Leading Electrical and Instrumentation Construction Company
COMPANYPRESENTATION
Leading Electrical and Instrumentation Construction Company
Leading Electrical and Instrumentation Construction Company
Agenda
1. Company Overview
2. Typical Installations
3. Contract Profiles
4. Typical Projects
5. Experience Schedule
Leading Electrical and Instrumentation Construction Company
Leading Electrical and Instrumentation Construction CompanyLeading Electrical and Instrumentation Construction Company
COMPANY OVERVIEW
Leading Electrical and Instrumentation Construction Company
OverviewB&W have been established in the electrical and instrumentation (E&I) construction industryfor 42 years. B&W are one of the largest specialist E&I contractors in South Africa.
B&W has worked and gained valuable experience in mining, oil & gas, chemical, utilities,renewable energy, power generation, industrial process plants and infrastructure. Thestandard of electrical and instrumentation construction varies from industry to industry andB&W have developed highly qualified teams to cater for the needs of our clients.
B&W hosts numerous complementary services ranging from field engineering, equipmentprocurement, material supply, testing and commissioning and maintenance services.
B&W acquired Pontins in 2009, one of the largest specialist suppliers of earthing andlightning protection services and have been in business for 43 years.
B&W’s commitment to providing a professional service, economically, timeously and withconsistency is the key to our enviable growth record.
B&W are a wholly owned subsidiary of the ELB Group.
Leading Electrical and Instrumentation Construction Company
Company StructureB&W Group
Mozambique
Swaziland
Kenya
Registered Offices
Namibia
South Africa
Company Services
Health, safety and environment
Marketing and proposals
Financial Procurement
Quality assurance Planning
HR skills development and training
Company Operations
E&I installations process plants
Regions
Maintenance and shutdowns Special services
Pontins
Earthing and Lightning Protection Specialists
Conductor Systems
Electrification Systems for Mobile Equipment
B&W Instrumentation and Electrical SA (Pty) Ltd
41.94%Equity
Level 4 B-BBEE Status
Tanzania
Leading Electrical and Instrumentation Construction Company
Group Structure
ELB Engineering Solutions (Pty) Ltd
ELB Equipment Holdings (Pty) Ltd
B&W Instrumentation and Electrical (Pty) Ltd
ELB Group Ltd
ELB Educational Trust
ELB International (Pty) Ltd
ELB Intelligent Solutions (Pty) Ltd
ELB Engineering (Pty) Ltd
B&W Instrumentation and Electrical Tanzania Ltd B-Quip (Pty) LtdPontins (Pty) Ltd
BWIE Properties (Pty) Ltd
H&S Training Academy (Pty) Ltd
B&W Instrumentation and Electrical SA (Pty) Ltd
B&W Instrumentation and Electrical Kenya Ltd
BWIE Instrumentation and Electrical Swaziland
B&W ElectricidadeLda (Mozambique)
B&W Instrumentation and Electrical Namibia (Pty) Ltd
Conductor Systems
Leading Electrical and Instrumentation Construction Company
Manpower ResourcesAdministration & Accounting 29
Construction Management 15
Quality Control 7
Planners 4
Junior Planners 3
HSE Personnel 15
Engineers & Technicians 22
Site Managers & Supervisors 38
Professional Project Managers 10
Foremen 21
Artisans 95
Learners 30
Semi-Skilled 250 – 400
Field Labour 600 - 1800
Leading Electrical and Instrumentation Construction Company
Target Industries
Mining
Renewable Energy
Power Generation
Transmission & Distribution
Industrial & Utilities
Chemical, Oil & Gas
Leading Electrical and Instrumentation Construction Company
Project Footprint
Leading Electrical and Instrumentation Construction Company
End User / Clients
Leading Electrical and Instrumentation Construction Company
Health and Safety
5 Star NOSA graded NOSCAR Award for 5 consecutive years
“Best performance E&I contractor in SA”
Leading Electrical and Instrumentation Construction Company
HSE Statistics
Criteria 2012 2013 2014 2015 Total
Man-hours 1,537,436.00 1,832,534.00 1,812,100.00 2,088,867.00 7,270,937.00
Fatalities 0 0 0 0 0
MTC’s and First Aid Cases Combined 14 18 10 6 48
LTI’s 1 0 0 0 1
LTIFR per 200,000 hours Year to Date 0.13 0.00 0.00 0.000.01
LTIFR per 200,000 hours 12 Month Period 0.13 0.00 0.00 0.00
12 Months to Date – 2014 / 2015
Lost Time Injury Rate (“LTIFR”) – 0.00 per 200,000 hours worked
Recordable Case Rate (“RCR”) – 0.33 per 200,000 hours worked
Leading Electrical and Instrumentation Construction Company
Quality Statement
It is a prime management objective of B&W Instrumentation andElectrical to supply products and services with a high level of qualityand reliability for the realisation of our clients requirements.
