CABINET
REPORT OF CORPORATE DIRECTORS GROUP
28 SEPTEMBER 2016
SECTION A – MATTER FOR DECISION WARDS AFFECTED: ALL DRAFT 2017/18 BUDGET FOR CONSULTATION 1. Purpose of Report
To seek Member approval to consult on draft proposals for financial savings and income generation for 2017/18 and beyond.
To confirm that consultation will take place to the end of December 2016 prior to reviewing responses and setting a balanced budget for 2017/18.
2. Executive Summary
Today's report does not seek final decisions from Members on priorities or on where financial savings should be made. The aim of this report is to seek approval to go out to consultation and listen to the views of our County Borough citizens and stakeholders in relation to the issues set out in this report. Final decisions on setting the Council's Budget for 2017/18 will be required to be taken in February 2017 following the end of public consultation and receipt of the Welsh Government's Final Local Government Settlement. The report identifies that due to projected UK Government spending cuts to beyond 2019/20 together with Welsh Health Service funding pressures it is projected that there will be a need for this Council to make budget savings of £11.2m for 2017/18 and £36 m over the next three years. The savings proposals set out in this report amount to £6.8m for 2017/18, which is short of the projected budget gap by £4.4m. Further work is continuing to be carried out to identify options to close this shortfall including work on income generation, reviewing
central budgets, amalgamating services and a further update will be provided to members following the Provisional Settlement announcement expected on 19 October 2016.
3. Background
On the 13 July 2016 a report was presented to Cabinet setting out the updated Forward Financial Plan Gap (FFP) for each financial year to March 2020. That report showed the various assumptions for each year including cost pressures such as pay award, inflation, new UK Government taxation in the form of an Apprenticeship Levy, together with population and specific service pressures. Further details of the pressures and inflation/other factors built into the budget are set out in Appendices 2 and 3. The report also reviewed and confirmed that £3.8m of the previously approved savings schedule for 2017/18 remained on target to help close the projected budget gap. The following table shows the projected Gap as reported at the July meeting:
Funding Gap @ June 2017/18 2018/19 2019/20
£’000 £’000 £’000
Total Budget Gap 12,645 14,740 10,332
Less withdrawal of one-off budget allocated to Streetscene for 2016/17 **
-1,229 0 0
Budget Gap before Directorate Savings
11,236 14,740 10,332
Cumulative Gap 11,236 25,976 36,308
Savings @ June 2016 -3,815 -250 -250
Budget Gap @ June 2016 7,421 14,490 10,082
Cumulative Gap @ June 2016
7,421 21,911 31,993
** Members will recall that due to the better than expected Local Government Settlement for 2016-17 at a reduction of 0.5% this council provided and invested for this financial year only an additional £1.229m in Environmental / Streetscene Improvements and therefore this is the first call for closing the budget savings gap in 2017/18. Following the outcome of the National Assembly for Wales’ elections of May 2016 the Welsh Government will require the support of other parties to set its annual budget from 2017/18 onwards. During the election campaign the Health Service was one of the main areas of debate and it is likely that the Welsh Government Budget will again prioritise funding for Health at the expense of Local Government and hence we can continue to expect further funding reductions over the next few years. Following the result of the EU Referendum held on 23 June 2016 which saw the people of the UK vote to leave the European Union there has been a number of changes at UK Government level. We have a new Prime Minister and Cabinet. A new team has been established to plan for the UK’s exit from the European Union which will take place 2 years from the date the UK issues notice under Article 50 of the Lisbon Treaty. The UK Government has not yet confirmed the actual date of issuing the notice to leave under Article 50 but this is not now expected until 2017. The new Chancellor of the Exchequer has already confirmed that the previous target of balancing the UK budget by 2020 will not be achieved and further clarification on the Government’s strategy will be announced in the Autumn Statement due in November. As a consequence it is expected that the Welsh Government will only announce a 1 year budget providing funding for 2017/18 only. The Draft Welsh Government Budget is expected to be announced on the 18 October with the Provisional Local Government Settlement a day later on the 19 October, with the Final Settlement in late December. The Chancellor for the Exchequer has stated that the UK Government will guarantee to “back” until 2020 EU funded projects signed before this year’s Autumn Statement. Since 2010 this Council has already had to cut in real terms some £72m from its revenue budget and reduced its workforce by 20% through a combination of voluntary redundancies and a transfer of functions.
