2019

May 8, 2019

Page 5: Building Schools and Educating Children since 1934€¦ · 2005 10% Maintenance & Operations Override Election Local Support for an additional 10% 2008 Bond Election $148 million

8/27/2019

2005 Capital Override Election(technology, textbooks, vehicles, furniture,

athletic/fine arts uniforms & equipment)

$52 Million

($7.5 Million for 7 Years)

2005 10% Maintenance &

Operations Override Election

Local Support for an

additional 10%

2008 Bond Election $148 million

2010 10% Maintenance &

Operations Override Election

Exceed Budget by 10%

2012 Capital Override Election

Failed

$52 Million

($7.5 Million for 7 Years)

2013 Bond Election $158.315 million

2015 15% Maintenance &

Operations Override Election

Local Support for an

additional 15%

Current Voter-Supported Revenue Sources

Page 6: Building Schools and Educating Children since 1934€¦ · 2005 10% Maintenance & Operations Override Election Local Support for an additional 10% 2008 Bond Election $148 million

State-Imposed Reductions

Over $112 million

in cumulative

State-imposed cuts

projected through

2019-20

Page 7: Building Schools and Educating Children since 1934€¦ · 2005 10% Maintenance & Operations Override Election Local Support for an additional 10% 2008 Bond Election $148 million

8/27/2019

“B” Bond

$175,000,000

Factual Election Information Only

Consult website for comprehensive plans district-wide.

www.dvusd.org

Page 8: Building Schools and Educating Children since 1934€¦ · 2005 10% Maintenance & Operations Override Election Local Support for an additional 10% 2008 Bond Election $148 million

8/27/2019

Why is an Election Needed?

Older schools need improvements to increase safety

State of Arizona has not funded cost to maintain buildings (SFB Building Renewal converted to a grant program, and only partially funded)

State imposed capital funding reductions has resulted in

funding gaps for such things as technology, textbooks, school

buses, etc.

Student growth necessitates additional facilities

Page 9: Building Schools and Educating Children since 1934€¦ · 2005 10% Maintenance & Operations Override Election Local Support for an additional 10% 2008 Bond Election $148 million

8/27/2019

“B” Bond

$175,000,000

“B” Bonds: Source of funding that allows

• purchase or lease of school sites

• build or renovate school buildings to improve school grounds

including physical improvements and additions beyond the

minimum standards by the State of Arizona

• purchase pupil transportation vehicles

• recent changes to statutes allow for furniture, fixtures and

equipment to also be funded from “B” bonds

Page 10: Building Schools and Educating Children since 1934€¦ · 2005 10% Maintenance & Operations Override Election Local Support for an additional 10% 2008 Bond Election $148 million

8/27/2019

2019 Bond Election Focus

➔ Safety & Security

➔ Instructional Resources

➔ Technology

➔ Building Renewal

➔ Conservation

➔ Buses

➔ Student Growth

Page 11: Building Schools and Educating Children since 1934€¦ · 2005 10% Maintenance & Operations Override Election Local Support for an additional 10% 2008 Bond Election $148 million

8/27/2019

“B

” B

on

d F

act

Sh

eet

$167,807,000

Instruction-Related Needs School-Based

Curriculum

Library/Media Center Improvements 10,000,000$

Facility Improvements 3,000,000$

Extracurricular/Cocurricular Equipment 5,500,000$

Technology

Replacement/New 16,932,058$

Projectors/Peripherals/Printers 8,265,848$

Network Upgrades 7,650,000$

Wide Area Network 11,250,000$

Server/Distribution Replacements 2,745,000$

Copiers 2,200,000$ Furniture, Fixtures & Equipment

Furniture & Equipment 875,000$

New School Furniture & Equipment 2,000,000$

Instruction-Related Needs Subtotal 70,418,000$

Transportation Needs

Replacement Buses 5,775,000$

Microbuses 700,000$

Van Replacements 625,000$

Technology 250,000$

Transportation Subtotal 7,350,000$

Facility & Safety Needs

Building Renewal (Roofing, Painting, Flooring, Restroom Renovation) 30,076,000$

Conservation 26,025,000$

Safety & Security 9,750,000$

Furniture and Equipment 187,500$

Facility Needs Subtotal 66,039,000$

Student Growth Needs

Student Growth 2,000,000$

Elementary #32 22,000,000$

Student Growth Subtotal 24,000,000$

Page 12: Building Schools and Educating Children since 1934€¦ · 2005 10% Maintenance & Operations Override Election Local Support for an additional 10% 2008 Bond Election $148 million

