16
QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT 1 A. IT Equipment 2 Desktop PC with License HRD/PSRD/GSD 5 units 40,000.00 200,000.00 3 120,000.00 1 40,000.00 1 40,000.00 3 Desktop PC with License PSRD 1 unit 50,000.00 50,000.00 1 50,000.00 4 Desktop PC with License Commercial 1 unit 40,000.00 40,000.00 5 Desktop PC with License Finance 3 units 40,000.00 120,000.00 2 80,000.00 1 40,000.00 6 Desktop PC with Printer (for ACIT) PAMD 1 unit 50,000.00 50,000.00 1 50,000.00 7 Desktop PC (for NRW) Engineering 1 unit 40,000.00 40,000.00 1 40,000.00 8 Sub - Total 500,000.00 210,000.00 40,000.00 130,000.00 40,000.00 40,000.00 9 CPU Commercial 1 unit 35,000.00 35,000.00 10 Scanner - A3 Engineering 1 unit 50,000.00 50,000.00 1 50,000.00 11 3 in 1 Printer (A3 Size) Engineering 1 unit 30,000.00 30,000.00 1 30,000.00 12 Sub - Total 115,000.00 80,000.00 - - - - 13 Laptop PSRD/GSD 2 units 45,000.00 90,000.00 1 45,000.00 1 45,000.00 14 Laptop OBD 1 unit 45,000.00 45,000.00 1 45,000.00 15 Laptop PAMD 1 unit 50,000.00 50,000.00 1 50,000.00 16 Laptop Production 2 units 45,000.00 90,000.00 90,000.00 17 Sub - Total 275,000.00 - 90,000.00 95,000.00 45,000.00 45,000.00 18 Cabling for IT Requirements ITCD 1 lot 700,000.00 19 Wireless Data Network for CCTV, Biometric & Telephony - Phase 1 (IT Requirements) PSRD 1 lot 492,000.00 492,000.00 20 Licensed GIS Software Production 1 lot 250,000.00 250,000.00 21 Environmental Compliance Certificate (ECC) Production 1 lot 450,000.00 22 Sub - Total 1,892,000.00 - 492,000.00 250,000.00 - - 23 TOTAL - IT EQUIPMENT 2,782,000.00 290,000.00 622,000.00 475,000.00 85,000.00 85,000.00 24 B. Communication Equipment 25 VHF Handheld Radio Commercial 2 units 21,000.00 42,000.00 2 42,000.00 26 VHF Handheld Radio Production 5 units 21,000.00 105,000.00 105,000.00 27 Sub - Total - Comm Equipt 147,000.00 42,000.00 105,000.00 - - - 28 B. Office Equipment 29 12 Doors Cabinet Locker (Steel) GSD 1 unit 20,000.00 20,000.00 20,000.00 30 6 Doors Cabinet Locker (Steel) GSD 1 unit 10,000.00 10,000.00 10,000.00 31 Aircon, Window Type, 2 HP GSD 4 units 30,000.00 120,000.00 3 90,000.00 30,000.00 32 DSLR Camera with carrying bag PSRD 1 unit 30,000.00 30,000.00 1 30,000.00 33 ID Laminator HRD 1 unit 12,000.00 12,000.00 1 12,000.00 34 Projector, DLP OBD 1 unit 50,000.00 50,000.00 1 50,000.00 35 PSION Workabout Commercial 3 units 38,500.00 115,500.00 3 115,500.00 36 Queuing System (for 2 Frontliner) Commercial 1 set 50,000.00 50,000.00 1 50,000.00 BUTUAN CITY WATER DISTRICT APPROVED BUDGET 2015 CONSOLIDATED CAPITAL EXPENDITURE (CAPEX) Item No. Budgetary Items Qty Unit Unit Cost Approved Budget for 2015 JANUARY FEBRUARY MARCH APRIL MAY End User Page 1 of 16

Upload: buitram

Post on 30-Jul-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT

1 A. IT Equipment

2 Desktop PC with License HRD/PSRD/GSD 5 units 40,000.00 200,000.00 3 120,000.00 1 40,000.00 1 40,000.00

3 Desktop PC with License PSRD 1 unit 50,000.00 50,000.00 1 50,000.00

4 Desktop PC with License Commercial 1 unit 40,000.00 40,000.00

5 Desktop PC with License Finance 3 units 40,000.00 120,000.00 2 80,000.00 1 40,000.00

6 Desktop PC with Printer (for ACIT) PAMD 1 unit 50,000.00 50,000.00 1 50,000.00

7 Desktop PC (for NRW) Engineering 1 unit 40,000.00 40,000.00 1 40,000.00

8 Sub - Total 500,000.00 210,000.00 40,000.00 130,000.00 40,000.00 40,000.00

9 CPU Commercial 1 unit 35,000.00 35,000.00

10 Scanner - A3 Engineering 1 unit 50,000.00 50,000.00 1 50,000.00

11 3 in 1 Printer (A3 Size) Engineering 1 unit 30,000.00 30,000.00 1 30,000.00

12 Sub - Total 115,000.00 80,000.00 - - - -

13 Laptop PSRD/GSD 2 units 45,000.00 90,000.00 1 45,000.00 1 45,000.00

14 Laptop OBD 1 unit 45,000.00 45,000.00 1 45,000.00

15 Laptop PAMD 1 unit 50,000.00 50,000.00 1 50,000.00

16 Laptop Production 2 units 45,000.00 90,000.00 90,000.00

17 Sub - Total 275,000.00 - 90,000.00 95,000.00 45,000.00 45,000.00

18 Cabling for IT Requirements ITCD 1 lot 700,000.00

19Wireless Data Network for CCTV, Biometric &

Telephony - Phase 1 (IT Requirements)PSRD 1 lot 492,000.00 492,000.00

20 Licensed GIS Software Production 1 lot 250,000.00 250,000.00

21 Environmental Compliance Certificate (ECC) Production 1 lot 450,000.00

22 Sub - Total 1,892,000.00 - 492,000.00 250,000.00 - -

23 TOTAL - IT EQUIPMENT 2,782,000.00 290,000.00 622,000.00 475,000.00 85,000.00 85,000.00

24 B. Communication Equipment

25 VHF Handheld Radio Commercial 2 units 21,000.00 42,000.00 2 42,000.00

26 VHF Handheld Radio Production 5 units 21,000.00 105,000.00 105,000.00

27 Sub - Total - Comm Equipt 147,000.00 42,000.00 105,000.00 - - -

28 B. Office Equipment

29 12 Doors Cabinet Locker (Steel) GSD 1 unit 20,000.00 20,000.00 20,000.00

30 6 Doors Cabinet Locker (Steel) GSD 1 unit 10,000.00 10,000.00 10,000.00

31 Aircon, Window Type, 2 HP GSD 4 units 30,000.00 120,000.00 3 90,000.00 30,000.00

32 DSLR Camera with carrying bag PSRD 1 unit 30,000.00 30,000.00 1 30,000.00

33 ID Laminator HRD 1 unit 12,000.00 12,000.00 1 12,000.00

34 Projector, DLP OBD 1 unit 50,000.00 50,000.00 1 50,000.00

35 PSION Workabout Commercial 3 units 38,500.00 115,500.00 3 115,500.00

36 Queuing System (for 2 Frontliner) Commercial 1 set 50,000.00 50,000.00 1 50,000.00

BUTUAN CITY WATER DISTRICT

APPROVED BUDGET 2015

CONSOLIDATED CAPITAL EXPENDITURE (CAPEX)