Neath Port Talbot Councils net revenue budget for 2016/17 is £270.9m and together with grants and income results in a gross budget or investment of some £417m in Council services across the County Borough. The Council also invests annually a further £50m+ through its capital programme.
4. Council Priorities 2016 - 2019 On the 20th May 2016 the Council published its Corporate Improvement Plan for the period 2016 – 2019. There are six improvement objectives that were established at the beginning of the term of the current administration, reflecting the Council’s priorities. The Council has retained the same six objectives for 2016/17 but with a particular focus and these have been used to establish the Budget Priorities for 2017/18. These are also referred to in the Chief Executive’s separate report to today’s meeting. The priority areas are as follows:-
Improve outcomes for children in need and children looked after by improving the performance of the Council’s Children and Young People Services Department.
Raise educational standards and attainment for all young people.
Maximise the number of adults who are able to live independently with or without support within the home of their choice within their community.
Support and invest in our town centres and communities to promote economic growth, regeneration and sustainability to maximise job opportunities and improve access to employment.
Increase the percentage of waste recycled and composted.
Improve customer/citizen access to services and functions provided by the Council, or on behalf of the Council, and to improve the efficiency of those services and functions.
5. Budget 2016/17 and FFP Gap 2017 - 2020
Neath Port Talbot Council approved its 2016/17 budget on the 3rd February 2016 and finalised the council tax at the meeting of 10th March 2016. The medium term budget forecast, at that time, assumed a 3.5% per annum reduction in Welsh Government funding for both 2017/18 and 2018/19 and a 2% reduction in 2019/20. As Members are aware, a 1% variation in the level of this funding equates to £2m. The forecast showed the need to identify savings solutions of circa £36m over the next three financial years. This is after making provision for increases in pay and price inflation, the introduction of an apprenticeship levy and other cost pressures. The report also showed that of this sum the Council had identified savings of some £4.1m for 2017/18 and £260k for 2018/19 thus reducing the amount of further savings required to set a balanced budget over the 3 years to £32m. The following table shows the summarised Council Net Budget and Funding for 2016/17.
Net Budget 2016/17 Budget Budget
£m %
Total Education, Leisure & Lifelong Learning (including Schools at £79.6m or 29%)
£ 103.208 38.10%
Social Services, Health & Housing
£ 75.138 27.80%
Environment £ 31.458 11.60%
Finance & Corporate Services £ 16.653 6.10%
Fire Authority £ 6.851 2.50%
Capital Financing £ 16.408 6.10%
Council Tax Support £ 17.404 6.40%
Other including Contingency £ 3.776
1.40%
Budget Requirement £ 270.896 100%
Funding 2016/17 Budget £m
Budget %
Revenue Support Grant £ 163.137 60.2%
National Non Domestic Rates £ 42.438 15.7%
Discretionary Rate Relief -£ 0.209 -0.1%
Council Tax £ 65.530 24.2%
Total Income £ 270.896 100%
As Members are aware the Council's Standard Spending Assessment (SSA) totals £258.331m. The SSA represents the Welsh Government's standard level of funding per service that it makes available to Local Authorities. As the Council spends £270.9m this is £12.6m or 4.86% above SSA. The following table illustrates the position per service area:
SSA Budget Variance Variance
£m £m £m %
Education £ 102.897 £ 100.572 -£ 2.325 -2.3%
Social Services £ 72.833 £ 83.565 £ 10.732 14.7%
Roads & Transport £ 7.660 £ 9.986 £ 2.326 30.4%
Other Services £ 35.633 £ 36.200 £ 0.567 1.6%
Capital Financing £ 15.385 £ 16.408 £ 1.023 6.6%
Council Tax Support £ 16.040 £ 17.404 £ 1.364 8.5%
Fire Service £ 5.524 £ 6.851 £ 1.327 24.0%
Deprivation Grant £ 2.359 £ - -£ 2.359 -100.0%
Total £ 258.331 £ 270.986 £ 12.655 4.9%
The above table shows that some £155m or 56% of the budget is spent directly on educating children in our schools (£80m) and providing social care to children, adults and the people with disabilities (£75m).