8/27/2019

“B

” B

on

d F

act

Sh

eet

$ 7,193,000

Total $ 175,000,000

Administration Needs

Technology Needs

Replacement/New Admin 714,840$

Projectors/Peripherals/Printers 435,045$

Network Upgrades 200,000$

Wide Area Network 1,250,000$

Server/Distribution Replacements 305,000$

Copiers 300,000$

Technology Subtotal 3,205,000$

Transportation Needs

Fleet Vehicle Replacement 750,000$

Northern Services Center Improvements 1,200,000$

Transportation Subtotal 1,950,000$

Facility Needs

Building Renewal (Roofing, Painting, Flooring, Restroom Renovation) 1,275,000$

Conservation 325,000$

Furniture and Equipment 437,500$

Facility Needs Subtotal 2,038,000$

Page 13: Building Schools and Educating Children since 1934€¦ · 2005 10% Maintenance & Operations Override Election Local Support for an additional 10% 2008 Bond Election $148 million

8/27/2019

What will passage of the “B”

Bond do for your school?

Page 14: Building Schools and Educating Children since 1934€¦ · 2005 10% Maintenance & Operations Override Election Local Support for an additional 10% 2008 Bond Election $148 million

Planned 2019 Bond ProjectsANTHEM

Painting Improvements

Playground Improvements

Resurfacing Improvements

Roofing Improvements

Security & Safety Improvements

Water Conservation – Irrigation &

Grounds Improvements

Wireless Device for every student

Replacement of Classroom displays

Stem Lab and Computer Science

technology

Update Campus Network

Increased Bandwidth

Copier Replacements

BARRY GOLDWATER HIGH SCHOOL

Media Center Renovations

Building Component Replacement – Infrastructure

Improvements (plumbing, PA Rigging)

Energy Conservation – EMS Upgrades, Performing

Art Stage & Athletic Field Lighting

Maintaining Hardwood Floors – Sports, Stages &

Dance Floors

Resurfacing Improvements

Roofing Improvements

Security & Safety Improvements

Water Conservation – HVAC Tower Upgrades

Water Conservation – Artificial Turf for Football

Stadium and Irrigation & Grounds Improvements

Extracurricular Equipment & Uniform Replacements

Refresh of all student wireless Tech Rich devices

Replacement of Classroom

Update Campus network

Increased Bandwidth

Copier Replacements

8/27/2019

Page 15: Building Schools and Educating Children since 1934€¦ · 2005 10% Maintenance & Operations Override Election Local Support for an additional 10% 2008 Bond Election $148 million

Planned 2019 Bond ProjectsARROWHEAD

Painting Improvements

Restroom Renovations

Roofing Improvements

Security & Safety Improvements

Wireless Device for every student

Replacement of Classroom displays

Stem Lab and Computer Science technology

Update Campus Network

Increased Bandwidth

Copier Replacements

BELLAIR

Roofing Improvements

Security & Safety Improvements

Wireless Device for every student

Replacement of Classroom displays

Stem Lab and Computer Science technology

Update Campus Network

Increased Bandwidth

Copier Replacements

8/27/2019

Page 16: Building Schools and Educating Children since 1934€¦ · 2005 10% Maintenance & Operations Override Election Local Support for an additional 10% 2008 Bond Election $148 million

Planned 2019 Bond Projects

CANYON SPRINGS

Flooring Improvements

HVAC Retrofit

Lighting Retrofit

Painting Improvements

Resurfacing Improvements

Roofing Improvements

Security & Safety Improvements

Water Conservation – Irrigation &

Grounds Improvements

Wireless Device for every student

Replacement of Classroom displays

Stem Lab and Computer Science

technology

Update Campus Network

Increased Bandwidth

Copier Replacements

8/27/2019

BOULDER CREEK HIGH SCHOOL

Media Center Renovations

Building Component Replacement – Infrastructure

Improvements (PA Rigging)

Energy Conservation – EMS Upgrades, Performing

Art Stage & Athletic Field Lighting

Maintaining Hardwood Floors – Sports, Stages &

Dance Floors

Painting Improvements

Resurfacing Improvements

Roofing Improvements

Security & Safety Improvements

Water Conservation – Artificial Turf for Football

Stadium and Irrigation & Grounds Improvements

Extracurricular Equipment & Uniform

Replacements

Refresh of all student wireless Tech Rich devices

Replacement of Classroom

Update Campus network

Increased Bandwidth

Copier Replacements

Page 17: Building Schools and Educating Children since 1934€¦ · 2005 10% Maintenance & Operations Override Election Local Support for an additional 10% 2008 Bond Election $148 million