Item

No.Budgetary Items Qty Unit Unit Cost

Approved Budget

for 2015

SCHEDULE/MILESTONE OF ACTIVITIES

JANUARY FEBRUARY MARCH APRIL MAYEnd User

Page 1 of 16

QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT

Item

No.Budgetary Items Qty Unit Unit Cost

Approved Budget

for 2015

SCHEDULE/MILESTONE OF ACTIVITIES

JANUARY FEBRUARY MARCH APRIL MAYEnd User

37 Refrigerator, 8 cu.ft. OBD 1 unit 21,000.00 21,000.00

38 Wooden Cabinet Engineering 1 unit 40,000.00 40,000.00 1 40,000.00

39 Sub - Total - Office Equipt 468,500.00 82,000.00 140,000.00 165,500.00 30,000.00 30,000.00

40 C. Power Operated Equipment

41 Air Compressor - 5 HP, 3 Phase Production 1 unit 65,000.00 65,000.00 1 65,000.00

42 Bench Grinder PAMD 1 unit 15,000.00 15,000.00 1 15,000.00

43 Concrete Mixer - 1 Bagger ENGINEERING 1 unit 65,000.00 65,000.00 1 65,000.00

44 Conrete Vibrator - 32mmØ ENGINEERING 1 unit 28,000.00 28,000.00 1 28,000.00

45 Cut-Off Machine 14" PAMD 1 unit 20,000.00 20,000.00 1 20,000.00

46 Cutting Outfit PAMD 1 unit 20,000.00 20,000.00 1 20,000.00

47 Generator Set, 150 KVA GSD 1 unit 1,104,000.00 1,104,000.00

48 Grass Cutter - Heavy Duty Production 1 unit 18,500.00 18,500.00 1 18,500.00

49 Hydraulic Lifter GSD 1 unit 300,000.00 300,000.00

50 Portable Drill PAMD 1 unit 10,000.00 10,000.00 1 10,000.00

51 Water Meter Test Bench GSD 1 unit 2,500,000.00 2,500,000.00 1 2,500,000.00

52 Sub - Total - POE 4,145,500.00 18,500.00 158,000.00 2,565,000.00 - -

53 D. Building/Structures and Improvements

54 Admin Building Renovation PSRD 1 lot 4,000,000.00 500,000.00 3,500,000.00

55Backfilling of Lot Area - back of Admin building

(Additional)GSD 1 lot 500,000.00 500,000.00

56Backfilling of Lot Area - back of Admin building

(Continuation)GSD 1 lot 116,175.27 116,175.27

57 Construction of Generator Set House GSD 1 lot 250,000.00

58 Construction of Perimeter Fence GSD 1 lot 1,500,000.00 1,500,000.00

59Construction of Records Room / Office,

including fabrication of rack, wiring / cablingPSRD 1 lot 1,000,000.00 1,000,000.00

