bulding 245 schedule update
DESCRIPTION
TE EPC. Bulding 245 schedule update. LIU Booster Meeting 13-09-2012 Serge Pittet, Fulvio Boattini TE-EPC. Building 245 Position. TE EPC. France. Limit for edification. France-Swiss border. Switzerland. Building 245 Preliminary D esign. TE EPC. HVAC room at ground floor - PowerPoint PPT PresentationTRANSCRIPT
Bulding 245 schedule update
LIU Booster Meeting 13-09-2012Serge Pittet, Fulvio Boattini
TE-EPC
TE EPC
Building 245 Position
13/09/2011 TE-EPC - Serge Pittet, Fulvio Boattini 2
TE EPC
France-Swiss border
Limit for edification
France
Switzerland
Building 245 Preliminary Design
13/09/2011 TE-EPC - Serge Pittet, Fulvio Boattini 3
TE EPC
Input Transformers
Cooling towers
HVAC room at ground floorControl rooms at first floor
Storage capacitorsMain entrance
Converter building
MPSB Time Schedule
13/09/2011 TE-EPC - Serge Pittet, Fulvio Boattini 4
TE EPC
physics LS1 physics LS2 physics
2012 2013 2014 2015 2016 2017 2018 2019
26 May 2016Building ReadyNo ressources
Services Integration(EL, CV,..)
GS/SE studies and procurement
Building construction
Cooling installati
on
Air conditioning and cooling
pipes installation
17 October 201320 March 2014 26 March 2015
FCLV cabinets installation.Lights and
other services
18kV cabinets
installation
Cooling and Conditioning operating
Lights and electrical cabinets installed
Overhead Crane installed
Fire alarm system
installation
Fire alarm system installation
14 April 2017Start
Commissioning on dummy load
MPSB Time Schedule
13/09/2011 TE-EPC - Serge Pittet, Fulvio Boattini 5
TE EPC
physics LS1 physics LS2 physics
2012 2013 2014 2015 2016 2017 2018 2019
26 May 2016Building ReadyNo ressources
Services Integration(EL, CV,..)
GS/SE studies and procurement
Building construction
Power converterDesign & specification
Market Survey& Call for tender
Power converterDesign
(supplier)
Power converterconstruction
Power converter
Installation and cold
commissioning
Systemcommissioning
on PSB magnets
17 October 201320 March 2014 26 March 2015
FC
25 August 201620 June 2014FC
14 April 2017Start
Commissioning on dummy load
Power converter
commissioning on test
magnets
MPSB Time Schedule 2018
13/09/2011 TE-EPC - Serge Pittet, Fulvio Boattini 6
TE EPC
LS2 2018
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
System Ready and Debugged
Preliminary test of 1 MPS converter on half magnets string:4 Weeks
Testing on spare magnets
Tests of 1 MPS + 1 Trim on half magnet string:4 weeks
Commissioning testing of all converters:(8 Weeks)
Testing on spare magnets
Is this slot feasible?
Of the utmost importance
MPSB Time Schedule: Building constructionTE EPC
Integration is the first phase. Planned starting: October 2013Required resources: 1 Engineer + 1 CAD designer for the most involved services
Not a Full Time activity during the all integration phase
TE-EPC - Serge Pittet, Fulvio Boattini 713/09/2012
DeadLine for building with services
Oct 2013 all services shall start to work to the integration
TE-EPC - Serge Pittet, Fulvio Boattini 8
THANKS FOR THE ATTENTION
QUESTIONS?
Bulding 245 schedule update
TE EPC
13/09/2012
MPSB Technical Baseline
06/09/2011 TE-EPC - Serge Pittet, Fulvio Boattini 10
TE EPC
• Overall voltage available increases and would allow a reduction of the RMS current using a faster ramping.
• The capacitor bank totally absorbs the peak power on the 18kV network. Meyrin SVC would then become optional.
• Spare sharing between MPS A and B and possibly with POPS.
• Only a few new cables needed between the reference magnet (BCER) and the MPS.
• New B-field regulation to minimize eddy currents and saturation effects impact at higher current and acceleration rate.
• Some additional trim converters might be needed for shorter dipoles in the injection region.
Reference magnet
Ring 2&3
GND
MPS B2500V5500A
QFO600V450A
QDE600V450A
GND
MPS A2500V5500A
DC3
DC
DC +
-
MAGNETS
V_F3
UdcF3
AC
CC1
AC
MV7308
DC
DIP+QF+REF
DC3
DC
DC +
-
V_F3
UdcF3
AC
CC1
AC
MV7308
DC
DIP+QD+REF
DC3
DC
DC +
-
UdcF3
AC
CC1
AC
MV7308
DC
64 BHZ Rings 1&4
128 QFO Rings 1,2,3&4
64 QDE Rings 1,2,3&4
64 BHZ Rings 2&3
Reference magnet
Ring 1&4
Ring 1 B-filedmeasurement
Ring 2 B-filedmeasurement
06/09/2011 TE-EPC - Serge Pittet, Fulvio Boattini 11
TE EPCMPSB Preliminary dimensioning
0 100 200 300 400 500 600 700 800 900
-3500
-2500
-1500
-500
500
1500
2500
3500
4500
5500900ms cycle 2GeV
Pafe [kW]
Current [A]
Udc_C
Vref [V]
Time [ms]
PTrn=2.4MW
PAFEpk=2.8MW PDCDCpk=13.7MW
Storage=0.25F@5kV
Output ripple specification to be published soon
Trim(s?) still to be dimensioned
MPSB Time Schedule: Building construction
06/09/2011 TE-EPC - Serge Pittet, Fulvio Boattini 12
TE EPC
physics LS1 physics LS2 physics
2012 2013 2014 2015 2016 2017 2018 2019
Building infrastructure & services ready
Services Integration(EL, CV,..)
GS/SEEngineering
Building construction
ServicesInstallation(EL,CV…)
Cooling station
installation
Doing the integration Now and until beginning LS1 will allow GS/SE to start with specification.
No ressources
MPSB Time Schedule
06/09/2011 TE-EPC - Serge Pittet, Fulvio Boattini 13
TE EPC
physics LS1 physics LS2 physics
2012 2013 2014 2015 2016 2017 2018 2019
26 May 2016Building ready
First tests on PSB magnets
Converters performance
commissioned and ready for operation
Converter manufactured and installed
No ressourcesServices
Integration(EL, CV,..)
GS/SE studies and procurement
Building construction
ServicesInstallation
Cooling station
installation
17 October 2013
20 March 2014
26 March 2015FC
MPSB Time Schedule
06/09/2011 TE-EPC - Serge Pittet, Fulvio Boattini 14
TE EPC
physics LS1 physics LS2 physics
2012 2013 2014 2015 2016 2017 2018 2019
26 May 2016Building ReadyNo ressources
Services Integration(EL, CV,..)
GS/SE studies and procurement
Building construction
Cooling installati
on
Air conditioning and cooling
pipes installation
17 October 201320 March 2014 26 March 2015
FCLV cabinets installation.Lights and
other services
18kV cabinets
installation
Cooling and Conditioning operating
Lights and electrical cabinets installed
Overhead Crane installed
Fire alarm system
installation
Fire alarm system installation
14 April 2017Start
Commissioning on dummy load