6. FFP Gap and Draft Savings for Consultation Attached at Appendix 1 is a schedule of draft savings for public consultation. The schedule totals some £6.8m for 2017/18, £1m for 2018/19 and £0.7m in 2019/20. Members should also note ongoing
work to identify areas for generating increased income and savings from service reviews and amalgamation. The total savings per Directorate included within Appendix 1 is as follows:-
In relation to council tax the 2017-18 Budget assumes a 3% increase. However, the actual council tax for next year will not be set until the Budget Meeting of February 2017. For information Members should note that every 1% increase in council tax generates some £600,000 of additional funding (£480k net of Council Tax Support). In addition members should note that the Local Government Pension Scheme is revalued every 3 years with the next valuation outcome due to be announced in early 2017 for implementation from 1st April 2017. The FFP includes an increase of 0.5% per annum for the employers’ contribution rate. In the current year this amounts to 24% of pensionable pay. The Government Actuarial Department is coordinating and requiring consistent assumptions be applied to all pension funds and there is potential for an even higher rat. A further 1% increase equates to approximately £750k of additional costs. Members should note that the Director of Social Services Health and Housing is chairing a group of senior officers and trade unions looking at Income Generation and Trading. Given the projected FFP Gap and hence the requirement for ongoing budget savings beyond 2018, it is critical that we look to maximise income over the next few years. This will help reduce budget savings and reduce the cost of council subsidies for some service areas such as leisure, parks etc. A separate report will be prepared for member consideration later in the year to identify those areas for development. A target of £3m to £5m over the next 3 years is being targeted into the Forward
Directorate 2017/18 £’000
2018/19 £’000
2019-20 £’000
Education, Leisure & Lifelong Learning including Schools
£1,794 £503 £152
Social Services, Health & Housing £2,802 £250 £250
Environment £1,285 £20 £33
Corporate £958 £306 £266
Total £6,839 £1,079 £701
Financial Plan. Additional income generated will further reduce the FFP Gap mentioned below. Members should also note that work is to be progressed to amalgamate the cross directorate catering and cleaning services and in 2017 commence to identify savings from services provided by both Education and Children Services to our young people. The following table shows the projected FFP Gap after updating the Savings Schedule proposals as set out in Appendix 1. The table shows that the gap remains some £4.4 m short of the savings target for 2017/18 and some £28m over the 3 years and work is ongoing to close this projected gap
Funding Gap @ Sept 2016 2017/18 2018/19 2019/20
£’000 £’000 £’000
Total Budget Gap 12,465 14,740 10,332
Less withdrawal of one off budget allocated to Streetscene in 2016/17
-1,229 0 0
Budget Gap before Directorate Savings
11,236 14,740 10,332
Cumulative Gap 11,236 25,976 36,308
Updated Savings @ Sept 2016 -6,839 -1,079 -701
Budget Gap @ Sept 2016 4,397 13,661 9,631
Cumulative Gap @ Sept 2016 4,397 18,058 27,689
7. Other Funding Considerations A review of all non-directorate budgets including council tax support, capital financing and the levies/precepts will also be undertaken to help close the remaining budget gap.
Specific Grants also provide funding to underpin the delivery of many statutory services or Welsh Government Priorities. These include Pupil Deprivation Grant and other Education/School Improvement, Waste and Recycling Services, Supporting People, Community First etc. As in previous years it is critical that we receive early notification of these grants for 2017/18 otherwise they could provide even more service and financial challenges. As previously reported 76% of the Council’s funding comes from the Welsh Government settlement. Local Authorities, the Welsh Local Government Association and Trade Unions have over the past few months been setting out the case for a reasonable funding settlement for local public services and if successful this will also assist to close the budget gap.
8. Crime and Disorder Impact The Council has a legal duty under Section 17 of the Crime and Disorder Act 1998 to carry out all its various functions with “due regard to the need to prevent Crime and Disorder in its area”. Individual proposals are being assessed as to their impact on crime and disorder and should any specific impact be identified these will be identified against individual proposals and summarised in final proposals.