60 Fabrication & Installation of Steel Rack PMMD 1 lot 179,500.00 179,500.00

61 Improvement of Garage CR GSD 1 lot 100,000.00 100,000.00

62 Improvement of Water Meter Shop GSD 1 lot 450,000.00 450,000.00

63 Installation of Venetian Blinds GSD 1 lot 150,000.00 150,000.00

64 Perimeter Fence at PS#2 (Continuation) PMMD 1 lot 165,478.00 165,478.00

65 Rehab of Electrical Room GSD 1 lot 900,000.00 900,000.00

66 Renovation of 2nd Floor Admin Building GSD 1 lot 1,000,000.00

67 Repair of PSRD Office PSRD 1 lot 200,000.00 200,000.00

68 Roofdeck Flooring - Repainting GSD 1 lot 390,000.00 390,000.00

69Site Development Plan of BCWD Laboratory

Building - Conceptual DesignProduction 1 lot 500,000.00

70 Bon-Bon Rehabilitation Production 1 lot 1,700,000.00 1,700,000.00

71Ground Reservoir at Line Booster, San Vicente

/ Bit-OsProduction 1 lot 1,000,000.00

72 Sub - Total - Structures Improvement 14,101,153.27 781,653.27 750,000.00 2,790,000.00 6,579,500.00 450,000.00

Page 2 of 16

QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT

Item

No.Budgetary Items Qty Unit Unit Cost

Approved Budget

for 2015

SCHEDULE/MILESTONE OF ACTIVITIES

JANUARY FEBRUARY MARCH APRIL MAYEnd User

73 E. Laboratory Equipment / Water Quality

74 Weighing Scale for Chlorine Production 2 units 75,000.00 150,000.00 150,000.00

75 Serological Pippetor Production 3 units 20,000.00 60,000.00 60,000.00

76 Colorimeter Production 2 units 30,000.00 60,000.00 60,000.00

77 Butterfly Valve 900mm Production 1 unit 800,000.00 800,000.00 1 800,000.00

78 Butterfly Valve 800mm Production 1 unit 700,000.00 700,000.00 1 700,000.00

79 Chlorinator at Well No. 17 Production 1 lot 270,000.00 270,000.00 1 270,000.00

80 Sub - Total - Lab Equipt 2,040,000.00 - 390,000.00 150,000.00 - 1,500,000.00

81 F. Transportation Equipment

82 Service Vehicle (FB Type) GSD 3 units 900,000.00 2,700,000.00 2,700,000.00

83 Water Tanker GSD 1 units 3,000,000.00 3,000,000.00 3,000,000.00

84Service Vehicle (VAN Type) - Carry Over from

2014OBD 1 unit 2,500,000.00 2,500,000.00 2,500,000.00

85 Sub - Total - Transpo 8,200,000.00 - - 5,500,000.00 - 2,700,000.00

86 PIPES, VALVES & FITTINGS

87 BRASS FITTINGS

88Brass Angle Meter Valve 25mmǾ x 25mmØ,

ISOEngineering 2,356 pcs. 580.00 1,366,480.00

89Brass Angle Valve 3/4", ISO (25mmØx

25mmØ)PAMD 84 pcs. 638.00 53,592.00 84 53,592.00

90 Brass Corporation Stop 32mmØ, ISO Engineering 590 pcs. 1,000.00 590,000.00

91 Brass Coupling 1", ISO (32mmØ) PAMD 36 pcs. 418.00 15,048.00 36 15,048.00

92 Brass Coupling 32mmØ, ISO Engineering 590 pcs. 380.00 224,200.00

93 Brass Union 1", ISO (32mmØ) PAMD 36 pcs. 660.00 23,760.00 36 23,760.00

94 Sub - Total - Brass Fittings 2,273,080.00 - 92,400.00 - - -

95 Cement PAMD 24 bags 325.00 7,800.00 2 650.00 2 650.00 2 650.00 2 650.00 2 650.00

96 Cement Engineering 287 bags 210.00 60,270.00

97 Cement Engineering 2,218 bags 250.00 554,500.00

98 Sub - Total - Cement 622,570.00 650.00 650.00 650.00 650.00 650.00

99 VALVES & FITTINGS

100100mmØ C.I. Combination Flange w/ Tensile

RingPAMD 8 pcs. 4,242.00 33,936.00 8 33,936.00

101100mmØ C.I. Gate Valve w/ BNG, F/F, NRS,

ISOPAMD 6 pcs. 10,185.00 61,110.00 6 61,110.00

102 100mmØ Gate Valve BNG, F/F, NRS, ISO Engineering 3 pcs. 16,000.00 48,000.00

103 100mmØ Gate Valve BNG, F/F, NRS, ISO Engineering 1 pc 16,000.00 16,000.00

104 100mmØ Gate Valve BNG, F/F, NRS, ISO Engineering 1 l.s. 16,000.00 16,000.00

105 100mmØ Gate Valve BNG, F/F, NRS, ISO Engineering 3 pcs. 16,000.00 48,000.00

106 100mmØ Plug Cap PAMD 3 pcs. 330.00 990.00 3 990.00

107 100mmØ x 100mmØ C.I. Tee F/F Engineering 1 pcs. 16,000.00 16,000.00

108 100mmØ x 100mmØ C.I. Tee MJ/MF PAMD 2 pcs. 3,361.75 6,723.50 2 6,723.50

109 100mmØ x 90° C.I. Mech. Bend PAMD 1 pc. 4,874.00 4,874.00 1 4,874.00

Page 3 of 16

QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT

Item

No.Budgetary Items Qty Unit Unit Cost

Approved Budget

for 2015

SCHEDULE/MILESTONE OF ACTIVITIES

JANUARY FEBRUARY MARCH APRIL MAYEnd User

110 110mmØ C.I End Cap Engineering 1 pc 3,800.00 3,800.00

111110mmØ C.I. Combination Flange w/ Tensile

Ring Engineering 2 pcs. 5,700.00 11,400.00

112110mmØ C.I. Combination Flange w/ Tensile

Ring Engineering 4 pcs. 5,700.00 22,800.00

113110mmØ C.I. Combination Flange w/ Tensile

Ring BNG ISO Engineering 5 pcs. 5,700.00 28,500.00

114110mmØ C.I. Combination Flange w/ Tensile

Ring BNG ISO Engineering 2 l.s. 5,700.00 11,400.00

115 110mmØ C.I. Flexible Coupling - uPVC Engineering 3 pcs. 5,500.00 16,500.00

116 110mmØ C.I. Flexible Coupling - uPVC Engineering 2 pcs. 5,500.00 11,000.00

117 110mmØ C.I. Flexible Coupling - uPVC Engineering 4 pcs. 5,500.00 22,000.00

118 110mmØ x 110mmØ CI Tee MJ/MF Engineering 2 pcs. 19,000.00 38,000.00

119 110mmØ x 45° CI Elbow Mechanical Engineering 4 pcs. 4,700.00 18,800.00

120 110mmØ x 63mmØ CI Tee MJ/MF Engineering 10 rolls 4,400.00 44,000.00

121 110mmØ x 90° CI Elbow Mechanical Engineering 1 pc 5,000.00 5,000.00

122 110mmØ x 90° CI Elbow Mechanical Engineering 1 pc 5,000.00 5,000.00

123 110mmØ x 90° CI Elbow Mechanical-uPVC Engineering 5 pcs. 5,000.00 25,000.00

124 150mmØ x 100mmØ CI Split Tee Mechanical Engineering 1 pc 27,000.00 27,000.00

125 160mmØ C.I. Flexible Coupling PAMD 1 pc. 3,500.00 3,500.00 1 3,500.00

126 160mmØ x 32mmØ C.I. Clamp PAMD 1 pc. 950.00 950.00 1 950.00

127 160mmØ x 45° C.I. Bend PAMD 4 pcs. 4,266.00 17,064.00 4 17,064.00

128 200mmØ C.I. Flexible Coupling, BNG, ISO PAMD 1 pc. 4,500.00 4,500.00 1 4,500.00

129200mmØ C.I. Gate Valve w/BNG, F/F, NRS,

ISOPAMD 2 pcs. 19,962.00 39,924.00 2 39,924.00

130 200mmØ Combination Flange w/ Tensile Ring PAMD 5 pcs. 15,416.00 77,080.00 5 77,080.00