It is the objective to effectively complete contracts with the followingcriteria as our primary requirements:
• To minimise all Quality complaints• To maximise client confidence in our competence• The improvement of the profit objectives of the company by
adherence to the above
Leading Electrical and Instrumentation Construction Company
ISO 9001:2008
B&W operates in accordance with proceduresestablished to comply with the strenuous ISO9001:2008 quality requirements.
B&W are currently one of the only ISO9001:2008 accredited electrical andinstrumentation contractors in Sub-SaharanAfrica.
This accreditation not only provides newclients with the comfort that our existingclients have come to expect from us, butaffords us the opportunity of outside auditsby the SABS to ensure that the standards setare not only maintained, but continuallyimproved where possible.
Leading Electrical and Instrumentation Construction Company
BBBEE Status
B&W aims to bring about true broadbased empowerment. An Employee Trustestablished in September 2006 owns a7% stake in the company benefitingemployees with more than four yearsuninterrupted service, with an emphasison black staff (75% of benefits).
B&W is a comfortable ‘Level 4’contributor in terms of the draftDepartment of Trade & Industry’s BBBEECodes of Good Practice. Accordingly100% of client spend can be counted asspend with a BEE company.
Leading Electrical and Instrumentation Construction Company
CIDB Certification
B&W has an 8EP and 8EB grading. This would include major public sector projects such as those for Eskom.
Due to new regulations by the CIDB, certificates are no longer issued.
B&W CIDB number: 149138
Leading Electrical and Instrumentation Construction Company
Corporate Social Responsibility
In B&W Southern Africa Corporate Social Responsibility is an important business priority and integral to our overall business strategy.
Corporate Social Responsibility (CSR) projects are selected on social need and the extent to which they are aligned with our business and can add value to our clients and our communities.
Our policy is to identify worthy Social Economic Development (SED) projects in the areas in which we work. Our projects have proved highly successful, making a meaningful difference.
CSR to us is about building relationships with our customers, attracting and retaining talented staff, managing risk and building reputation.
Leading Electrical and Instrumentation Construction Company
Training
In response to the skills shortage in SouthAfrica B&W has invested substantially in thetraining of field labour to increase its skillspool. B&W has its own fully equipped in-housetraining centre based in Alberton and is anaccredited service provider throughConstruction SETA.
B&W has implemented training programmesin line with accredited SAQA unit standards toadvance employee skills and ensure traineesreceive an accredited qualification. Todetermine the appropriate skills developmentrequired B&W provides ongoing on-the-jobassessments. In addition long-term incentivesensure retention of core staff.