Planned 2019 Bond Projects

CONSTITUTION

Flooring Improvements (cafeteria)

HVAC Retrofit

Painting Improvements

Resurfacing Improvements

Roofing Improvements

Security & Safety Improvements

Water Conservation – Irrigation & Grounds

Improvements

Wireless Device for every student

Replacement of Classroom displays

Stem Lab and Computer Science

technology

Update Campus Network

Increased Bandwidth

Copier Replacements

8/27/2019

Page 18: Building Schools and Educating Children since 1934€¦ · 2005 10% Maintenance & Operations Override Election Local Support for an additional 10% 2008 Bond Election $148 million

Planned 2019 Bond ProjectsCOPPER CREEK

Energy Conservation – EMS Upgrades

Flooring Improvements

Painting Improvements

Resurfacing Improvements

Roofing Improvements

Security & Safety Improvements

Water Conservation – Irrigation & Grounds

Improvements

Wireless Device for every student

Replacement of Classroom displays

Stem Lab and Computer Science

technology

Update Campus Network

Increased Bandwidth

Copier Replacements

DEER VALLEY MIDDLE

Media Center Renovations

Building Component Replacement –

Infrastructure Improvements (plumbing)

HVAC Retrofit

Lighting Retrofit – Cafeteria

Maintaining Hardwood Floors – Sports

Floors

Painting Improvements

Resurfacing Improvements

Security & Safety Improvements

Water Conservation –Irrigation & Grounds

Improvements

Wireless Device for every student

Replacement of Classroom displays

Stem Lab and Computer Science

technology

Update Campus Network

Increased Bandwidth

Copier Replacements

8/27/2019

Page 19: Building Schools and Educating Children since 1934€¦ · 2005 10% Maintenance & Operations Override Election Local Support for an additional 10% 2008 Bond Election $148 million

Planned 2019 Bond ProjectsDESERT MOUNTAIN

Flooring Improvements

HVAC Retrofit

Maintaining Hardwood Floors – Sports

Floors

Painting Improvements

Playground Improvements

Resurfacing Improvements

Roofing Improvements

Security & Safety Improvements

Water Conservation – Irrigation & Grounds

Improvements

Wireless Device for every student

Replacement of Classroom displays

Stem Lab and Computer Science

technology

Update Campus Network

Increased Bandwidth

Copier Replacements

8/27/2019

Page 20: Building Schools and Educating Children since 1934€¦ · 2005 10% Maintenance & Operations Override Election Local Support for an additional 10% 2008 Bond Election $148 million

Planned 2019 Bond Projects

DESERT SAGE

Energy Conservation – EMS Upgrades

Flooring Improvements

Painting Improvements

Resurfacing Improvements

Roofing Improvements

Security & Safety Improvements

Water Conservation – Irrigation &

Grounds Improvements

Wireless Device for every student

Replacement of Classroom displays

Stem Lab and Computer Science

technology

Update Campus Network

Increased Bandwidth

Copier Replacements

DEER VALLEY HIGH SCHOOL

Media Center Renovations

Building Component Replacement – Infrastructure

Improvements (plumbing, PA Rigging)

Energy Conservation – EMS Upgrades, Performing

Art Stage & Athletic Field Lighting

Maintaining Hardwood Floors – Sports, Stages &

Dance Floors

Restroom Renovations – Locker Rooms

Resurfacing Improvements

Roofing Improvements

Security & Safety Improvements

Water Conservation – Artificial Turf for Football

Stadium and Irrigation & Grounds Improvements

Extracurricular Equipment & Uniform

Replacements

Refresh of all student wireless Tech Rich devices

Replacement of Classroom

Update Campus network

Increased Bandwidth

Copier Replacements

8/27/2019

Page 21: Building Schools and Educating Children since 1934€¦ · 2005 10% Maintenance & Operations Override Election Local Support for an additional 10% 2008 Bond Election $148 million