131200mmØ x 100mmØ C.I. Split Tee Red., BNG,

F/F, ISOPAMD 1 pc. 14,010.00 14,010.00 1 14,010.00

132 200mmØ x 32mmØ C.I. Clamp, BNG, ISO PAMD 1 pc. 1,500.00 1,500.00 1 1,500.00

133 200mmØ x 45° C.I. Bend PAMD 4 pcs. 3,000.00 12,000.00 4 12,000.00

134 210mmØ x 110mmØ CI Split Tee MJ/MF Engineering 1 pc 36,000.00 36,000.00

135 50mmØ Air Release Valve PAMD 2 pcs. 38,700.00 77,400.00 2 77,400.00

136 C.I.Saddle Clamp, 8"Ø x 1"Ø Engineering 36 pcs. 2,565.19 92,346.90

137 C.I.Valve Box Cover Engineering 3 pcs. 2,300.00 6,900.00

138 C.I.Valve Box Cover Engineering 1 pc 2,300.00 2,300.00

139 Sub-Total - Valves & Fittings 927,308.40 - 355,561.50 - - -

140 G.I. PIPES & FITTINGS

141 100mmØ GI Plug Cap Engineering 1 pcs. 480.00 480.00

142 100mmØ GI Plug Cap Engineering 1 pcs. 480.00 480.00

143 100mmØ GI Plug Cap Engineering 1 pc 480.00 480.00

144 100mmØ GI Plug Cap Engineering 2 pcs. 480.00 960.00

Page 4 of 16

QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT

Item

No.Budgetary Items Qty Unit Unit Cost

Approved Budget

for 2015

SCHEDULE/MILESTONE OF ACTIVITIES

JANUARY FEBRUARY MARCH APRIL MAYEnd User

145 100mmØ x 2m GI Stand Pipe Sch. 40 STD Engineering 2 pcs. 4,800.00 9,600.00

146 100mmØ x 2m GI Stand Pipe Sch. 40 STD Engineering 2 pcs. 4,700.00 9,400.00

147 100mmØ x 2m GI Stand Pipe Sch. 40 STD Engineering 1 pcs. 4,800.00 4,800.00

148 100mmØ x 2m GI Stand Pipe Sch. 40 STD Engineering 1 l.s. 4,800.00 4,800.00

149 100mmØ x 2m GI Stand Pipe Sch. 40 STD Engineering 1 pcs. 4,800.00 4,800.00

150 100mmØ x 90° G.I Elbow Sch.40 STD Engineering 2 pcs. 7,500.00 15,000.00

151 100mmØ x 90° G.I Elbow Sch.40 STD Engineering 2 pcs. 7,500.00 15,000.00

152 100mmØ x 90° G.I Elbow Sch.40 STD Engineering 4 pcs. 750.00 3,000.00

153 100mmØ x 90° G.I Elbow Sch.40 STD Engineering 2 l.s. 750.00 1,500.00

154 110mmØ x 6m G.I Pipe Sch. 40 Engineering 10 pcs. 14,800.00 148,000.00

155 Deformed Bars, 10mmØ Engineering 60 pcs. 120.00 7,200.00

156 GI Bushing Reducer 1" x 3/4", Sch 40, Std PAMD 24 pcs. 36.00 864.00 24 864.00

157 GI Bushing Reducer 1"Ǿ x ¾"Ǿ, Sch.40 Std Engineering 252 pcs. 52.00 13,104.00

158 GI Bushing Reducer 3/4" x 1/2" Sch. 40 Std PAMD 24 pcs. 25.00 600.00 24 600.00

159 GI Elbow 1" x 90º PAMD 24 pcs. 56.00 1,344.00 24 1,344.00

160 GI Elbow 1"Ø x 90º, Sch. 60 Engineering 1,700 pcs. 48.80 82,960.00

161 GI Elbow 3/4" x 90º PAMD 24 pcs. 35.00 840.00 24 840.00

162 GI Elbow Reducer 1" x 3/4" PAMD 24 pcs. 18.00 432.00 24 432.00

163 GI Elbow Reducer 3/4" x 1/2" PAMD 24 pcs. 42.00 1,008.00 24 1,008.00

164 GI Nipple 1" x 13" Sch. 40 Std PAMD 36 pcs. 65.00 2,340.00 36 2,340.00

165 GI Nipple 1" x 18" Sch. 40 Std PAMD 36 pcs. 130.00 4,680.00 36 4,680.00

166 GI Nipple 1" x 27" Sch. 40 Std PAMD 36 pcs. 260.00 9,360.00 36 9,360.00

167 GI Nipple 1" x 4" Sch. 40 Std PAMD 96 pcs. 32.00 3,072.00 96 3,072.00

168 GI Nipple 1" x 9" Sch. 40 Std PAMD 36 pcs. 65.00 2,340.00 36 2,340.00

169 GI Nipple 1/2" x 4", Sch. 40 Std PAMD 24 pcs. 18.00 432.00 24 432.00

170 GI Nipple 3/4" x 4" Sch. 40 Std PAMD 48 pcs. 20.00 960.00 48 960.00

171 GI Pipe 1"Ø x 20', Sch. 40 Std Engineering 212 pcs. 1,500.00 318,060.00

172 GI Plug ¾" Ø Engineering 1,775 pcs. 18.50 32,837.50

173 GI Straight Elbow 1" Sch. 40 Std PAMD 24 pcs. 32.00 768.00 24 768.00

174 GI Straight Elbow 1/2" Sch. 40 Std PAMD 24 pcs. 15.00 360.00 24 360.00

175 GI Straight Elbow 3/4" Sch. 40 Std PAMD 24 pcs. 22.00 528.00 24 528.00

176 GI Tee 1" x 1" Sch. 40 Std PAMD 24 pcs. 75.00 1,800.00 24 1,800.00

177 GI Tee 1"Ø x 1"Ø, Sch. 40 Std Engineering 1,179 pcs. 63.90 75,338.10

178 GI Tee 3/4" Sch. 40 Std PAMD 36 pcs. 25.00 900.00 36 900.00

179 GI Tee Reducer 1" x 3/4" Sch. 40 Std PAMD 36 pcs. 90.00 3,240.00 36 3,240.00

180 GI Tee Reducer 1"Ø x ¾" Ø, Sch. 40 Std Engineering 2,355 pcs. 78.20 184,161.00

181 GI Union 1" PAMD 24 pcs. 56.00 1,344.00 24 1,344.00

182 GI Union 1"Ø, Sch.60 Engineering 590 pcs. 106.00 62,540.00

Page 5 of 16

QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT

Item

No.Budgetary Items Qty Unit Unit Cost

Approved Budget

for 2015

SCHEDULE/MILESTONE OF ACTIVITIES

JANUARY FEBRUARY MARCH APRIL MAYEnd User

183 GI Union 3/4" Sch. 40 Std PAMD 24 pcs. 45.00 1,080.00 24 1,080.00

184 GI Valve Box Cover Engineering 1 l.s. 2,300.00 2,300.00

185 GI Valve Box Cover Engineering 3 pcs. 2,300.00 6,900.00

186 Teflon Tape ¾" Ø x 10mts. Engineering 4,715 rls. 20.00 94,300.00

187 Teflon Tape 3/4" x 10 mts PAMD 804 rls 15.00 12,060.00 804 12,060.00

188 Sub - Total - GI Pipes & Fittings 1,148,352.60 - 50,352.00 - - -

189 PLASTIC FITTINGS

190 Plastic Coupling 1" (32mmØ), ISO PAMD 48 pcs. 198.00 9,504.00 48 9,504.00

191 Plastic Coupling 25mmØ, ISO Engineering 2,356 pcs. 128.00 301,568.00

192 Plastic Coupling 3/4" (25mm), ISO PAMD 48 pcs. 128.00 6,144.00 48 6,144.00

193 Plastic Saddle Clamp, 3"Ø x 1"Ø Engineering 140 pcs. 500.00 70,000.00

194 Plastic Saddle Clamp, 4"Ø x 1"Ø Engineering 419 pcs. 550.00 230,422.50

195 Plastic Union 1" (32mmØ), ISO PAMD 48 pcs. 286.00 13,728.00 48 13,728.00

196 Plastic Union 3/4" (25mmØ), ISO PAMD 48 pcs. 204.00 9,792.00 48 9,792.00

197 Sub - Total - Plastic Fittings 641,158.50 - 39,168.00 - - -

198 PIPES

199 100mmØ x 6m uPVC, S-10,C-100 w/ R/R,ISO PAMD 342 pcs. 1,585.00 542,070.00 342 542,070.00

200 110mmØ Rubber Gasket for uPVC Engineering 500 pcs. 50.00 25,000.00

201110mmØ x 6m uPVC, S-10, C-100 w/ R/R,

ISO Engineering 534 l.s. 1,500.00 801,000.00

202110mmØ x 6m uPVC, S-10, C-100 w/ R/R,

ISO Engineering 75 pcs. 1,500.00 112,500.00

203110mmØ x 6m uPVC, S-10, C-100 w/ R/R,

ISO Engineering 50 l.s. 1,500.00 75,000.00

204110mmØ x 6m uPVC, S-10, C-100 w/ R/R,

ISO Engineering 277 pcs. 1,500.00 415,500.00

205 160mmØ x 6m uPVC, S-10,C-100 w/ R/R,ISO PAMD 200 pcs. 3,368.00 673,600.00 200 673,600.00

206 200mmØ x 6m uPVC, S-10,C-100 w/ R/R,ISO PAMD 445 pcs. 6,690.00 2,977,050.00 445 2,977,050.00

207 200mmØ x 6m x 6mm thk. Spiral Steel Pipe PAMD 5 pcs. 25,000.00 125,000.00 5 125,000.00

