c-1901 ps19001

5
PHOTOGRAPHY REPORT ASSET INTEGRITY MANAGEMENT DEPARTMENT REPORT NO: EQPT. TAG: PMT/PMD/PMA: DATE: Pre-Cleaning Inspection After-Cleaning Inspection Others: AIM-6 Form Rev. Oct 2011 Item: 10” PS19001-15202R-PP OVERHEAD PIPING FROM C-1901 TO AFC E-1906 x Piping External VI Piping External VI NIL 13/04/2012 Findings: Item: Findings: Overview of overhead piping from top C-1901 10” PS19001-15202R-PP OVERHEAD PIPING FROM C-1901 TO AFC E-1906 Surface rust on welding joints and reinforcement pad due to poor painting surface preparation

Upload: saiful-rizal

Post on 13-Dec-2015

9 views

Category:

Documents


0 download

DESCRIPTION

valve

TRANSCRIPT

Page 1: C-1901 PS19001

PHOTOGRAPHY REPORTASSET INTEGRITY MANAGEMENT DEPARTMENT

REPORT NO: EQPT. TAG: PMT/PMD/PMA: DATE:

Pre-Cleaning Inspection After-Cleaning Inspection Others:

AIM-6 Form Rev. Oct 2011

Item: 10” PS19001-15202R-PP OVERHEAD PIPING FROM C-1901 TO AFC E-1906

x Piping External VI

Piping External VI NIL 13/04/2012

Findings:

Item:

Findings:

Overview of overhead piping from top C-1901

10” PS19001-15202R-PP OVERHEAD PIPING FROM C-1901 TO AFC E-1906

Surface rust on welding joints and reinforcement pad due to poor painting surface preparation

Page 2: C-1901 PS19001

PHOTOGRAPHY REPORTASSET INTEGRITY MANAGEMENT DEPARTMENT

REPORT NO: EQPT. TAG: PMT/PMD/PMA: DATE:

Pre-Cleaning Inspection After-Cleaning Inspection Others:

AIM-6 Form Rev. Oct 2011

Item: 10” PS19001-15202R-PP OVERHEAD PIPING FROM C-1901 TO AFC E-1906

x Piping External VI

PS-19001-15202R-PP NIL 13/04/2012

BA

Findings:

Item:

Findings:

Painting damage and rusted on elbow pipe and welding joints

10” PS19001-15202R-PP OVERHEAD PIPING FROM C-1901 TO AFC E-1906

Painting damage /scratches and rusted on elbow and straight pipe

B

Page 3: C-1901 PS19001

PHOTOGRAPHY REPORTASSET INTEGRITY MANAGEMENT DEPARTMENT

REPORT NO: EQPT. TAG: PMT/PMD/PMA: DATE:

Pre-Cleaning Inspection After-Cleaning Inspection Others:

AIM-6 Form Rev. Oct 2011

Item: 10” PS19001-15202R-PP OVERHEAD PIPING FROM C-1901 TO AFC E-1906

x Piping External VI

PS-19001-15202R-PP NIL 13/04/2012

Findings:

Item:

Findings:

Painting damage and rusted on welding and HAZ area of pipe support to run pipe

10” PS19001-15202R-PP OVERHEAD PIPING FROM C-1901 TO AFC E-1906

Painting damage and rusted on elbow pipe and welding joints

Page 4: C-1901 PS19001

PHOTOGRAPHY REPORTASSET INTEGRITY MANAGEMENT DEPARTMENT

REPORT NO: EQPT. TAG: PMT/PMD/PMA: DATE:

Pre-Cleaning Inspection After-Cleaning Inspection Others:

AIM-6 Form Rev. Oct 2011

Item: 10” PS19001-15202R-PP OVERHEAD PIPING FROM C-1901 TO AFC E-1906

x Piping External VI

PS-19001-15202R-PP NIL 13/04/2012

6” pipe

8” x 6” reducerA

B

Findings:

Item:

Findings:

Painting damage and rusted on welding and HAZ area of pipe support to run pipe

10” PS19001-15202R-PP OVERHEAD PIPING FROM C-1901 TO AFC E-1906

Closer view of painting failure and rusted on welding joints and on pipe and fitting body.

A

Page 5: C-1901 PS19001

PHOTOGRAPHY REPORTASSET INTEGRITY MANAGEMENT DEPARTMENT

REPORT NO: EQPT. TAG: PMT/PMD/PMA: DATE:

Pre-Cleaning Inspection After-Cleaning Inspection Others:

AIM-6 Form Rev. Oct 2011

Item:

X

PS-19001-15202R-PP NIL 13/04/2012

Piping External VI

10” PS19001-15202R-PP OVERHEAD PIPING FROM C-1901 TO AFC E-1906

B

REVIEWED APPROVED

(NAME, STAMP, SIGNATURE) (NAME, STAMP, SIGNATURE)

I HEREBY CERTIFY THAT THIS IS A TRUE AND CORRECT REPORT

OF MY INSPECTION,

(NAME, STAMP, SIGNATURE):

DATE :

PREPARED BY:

Findings:

13th April 2012

Tengku Jasbi

Closer view of painting failure and rusted on welding joints and on pipe and fitting body.