Planned 2019 Bond Projects

DIAMOND CANYON

Energy Conservation – EMS Upgrades

Resurfacing Improvements

Roofing Improvements

Security & Safety Improvements

Water Conservation – Irrigation & Grounds

Improvements

Wireless Device for every student

Replacement of Classroom displays

Stem Lab and Computer Science

technology

Update Campus Network

Increased Bandwidth

Copier Replacements

8/27/2019

DESERT SKY MIDDLE

Media Center Renovations

Maintaining Hardwood Floors – Sports

Floors

Painting Improvements

Resurfacing Improvements

Roofing Improvements

Security & Safety Improvements

Water Conservation – Irrigation & Grounds

Improvements

Wireless Device for every student

Replacement of Classroom displays

Stem Lab and Computer Science

technology

Update Campus Network

Increased Bandwidth

Copier Replacements

Page 22: Building Schools and Educating Children since 1934€¦ · 2005 10% Maintenance & Operations Override Election Local Support for an additional 10% 2008 Bond Election $148 million

Planned 2019 Bond Projects

ESPERANZA

Painting Improvements

Resurfacing Improvements

Roofing Improvements

Security & Safety Improvements

Water Conservation – Irrigation & Grounds

Improvements

Wireless Device for every student

Replacement of Classroom displays

Stem Lab and Computer Science

technology

Update Campus Network

Increased Bandwidth

Copier Replacements

HIGHLAND LAKES

Media Center Renovations

Flooring Improvements

Maintaining Hardwood Floors – Sports

Floors

Painting Improvements

Resurfacing Improvements

Roofing Improvements

Security & Safety Improvements

Water Conservation – Irrigation & Grounds

Improvements

Wireless Device for every student

Replacement of Classroom displays

Stem Lab and Computer Science

technology

Update Campus Network

Increased Bandwidth

Copier Replacements

8/27/2019

Page 23: Building Schools and Educating Children since 1934€¦ · 2005 10% Maintenance & Operations Override Election Local Support for an additional 10% 2008 Bond Election $148 million

Planned 2019 Bond Projects

GAVILAN PEAK

Building Component Replacement –

Infrastructure Improvements (plumbing)

HVAC Retrofit

Painting Improvements

Resurfacing Improvements

Roofing Improvements

Security & Safety Improvements

Water Conservation – Irrigation & Grounds

Improvements

Wireless Device for every student

Replacement of Classroom displays

Stem Lab and Computer Science

technology

Update Campus Network

Increased Bandwidth

Copier Replacements

8/27/2019

Page 24: Building Schools and Educating Children since 1934€¦ · 2005 10% Maintenance & Operations Override Election Local Support for an additional 10% 2008 Bond Election $148 million

Planned 2019 Bond Projects

GREENBRIER

Energy Conservation – EMS Upgrades

Flooring Improvements

Painting Improvements

Resurfacing Improvements

Roofing Improvements

Security & Safety Improvements

Water Conservation – HVAC Tower

Upgrades

Water Conservation – Irrigation & Grounds

Improvements

Wireless Device for every student

Replacement of Classroom displays

Stem Lab and Computer Science

technology

Update Campus Network

Increased Bandwidth

Copier Replacements

HILLCREST MIDDLE

Media Center Renovations

Flooring Improvements

Maintaining Hardwood Floors – Sports

Floors

Painting Improvements

Restroom Renovations

Resurfacing Improvements

Security & Safety Improvements

Water Conservation – Irrigation & Grounds

Improvements

Wireless Device for every student

Replacement of Classroom displays

Stem Lab and Computer Science

technology

Update Campus Network

Increased Bandwidth

Copier Replacements

8/27/2019

Page 25: Building Schools and Educating Children since 1934€¦ · 2005 10% Maintenance & Operations Override Election Local Support for an additional 10% 2008 Bond Election $148 million

Planned 2019 Bond ProjectsLAS BRISAS

Energy Conservation – EMS Upgrades

Flooring Improvements

Restroom Renovations

Resurfacing Improvements

Roofing Improvements

Security & Safety Improvements

Water Conservation – Irrigation & Grounds

Improvements

Wireless Device for every student

Replacement of Classroom displays

Stem Lab and Computer Science

technology

Update Campus Network

Increased Bandwidth

Copier Replacements

8/27/2019

Page 26: Building Schools and Educating Children since 1934€¦ · 2005 10% Maintenance & Operations Override Election Local Support for an additional 10% 2008 Bond Election $148 million

