camilo llorens bearman_portfolio

16
camilo llorens bearman A I A L E E D A P 522 East Glendale Avenue Alexandria, Virginia 22301 703.340.6083 [email protected] portfolio

Upload: moeman

Post on 27-Apr-2015

116 views

Category:

Documents


0 download

DESCRIPTION

Camilo Llorens Bearman AIA, LEED APArchitecture Portfolio

TRANSCRIPT

Page 1: Camilo Llorens Bearman_Portfolio

camilo llorens bearmanA I AL E E D A P

522 East Glendale AvenueAlexandria, Virginia [email protected] portfolio

Page 2: Camilo Llorens Bearman_Portfolio

Project management, design, construction document leadership, and construction contract administration by Camilo Llorens Bearman AIA, unless otherwise stated.

portfolio

• Lab School of Washington - Library Retrofit• Green Acres School - Activities Center Addition• Sportrock Climbing Center - Expansion• Virginia Tech Facilitator - Farmer’s Market Study• River Park Mutual Homes - Facade Restoration• Geier Brown Renfrow Architects - Studio Fit-Out• Lab School of Washington - Space Assessment• DOD Pentagon - Pedestrian Plaza • Green Acres School - Main Building Renovation• American Assn. of Child + Adolescent Psychiatrists• Adaptive Re-Use Condominium• Green Acres School - Middle School Building• German School of Washington - Science Building

Page 3: Camilo Llorens Bearman_Portfolio

reading areacirculation

rotating bookcases

meeting roomcomputers

• 1500 sf library for children with learning difficulties• retrofitted into space previously used as 3 classrooms• rotating bookcases house 5000 volume collection

lab school of washington - library retrofit

initial concept sketch

Page 4: Camilo Llorens Bearman_Portfolio

green acres school - activities center addition, rockville md

JURY: “For a modest project, it works within its means to produce a very skillful result with some interesting spaces. Where too often simple surface treatments are provided, this project accomplishes a fully 3-dimensional piece of architecture.”

2007 AIA NORTHERN VIRGINIACHAPTER AWARDS award

• 5000 sf addition to gymnasium• olympic size pool, ceramics room,

art studio and dance studio

Page 5: Camilo Llorens Bearman_Portfolio

sportrock indoor climbing center - alexandria, va

construction photographs of VE design

climbing walls by rockwerx

16,500 sf expansion of indoor rock climbing center

under construction

original concept model

Page 6: Camilo Llorens Bearman_Portfolio

virginia tech facilitator - independent study for del ray farmers’ market corner in progress

community presentation

kate + chris chatting with a mom

at work in the studio

kate + chris chatting with a mom

Page 7: Camilo Llorens Bearman_Portfolio

renderings by others

custom aluminum extrusions for new skin systemhistorically accurate + modern color schemeunify house numbering + lighting systemaluminum screen restoration

2006 AIA NORTHERN VIRGINIACHAPTER AWARDSawardJURY: “This is a type of preservation that operates at the scale of the

hand, the scale of inches. It’s both an analytical and artful process.”

• construction administration for 5 phase historical renovation to Charles Goodman mid-century modern complex

• black and white photography from Robert C. Lautman Photography Collection, National Building Museum

panel color diagram

river park mutual homes, washington dc

Page 8: Camilo Llorens Bearman_Portfolio

seeking LEED commercial interiors certification

• 4500 sf office designed collaboratively by entire architecture office. Project management, documents + CA by others.

• Co-Lab (central working space) positioned to allow visitors to enter directly into the energy of the design space

concept rendering

geier brown renfrow architects studio

conference

Co-Lab

quiet focus work area

kitchen

model by others

Page 9: Camilo Llorens Bearman_Portfolio

gaming charrette boards

lab school of washington campus space assessment

collaborative faculty planning session in studio

on the boards

• co-management of 97,000 sf space and campus assessment

• inventory and recommendations for strategic planning

• collaborative faculty planning charrette

Page 10: Camilo Llorens Bearman_Portfolio

2008 AIA NY MANHATTAN CHAPTERSUBMISSION BY ROGERS MARVEL ARCHITECTSaward

JURY: “The designers didn’t try to invent the solution out of whole cloth but drew on historical antecedents to use the landscape for security”

pentagon pedestrian plaza / feasibility study• Post 9/11 DOD feasibility study to create a secure pedestrian and vehicular

perimeter on 15 acre site• collaboration with Rogers Marvel Architects of NYC.

consolidated parking

relocated road

vehicular stand-off

pedestrian access

pedestrian stand-off

service tunnel

lawns + berms

CONCEPT SECTION

pentagoncontrolled access bridge

Page 11: Camilo Llorens Bearman_Portfolio

green acres school - main building renovation, rockville md

• 12,000 sf renovation to award winning mid-century school building• lower, middle + upper school science labs; computer lab; music

room; kitchen + cafeteria; administration offices

Page 12: Camilo Llorens Bearman_Portfolio

american association of child and adolescent psychiatrists, washington dc

construction photographs

12,000 SF (on 3 floors) interior renovation and space planning for mid-century office building

under construction

bird’s eye view of main floor

offices

lobby

cafe

Page 13: Camilo Llorens Bearman_Portfolio

children’s bedrooms

den

kitchen

master bedroom

continuous header

2008 VIRGINIA SOCIETY AIAINTERIORS AWARDaward

JURY: “We admire the project’s formal, material, and detail inventiveness [and are] inspired by the example the project sets for how design can positively impact the lives of people. It feels like a project made to be lived in -- a solution carefully tailored to the needs of people.”

1500 sf renovation of warehouse space attached to existing sustainable co-housing community

adaptive reuse condominium, silver spring, maryland

Page 14: Camilo Llorens Bearman_Portfolio

green acres school - middle school, rockville md• 13,000 sf classroom building• includes 8 classrooms,

photography studio, and black-box theater

Page 15: Camilo Llorens Bearman_Portfolio

german school of washington science building - under construction

initial concept rendering

2009 AIA DC CHAPTERINAUGURAL UN-BUILT AWARDS award

JURY: “...elegant and economical composition knitted into an existing campus.”

bridge to knoll + roof screen

green roof

knoll

phenolic rainscreen

viewbox/window

bio-retention garden

lab exhaustfans

viewbox/window

skewed columns

crinkled curtain wall

bio-retention garden

upper school courtyard

• 15,000 sf LEED for Schools, LABS 21 facility• LEED Silver program / seeking LEED Gold

Page 16: Camilo Llorens Bearman_Portfolio

Professional Photography by Robert C. Lautman, James Rawlings, and Gunnar Westerlind.

Layout: Mac Pages. Font: Helvetica Neue. Additional software: AutoCAD, SketchUp Pro, Podium, Illustrator, InDesign, Photoshop, Photoshop Elements, + Podium.

Special thanks to Lisa, Paul + Olivia. No thanks to Skittles the cat.

Camilo at Green Acres School.Polaroid by Bob Lautman.