9. Equality Impact Assessment The Equality Act 2010 requires public bodies to “pay due regard to the need to: • eliminate discrimination, harassment, victimisation and any other conduct that is prohibited by or under the Act; • advance equality of opportunity between persons who share a relevant protected characteristic and persons who do not share it; and • foster good relations between persons who share a relevant protected characteristics and persons who do not share it.” This report identifies the need to make budget savings of over £11m for 2017/18 and £36m over the next 3 years. The draft proposals will have different impacts on services provided across the whole of the
County Borough i.e. on citizens, on service users and various people included within the protected characteristics groups set out in the Equality Act 2010. Individual Equality Impact Assessments for specific proposals are being undertaken and will be made available to Members as part of the budget scrutiny process.
10. Workforce Impacts The workforce will be impacted by the reduction in budget funding available to run services. The Council has shared this report and information with trade unions and are having and will continue to hold staff briefings over the next few months. The Council wishes to minimise compulsory redundancies and is launching its early retirement/voluntary redundancy scheme in late October/November 2016.
11. Consultation The report to Cabinet of the 13 July 2016 commenced early consultation in relation to budget matters. The Chief Executive has also presented a separate report to today’s meeting setting out the external context and alignment with the Council’s Corporate Plan and this Budget. Today will commence the formal consultation with the public on the draft budget proposals for savings/income generation. Members will note the Budget Timetable as set out at Appendix 4 to this report.
12. Recommendations
It is recommended that Members authorise the Chief Executive to consult the public on the savings and additional income proposals set out at Appendix 1 of this report.
13. Reason for Proposed Decision
To commence the budget savings consultation for 2017/18.
14. Implementation of Decision
The decision is proposed for implementation immediately after consultation with the Cabinet Scrutiny Committee.
15. Appendices Appendix 1 - Draft savings for consultation Appendix 2 - Revenue Service Pressures 2017 to 2020 Appendix 3 – Inflation and other Factors Appendix 4 –Budget Timetable 2017/18
16. Background Papers Cabinet Report of 13 July 2016 – Forward Financial Plan 2017-2020 Budget working files
17. Wards Affected
All
18. Officer Contact
For further information on this report item, please contact:
Mr. Steven Phillips – Chief Executive Tel: 01639 763305 Email: [email protected] Mr Hywel Jenkins – Director of Finance & Corporate Services - Tel: 01639 763251 E-mail: [email protected] Mr Aled Evans – Director of Education, Leisure and Lifelong Learning – Tel: 01639 763393 Email: [email protected] Mr Nick Jarman – Director of Social Services, Health and Housing – Tel: 01639 763279 Email: [email protected] Mr Gareth Nutt – Director of Environment Services Tel: 01639 686668 Email: [email protected]
Appendix 1 Draft savings for consultation
New Ref Board Description Lead Main Impacts 2017/18 £000
2018/19 £000
2019/20 £000
ELLL502 CYPE Home to School/College Transport
Chris Millis Continue to rationalise home to school transport routes as per agreed policy.
55
ELLL524 ECR Leisure Services Aled Evans Reduction in Celtic Leisure contract sum via contract efficiencies
200
ELLL604 ECR Restructure of library service / further reduction or transfer of library provision
Andrew Thomas
Transfer of Skewen and Baglan library to communities and other efficiencies.
54
ELLL605 ECR Reduction in subsidy for Cefn Coed Museum
Chris Millis Continue consultation and working with the friends of Cefn Coed Museum to make efficiency savings. Ongoing discussions with Welsh Government in relation to their site liabilities.
10
ELLL620 ECR Margam Park Andrew Thomas
Internal restructure within Margam Park has led to favourable income generation
75
ELLL624 CYPE Increase price of school meals
Chris Millis Increase price for schools meals charged to parents
30
ELLL626 CYPE Review of Welsh translation unit
Chris Millis Cost efficiencies and service charges 20
ELLL701 CYPE Reduction of Schools' Base Budget
Aled Evans Less funding for all schools. Potential job losses.