Planned 2019 Bond Projects

LEGEND SPRINGS

Energy Conservation – EMS Upgrades

Painting Improvements

Resurfacing Improvements

Roofing Improvements

Security & Safety Improvements

Water Conservation – Irrigation &

Grounds Improvements

Wireless Device for every student

Replacement of Classroom displays

Stem Lab and Computer Science

technology

Update Campus Network

Increased Bandwidth

Copier Replacements

MOUNTAIN RIDGE HIGH SCHOOL

Media Center Renovations

Energy Conservation – EMS Upgrades,

Performing Art Stage & Athletic Field Lighting

Flooring Improvements

Maintaining Hardwood Floors – Sports, Stages &

Dance Floors

Painting Improvements

Resurfacing Improvements

Roofing Improvements

Security & Safety Improvements

Water Conservation – HVAC Tower Upgrades

Water Conservation – Artificial Turf for Football

Stadium and Irrigation & Grounds Improvements

Extracurricular Equipment & Uniform

Replacements

Refresh of all student wireless Tech Rich devices

Replacement of Classroom

Update Campus network

Increased Bandwidth

Copier Replacements

8/27/2019

Page 27: Building Schools and Educating Children since 1934€¦ · 2005 10% Maintenance & Operations Override Election Local Support for an additional 10% 2008 Bond Election $148 million

Planned 2019 Bond Projects

MIRAGE

Energy Conservation – EMS Upgrades

Flooring Improvements

Painting Improvements

Resurfacing Improvements

Security & Safety Improvements

Water Conservation – Irrigation & Grounds

Improvements

Wireless Device for every student

Replacement of Classroom displays

Stem Lab and Computer Science

technology

Update Campus Network

Increased Bandwidth

Copier Replacements

8/27/2019

Page 28: Building Schools and Educating Children since 1934€¦ · 2005 10% Maintenance & Operations Override Election Local Support for an additional 10% 2008 Bond Election $148 million

Planned 2019 Bond ProjectsMOUNTAIN SHADOWS

Energy Conservation – EMS

Upgrades

Flooring Improvements

Painting Improvements

Resurfacing Improvements

Roofing Improvements

Security & Safety Improvements

Water Conservation – HVAC Tower

Upgrades

Water Conservation – Irrigation &

Grounds Improvements

Wireless Device for every student

Replacement of Classroom displays

Stem Lab and Computer Science

technology

Update Campus Network

Increased Bandwidth

Copier Replacements

SANDRA DAY O’CONNOR HIGH SCHOOL

Media Center Renovations

Building Component Replacement – Infrastructure

Improvements (plumbing, PA Rigging)

Energy Conservation – EMS Upgrades, Performing

Art Stage & Athletic Field Lighting

Maintaining Hardwood Floors – Sports, Stages &

Dance Floors

Painting Improvements

Resurfacing Improvements

Roofing Improvements

Security & Safety Improvements

Water Conservation – HVAC Tower Upgrades

Water Conservation – Artificial Turf for Football

Stadium and Irrigation & Grounds Improvements

Extracurricular Equipment & Uniform Replacements

Refresh of all student wireless Tech Rich devices

Replacement of Classroom

Update Campus network

Increased Bandwidth

Copier Replacements

8/27/2019

Page 29: Building Schools and Educating Children since 1934€¦ · 2005 10% Maintenance & Operations Override Election Local Support for an additional 10% 2008 Bond Election $148 million

Planned 2019 Bond ProjectsNEW RIVER

Building Component Replacement –

Infrastructure Improvements (well tanks)

HVAC Retrofit

Painting Improvements

Resurfacing Improvements

Roofing Improvements

Security & Safety Improvements

Water Conservation – Irrigation & Grounds

Improvements

Wireless Device for every student

Replacement of Classroom displays

Stem Lab and Computer Science

technology

Update Campus Network

Increased Bandwidth

Copier Replacements

8/27/2019

Page 30: Building Schools and Educating Children since 1934€¦ · 2005 10% Maintenance & Operations Override Election Local Support for an additional 10% 2008 Bond Election $148 million

Planned 2019 Bond Projects

NORTERRA CANYON

Flooring Improvements

Painting Improvements

Resurfacing Improvements

Roofing Improvements

Security & Safety Improvements

Water Conservation – Irrigation & Grounds

Improvements

Wireless Device for every student

Replacement of Classroom displays

Stem Lab and Computer Science

technology

Update Campus Network

Increased Bandwidth

Copier Replacements

VISTA PEAK

Energy Conservation – EMS Upgrades

Flooring Improvements

Painting Improvements

Resurfacing Improvements

Roofing Improvements

Security & Safety Improvements

Water Conservation – HVAC Tower

Upgrades

Water Conservation – Irrigation & Grounds

Improvements

Wireless Device for every student

Replacement of Classroom displays

Stem Lab and Computer Science

technology

Update Campus Network

Increased Bandwidth

Copier Replacements

8/27/2019

Page 31: Building Schools and Educating Children since 1934€¦ · 2005 10% Maintenance & Operations Override Election Local Support for an additional 10% 2008 Bond Election $148 million