208 Black HDPE Pipe 2"Ø x 60mts, SDR 11, ISO Engineering 100 rolls 12,000.00 1,200,000.00

209Black HDPE Pipe 32mmØ x 90mts., SDR 11,

ISOEngineering 72 rls. 2,800.00 201,600.00

210 Sub - Total 7,148,320.00 - 4,317,720.00 - - -

211 Sand PAMD 12 cu.m 616.00 7,392.00 1 616.00 1 616.00 1 616.00 1 616.00 1 616.00

212 Gravel PAMD 24 cu.m 685.00 16,440.00 2 1,370.00 2 1,370.00 2 1,370.00 2 1,370.00 2 1,370.00

213 Gravel Engineering 19 T.L. 5,500.00 104,500.00

214 Sand Engineering 9 T.L. 6,500.00 58,500.00

215 Sand and Gravel Engineering 40 m3 359.10 14,364.00

216 Sand Bedding Engineering 16 T.L. 6,500.00 104,000.00

217 Sand Bedding Engineering 2 RLS 3,500.00 7,000.00

Page 6 of 16

QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT

Item

No.Budgetary Items Qty Unit Unit Cost

Approved Budget

for 2015

SCHEDULE/MILESTONE OF ACTIVITIES

JANUARY FEBRUARY MARCH APRIL MAYEnd User

218 Sand Bedding Engineering 1 pc 6,500.00 6,500.00

219 Sand Bedding Engineering 8 T.L. 6,500.00 52,000.00

220 Sand Bedding 4" Ø Pipe PAMD 312 cu.m 500.00 156,000.00 312 156,000.00

221 Sand Bedding 6" Ø Pipe PAMD 222 cu.m 500.00 111,000.00 222 111,000.00

222 Sand Bedding 8" Ø Pipe PAMD 590 cu.m 500.00 295,000.00 590 295,000.00

223 Sub-Total - Sand & Gravel 932,696.00 1,986.00 563,986.00 1,986.00 1,986.00 1,986.00

224 Warning Tape PAMD 20 rolls 3,500.00 70,000.00 20 70,000.00

225 Warning Tape Engineering 20 rolls 3,800.00 76,000.00

226 Sub-Total - Warning Tape 146,000.00 - 70,000.00 - - -

227 TOTAL - MATERIALS & FITTINGS 13,839,485.50 2,636.00 5,489,837.50 2,636.00 2,636.00 2,636.00

228 LABOR COST

229 Barricade Fabrication PAMD 1 lot 10,000.00 1 10,000.00

230 Barricade Fabrication Engineering 1 lot 25,000.00

231A Brown (BCWD share for the Construction of

Booster Pump and Transmission Line)Engineering 1 lot 500,000.00 41,666.67 41,666.67 41,666.67 41,666.67 41,666.67

232 Drilling Works PAMD 1 lot 35,700.00 35,700.00 1 35,700.00

233 Equipment Consumption/Rental PAMD 1 lot 35,000.00 1 35,000.00

234 Excavation, Backfilling and Compaction PAMD 5,950 lm 200.00 1,190,000.00 5,950 1,190,000.00

235 Hydrotesting, Disinfection and Appurtenances PAMD 1 lot 28,800.00 28,800.00 1 28,800.00

236 Installation of Blow-Off and Fire Hydrants PAMD 4 units 20,000.00 80,000.00 4 80,000.00

237 Installation, Jointing and Hauling PAMD 992 lm 50.00 49,600.00 992 49,600.00

238Interconnection (Bellhole Excavation and

Backfilling)PAMD 1 lot 18,000.00 18,000.00 1 18,000.00

239 Labor (5 Plumbers, 1 Clerk Processor) PAMD 1 lot 890,617.00 74,218.08 74,218.08 74,218.08 74,218.08 74,218.08

240 Labor - Backfilling Engineering 433 cu. m 239.00 103,487.00 10,348.70 10,348.70 10,348.70

241 Labor - Concrete Pouring/ Restoration Engineering 4 cu. m 4,108.40 16,433.60 1,643.36 1,643.36 1,643.36

242 Labor - Concrete/Asphalt Cutting Engineering 172 l.m. 43.03 7,401.16 740.12 740.12 740.12

243 Labor - Demolition Engineering 17 cu. m 516.22 8,767.74 876.78 876.78 876.78

244Labor - Excavation & Backfilling of trench for

Pipe laying 1" dia. 3/4" dia (0.20 x 0.30 x 1.0 Engineering 2,250 l.m. 43.87 96,707.50 9,670.75 9,670.75 9,670.75

245 Labor - Excavation of Bellhole Clay Engineering 145 cu. m. 459.20 66,584.00 6,658.40 6,658.40 6,658.40

246 Labor - Excavation of Bellhole Gravel Mix Engineering 250 m³ 695.76 173,940.00 17,394.00 17,394.00 17,394.00

247 Labor - Excavation of Bellhole Sandy Engineering 45 cu. m. 553.25 24,631.90 2,463.19 2,463.19 2,463.19

248 Sub-Total - Labor Cost 3,360,669.90 115,884.75 0.00 1,562,984.75 0.00 165,680.05 165,680.05 0.00 165,680.05

249 OCM Engineering 565,961.92 60,000.00 106,438.85 165,016.13 115,208.73 56,300.51

250 OCM Engineering 391,960.99

251 OCM (7% TDC) PAMD 472,672.31 472,672.31

252 Sub - Total 1,430,595.22 60,000.00 579,111.16 165,016.13 115,208.73 56,300.51

253 TOTAL - LABOR & OCM 4,791,265.12 175,884.75 2,142,095.91 330,696.18 280,888.78 221,980.56

254 CARRY OVER BUDGET FROM 2014

255 Production and Distribution Department

256 PRV Perimeter Fence Production 1 lot 568,184.00 568,184.00

Page 7 of 16

QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT

Item

No.Budgetary Items Qty Unit Unit Cost

Approved Budget

for 2015

SCHEDULE/MILESTONE OF ACTIVITIES

JANUARY FEBRUARY MARCH APRIL MAYEnd User

257 Ground Reservoir at Line Booster, Libertad Production 1 lot 4,388,000.00 4,388,000.00

258 Extension of Pinamanculan Reservoir Production 1 lot 1,100,000.00 1,100,000.00

259 Sub - Total 6,056,184.00 5,488,000.00 - 568,184.00 - -

260 Engineering Department

261 Fuel, Oil and other Maintenance Engineering 485,324.68 50,000.00 89,822.33 144,407.54 89,005.28 58,068.16

262 Porject Based Personnel Engineering 956,940.00 100,000.00 173,800.00 217,340.00 152,200.00 150,700.00

263 Sub - Total 1,442,264.68 150,000.00 263,622.33 361,747.54 241,205.28 208,768.16

264 TOTAL 58,013,352.57 7,030,674.02 10,060,555.74 12,908,763.72 7,219,230.06 5,198,384.72

265 LESS - IMPLEMENTED PROJECTS Engineering 3,360,587.41 908,810.41 33,880.04 65,899.99 34,000.00 33,999.99

266 GRAND TOTAL 61,373,939.98 7,939,484.43 10,094,435.78 12,974,663.71 7,253,230.06 5,232,384.71

Page 8 of 16

1 A. IT Equipment

2 Desktop PC with License

3 Desktop PC with License

4 Desktop PC with License

5 Desktop PC with License

6 Desktop PC with Printer (for ACIT)

7 Desktop PC (for NRW)

8 Sub - Total

9 CPU

10 Scanner - A3

11 3 in 1 Printer (A3 Size)

12 Sub - Total

13 Laptop

14 Laptop

15 Laptop

16 Laptop

17 Sub - Total

18 Cabling for IT Requirements

19Wireless Data Network for CCTV, Biometric &

Telephony - Phase 1 (IT Requirements)

20 Licensed GIS Software

21 Environmental Compliance Certificate (ECC)

22 Sub - Total

23 TOTAL - IT EQUIPMENT

24 B. Communication Equipment

25 VHF Handheld Radio

26 VHF Handheld Radio

27 Sub - Total - Comm Equipt

28 B. Office Equipment

29 12 Doors Cabinet Locker (Steel)

30 6 Doors Cabinet Locker (Steel)

31 Aircon, Window Type, 2 HP

32 DSLR Camera with carrying bag

33 ID Laminator

34 Projector, DLP

35 PSION Workabout

36 Queuing System (for 2 Frontliner)

BUTUAN CITY WATER DISTRICT

APPROVED BUDGET 2015

CONSOLIDATED CAPITAL EXPENDITURE (CAPEX)

Item

No.Budgetary Items

QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT

Small Value Procurement

Small Value Procurement

1 40,000.00 Small Value Procurement

Small Value Procurement

Small Value Procurement

- - - - 40,000.00 - -

1 35,000.00 Small Value Procurement

35,000.00 - - - - - -

Small Value Procurement

Small Value Procurement

Small Value Procurement

- - - - - - -

700,000.00 Public Bidding

Small Value Procurement

450,000.00

1,150,000.00 - - - - - -

1,185,000.00 - - - 40,000.00 - -

- - - - - - -

Small Value Procurement

Small Value Procurement

Small Value Procurement

Small Value Procurement

Small Value Procurement

Small Value Procurement

Small Value Procurement

Small Value Procurement

MODE OF PROCUREMENT

BUTUAN CITY WATER DISTRICT

APPROVED BUDGET 2015

CONSOLIDATED CAPITAL EXPENDITURE (CAPEX)