Leading Electrical and Instrumentation Construction Company
Typical Training CoursesApproved Unit Standards
• 229998 Explain and perform fall arrest techniques when working at heights
• 9964 Apply health and safety to a work area
• 12484 Perform basic fire fighting
• 120344 Demonstrate knowledge and understanding of relevant current occupational health and safety legislation
• 12878 Use and maintain power hand tools on a construction site
• 116999 Apply accurate information about HIV & AIDS to everyday life
Unit Standards Awaiting Approval
• Hazard identification and risk assessment
• First aid (Level 1–3)
• Fire fighting
• Occupational health and safety rep
Leading Electrical and Instrumentation Construction CompanyLeading Electrical and Instrumentation Construction Company
TYPICAL INSTALLATIONS
Leading Electrical and Instrumentation Construction Company
Electrical
Leading Electrical and Instrumentation Construction Company
Electrical
Leading Electrical and Instrumentation Construction Company
Instrumentation
Leading Electrical and Instrumentation Construction CompanyLeading Electrical and Instrumentation Construction Company
CONTRACT PROFILES
Leading Electrical and Instrumentation Construction Company
Contract ProfileTemane Pande Development Project
Client: Sasol
Project Manager: Foster Wheeler
Engineer: Foster Wheeler
Location: Temane, Mozambique
Value: R49,6 million
Start Date: January 2003
Completion Date: March 2004
Site Man‐hours Used: 256,000
Peak Manpower: 380
Number of Drives: 324
I/O Count: 2800
Field Instruments: 1120
Quantity of Cable: 314,000m
Quantity of Cable Rack: 11,600m
Leading Electrical and Instrumentation Construction Company
Contract ProfileWaste Water Recycle Facility Project
Client: Sasol / Foster Wheeler
Project Manager: B. Scorpion
Engineer: J. de Lange / J. van Heerden
Location: Secunda
Value: R35,0 million
Start Date: June 2004
Completion Date: November 2005
Site Man‐hours Used: 196,000
Peak Manpower: 200
Number of Drives: 158
I/O Count: 1630
Field Instruments: 879
Quantity of Cable: 182,000m
Quantity of Cable Rack: 7,282m
Leading Electrical and Instrumentation Construction Company
Contract ProfileVeolia Water Treatment Plant Project
Client: Sasol Veolia
Project Manager: John Henry Pelser
Engineer: C. Marcotta
Location: Secunda
Value: R38,2 million
Start Date: March 2005
Completion Date: April 2006
Site Man‐hours Used: 218,000
Peak Manpower: 288
Number of Drives: 330
I/O Count: 2960
Field Instruments: 1230
Quantity of Cable: 233,000m
Quantity of Cable Rack: 9,214m
Leading Electrical and Instrumentation Construction Company
Contract ProfilePprust 600KTPM Concentrator Project
Client: Anglo Platinum
Project Manager: C. Coetzee
Engineer: Vhumbanani
Location: Potgietersrust
Value: R179,0 million
Start Date: March 2007
Completion Date: April 2009
Site Man‐hours Used: 802,000 (Accident free)
Peak Manpower: 928
Number of Drives: 483
Field Instruments: 3700
Quantity of Cable: 450,000m
Quantity of Cable Rack: 27,000m
Leading Electrical and Instrumentation Construction Company
Contract ProfileShondoni Mining Project
Client: Sasol Mining
Project Manager: Peter Wooldridge
Engineer: Bradley Duncan
Location: Secunda
Value: R86,0 million
Start Date: May 2013
Completion Date: June 2015
Site Man‐hours Used: 230,000
Peak Manpower: 94
Number of Substations: 8
Number of Mini Substations: 10
Number of 11kV Panels: 72
Number of 132kV Circuit Breakers: 4
Number of 20MVA 22kV / 11kV TRF: 2
Number of Street Lights: 54
Quantity of Cable: 32,000m
Leading Electrical and Instrumentation Construction CompanyLeading Electrical and Instrumentation Construction Company
TYPICAL PROJECTS
Leading Electrical and Instrumentation Construction Company
Project ReferenceAmbatovy Project Overview
Project Name: Ambatovy (Process Plant)
Location: Tamatave, Madagascar
Project duration: 26 months (July 2009 – September 2011)
B&W contract value: US$ 60 million
• After the successful completion of the Early Works contract on the same project, B&W was appointed as the main Electrical &
Instrumentation installation contractor on one of the largest projects in the world at the time.