796
ELLL702 CYPE Reduce the DBS Budget Chris Millis Traditionally the LA has paid for DBS checks on behalf of schools. This is no longer sustainable. Schools will be required to comply with the Safer Recruitment Policy. Regional working has reduced the unit costs.
28
ELLL703 CYPE Full Cost Recovery - School Cleaning
Chris Millis Risk that schools may choose to opt out of using the service.
76
ELLL704 CYPE Age profiles of children attending out of county placements
Andrew Thomas
No major impact, pupils will have reached school leaving age. Possible potential savings in special school transport costs
135 213 72
Appendix 1 Draft savings for consultation
New Ref Board Description Lead Main Impacts 2017/18 £000
2018/19 £000
2019/20 £000
ELLL705 CYPE / ECR
Vacancy Management Andrew Thomas / Chris Millis
Additional workload for staff. Prioritised workloads.
30
ELLL706 ECR Increase Income - NPT Works
Chris Millis Continued improvement in service delivery.
30
ELLL707 ECR Reduce Subsidy - Pontardawe Arts Centre
Andrew Thomas
Further reduction in funding to theatres, possibly a reduction in opening times
40 40 40
ELLL708 ECR Reduce Subsidy - Gwyn Hall
Andrew Thomas
More efficient management of Celtic Leisure contract.
40 40 40
ELLL709 ECR Re-structure community services and funding
Andrew Thomas
More effective use of grant funding to reduce core costs
39
ELLL710 CYPE / ECR
Innovative use of grant funding
Andrew Thomas / Chris Millis
Review existing grants in order to maximise the use of grant funding
100
ELLL711 ECR Further reduction in subsidy to Aberafan Seafront / Lifeboat Service
Andrew Thomas
Further reduction in Subsidy. Service may become unsustainable
5
ELLL712 CYPE Reduce Special Education Needs budget for schools
Andrew Thomas
Reduction in support for our most vulnerable pupils.
27 19
ELLL713 CYPE Negotiate a 10% reduction towards the Core Costs of ERW
Chris Millis Currently pay a contribution towards the central support team of ERW.
4
ELLL714 ECR Withdraw match support for Disability Sports Coordinator's post
Chris Millis Withdrawal of match funding support for a Disability Sports Co-coordinator
15
ELLL715 CYPE Implementation of the recommendations from the catering review
Chris Millis Reduction in the conditions of service for staff.
100
ELLL716 ECR Ensure that the running costs of Tir Morfa Education Centre are self-financing
Chris Millis Potential additional pressure on Adult Education, Skills and Training Unit and Youth Service Budgets.
76
Appendix 1 Draft savings for consultation
New Ref Board Description Lead Main Impacts 2017/18 £000
2018/19 £000
2019/20 £000
ELLL717 ECR Twyn Yr Hydd Andrew Thomas
Potential rental opportunities for 2018. Value to be confirmed in due course
ELLL718 ECR Margam Park Andrew Thomas
Income opportunities being reviewed. Value to be confirmed in due course
SSHH514 SCHH / CYPE
Workforce Strategy Savings All SSHH Implement new grading structure 95
SSHH516 SSHH Homecare - Review of savings opportunities
N Jarman Continue to improve the efficiency of the Homecare Service
338
SSHH540 CYPE Children’s Services A Jarrett Savings arising from ongoing reductions in Looked After Children
614
SSHH543 SCHH Restructure of Social Work Teams
N Jarman Review of Social Work workforce to operate as efficiently as possible
125
SSHH605 SCHH Respite and day care N Jarman Modernisation of LD and OP respite and day care-rationalisation of premises and increase capacity utilisation (particularly Trem-y-Mor respite)
250 250 250
SSHH701 SCHH Complex Needs A Jarrett Modernisation of complex needs service - rationalisation of premises and increase capacity utilisation, transferring more packages of care internally.
250
SSHH702 SCHH Community Resource Team A Jarrett Improve the flow of service users through the whole system which will allow more efficient use of the reablement service. Anticipated savings should arise from reduced demand for long term residential care and reduced hours of domiciliary care.
300
Appendix 1 Draft savings for consultation
New Ref Board Description Lead Main Impacts 2017/18 £000
2018/19 £000
2019/20 £000
SSHH703 SCHH Placements Budget A Jarrett Reduce Placements budgets (extend the PTI approach to all packages of care), implement Local Area Co-ordination model and re-introduce panel arrangements for elderly residential care.