Planned 2019 Bond Projects

PARK MEADOWS

Flooring Improvements

HVAC Retrofit

Painting Improvements

Restroom Renovations

Resurfacing Improvements

Roofing Improvements

Security & Safety Improvements

Water Conservation – Irrigation & Grounds

Improvements

Wireless Device for every student

Replacement of Classroom displays

Stem Lab and Computer Science

technology

Update Campus Network

Increased Bandwidth

Copier Replacements

8/27/2019

Page 32: Building Schools and Educating Children since 1934€¦ · 2005 10% Maintenance & Operations Override Election Local Support for an additional 10% 2008 Bond Election $148 million

Planned 2019 Bond ProjectsPASEO HILLS

Painting Improvements

Resurfacing Improvements

Roofing Improvements

Security & Safety Improvements

Water Conservation – Irrigation & Grounds

Improvements

Wireless Device for every student

Replacement of Classroom displays

Stem Lab and Computer Science technology

Update Campus Network

Increased Bandwidth

Copier Replacements

SIERRA VERDE

Flooring Improvements - Cafeteria

Painting Improvements

Resurfacing Improvements

Roofing Improvements

Security & Safety Improvements

Water Conservation – Irrigation & Grounds

Improvements

Wireless Device for every student

Replacement of Classroom displays

Stem Lab and Computer Science

technology

Update Campus Network

Increased Bandwidth

Copier Replacements

8/27/2019

Page 33: Building Schools and Educating Children since 1934€¦ · 2005 10% Maintenance & Operations Override Election Local Support for an additional 10% 2008 Bond Election $148 million

Planned 2019 Bond ProjectsSONORAN FOOTHILLS

Painting Improvements

Resurfacing Improvements

Security & Safety Improvements

Water Conservation – Irrigation & Grounds

Improvements

Wireless Device for every student

Replacement of Classroom displays

Stem Lab and Computer Science technology

Update Campus Network

Increased Bandwidth

Copier Replacements

8/27/2019

STETSON HILLS

Flooring Improvements - Cafeteria

Painting Improvements

Resurfacing Improvements

Roofing Improvements

Security & Safety Improvements

Water Conservation – Irrigation & Grounds

Improvements

Wireless Device for every student

Replacement of Classroom displays

Stem Lab and Computer Science

technology

Update Campus Network

Increased Bandwidth

Copier Replacements

Page 34: Building Schools and Educating Children since 1934€¦ · 2005 10% Maintenance & Operations Override Election Local Support for an additional 10% 2008 Bond Election $148 million

Planned 2019 Bond Projects

SUNRISE

Energy Conservation – EMS Upgrades

Painting Improvements

Resurfacing Improvements

Roofing Improvements

Security & Safety Improvements

Water Conservation – Irrigation & Grounds

Improvements

Wireless Device for every student

Replacement of Classroom displays

Stem Lab and Computer Science technology

Update Campus Network

Increased Bandwidth

Copier Replacements

SUNSET RIDGE

Flooring Improvements - Cafeteria

Painting Improvements

Resurfacing Improvements

Roofing Improvements

Security & Safety Improvements

Water Conservation – Irrigation & Grounds

Improvements

Wireless Device for every student

Replacement of Classroom displays

Stem Lab and Computer Science

technology

Update Campus Network

Increased Bandwidth

Copier Replacements

8/27/2019

Page 35: Building Schools and Educating Children since 1934€¦ · 2005 10% Maintenance & Operations Override Election Local Support for an additional 10% 2008 Bond Election $148 million

Planned 2019 Bond Projects

TERRAMAR

Painting Improvements

Resurfacing Improvements

Roofing Improvements

Security & Safety Improvements

Water Conservation – Irrigation & Grounds

Improvements

Wireless Device for every student

Replacement of Classroom displays

Stem Lab and Computer Science technology

Update Campus Network

Increased Bandwidth

Copier Replacements

8/27/2019

Page 36: Building Schools and Educating Children since 1934€¦ · 2005 10% Maintenance & Operations Override Election Local Support for an additional 10% 2008 Bond Election $148 million

Planned 2019 Bond Projects

VILLAGE MEADOWS

Building Component Replacement –

Infrastructure Improvements (plumbing)