• The plant is designed to produce 50t of nickel, 5t of cobalt and 130t of ammonium phosphate. Although the plant is constructed in
Tamatave, near the harbour, the mine is situated near the town of Muramanga, some 450km away.
• The scope of work included the entire electrical and instrumentation installation, including calibration and cold commissioning, on the
plant site, with the exception of the Refinery, Power Generation Plant, Acid Plant and Lime handling sections, which were separate
packages. The enormous scope of work, and limited time for completion, make the project one of, if not the biggest E&I project
undertaken by a South African contractor.
• The scope for included everything from the 11kV and 6.6kV distribution, plant wide, to the lighting and small power, calibration of
instruments, LV and instrumentation installations and cold commissioning, while the Early Works contract included the design, supply
and installation of 11kV overhead lines, distribution and street lighting on the plant site and 6.6kV overhead lines, distribution and
street lighting at the mine site.
Leading Electrical and Instrumentation Construction Company
Project Reference
• 900,000m of electrical cabling
• 490,000m of instrument cabling
• 49,000m of straight cable racking plus 4,950 fittings
• 25,000m of stainless steel instrument tubing
• 395t of sundry steelwork & angle droppers
• 30,000m of single unistrut supports
• 1,100 drives
• 3,455 instruments
• 1,950 luminaries
• 4,880,785 man‐hours – all without lost time injury (5,232,096 including the Early Works)
• A peak of 1,656 personnel on site
• The final value of the contract was roughly R430 million and being that the bulk of the materials, including the equipment, cable,
racking, luminaries, instruments and even the cable glands were free‐issue by the client; this understates the magnitude of the work
completed.
• On site, B&W had a peak of 628 expatriates (mainly South African) and employed a peak of 1,028 local Malagasy workers. Due to local
content requirements, B&W established the subsidiary, B&W Madagascar SaRl, in Madagascar for the execution of the contract.
Ambatovy Project Statistics
Leading Electrical and Instrumentation Construction Company
Project ReferenceAmbatovy Project Overview & Statistics
Project Name: Ambatovy (Early Works)
Location: Tamatave, Madagascar
Project duration: 8 months (November 2008 – June 2009)
Contract value: US$ 16 million
Project statistics (Early Works, Plant and Mine Site)
• 25km 11kV overhead lines
• 22,5km 6.6kV overhead lines
• 28km fibre optic
• 388 luminaries
• 351,311 man‐hours, all without lost time injury
Leading Electrical and Instrumentation Construction Company
Project ReferenceAmbatovy Plant Site
Leading Electrical and Instrumentation Construction Company
Project ReferenceAmbatovy Mine Site
Leading Electrical and Instrumentation Construction Company
Project ReferenceAmbatovy Harbour
Leading Electrical and Instrumentation Construction Company
Project ReferenceAmbatovy Pipeline
Leading Electrical and Instrumentation Construction Company
Coal ProjectSouth Africa
Contracts awarded for two Coal Projects in South Africa, combined value of R152.0 million
Leading Electrical and Instrumentation Construction Company
InstrumentationMadagascar
Completed Early Works Project and commenced E&I Installation on Main Process Plant
