calabasas gas-to-energy facility · 2016. 6. 8. · project timeline • 06/17/04: ed wheless’...

28
Mark Hughes, Solar Turbines Dave Czerniak, LA Sanitation Districts Mark McDannel, LA Sanitation Districts 1/20/2011 Calabasas Gas-To-Energy Facility

Upload: others

Post on 28-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Calabasas Gas-To-Energy Facility · 2016. 6. 8. · Project Timeline • 06/17/04: Ed Wheless’ suggestion to Solar • 10/12/06: Biogas Mercury 50 released • 01/23/07: Calabasas

Mark Hughes, Solar TurbinesDave Czerniak, LA Sanitation DistrictsMark McDannel, LA Sanitation Districts

1/20/2011

Calabasas Gas-To-Energy Facility

Page 2: Calabasas Gas-To-Energy Facility · 2016. 6. 8. · Project Timeline • 06/17/04: Ed Wheless’ suggestion to Solar • 10/12/06: Biogas Mercury 50 released • 01/23/07: Calabasas

2/28

Agenda

• Sanitation Districts• Project Background• Plant Design• Project Timeline• Operation and Lessons Learned• Summary

Page 3: Calabasas Gas-To-Energy Facility · 2016. 6. 8. · Project Timeline • 06/17/04: Ed Wheless’ suggestion to Solar • 10/12/06: Biogas Mercury 50 released • 01/23/07: Calabasas

3/28

Agenda

• Sanitation Districts • Project Background• Plant Design• Project Timeline• Operation and Lessons Learned• Summary

Page 4: Calabasas Gas-To-Energy Facility · 2016. 6. 8. · Project Timeline • 06/17/04: Ed Wheless’ suggestion to Solar • 10/12/06: Biogas Mercury 50 released • 01/23/07: Calabasas

4/28

Sanitation Districts

• 23 independent districts• Manages wastewater and solid wastes• 1,400 miles of main trunk sewers• 3 operating landfills• 3 closed landfills• 2 recycle centers• 3 materials recovery/transfer facilities• 2 refuse-to-energy facilities• 7 landfill energy recovery facilities

Page 5: Calabasas Gas-To-Energy Facility · 2016. 6. 8. · Project Timeline • 06/17/04: Ed Wheless’ suggestion to Solar • 10/12/06: Biogas Mercury 50 released • 01/23/07: Calabasas

5/28

Solid Waste Facilities

Page 6: Calabasas Gas-To-Energy Facility · 2016. 6. 8. · Project Timeline • 06/17/04: Ed Wheless’ suggestion to Solar • 10/12/06: Biogas Mercury 50 released • 01/23/07: Calabasas

6/28

Districts’ Industry Advances

• 1970’s: worked with EPA to develop gas collection system designs

• 1980’s: first gas-to-energy facilities, both landfill and digester gas

• 1990-2000’s: microturbine and fuel cell demonstration projects

• 2010: Calabasas GTE facility

Page 7: Calabasas Gas-To-Energy Facility · 2016. 6. 8. · Project Timeline • 06/17/04: Ed Wheless’ suggestion to Solar • 10/12/06: Biogas Mercury 50 released • 01/23/07: Calabasas

7/28

Agenda

• Sanitation Districts• Project Background• Plant Design• Project Timeline• Operation and Lessons Learned• Summary

Page 8: Calabasas Gas-To-Energy Facility · 2016. 6. 8. · Project Timeline • 06/17/04: Ed Wheless’ suggestion to Solar • 10/12/06: Biogas Mercury 50 released • 01/23/07: Calabasas

8/28

Calabasas Landfill

• Began operation in 1961

• 20 millions tons in place

• 505 acres

• 850 tons/day

• 30 more years

• 5600 SCFM

• 25-28% methane

Page 9: Calabasas Gas-To-Energy Facility · 2016. 6. 8. · Project Timeline • 06/17/04: Ed Wheless’ suggestion to Solar • 10/12/06: Biogas Mercury 50 released • 01/23/07: Calabasas