500
SSHH704 SCHH Supporting People A Thomas Review of externally commissioned housing services.
330
ENV508 E&H / ECR
Workforce Strategy Savings All ENVT Implement new grading structure 14
ENV531 ECR Cease security contract for Authorities Estate
S Brennan Cease security contract costs 20
ENV533 ECR Property services S Brennan Property increase income and reduce expenditure
50
ENV534 ECR Reduce Building Maintenance expenditure
S Brennan Will reduce maintenance works on County's buildings
50
ENV556 E&H Waste Disposal M Roberts Anticipated procurement savings 160
ENV639 E&H Waste Collection M Roberts Savings from side waste restriction 40
ENV603 ECR Planning N Pearce Revised table of charges for pre-applications
10
ENV605 ECR Gypsy S Brennan Increase rent income and reduce expenditure, following the extension of Caegarw
25
ENV606 ECR /E&H
Civic Building S Brennan Additional rental Income at Pontardawe One Stop Shop
8
ENV611 E&H Car Parking D Griffiths Car Parking Income withdraw Christmas free parking. Possible impact on trade.
20
ENV612 ECR Sandfields Young Business Centre
S Brennan Increase Income 10
Appendix 1 Draft savings for consultation
New Ref Board Description Lead Main Impacts 2017/18 £000
2018/19 £000
2019/20 £000
ENV614 ECR Planning N Pearce Reduce car allowances, professional fees, advertising costs
12
ENV615 ECR Building Control N Pearce Reduce office and general expenditure 8
ENV616 ECR Planning Policy N Pearce Reduce office and general expenditure 2
ENV617 E&H Wildlife, Countryside and Biodiversity
N Pearce Reduction in expenditure 11
ENV618 ECR Property division S Brennan Running costs savings re asset management, strategic development and land acquisition
33
ENV623 ECR Energy - Management / Business Support Fund
S Brennan Decrease Professional Fees Budget 9
ENV644 ECR Building Maintenance S Brennan Reduction in building maintenance budget 50
ENV626 ECR Planning N Pearce Reduce staff costs 36
ENV627 E&H Wildlife, Countryside and Biodiversity
N Pearce Reduce staff costs 36
ENV629 ECR /E&H
Civic Building S Brennan Reduce staff costs 20
ENV637 E&H Community Transport D Griffiths Savings from Social Service Day Services review resulting in reduced transport costs
260
ENV640 E&H Street furniture M Roberts Reduced maintenance 3
ENV641 ECR /E&H
Public Conveniences S Brennan/ M Roberts
Review and close public conveniences e.g. Resolven
15
ENV645 E&H Management of stray dogs M Roberts Full year's impact of savings partially delivered in 2016/17
10
ENV701 E&H Community Services
Transport Savings Dave Griffiths
Service review 200
ENV702 E&H Transport Admin staff
reduction Dave Griffiths
Dependant on ER/VR 23
ENV703 ECR /E&H
Cease to use MENTOR system
Michael Roberts
Functionality to be replaced by in-house solution
49
Appendix 1 Draft savings for consultation
New Ref Board Description Lead Main Impacts 2017/18 £000
2018/19 £000
2019/20 £000
ENV704 E&H
Survey Team Michael Roberts
Reduction in staff costs 26
ENV705 E&H
Crematorium/ Cemeteries Michael Roberts
Amalgamation of the two services 20 33
ENV706 ECR /E&H Asset Sponsorship
Nicola Pearce
Income generation 75
ENV707 ECR Catering and Cleaning Simon Brennan
Cross Directorate Service review. Value to be confirmed in due course
CORP503 PRB Workforce Strategy Savings All CORP Implement new grading structure 40
CORP576 PRB Introduce revised access to service policy across council
Karen Jones
Implement the digital by choice strategy, moving more customers to self-serve options thus reducing the volume of telephone and face to face enquiries. The channel shift will reduce the staffing requirement across Customer Services and change the skills mix. New voice technology to provide opportunities to automate a significant element of the switchboard function. The target has been reduced from £150k due to delays in introducing new voice technology
22 75 36
Appendix 1 Draft savings for consultation
New Ref Board Description Lead Main Impacts 2017/18 £000
2018/19 £000
2019/20 £000
CORP577 PRB Review of CCTV operation to further reduce costs
Karen Jones
Implement the decisions taken by Members to reduce the number of cameras across the County Borough to ensure all cameras meet the "necessity test". Complete discussion with the City and County of Swansea to establish if a business cases exists to create a joint CCTV monitoring service which would restore 24/7 monitoring across the remaining cameras but require fewer staff. The target has been reduced from £114k as Members elected not to pursue further reduction in the monitoring service.