Main Process Plant was initially delayed for ten months
Leading Electrical and Instrumentation Construction Company
Coal Project
66kV Overhead Line
Remote Northern Mozambique
1.2km span with Lattice Structures
Mozambique
Leading Electrical and Instrumentation Construction Company
Coal Project
Commenced construction on Moatize Coal Project in Northern Mozambique
Further opportunities in the region with other clients now starting with project implementation
Mozambique
Leading Electrical and Instrumentation Construction Company
Oil & Gas
Awarded E&I Installation Extension to Panda Gas Project
B&W awarded Phase 1 in 2002
Mozambique
Leading Electrical and Instrumentation Construction Company
Sands Project
22kV Supporting Infrastructure
‐ Substations & H.T cabling
‐ Back up generators
Process Cabling & Instrumentation for:‐
‐Wet Concentrator Plant
‐ Ponds, Pontoons & Dredges
‐Mineral Separation Plant
‐ Starter Ponds
‐ Product Storage
‐ Conveyors
Mozambique
Leading Electrical and Instrumentation Construction Company
Solar Photovoltaic
Contract for the 64MWp Solar Photovoltaic ("PV") Project at Postmasburg in the Northern Cape area of South Africa
The project is a key component of Phase 2 of the South African Department of Energy's Renewable Energy IPP Procurement Program
Assistance with commissioning of the total plant
South Africa
Leading Electrical and Instrumentation Construction CompanyLeading Electrical and Instrumentation Construction Company
EXPERIENCE SCHEDULE
Leading Electrical and Instrumentation Construction Company
Current ProjectsOWNER EPCM
CONTRACTOR PROCESS LOCATION CURRENT VALUE
MONTH OF COMPLETION
Aquarius Aquarius E&I Installation RustenburgRSA R20 million / year On Going
Sasol Sasol E&I Installation SecundaRSA R8 million / year On Going
Sasol Sasol Coal TweedraaiElectrical Infrastructure
SecundaRSA R11,2 million Mar 2016
Sasol BET TweedraaiE&I Installation & Material Handling
SecundaRSA R17 million Mar 2016
Ilitha Mining Enviroplus Chrome Tailings RustenburgRSA R3 million Apr 2016
Sasol ELB ImpumeleloE&I Installation & Material Handling
SecundaRSA R5,8 million Apr 2016
Sasol Coal Worley Parsons Shondoni Phase I & II
Sub-stations & cablingSecunda
RSA R117 million Apr 2016
Vale ABB Moatize Coal mineE&I Installation Mozambique R202 million Apr 2016
Anglo American Venn & Milford Zebulo ColliaryUnderground Mining
OgiesRSA R7 million May 2016
Swakop Uranium Amec / Bateman Husab Uranium MineE&I Installation Namibia R212 million Aug 2016
Eskom ELB MedupiE&I Installation & Material Handling
EllisrasRSA R9 million Jan 2017
Eskom Tenova KusileE&I Installation
OgiesRSA R27 million Jan 2017
Leading Electrical and Instrumentation Construction Company
Oil & Gas
OWNER EPCM CONTRACTOR PROCESS LOCATION VALUE DURATION
Fina Fluor Daniel Crude Unit Revamp Angola R8 million 6 months
Mosgas / Petrosa Foster Wheeler Low Aromatic Distillation Unit Mossel BayRSA R12,7 million 6 months
Sasol Foster Wheeler Temane Pande Central Processing Facility Mozambique R48 million 17 months
Sasol Foster Wheeler Waste Recycle E&I Installation
Secunda RSA R35 million 11 months
Sasol Veolia / Proconics Veolia Water Treatment Plant Secunda RSA R38,2 million 14 months
Sasol Foster Wheeler Gas Engine Power Plant E&I Installation
SasolburgRSA R22,4 million 7 months