9/28

Calabasas Dilemma

• All that gas…going to waste

• Boiler/steam turbine not viable

• No other technology available

• Emissions regs too:

– GT BACT: 25 ppm NOx, 130 ppm CO

– Recips: bigger emissions problems

Page 10: Calabasas Gas-To-Energy Facility · 2016. 6. 8. · Project Timeline • 06/17/04: Ed Wheless’ suggestion to Solar • 10/12/06: Biogas Mercury 50 released • 01/23/07: Calabasas

10/28

Daring Solution

• June 2004: approached Solar Turbines• Suggested modifying Mercury 50• Basis:

– Centaur 40 GT experience at Puente Hills– Recuperated cycle: high efficiency– Demonstrated low emissions (natural gas)

• Convinced Solar to try

Page 11: Calabasas Gas-To-Energy Facility · 2016. 6. 8. · Project Timeline • 06/17/04: Ed Wheless’ suggestion to Solar • 10/12/06: Biogas Mercury 50 released • 01/23/07: Calabasas

11/28

Agenda

• Sanitation Districts• Project Background• Plant Design• Project Timeline• Operation and Lessons Learned• Summary

Page 12: Calabasas Gas-To-Energy Facility · 2016. 6. 8. · Project Timeline • 06/17/04: Ed Wheless’ suggestion to Solar • 10/12/06: Biogas Mercury 50 released • 01/23/07: Calabasas

12/28

Plant Design

• 3 turbines (one for growth)

• 3 fuel trains w/natural gas mixing

• 3 stages of compression

• Water removal

• Siloxane removal: passive silica gel towers

• CEMS for NOx

• Control room/maintenance building

Page 13: Calabasas Gas-To-Energy Facility · 2016. 6. 8. · Project Timeline • 06/17/04: Ed Wheless’ suggestion to Solar • 10/12/06: Biogas Mercury 50 released • 01/23/07: Calabasas

13/28

Plant Design (x3)

Booster Blower

From FlareStation

Natural GasBlending Vessel

Natural Gas

Gas to WaterHeat ExchangerChiller

CEMS

LPCompressor

Silica GelVessel

HPCompressor

Gas Turbine

Page 14: Calabasas Gas-To-Energy Facility · 2016. 6. 8. · Project Timeline • 06/17/04: Ed Wheless’ suggestion to Solar • 10/12/06: Biogas Mercury 50 released • 01/23/07: Calabasas

14/28

Major Suppliers

• Gas turbines: Solar Turbines

• Compressors: Vilter

• Gas chilling and drying: Johnson Thermal

• CEMS: CISCO

• Engineering: Jacobs Carter & Burgess

• Construction: Hobbs Bannerman

Page 15: Calabasas Gas-To-Energy Facility · 2016. 6. 8. · Project Timeline • 06/17/04: Ed Wheless’ suggestion to Solar • 10/12/06: Biogas Mercury 50 released • 01/23/07: Calabasas

15/28

Construction: The Beginning

Page 16: Calabasas Gas-To-Energy Facility · 2016. 6. 8. · Project Timeline • 06/17/04: Ed Wheless’ suggestion to Solar • 10/12/06: Biogas Mercury 50 released • 01/23/07: Calabasas

16/28

Building the Base

Page 17: Calabasas Gas-To-Energy Facility · 2016. 6. 8. · Project Timeline • 06/17/04: Ed Wheless’ suggestion to Solar • 10/12/06: Biogas Mercury 50 released • 01/23/07: Calabasas

17/28

Taking Shape

Page 18: Calabasas Gas-To-Energy Facility · 2016. 6. 8. · Project Timeline • 06/17/04: Ed Wheless’ suggestion to Solar • 10/12/06: Biogas Mercury 50 released • 01/23/07: Calabasas

18/28

Up And Running…

Page 19: Calabasas Gas-To-Energy Facility · 2016. 6. 8. · Project Timeline • 06/17/04: Ed Wheless’ suggestion to Solar • 10/12/06: Biogas Mercury 50 released • 01/23/07: Calabasas