44 30
CORP591 PRB Legal Staffing David Michael
Reduction in staffing via ER/VR. Further savings will need to be compensated for by reduced workload. There is a risk of destabilising teams.
100
CORP598 PRB ICT - Strategies to be identified
Steve John Identify new income streams - but if these cannot be identified will result in reduction of staff.
359
CORP602 PRB Human Resources Sheenagh Rees
Reduce non salary budget lines, e.g. car allowances, printing expenses, postage costs, etc.
15
CORP603 PRB Reduce Corporate Training Budgets
Sheenagh Rees
Reduced provision of corporate management development and equalities training, which will now be minimal.
11
CORP604 PRB Reduce Occupational Health Professional fees budget
Sheenagh Rees
Introduction of Occupational Health on line referral system and the referral hotline number will reduce unnecessary referrals to the service and increase capacity of professional nursing team, reducing the need for externally purchased service.
10 10
Appendix 1 Draft savings for consultation
New Ref Board Description Lead Main Impacts 2017/18 £000
2018/19 £000
2019/20 £000
CORP608 PRB Democratic Services Karen Jones
Reduce budgets to reflect actual costs across a range of headings
15
CORP609 PRB Corporate Strategy - staff restructuring
Karen Jones
Remodelling of the staffing arrangements to take account of the impact of new legislation on the corporate strategy function
18 6
CORP613 PRB Financial Services - increase Income generation
Dave Rees Limited scope for income generation 23
CORP614 PRB Financial Services - reduce staffing across the division
Dave Rees Reduced capacity to provide services to the public and other directorates. Performance in key areas is likely to fall. Future year savings will increase risk that statutory functions are not delivered in full. Loss of experience. Target has been reduced from £280k.
210
CORP701 PRB Non staff savings Dave Rees Limited scope for further non staff savings 56
CORP702 PRB Staff reductions S John The ICT service will be significantly impaired. Development capacity will fall and service requests will take longer to effect. Income generation and/or collaborative opportunities may offset some job losses/service issues.
200 200
CORP703 PRB Increase Joint Resilience Unit charges for externally provided services carried out in relation to COMAH work to ensure full cost recovery.
Sheenagh Rees
The Council has a duty to address the statutory requirements of the COMAH regulations including the development, production, maintenance and testing of COMAH off site emergency plans. The Council is entitled to recover the costs for providing this service. The charging regime has been reviewed to ensure that costs match current service provision.
7
Appendix 1 Draft savings for consultation
New Ref Board Description Lead Main Impacts 2017/18 £000
2018/19 £000
2019/20 £000
CORP704 PRB Delete vacant Assistant HR Officer post
Sheenagh Rees
An Assistant HR Officer post has been recently vacated as a result of promotion of the postholder. The team will no longer have a 'training grade' post which has been used to grow our own HR Officers - as a result of this, should HR Officer vacancies arise which need to be filled, we will have to go to the external market to fill.
28
CORP705 PRB Human Resources Sheenagh Rees
Delete partial hours where post holders have reduced their working hours.