SCHEDULE/MILESTONE OF ACTIVITIES

JUNE JULY SEPTEMBER OCTOBER NOVEMBER DECEMBERAUGUST

Page 9 of 16

Item

No.Budgetary Items

37 Refrigerator, 8 cu.ft.

38 Wooden Cabinet

39 Sub - Total - Office Equipt

40 C. Power Operated Equipment

41 Air Compressor - 5 HP, 3 Phase

42 Bench Grinder

43 Concrete Mixer - 1 Bagger

44 Conrete Vibrator - 32mmØ

45 Cut-Off Machine 14"

46 Cutting Outfit

47 Generator Set, 150 KVA

48 Grass Cutter - Heavy Duty

49 Hydraulic Lifter

50 Portable Drill

51 Water Meter Test Bench

52 Sub - Total - POE

53 D. Building/Structures and Improvements

54 Admin Building Renovation

55Backfilling of Lot Area - back of Admin building

(Additional)

56Backfilling of Lot Area - back of Admin building

(Continuation)

57 Construction of Generator Set House

58 Construction of Perimeter Fence

59Construction of Records Room / Office,

including fabrication of rack, wiring / cabling

60 Fabrication & Installation of Steel Rack

61 Improvement of Garage CR

62 Improvement of Water Meter Shop

63 Installation of Venetian Blinds

64 Perimeter Fence at PS#2 (Continuation)

65 Rehab of Electrical Room

66 Renovation of 2nd Floor Admin Building

67 Repair of PSRD Office

68 Roofdeck Flooring - Repainting

69Site Development Plan of BCWD Laboratory

Building - Conceptual Design

70 Bon-Bon Rehabilitation

71Ground Reservoir at Line Booster, San Vicente

/ Bit-Os

72 Sub - Total - Structures Improvement

QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT

MODE OF PROCUREMENT

SCHEDULE/MILESTONE OF ACTIVITIES

JUNE JULY SEPTEMBER OCTOBER NOVEMBER DECEMBERAUGUST

1 21,000.00 Small Value Procurement

- - - 21,000.00 - - -

Shopping

Shopping

Shopping

Shopping

Shopping

Shopping

1,104,000.00 Public Bidding

Shopping

300,000.00 Small Value Procurement

Shopping

Public Bidding

1,104,000.00 300,000.00 - - - - -

Public Bidding

Small Value Procurement

Small Value Procurement

250,000.00 Small Value Procurement

Public Bidding

Small Value Procurement

Small Value Procurement

Small Value Procurement

Small Value Procurement

Small Value Procurement

Small Value Procurement

Public Bidding

1,000,000.00 Public Bidding

Small Value Procurement

Small Value Procurement

500,000.00 Small Value Procurement

Public Bidding

1,000,000.00 Public Bidding

1,000,000.00 750,000.00 1,000,000.00 - - - -

Page 10 of 16

Item

No.Budgetary Items

73 E. Laboratory Equipment / Water Quality

74 Weighing Scale for Chlorine

75 Serological Pippetor

76 Colorimeter

77 Butterfly Valve 900mm

78 Butterfly Valve 800mm

79 Chlorinator at Well No. 17

80 Sub - Total - Lab Equipt

81 F. Transportation Equipment

82 Service Vehicle (FB Type)

83 Water Tanker

84Service Vehicle (VAN Type) - Carry Over from

2014

85 Sub - Total - Transpo

86 PIPES, VALVES & FITTINGS

87 BRASS FITTINGS

88Brass Angle Meter Valve 25mmǾ x 25mmØ,

ISO

89Brass Angle Valve 3/4", ISO (25mmØx

25mmØ)

90 Brass Corporation Stop 32mmØ, ISO

91 Brass Coupling 1", ISO (32mmØ)

92 Brass Coupling 32mmØ, ISO

93 Brass Union 1", ISO (32mmØ)

94 Sub - Total - Brass Fittings

95 Cement

96 Cement

97 Cement

98 Sub - Total - Cement

99 VALVES & FITTINGS

100100mmØ C.I. Combination Flange w/ Tensile

Ring

101100mmØ C.I. Gate Valve w/ BNG, F/F, NRS,

ISO

102 100mmØ Gate Valve BNG, F/F, NRS, ISO

103 100mmØ Gate Valve BNG, F/F, NRS, ISO

104 100mmØ Gate Valve BNG, F/F, NRS, ISO

105 100mmØ Gate Valve BNG, F/F, NRS, ISO

106 100mmØ Plug Cap

107 100mmØ x 100mmØ C.I. Tee F/F

108 100mmØ x 100mmØ C.I. Tee MJ/MF

109 100mmØ x 90° C.I. Mech. Bend

QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT

MODE OF PROCUREMENT

SCHEDULE/MILESTONE OF ACTIVITIES

JUNE JULY SEPTEMBER OCTOBER NOVEMBER DECEMBERAUGUST

Small Value Procurement

Small Value Procurement

Small Value Procurement

Public Bidding

Public Bidding

Small Value Procurement

- - - - - - -

Public Bidding

Public Bidding

Public Bidding

- - - - - - -

2,356 1,366,480.00 Public Bidding

Public Bidding

590 590,000.00 Public Bidding

Public Bidding

590 224,200.00 Public Bidding

Public Bidding

2,180,680.00 - - - - - -

2 650.00 2 650.00 2 650.00 2 650.00 2 650.00 2 650.00 2 650.00 Shopping

287 60,270.00 Public Bidding

443 110,750.00 443 110,750.00 444 111,000.00 444 111,000.00 444 111,000.00 Shopping