19/28

…Beautifully

Page 20: Calabasas Gas-To-Energy Facility · 2016. 6. 8. · Project Timeline • 06/17/04: Ed Wheless’ suggestion to Solar • 10/12/06: Biogas Mercury 50 released • 01/23/07: Calabasas

20/28

Agenda

• Sanitation Districts• Project Background• Plant Design• Project Timeline• Operation and Lessons Learned• Summary

Page 21: Calabasas Gas-To-Energy Facility · 2016. 6. 8. · Project Timeline • 06/17/04: Ed Wheless’ suggestion to Solar • 10/12/06: Biogas Mercury 50 released • 01/23/07: Calabasas

21/28

Project Timeline

• 06/17/04: Ed Wheless’ suggestion to Solar

• 10/12/06: Biogas Mercury 50 released

• 01/23/07: Calabasas project kickoff

• 07/28/07: Engineering contract awarded

• 11/27/07: Final permits issued

• 01/07/09: Construction commenced

• 06/01/10: Start plant commissioning

• 07/12/10: Commercial operation

Page 22: Calabasas Gas-To-Energy Facility · 2016. 6. 8. · Project Timeline • 06/17/04: Ed Wheless’ suggestion to Solar • 10/12/06: Biogas Mercury 50 released • 01/23/07: Calabasas

22/28

Agenda

• Sanitation District• Project Background• Plant Design• Project Timeline• Operation and Lessons Learned• Summary

Page 23: Calabasas Gas-To-Energy Facility · 2016. 6. 8. · Project Timeline • 06/17/04: Ed Wheless’ suggestion to Solar • 10/12/06: Biogas Mercury 50 released • 01/23/07: Calabasas

23/28

Operation

• 2 of 3 turbines operate continuously

• Plant output: 9.5 MW gross, 7.6 MW net

• Emissions:– 7 ppm NOx (0.08 g/bhp-hr)

– 3 ppm CO (0.02 g/bhp-hr)

• Fuel quality: ~260 Btu/ft3

• Plant availability to date: 95%

• Used 99% of available LFG last 3 months

Page 24: Calabasas Gas-To-Energy Facility · 2016. 6. 8. · Project Timeline • 06/17/04: Ed Wheless’ suggestion to Solar • 10/12/06: Biogas Mercury 50 released • 01/23/07: Calabasas

24/28

Lessons Learned/Issues

• Equipment delivery issues• Construction delays• Design coordination• Water ingestion in process piping• Oil carryover from compressors• Compressor motor bearing failure• Failed wire nut in GT enclosure fan

Page 25: Calabasas Gas-To-Energy Facility · 2016. 6. 8. · Project Timeline • 06/17/04: Ed Wheless’ suggestion to Solar • 10/12/06: Biogas Mercury 50 released • 01/23/07: Calabasas

25/28

Agenda

• Sanitation District• Project Background• Plant Design• Project Timeline• Operation and Lessons Learned• Summary

Page 26: Calabasas Gas-To-Energy Facility · 2016. 6. 8. · Project Timeline • 06/17/04: Ed Wheless’ suggestion to Solar • 10/12/06: Biogas Mercury 50 released • 01/23/07: Calabasas

26/28

What Did Project Accomplish?

• It didn’t:• Invent the cell phone

• Or the laser beam

• Perfect open heart surgery

• Or find the cure for the common cold

• Reinvent the wheel

• Leave the state-of-the-art untouched

Page 27: Calabasas Gas-To-Energy Facility · 2016. 6. 8. · Project Timeline • 06/17/04: Ed Wheless’ suggestion to Solar • 10/12/06: Biogas Mercury 50 released • 01/23/07: Calabasas

27/28

What Calabasas Did Do…

GT EfficiencyUp 29%

NOx CODown 97%Down 72%

And these breakthroughswere set with 260 Btu/ft3 fuel