c v saifullah for q.s-1,experience , passport - copy

Upload: ismail

Post on 04-Feb-2018

223 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/21/2019 C v Saifullah for Q.s-1,Experience , Passport - Copy

    1/8

    Technical analysis

    Leadership quantity

    To Work in a dynamic organization, with a challenging environment where growth depends upon sheer

    merit.

    Site Inspector QC

    Reconstruction &Rehabil itation of fully damaged school ,BHU,s ,Bridges &

    Watson under PaRRSA program Malakand Division Khyber Pakhtunkhwa

    Pakistan)

    Supervision of civil works on the site for compliance with project specification and applicable standards.

    Quantity surverying of work executed by the contractor for monthly valuations.

    Daily Progress reports & issuance of field instructions to contractor in order to execute the work as per

    Profile

    Detail estimate of building construction work

    Quantity Surveyor

    Reconstruction &Rehabil itation of fully damaged schools , BHU,s ,Bridges

    & Watson under PaRRSA program Malakand Division Khyber Pakhtunkhwa

    CLIENT USAID

    Mohalla Karim Abad ,Village Jehan Abad

    SAIFULLAH

    ID: 15602-8204915-7 Passport # AN5989152

    Experience [+07 Years Overall]

    Technical solution of problems arises at construction sites.

    Birth Date: 03/03/1986 Maritial Status: Married

    Saifullah Q S

    Managing work with limited/assigned resources and within time.

    P.O/Teh Charbagh & Ditt Swat ,Khyber Pakhtunkhwa Pakistan.

    Official Email :- [email protected]

    Personel Email :- [email protected]: 0344-8124424 , 0946-835356

    Objective

    Review of all types of Projects Estimates with site conditions, prepared by head office of the Consultant

    Preparation & recommendation of progressive & Interim payment Certificate.

    Rate analysis for the Non BOQ items.

    Preparing BBS as per detail construction drawings for execution at Site.

    Preparing Revise PC-1.

    To coordinate with other departments/stakeholders to define and obtain information needed for the estimate.

    Guidness of other staff members regarding Cost Estimates and other financial matters related to the project.

    Executing multiple tasks simultaneously as directed by supervisor

    Quantity Survey work of building construction

    CLIENT USAID

    December 2011~Todate

    January 18, 2011 ~ October 2011 CDM (Camp Dresser and McKeey)

  • 7/21/2019 C v Saifullah for Q.s-1,Experience , Passport - Copy

    2/8

    (ENGINEERING, PLANNING &ARCHITECHTURAL (EPAC)

    CONSULTANTS(in a Joint Venture with CIV-TECH ASSOCIATES

    (KHYBER GRACE(PVT)LIMITED)

    Microsoft Power point

    Auto CADOffice programs

    Education

    Preparation & recommendation of progressive & Interim payment Certificate.

    Rate analysis for the Non BOQ items.

    Preparing BBS as per detail construction drawings for execution at Site.

    Preparing Revise PC-1.

    Development of workshop drawings in technical office and supervision of production of structure in workshopand ensuring the structure produced in workshop is being produced as per design, specifications and applicable

    standards.

    Managing on site erection of steel structure and cladding system.

    Construction of Parking shed, Boundary wall, Septic tank, Soakage pit, Inspection chamber, Waterproofing

    &Grassing.

    QA/QC Inspection during execution and after completion of an activity.

    Preparation of bidding documents for new projects, making calculations and quantity surveying, selecting

    types of structures to be used in construction, selecting materials and suppliers.

    Worked on multiple overlaping projects during this period (industrial production facilities buildings, sports

    gymnasium, stadium roof structure, skylights) through civil estimating for new project bidding phase, planningof work, development of structure in workshop on site erection and handover.

    3D STUDIO MAX

    Browsing & E-mail Procedure

    CLIENT Works Welfare board & "PCU" Police Coordination UnitPeshawar

    MS Project

    Skills

    Construction of 600 Family quarter in industrial Estate Haripur Hattar ,

    Construction of 1350 Family Quarter in industrial Estate Gadoon Amazai &

    Construction of Police Station , Police Post & Police Patrolling Post in Swat

    2000 S.S.C from BISE Swat Khyber Pakhtunkhwa Pakistan.

    2007 Diploma in Civil Engineering from Board of Technical Education Peshawar Khyber Pakhtunkhwa Pakistan.

    Quantity Surveyor

    Review of all types of Projects Estimates with site conditions, prepared by head office of the Consultant

    Preparation & recommendation of progressive & Interim payment Certificate.

    Rate analysis for the Non BOQ items.

    Preparing BBS as per detail construction drawings for execution at Site.

    Preparing Revise PC-1.

    To coordinate with other departments/stakeholders to define and obtain information needed for the estimate.

    Guidness of other staff members regarding Cost Estimates and other financial matters related to the project.

    Quantity Surveyor & Site Engineer

    CLIENT Works Welfare board Peshawar

    2009 B,A from Malakand University Khyber Pakhtunkhwa Pakistan.

    2005 FSc from BISE Swat Khyber Pakhtunkhwa Pakistan.

    Language

    Construction of 600 Family quarter i n indust rial Estate Haripur Hattar.

    January 2007 ~ February 2008

    Apr 2008 ~ December 1st, 2010

  • 7/21/2019 C v Saifullah for Q.s-1,Experience , Passport - Copy

    3/8

  • 7/21/2019 C v Saifullah for Q.s-1,Experience , Passport - Copy

    4/8

  • 7/21/2019 C v Saifullah for Q.s-1,Experience , Passport - Copy

    5/8

  • 7/21/2019 C v Saifullah for Q.s-1,Experience , Passport - Copy

    6/8

  • 7/21/2019 C v Saifullah for Q.s-1,Experience , Passport - Copy

    7/8

  • 7/21/2019 C v Saifullah for Q.s-1,Experience , Passport - Copy

    8/8