60,920.00 650.00 111,400.00 111,400.00 111,650.00 111,650.00 111,650.00

Public Bidding

Public Bidding

3 48,000.00 Public Bidding

1 16,000.00 Public Bidding

1 16,000.00 Public Bidding

3 48,000.00 Public Bidding

Public Bidding

1 16,000.00 Public Bidding

Public Bidding

Public Bidding

Page 11 of 16

Item

No.Budgetary Items

110 110mmØ C.I End Cap

111110mmØ C.I. Combination Flange w/ Tensile

Ring

112110mmØ C.I. Combination Flange w/ Tensile

Ring

113110mmØ C.I. Combination Flange w/ Tensile

Ring BNG ISO

114110mmØ C.I. Combination Flange w/ Tensile

Ring BNG ISO

115 110mmØ C.I. Flexible Coupling - uPVC

116 110mmØ C.I. Flexible Coupling - uPVC

117 110mmØ C.I. Flexible Coupling - uPVC

118 110mmØ x 110mmØ CI Tee MJ/MF

119 110mmØ x 45° CI Elbow Mechanical

120 110mmØ x 63mmØ CI Tee MJ/MF

121 110mmØ x 90° CI Elbow Mechanical

122 110mmØ x 90° CI Elbow Mechanical

123 110mmØ x 90° CI Elbow Mechanical-uPVC

124 150mmØ x 100mmØ CI Split Tee Mechanical

125 160mmØ C.I. Flexible Coupling

126 160mmØ x 32mmØ C.I. Clamp

127 160mmØ x 45° C.I. Bend

128 200mmØ C.I. Flexible Coupling, BNG, ISO

129200mmØ C.I. Gate Valve w/BNG, F/F, NRS,

ISO

130 200mmØ Combination Flange w/ Tensile Ring

131200mmØ x 100mmØ C.I. Split Tee Red., BNG,

F/F, ISO

132 200mmØ x 32mmØ C.I. Clamp, BNG, ISO

133 200mmØ x 45° C.I. Bend

134 210mmØ x 110mmØ CI Split Tee MJ/MF

135 50mmØ Air Release Valve

136 C.I.Saddle Clamp, 8"Ø x 1"Ø

137 C.I.Valve Box Cover

138 C.I.Valve Box Cover

139 Sub-Total - Valves & Fittings

140 G.I. PIPES & FITTINGS

141 100mmØ GI Plug Cap

142 100mmØ GI Plug Cap

143 100mmØ GI Plug Cap

144 100mmØ GI Plug Cap

QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT

MODE OF PROCUREMENT

SCHEDULE/MILESTONE OF ACTIVITIES

JUNE JULY SEPTEMBER OCTOBER NOVEMBER DECEMBERAUGUST

1 3,800.00 Public Bidding

2 11,400.00 Public Bidding

4 22,800.00 Public Bidding

5 28,500.00 Public Bidding

2 11,400.00 Public Bidding

3 16,500.00 Public Bidding

2 11,000.00 Public Bidding

4 22,000.00 Public Bidding

2 38,000.00 Public Bidding

4 18,800.00 Public Bidding

10 44,000.00 Public Bidding

1 5,000.00 Public Bidding

1 5,000.00 Public Bidding

5 25,000.00 Public Bidding

1 27,000.00 Public Bidding

Public Bidding

Public Bidding

Public Bidding

Public Bidding

Public Bidding

Public Bidding

Public Bidding

Public Bidding

Public Bidding

1 36,000.00 Public Bidding

Public Bidding

36 92,346.90 Public Bidding

3 6,900.00 Public Bidding

1 2,300.00 Public Bidding

571,746.90 - - - - - -

1 480.00 Public Bidding

1 480.00 Public Bidding

1 480.00 Public Bidding

2 960.00 Public Bidding

Page 12 of 16

Item

No.Budgetary Items

145 100mmØ x 2m GI Stand Pipe Sch. 40 STD

146 100mmØ x 2m GI Stand Pipe Sch. 40 STD

147 100mmØ x 2m GI Stand Pipe Sch. 40 STD

148 100mmØ x 2m GI Stand Pipe Sch. 40 STD

149 100mmØ x 2m GI Stand Pipe Sch. 40 STD

150 100mmØ x 90° G.I Elbow Sch.40 STD

151 100mmØ x 90° G.I Elbow Sch.40 STD

152 100mmØ x 90° G.I Elbow Sch.40 STD

153 100mmØ x 90° G.I Elbow Sch.40 STD

154 110mmØ x 6m G.I Pipe Sch. 40

155 Deformed Bars, 10mmØ

156 GI Bushing Reducer 1" x 3/4", Sch 40, Std

157 GI Bushing Reducer 1"Ǿ x ¾"Ǿ, Sch.40 Std

158 GI Bushing Reducer 3/4" x 1/2" Sch. 40 Std

159 GI Elbow 1" x 90º

160 GI Elbow 1"Ø x 90º, Sch. 60

161 GI Elbow 3/4" x 90º

162 GI Elbow Reducer 1" x 3/4"

163 GI Elbow Reducer 3/4" x 1/2"

164 GI Nipple 1" x 13" Sch. 40 Std

165 GI Nipple 1" x 18" Sch. 40 Std

166 GI Nipple 1" x 27" Sch. 40 Std

167 GI Nipple 1" x 4" Sch. 40 Std

168 GI Nipple 1" x 9" Sch. 40 Std

169 GI Nipple 1/2" x 4", Sch. 40 Std

170 GI Nipple 3/4" x 4" Sch. 40 Std

171 GI Pipe 1"Ø x 20', Sch. 40 Std

172 GI Plug ¾" Ø

173 GI Straight Elbow 1" Sch. 40 Std

174 GI Straight Elbow 1/2" Sch. 40 Std

175 GI Straight Elbow 3/4" Sch. 40 Std

176 GI Tee 1" x 1" Sch. 40 Std

177 GI Tee 1"Ø x 1"Ø, Sch. 40 Std

178 GI Tee 3/4" Sch. 40 Std

179 GI Tee Reducer 1" x 3/4" Sch. 40 Std

180 GI Tee Reducer 1"Ø x ¾" Ø, Sch. 40 Std

181 GI Union 1"

182 GI Union 1"Ø, Sch.60

QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT

MODE OF PROCUREMENT

SCHEDULE/MILESTONE OF ACTIVITIES

JUNE JULY SEPTEMBER OCTOBER NOVEMBER DECEMBERAUGUST

2 9,600.00 Public Bidding

2 9,400.00 Public Bidding

1 4,800.00 Public Bidding

1 4,800.00 Public Bidding

1 4,800.00 Public Bidding

2 15,000.00 Public Bidding

2 15,000.00 Public Bidding

4 3,000.00 Public Bidding

2 1,500.00 Public Bidding

10 148,000.00 Public Bidding

60 7,200.00 Public Bidding

Public Bidding

252 13,104.00 Public Bidding

Public Bidding

Public Bidding

1,700 82,960.00 Public Bidding

Public Bidding

Public Bidding

Public Bidding

Public Bidding

Public Bidding

Public Bidding

Public Bidding

Public Bidding

Public Bidding

Public Bidding

212 318,060.00 Public Bidding

1,775 32,837.50 Public Bidding

Public Bidding

Public Bidding

Public Bidding

Public Bidding

1,179 75,338.10 Public Bidding

Public Bidding

Public Bidding

2,355 184,161.00 Public Bidding

Public Bidding

590 62,540.00 Public Bidding

Page 13 of 16

Item

No.Budgetary Items

183 GI Union 3/4" Sch. 40 Std

184 GI Valve Box Cover

185 GI Valve Box Cover

186 Teflon Tape ¾" Ø x 10mts.

187 Teflon Tape 3/4" x 10 mts

188 Sub - Total - GI Pipes & Fittings

189 PLASTIC FITTINGS

190 Plastic Coupling 1" (32mmØ), ISO

191 Plastic Coupling 25mmØ, ISO

192 Plastic Coupling 3/4" (25mm), ISO

193 Plastic Saddle Clamp, 3"Ø x 1"Ø

194 Plastic Saddle Clamp, 4"Ø x 1"Ø

195 Plastic Union 1" (32mmØ), ISO

196 Plastic Union 3/4" (25mmØ), ISO

197 Sub - Total - Plastic Fittings

198 PIPES

199 100mmØ x 6m uPVC, S-10,C-100 w/ R/R,ISO

200 110mmØ Rubber Gasket for uPVC

201110mmØ x 6m uPVC, S-10, C-100 w/ R/R,

ISO

202110mmØ x 6m uPVC, S-10, C-100 w/ R/R,