Sasol VGI Consulting Inc.Contractor for Alrode
Depot Wholesale Logistics ProjectE&I Installation
AlbertonRSA R60 million 13 months
Sasol Foster Wheeler Sasol Utilities Expansion ProjectE&I Installation
SasolburgRSA R29 million 8 months
Sasol Sastech New Pre-Coat Tank Unit 219E&I Installation
SecundaRSA R6,4 million 6 months
Leading Electrical and Instrumentation Construction Company
ChemicalOWNER EPCM
CONTRACTOR PROCESS LOCATION VALUE DURATION
Bayer Chemicals Foster Wheeler Chrome Chemical Plant NewcastleRSA R23,4 million 9 months
Indian Ocean Fertilizers
Sulphos (EMS / SNC Lavalin)
IOF Sulphuric & Phosphoric Acid Plant
Richards Bay RSA R22 million 8 months
Lafarge ICER Electrical Upgrade(Labour only)
LichtenbergRSA R10,1 million 5 months
Amplats (ACP) Stein Muller Acid Plant RustenburgRSA R15,5 million 8 months
PPC Krupp UHDE Slagment Plant SaldanhaRSA R14 million 14 months
PPC Kentz / TWP PPC Hercules Expansion ProjectE&I Installation
PretoriaRSA R27 million 8 months
Leading Electrical and Instrumentation Construction Company
Industrial PlantsOWNER EPCM
CONTRACTOR PROCESS LOCATION VALUE DURATION
PFG Glass PFG PFG GlassE&I Installation
SpringsRSA R21,4 million 4 months
Transnet Hatch CoegaInfrastructure
Port ElizabethRSA R68 million 14 months
Transnet Transnet Port Link Line & Salkor Yard Electrical Services
SaldanhaRSA R11 million 6 months
Ubombo Sugar BoschUbombo Sugar Mill Factory
ExpansionE&I Installation
Swaziland R44 million 5 months
Sappi AMEC E&I Installation NelspruitRSA R58 million 14 months
Air Products Air Products G-Plant E&I Installation
VanderbijlparkRSA R14,5 Million 6 months
Nestle ELB Nestle Process PlantE&I Installation
EstcourtRSA R32 million 10 months
Leading Electrical and Instrumentation Construction Company
Renewable EnergyOWNER EPCM
CONTRACTOR PROCESS LOCATION VALUE DURATION
Lesedi Energy Comycento LesediPhotovoltaic Solar
KathuRSA R40 million 10 months
Leading Electrical and Instrumentation Construction Company
MiningOWNER EPCM
CONTRACTOR PROCESS LOCATION VALUE DURATION
Aquarius DRA E&I Construction Concentrator Everest South Platinum
LydenburgRSA R13,4 million 3 months
Amplats WatervalSmelter Hatch ACP Stage B
E&IRustenburg
RSA R16,5 million 7 months
Xstrata J.V DRAMototolo Concentrator & Spiral
PlantE&I Installation
LydenburgRSA R23,1 million 7 months
Nkomati DRA ConcentratorE&I Installation
MachadadorpRSA R16,4 million 6 months
De Beers BatemanFinsch Mine Treatment Plant
Upgrade E&I Installation
Lime AcresRSA R46.3 million 20 months
Aflease Bateman Uranium PlantE&I Installation
KlerksdorpRSA R68 million 11 months
Amplats DRA / Vhumbanani ConcentratorE&I Installation
PotgietersrusRSA R149 million 13 months
Amplats Vhumbanani Amandelbult ConcentratorE&I Installation
NorthemRSA R48 million 6 months
ARM / Assmang DRA Iron OreE&I Plant & Infrastructure
SishenRSA R105 million 14 months
Amplats Vhumbanani Pilanesberg ConcentratorE&I Installation
RustenburgRSA R34 million 4 months
Anglo Coal / BHP Billiton DRA Phola Coal
E&I InstallationOgiesRSA R32 million 6 months
Leading Electrical and Instrumentation Construction Company
Mining
OWNER EPCM CONTRACTOR PROCESS LOCATION VALUE DURATION
BHP Billiton DRA DMO Washing PlantE&I Installation
MiddelburgRSA R88 million 14 months
Amplats Hatch PMR Effluent Treatment PlantE&I Installation
RustenburgRSA R26 million 7 months
