bureau of architecture ortega branch library · 40 th ave. site boundary lines 39 th ave. new...

14
Phase II – Design Development/ Arts Commission Presentation November 17, 2008 BUREAU OF ARCHITECTURE Ortega branch library

Upload: others

Post on 19-Oct-2020

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BUREAU OF ARCHITECTURE Ortega branch library · 40 th Ave. Site boundary lines 39 th Ave. new library Rec. & Park Clubhouse fence. Phase II – Design Development/ Arts Commission

Phase II – Design Development/ Arts Commission Presentation

November 17, 2008

BUREAU OF ARCHITECTUREOrtega branch library

Page 2: BUREAU OF ARCHITECTURE Ortega branch library · 40 th Ave. Site boundary lines 39 th Ave. new library Rec. & Park Clubhouse fence. Phase II – Design Development/ Arts Commission

Phase II – Design Development/ Arts Commission Presentation

November 17, 2008

BUREAU OF ARCHITECTUREOrtega branch library

Design Revisions

1

1

Site

• Remove portion of south fence to open Library to the Rec. & ParkPublic Plaza

• Revise entry court per Arts Commission – Phase I comment

Building

• South façade changed to allow for 400 SF expansion of program room and direct access to Public Plaza

• Roof was extended 10’ towards Public Plaza to provide sheltered terrace south of program room

• Limit The Living Roof to areas above Program Room and Children Area

• Library will meet Green Building LEED Silver

Page 3: BUREAU OF ARCHITECTURE Ortega branch library · 40 th Ave. Site boundary lines 39 th Ave. new library Rec. & Park Clubhouse fence. Phase II – Design Development/ Arts Commission

Phase II – Design Development/ Arts Commission Presentation

November 17, 2008

BUREAU OF ARCHITECTUREOrtega branch library

• The building site is located on Ortega Street and 39th Ave., adjacent to Rec. & Park complex playground which covers (10) city blocks.

• A unique feature of this site is its location. The current Library is sited on a level platform that is 10 feet above street level at the west end of the site. The site provides a nice view to Pacific Ocean

N

Site Context2

Page 4: BUREAU OF ARCHITECTURE Ortega branch library · 40 th Ave. Site boundary lines 39 th Ave. new library Rec. & Park Clubhouse fence. Phase II – Design Development/ Arts Commission

Phase II – Design Development/ Arts Commission Presentation

November 17, 2008

BUREAU OF ARCHITECTUREOrtega branch library

View looking at main entrance to the Library from Ortega Street. A.P. Giannini Middle School on the left.

View to existing site of the library from Ortega Street. Existing branch library is behind the trees.

Site Context3

Page 5: BUREAU OF ARCHITECTURE Ortega branch library · 40 th Ave. Site boundary lines 39 th Ave. new library Rec. & Park Clubhouse fence. Phase II – Design Development/ Arts Commission

Phase II – Design Development/ Arts Commission Presentation

November 17, 2008

BUREAU OF ARCHITECTUREOrtega branch library

View from Library site looking toward the ocean. Sunset Elementary School is 10 feet below the existing Library site.

View from Library site toward 39th Avenue View of Retaining Wall to remain View of A.P. Giannini Middle School

4 Site Context

Page 6: BUREAU OF ARCHITECTURE Ortega branch library · 40 th Ave. Site boundary lines 39 th Ave. new library Rec. & Park Clubhouse fence. Phase II – Design Development/ Arts Commission

Phase II – Design Development/ Arts Commission Presentation

November 17, 2008

BUREAU OF ARCHITECTUREOrtega branch library

Existing Site/ Site Context

A.P. Giannini Middle School

Sunset Elementary School

West sunsetplayground N

5

Page 7: BUREAU OF ARCHITECTURE Ortega branch library · 40 th Ave. Site boundary lines 39 th Ave. new library Rec. & Park Clubhouse fence. Phase II – Design Development/ Arts Commission

Phase II – Design Development/ Arts Commission Presentation

November 17, 2008

BUREAU OF ARCHITECTUREOrtega branch library

N

6 Site Plan

Residential Residential

O r t e g a St.

Public Plaza

West Sunset Playground

Exi

stin

g P

edes

trian

St.

& V

ehic

ular

Ser

vice

Acc

ess

40 th

Ave

.