ISO

203110mmØ x 6m uPVC, S-10, C-100 w/ R/R,

ISO

204110mmØ x 6m uPVC, S-10, C-100 w/ R/R,

ISO

205 160mmØ x 6m uPVC, S-10,C-100 w/ R/R,ISO

206 200mmØ x 6m uPVC, S-10,C-100 w/ R/R,ISO

207 200mmØ x 6m x 6mm thk. Spiral Steel Pipe

208 Black HDPE Pipe 2"Ø x 60mts, SDR 11, ISO

209Black HDPE Pipe 32mmØ x 90mts., SDR 11,

ISO

210 Sub - Total

211 Sand

212 Gravel

213 Gravel

214 Sand

215 Sand and Gravel

216 Sand Bedding

217 Sand Bedding

QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT

MODE OF PROCUREMENT

SCHEDULE/MILESTONE OF ACTIVITIES

JUNE JULY SEPTEMBER OCTOBER NOVEMBER DECEMBERAUGUST

Public Bidding

1 2,300.00 Public Bidding

3 6,900.00 Public Bidding

4,715 94,300.00 Public Bidding

Public Bidding

1,098,000.60 - - - - - -

Public Bidding

2,356 301,568.00 Public Bidding

Public Bidding

140 70,000.00 Public Bidding

419 230,422.50 Public Bidding

Public Bidding

Public Bidding

601,990.50 - - - - - -

Public Bidding

500 25,000.00 Public Bidding

534 801,000.00 Public Bidding

75 112,500.00 Public Bidding

50 75,000.00 Public Bidding

277 415,500.00 Public Bidding

Public Bidding

Public Bidding

Public Bidding

100 1,200,000.00 Public Bidding

72 201,600.00 Public Bidding

2,830,600.00 - - - - - -

1 616.00 1 616.00 1 616.00 1 616.00 1 616.00 1 616.00 1 616.00 Shopping

2 1,370.00 2 1,370.00 2 1,370.00 2 1,370.00 2 1,370.00 2 1,370.00 2 1,370.00 Shopping

19 104,500.00 Public Bidding

9 58,500.00 Public Bidding

40 14,364.00 Public Bidding

16 104,000.00 Public Bidding

2 7,000.00 Public Bidding

Page 14 of 16

Item

No.Budgetary Items

218 Sand Bedding

219 Sand Bedding

220 Sand Bedding 4" Ø Pipe

221 Sand Bedding 6" Ø Pipe

222 Sand Bedding 8" Ø Pipe

223 Sub-Total - Sand & Gravel

224 Warning Tape

225 Warning Tape

226 Sub-Total - Warning Tape

227 TOTAL - MATERIALS & FITTINGS

228 LABOR COST

229 Barricade Fabrication

230 Barricade Fabrication

231A Brown (BCWD share for the Construction of

Booster Pump and Transmission Line)

232 Drilling Works

233 Equipment Consumption/Rental

234 Excavation, Backfilling and Compaction

235 Hydrotesting, Disinfection and Appurtenances

236 Installation of Blow-Off and Fire Hydrants

237 Installation, Jointing and Hauling

238Interconnection (Bellhole Excavation and

Backfilling)

239 Labor (5 Plumbers, 1 Clerk Processor)

240 Labor - Backfilling

241 Labor - Concrete Pouring/ Restoration

242 Labor - Concrete/Asphalt Cutting

243 Labor - Demolition

244Labor - Excavation & Backfilling of trench for

Pipe laying 1" dia. 3/4" dia (0.20 x 0.30 x 1.0

245 Labor - Excavation of Bellhole Clay

246 Labor - Excavation of Bellhole Gravel Mix

247 Labor - Excavation of Bellhole Sandy

248 Sub-Total - Labor Cost

249 OCM

250 OCM

251 OCM (7% TDC)

252 Sub - Total

253 TOTAL - LABOR & OCM

254 CARRY OVER BUDGET FROM 2014

255 Production and Distribution Department

256 PRV Perimeter Fence

QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT

MODE OF PROCUREMENT

SCHEDULE/MILESTONE OF ACTIVITIES

JUNE JULY SEPTEMBER OCTOBER NOVEMBER DECEMBERAUGUST

1 6,500.00 Public Bidding

8 52,000.00 By Admin

Shopping

Shopping

Shopping

348,850.00 1,986.00 1,986.00 1,986.00 1,986.00 1,986.00 1,986.00

Shopping

65,500.00 10,500.00 Public Bidding

65,500.00 - 10,500.00 - - - -

7,758,288.00 2,636.00 123,886.00 113,386.00 113,636.00 113,636.00 113,636.00

Shopping

5,000.00 10,000.00 10,000.00 Shopping

41,666.67 41,666.67 41,666.67 41,666.67 41,666.67 41,666.67 41,666.63 Shopping

Public Bidding

Shopping

Public Bidding

Public Bidding

Public Bidding

Public Bidding

Public Bidding

74,218.08 74,218.08 74,218.08 74,218.08 74,218.08 74,218.08 74,218.12 By Admin

10,348.70 10,348.70 10,348.70 10,348.70 10,348.70 10,348.70 10,348.70 Public Bidding

1,643.36 1,643.36 1,643.36 1,643.36 1,643.36 1,643.36 1,643.36 Public Bidding

740.12 740.12 740.12 740.12 740.12 740.12 740.08 Public Bidding

876.78 876.78 876.78 876.78 876.78 876.78 876.72 Public Bidding

9,670.75 9,670.75 9,670.75 9,670.75 9,670.75 9,670.75 9,670.75 Public Bidding

6,658.40 6,658.40 6,658.40 6,658.40 6,658.40 6,658.40 6,658.40 Public Bidding

17,394.00 17,394.00 17,394.00 17,394.00 17,394.00 17,394.00 17,394.00 Public Bidding

2,463.19 2,463.19 2,463.19 2,463.19 2,463.19 2,463.19 2,463.19 Public Bidding

0.00 170,680.05 0.00 165,680.05 0.00 175,680.05 0.00 175,680.05 0.00 165,680.05 0.00 165,680.05 0.00 165,679.95

39,130.76 23,866.94

12,742.00 13,242.00 48,190.49 104,523.83 104,523.82 82,636.10 26,102.75

51,872.76 37,108.94 48,190.49 104,523.83 104,523.82 82,636.10 26,102.75

222,552.81 202,788.99 223,870.54 280,203.88 270,203.87 248,316.15 191,782.70

Page 15 of 16

Item

No.Budgetary Items

257 Ground Reservoir at Line Booster, Libertad

258 Extension of Pinamanculan Reservoir

259 Sub - Total

260 Engineering Department

261 Fuel, Oil and other Maintenance

262 Porject Based Personnel

263 Sub - Total

264 TOTAL

265 LESS - IMPLEMENTED PROJECTS

266 GRAND TOTAL

QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT

MODE OF PROCUREMENT

SCHEDULE/MILESTONE OF ACTIVITIES

JUNE JULY SEPTEMBER OCTOBER NOVEMBER DECEMBERAUGUST

- - - - - - -

33,556.01 20,465.36

113,800.00 49,100.00

147,356.01 69,565.36 - - - - -

11,417,196.82 1,324,990.35 1,347,756.54 414,589.88 423,839.87 361,952.15 305,418.70

76,925.50 343,425.49 423,879.99 411,921.98 411,921.99 411,821.97 204,100.06

11,494,122.32 1,668,415.84 1,771,636.53 826,511.86 835,761.86 773,774.12 509,518.76

Prepared by: Checked by: Approved by:

(Sgd) JOSEPH Y. TANTOY (Sgd) ROBERTO C. AGUILAR (Sgd) ENGR. ANSELMO L. SANG TIAN (Sgd) ATTY. ROLDAN L. TORRALBA

Member, BAC Secretariat Head, BAC Secretariat General Manager A Chair, Board of Directors

Page 16 of 16