15
Total 6,839 1,079 701
ELLL 1,794 503 152
Social Services, Health and Housing 2,802 250 250
Environment 1,285 20 33
Corporate 958 306 266
Total 6,839 1,079 701
Appendix 2
Revenue Service Pressures 2017 to 2020
Ref Service area 2017/18 2018/19 2019/20
£'000 £'000 £'000
ELLL5 Home to School Transport - Welsh Medium 2nd Campus
65 100 35
ELLL6 Ysgol Bae Baglan pay protection 121 -27 -53
SSHH44 Adult Services - Growth in numbers 100 100 100
SSHH48 Adult Services - Transition Growth 150 100 100
SSHH50 Living Wage - Contracts 450 595 630
ENVT11 Recycling, and additional residual waste freighter 200
ENVT12 Active Travel Plan - Integrated Network Maps 30
ENVT13 Japanese Knotweed - remediation of land 50
ENVT14 Borrowing for 2 backlane recycling vehicles. 31
ENVT15 Waste - Enforcement of side waste policy & recycling promotion.
100
ENVT16 Highway Bridges 30
ENVT17 Highway barrier safety, land drainage, pumping station new contract, signalling crossings
60
ENVT18 Housing Wales Act 2014 - Compulsory registration and licensing for landlords from October 2016.
46
ENVT19 Single Environment Grant - further reduction in quantum expected of circa 5%
142
CORP12 ICT service commitments 40
CORP13 Corporate Strategy - Loss of WG grant re PSB. 38
CORP14 Community Safety - Counter Terrorism and Security Act 2015. Channel Panel Chair and Training.
25
CORP15 Court Deputy Service - 40% increase in case work. 45
CORP16 Housing Benefit Admin Subsidy Grant reductions. 70 70 70
OTH004 Workforce strategy (current strategy ends 31/3/18) 0 1,800
OTH005 Apprenticeship levy 700
OTH006 Living wage - NPT staff 227 219 416
OTH007 Auto Enrolment – provision Oct 2017 50
OTH008 Living Wage – non-social care 250 250 250
CONT1 General Contingency 250 250 250
Total 3,270 3,457 1,798
Cumulative Total 8,525
Appendix 3
Inflation and other Factors 2017-18 2018-19 2019-20
Expenditure
Teachers Pay Award (Sep) 1.00% 1.58% 2.00%
Non-Teachers Pay 1.00% 2.00% 2.00%
LGPS Employers Rate 2.08% 2.04% 2.00%
NNDR 1.00% 1.50% 1.50%
Supplies & Services 1.00% 2.00% 2.00%
General Inflation 1.00% 2.00% 2.00%
Waste - MREC 1.50% 2.00% 2.00%
CA Sites – (updated) 2.25% 2.50% 2.50%
Capital Financing 1.00% 2.00% 2.00%
Levies 1.00% 2.00% 2.00%
Income & Funding
Income - Inflation & Volume 1.00% 2.00% 2.00%
RSG -3.50% -3.50% -2.00%
Council Tax 3.00% 3.00% 3.00%
Appendix 4
BUDGET TIMETABLE 2017/18
Event Date Objectives
Cabinet 13th July 2016 To consider the updated budget forecast
Town and Community Council Forum
Originally 12 September 2016 amended to 31st October 2016
To brief town and community councillors on the emerging budget strategy and the consultation exercise
Voluntary Sector Liaison Committee
19th September 2016
To brief voluntary sector representatives on the emerging budget strategy and the consultation exercise
Cabinet 28th September 2016
To authorise consultation on the proposed budget strategy
Public Consultation Period Commences on 28th September 2016 until 28th December 2016
Partners 11th October 2016
To begin consultation with partners – partnership event
Staff 10th October onwards
Chief Executive sessions to explain the budget strategy and invite responses to the consultation exercise
CYPE Scrutiny Committee
17th October To formally scrutinise the budget proposals within the committee’s purview
Policy and Resources Scrutiny Committee
18th October To formally scrutinise the budget proposals within the committee’s purview
ECR Scrutiny Committee 21st October To formally scrutinise the budget proposals within the committee’s purview
SCHH Scrutiny Committee
1st November To formally scrutinise the budget proposals within the committee’s purview
Appendix 4
Event Date Objectives
E&H Scrutiny Committee 8th November To formally scrutinise the budget proposals within the committee’s purview
Council 25th January 2017
Council Tax Scheme to be considered and agreed
Cabinet 31st January 2017
To agree final budget and proposals for 2017/18
Council 1st February 2017
Budget setting 2017/18
Council 1st March 2017 To set the Council Tax and agree the Pay Policy