HVAC Retrofit

Painting Improvements

Resurfacing Improvements

Roofing Improvements

Security & Safety Improvements

Water Conservation – Irrigation & Grounds

Improvements

Wireless Device for every student

Replacement of Classroom displays

Stem Lab and Computer Science technology

Update Campus Network

Increased Bandwidth

Copier Replacements

WEST WING

Energy Conservation – EMS Upgrades

Flooring Improvements

Painting Improvements

Resurfacing Improvements

Roofing Improvements

Security & Safety Improvements

Water Conservation – Irrigation & Grounds

Improvements

Wireless Device for every student

Replacement of Classroom displays

Stem Lab and Computer Science

technology

Update Campus Network

Increased Bandwidth

Copier Replacements

8/27/2019

Page 37: Building Schools and Educating Children since 1934€¦ · 2005 10% Maintenance & Operations Override Election Local Support for an additional 10% 2008 Bond Election $148 million

8/27/2019

Tax RatesDue to the structure of the debt schedule for this

bond authorization, the tax rate is not projected

to increase as a result of issuing these bonds.

Estimated Average Monthly Cost on the average assessed value home of $213,053 is $13.28/month,

which is a continuation of the tax rate already being assessed from prior bond authorizations

Page 38: Building Schools and Educating Children since 1934€¦ · 2005 10% Maintenance & Operations Override Election Local Support for an additional 10% 2008 Bond Election $148 million

8/27/2019

2019 M&O Override Election

November 5, 2019

Presentation of factual information

about the election

Page 39: Building Schools and Educating Children since 1934€¦ · 2005 10% Maintenance & Operations Override Election Local Support for an additional 10% 2008 Bond Election $148 million

8/27/2019

What is a Maintenance & Operation (M&O)

Override?

An override is voter authorization to exceed the amount of budget

otherwise allowed by the State of Arizona. This additional amount is

approved and funded by local taxpayer dollars as a means to provide

local support of programs deemed important by the community.

Overrides require voter approval because they are funded from

property taxes.

M&O Overrides are different than bond elections in that bonds fund

capital improvements (think of large construction projects) and

overrides fund the day-to-day operations of the District.

Page 40: Building Schools and Educating Children since 1934€¦ · 2005 10% Maintenance & Operations Override Election Local Support for an additional 10% 2008 Bond Election $148 million

8/27/2019

What is a Maintenance & Operation (M&O)

Override?

• Overrides allow school districts to

exceed its annual M&O budget limit

by up to 15%, for 5 full years

• If voters fail to reauthorize, the

M&O budget is reduced by 1/3 each

year for the next three years

$ - 0 -

Full

Override

Amount

Years 1 - 5 Year 6 Year 7 Year 8

100% 66%

33

%

Page 41: Building Schools and Educating Children since 1934€¦ · 2005 10% Maintenance & Operations Override Election Local Support for an additional 10% 2008 Bond Election $148 million

8/27/2019

What is the History of M&O Overrides in DVUSD?

• DVUSD has historically had a 10% override

(1991 to 2015)

• Legislation in 2009 allows for a continuation of the existing

10% override plus a new Special 5% override, that can be

combined into a 15% election

• November 2015 was last approval of our current 15% override

• November of 2019 is the planned renewal of the override

1991 M&O Override Approved

1995 M&O Override Not

Approved1996 M&O Override Renewed

2001 M&O Override Renewed

2005 M&O Override Renewed

March 2010 M&O

Override Not Approved

November 2010 M&O Override Renewed

November 2015 M&O Override

Approved at 15%

Page 42: Building Schools and Educating Children since 1934€¦ · 2005 10% Maintenance & Operations Override Election Local Support for an additional 10% 2008 Bond Election $148 million

8/27/2019

How Does a M&O Override Work? – DVUSD Example

• Basic Funding – # of students x base amount per student

(approximately $4,000/ student)

• Override – Allows district to budget an additional

percentage above Basic Funding.

2019-20 State Basic Funding Formula $191,465,989

15% Override Funding $28,719,898

Page 43: Building Schools and Educating Children since 1934€¦ · 2005 10% Maintenance & Operations Override Election Local Support for an additional 10% 2008 Bond Election $148 million

8/27/2019

Why is a M&O Override Needed?A committee of parents, community members, teachers, staff, and

administrators unanimously recommended calling for a renewal of the

M&O Override. The Governing Board unanimously approved calling

for the election on June 25th, 2019.