BHP Billiton Bateman ET DMO Materials HandlingE&I Installation
MiddelburgRSA R156 million 16 months
Nkomati DRA Nkomati Phase IIBE&I Installation
MachadadorpRSA R26 million 6 months
Sasol RSV Installation of 11kV Power Lines SecundaRSA R13 million 7 months
Douglas Colliery Bateman Water Reticulation ProjectE&I Installation
WitbankRSA R17 million 5 months
Kumba Iron Ore Hatch Sishen South E&I Installation
PostmasburgRSA R84 million 16 months
Assmang DRA KEP ProjectE&I Installation
KathuRSA R148 million 22 months
Assmang Chrome NAC E&I Installation Machadodorp
RSA R11,5 million 7 months
Sasol RSVThubelisha Mine Project
Electrical Installation, Termination for Plant Wide & OHL
SecundaRSA R34 million 15 months
Whims BKM DRA Iron OreE&I Installation
SishenRSA R64 million 8 months
Leading Electrical and Instrumentation Construction Company
MiningOWNER EPCM
CONTRACTOR PROCESS LOCATION VALUE DURATION
Kasese Bateman Kasese Cobalt ProjectE&I Installation Uganda R14,6 million 5 months
Namdeb Bateman DMS Plant – Elizabeth Bay E&I Installation Namibia R28 million 7 months
Kenmare Resources Bateman Moma Mineral SandsOHL and E&I Installation Mozambique R34 million 20 months
LetsengDiamonds Bateman E&I Installation Lesotho R16 million 6 months
African Mining Sennet / Logichem Process PlantE&I Installation Botswana R22,4 million 6 months
Albidon Zambia Limited GRC Minproc Munali Process PlantE&I Installation Zambia R16 million 4 months
Equinox Ausenco / Bateman Lumwana Copper MineE&I Installation Zambia R14,9 million 9 months
Dynatec SNC Lavalin AmbatovyOHL & Early Works Madagascar R96 million 18 months
Hulletts PGBIXinavane 380 TCH Factory
ExpansionElectrical Installation
Mozambique R33 million 6 months
Amplats VhumbananiUnki Mine Platinum
Concentrator E&I Installation
Zimbabwe R67 million 10 months
Sasol Thyssenkrupp Uhde Temane ExpansionE&I Installation Mozambique R58 million 25 months
Leading Electrical and Instrumentation Construction Company
MiningOWNER EPCM
CONTRACTOR PROCESS LOCATION VALUE DURATION
Vale ABB
Moatize CoalInfrastructure OHL &
SubstationsE&CI Installation
Mozambique R233 million 30 months
Dynatec SNC Lavalin Ambatovy Process PlantE&I Installation Madagascar R414 million 30 months
Rio Tinto Rio Tinto LV & MV Reticulation Mozambique R6,8 million 7 months
Riversdale SedgemanCoal Handling & Preparation
Plant E&I Installation
Mozambique R53 million 12 months
Vale Vale 66kV OHL Repairs Mozambique R5,6 million 2 months
Assmang DRA KOP E&I Installation
KathuRSA R44 million 16 months
Base Minerals Ausenco Kwale Mineral Sands ProjectE&I Installation Kenya R94 million 9 months
Rio Tinto Rio Tinto Various E&I Installation Mozambique R12 million 24 months
Kumba ELBKolomela & Sishen Iron Ore
Mine - DMS PlantsE&I Installation
Kolomela / SishenRSA R24 million 9 months
Xtrata DRATweefontein Collieries Coal
MineE&I Installation
TweefonteinRSA R144 million 16 months
Jindal S&P B&W Plant 33kV Reticulation Mozambique R13,5 million 11 months
Leading Electrical and Instrumentation Construction Company
Dean NevayProject Director
Tel: +27 11 907 1663
Fax: +27 11 907 1957
E-mail: [email protected]
Contact Details
Ken NelBusiness Development Manager
Tel: +27 11 907 1663
Fax: +27 11 907 1957
E-mail: [email protected]
Leading Electrical and Instrumentation Construction Company
THANK YOU