Site boundary lines

39 th

Ave

.

new libraryR

ec. &

Par

k C

lubh

ouse

fence

Page 8: BUREAU OF ARCHITECTURE Ortega branch library · 40 th Ave. Site boundary lines 39 th Ave. new library Rec. & Park Clubhouse fence. Phase II – Design Development/ Arts Commission

Phase II – Design Development/ Arts Commission Presentation

November 17, 2008

BUREAU OF ARCHITECTUREOrtega branch library

7 Floor Plan Design Concept

N

Features

• Library building and entry visible from Ortega Street

• New books and Audio/Visual Media located in central area near entrance

• Separate areas for Adults, Teen and Children

• Enclosed study room in Teen area

• Open and flexible floor plan with good sight lines from the service desk

• Program room with sliding glass walls that can be opened for larger programs

• Restrooms located adjacent to public areas and program room

• Outdoor terrace areas adjacent to program room allow for overflow

main

entrance

Service area

Teen area

Adult collectio

n

Program room

Children area

O r

t

e g

a

St.

fence

Page 9: BUREAU OF ARCHITECTURE Ortega branch library · 40 th Ave. Site boundary lines 39 th Ave. new library Rec. & Park Clubhouse fence. Phase II – Design Development/ Arts Commission

Phase II – Design Development/ Arts Commission Presentation

November 17, 2008

BUREAU OF ARCHITECTUREOrtega branch library

Living Roof

Guardrail along site at retaining wall

Ocean View

N

8

Gua

rdra

il al

ong

site

at r

etai

ning

wal

lO r t e g a St.

P e

d e

s t

r i

a n

St.

Public Plaza

Living roof SBS Roofing

SBS Roofing

Page 10: BUREAU OF ARCHITECTURE Ortega branch library · 40 th Ave. Site boundary lines 39 th Ave. new library Rec. & Park Clubhouse fence. Phase II – Design Development/ Arts Commission

Phase II – Design Development/ Arts Commission Presentation

November 17, 2008

BUREAU OF ARCHITECTUREOrtega branch library

North Elevation

aluminum window wall w/ low-e glazing & operable windows

standing seam metal overhang

painted stucco

Standing seam metal wall and overhang

living roof

South Elevation

9 Building Elevations

living roof

standing seam metal overhang

painted stucco

painted stucco

living roof

o r t e g a St.

clerestory

green screen

Page 11: BUREAU OF ARCHITECTURE Ortega branch library · 40 th Ave. Site boundary lines 39 th Ave. new library Rec. & Park Clubhouse fence. Phase II – Design Development/ Arts Commission

Phase II – Design Development/ Arts Commission Presentation

November 17, 2008

BUREAU OF ARCHITECTUREOrtega branch library

East Elevation

aluminum window wall w/ low-e glazing & operable windowsskylights above central area

living roofstanding seam

metal overhang

10 Building Elevations

overhang above program rm.

West Elevation

aluminum window wall w/ low-e glazing & operable windows

painted stucco

living roof

SBS roofing

Page 12: BUREAU OF ARCHITECTURE Ortega branch library · 40 th Ave. Site boundary lines 39 th Ave. new library Rec. & Park Clubhouse fence. Phase II – Design Development/ Arts Commission

Phase II – Design Development/ Arts Commission Presentation

November 17, 2008

BUREAU OF ARCHITECTUREOrtega branch library

11 Building Sections

East - West Longitudinal Section

Page 13: BUREAU OF ARCHITECTURE Ortega branch library · 40 th Ave. Site boundary lines 39 th Ave. new library Rec. & Park Clubhouse fence. Phase II – Design Development/ Arts Commission

Phase II – Design Development/ Arts Commission Presentation

November 17, 2008

BUREAU OF ARCHITECTUREOrtega branch library

12 Building Sections

North – South Transverse Section

Page 14: BUREAU OF ARCHITECTURE Ortega branch library · 40 th Ave. Site boundary lines 39 th Ave. new library Rec. & Park Clubhouse fence. Phase II – Design Development/ Arts Commission

Phase II – Design Development/ Arts Commission Presentation

November 17, 2008

BUREAU OF ARCHITECTUREOrtega branch library

13 Perspective viewmain entrance