Factors that were reviewed in calling for this election:

• State Comparison of Funding

• State-Imposed Reductions

• Retention of Quality Staff

• Quality Programs for Students

Page 44: Building Schools and Educating Children since 1934€¦ · 2005 10% Maintenance & Operations Override Election Local Support for an additional 10% 2008 Bond Election $148 million

Per Pupil Spending ComparisonSource: Auditor General District Spending Report

DVUSD receives less

money per pupil than

peer/comparable

districts, the State as a

whole, and the National

average - with the

existing 15% M&O

override in place.

8/27/2019

Page 45: Building Schools and Educating Children since 1934€¦ · 2005 10% Maintenance & Operations Override Election Local Support for an additional 10% 2008 Bond Election $148 million

Student Benefits from M&O Override :

Quality Staff

Maintaining Class Size

Gifted Education

Athletics

Special Areas: Arts, Band, Chorus, PE

Student Programs: Language Immersion, STEM,

STEAM, IB, CTE, etc.

Social Emotional Programs and Supports

Full-Day Kindergarten (at no additional cost to parents)

8/27/2019

Page 46: Building Schools and Educating Children since 1934€¦ · 2005 10% Maintenance & Operations Override Election Local Support for an additional 10% 2008 Bond Election $148 million

8/27/2019

How will the override be used?M&O Override Category Planned in FY20

Existing M&O Salaries (8.5% of existing salaries) 14,610,000$

Class Size at Grades K-6 (-3 FTE/Class Load) 3,300,000$ Class Size at Grades 7-12 (-3 FTE/Class Load) 3,730,000$

Specialized Programs for

Students Including Co-

Curricular, Extra-Curricular and

Full-Day Kindergarten

5,304,898$

Extracurricular Activities 500,000$

Counselors and Support Services Staff 500,000$

District Budgets (10%) 525,000$

School Budgets (10%) 250,000$

28,719,898$

Page 47: Building Schools and Educating Children since 1934€¦ · 2005 10% Maintenance & Operations Override Election Local Support for an additional 10% 2008 Bond Election $148 million

8/27/2019

What will be cut if the override does not pass?

• The Governing Board will be forced to make over $9

million in cuts each of the three years of the phase down of

the M&O Override, for a total of nearly $30 million cuts to

the District operating budget.

Page 48: Building Schools and Educating Children since 1934€¦ · 2005 10% Maintenance & Operations Override Election Local Support for an additional 10% 2008 Bond Election $148 million

8/27/2019

What About Other Proposals to Increase Funding for Education?

Inflationary Lawsuit – inflation lawsuit was settled (Proposition

123) for a percentage of what was owed and inflation growth is

capped at no more than 2% annually.

Governor’s 20% by 2020 – even with this initiative the average

teacher salary in Arizona is at least $11,000 less than the

national average.

Source: Expect More Arizona

data adjusted for cost of living

Page 49: Building Schools and Educating Children since 1934€¦ · 2005 10% Maintenance & Operations Override Election Local Support for an additional 10% 2008 Bond Election $148 million

8/27/2019

What will the M&O Override cost?

Average Assessed Valuation Residential Property: $213,053

Projected Tax Rate for 15% M&O Override: $1.0832

Projected Annual Tax Amount: $230.79

or, just $19.23 per month

This amount is not an increase.

It is a continuation of the local support already being paid.

Page 50: Building Schools and Educating Children since 1934€¦ · 2005 10% Maintenance & Operations Override Election Local Support for an additional 10% 2008 Bond Election $148 million

8/27/2019

Election Guidelines for DVUSD Employees

What Can Employees Do?

Speak freely as private citizens after work

hours and away from school facilities.

Answer questions and provide factual

information without advocacy at any time.

Page 51: Building Schools and Educating Children since 1934€¦ · 2005 10% Maintenance & Operations Override Election Local Support for an additional 10% 2008 Bond Election $148 million

8/27/2019

Election Guidelines for DVUSD Employees

What Can’t Employees Do?

Use school resources such as personnel,

computers, copiers, postage, and supplies.

Give election materials to students to carry

home.

Use the authority of their position to influence

the vote.

Page 52: Building Schools and Educating Children since 1934€¦ · 2005 10% Maintenance & Operations Override Election Local Support for an additional 10% 2008 Bond Election $148 million

8/27/2019

Dates to Remember

October 7 Last day to register to vote

October 15 Ballots ready for mailing

November 5 Election day

NOTE – this will be an all mail-in election, there will not be any polling places for this election

Questions?

Call Communications and Community Engagement Office

623-445-5010

www.dvusd.org