PROJECT SCOPE:
THIS PROJECT INVOLVES WORK AT BUILDINGS 100, 200 AND 300 ON THE JACK W.
HARMON ELEMENTARY SCHOOL CAMPUS.
CLEAN ALL EXTERIOR SURFACES, INCLUDING CONCRETE, MASONRY, METAL,
GYPSUM BOARD, METAL FASCIA, LOW SLOPE ROOF AND STUCCO SURFACES.
REMOVE ALL BUILDING SEALANTS INCLUDING THOSE AT ALL EXPANSION AND
CONSTRUCTION JOINTS, WINDOW AND DOOR FRAMES, METAL PANEL JOINTS,
SHEET METAL AND FLASHING JOINTS, PENETRATIONS AND ANY OTHER
SEALANTS WHERE THEY OCCUR. CLEAN AND REPAIR JOINTS AND CRACKS,
APPLY NEW BACKER ROD AND SEALANT.
EXCAVATE TOP THREE INCHES OF SOIL ADJACENT TO WALLS AT ALL BUILDINGS
FOR APPLICATION OF COATING TO WALLS. REGRADE FOR POSITIVE DRAINAGE
AFTER APPLICATION AND CURE OF COATING.
REPAIR, PREPARE, BLOCKFILL AND COAT ALL CONCRETE MASONRY AND
STUCCO SURFACES.
PREPARE AND PAINT ALL STEEL, STEEL DOORS, STEEL FRAMES, METAL
CANOPIES, METAL DOWNSPOUTS, METAL TRIM, AND EXPOSED FLASHINGS.
PRE-FINISHED METAL PANELS EXCLUDED.
PREPARE, REPAIR, SPOT PRIME AND PAINT ALL PAINTABLE HORIZONTAL
SURFACES SUCH AS EXTERIOR SOFFITS.
REMOVE ALL PARAPET COPINGS. INSPECT EXISTING WOOD NAILERS AND
REPLACE IF DAMAGED. INSTALL NEW SELF-ADHERED BITUMINOUS FLASHING
AND NEW PRE-FINISHED SHEET METAL COPING SYSTEM.
LOW SLOPE ROOF AREA: REPAIR, PREPARE AND PRIME EXISTING ROOFING
SURFACE. CUT AND REPAIR DAMAGED AREAS IF THEY OCCUR. REMOVE ALL
VERTICAL WALL SEALANTS, CLEAN JOINTS AND INSTALL NEW BACKER ROD AND
SEALANT. INSPECT AND PRESSURE TEST ROOF DRAINS AND REPAIR AS
NECESSARY, REPLACE MISSING OR DAMAGED DRAIN BASKETS. APPLY NEW
SEAMLESS ROOF COATING SYSTEM TO ALL PREVIOUSLY COATED SURFACES
INCLUDING THOSE AT THE ROOF, BACKS OF PARAPETS AND HIGH WALLS.
PROVIDE NEW ROOF BLOCKS AND TRAFFIC SURFACES.
PROVIDE NEW CONCRETE SPLASH BLOCKS AT ALL DOWNSPOUT DISCHARGE
LOCATIONS. GRADE TO ASSURE POSITIVE DRAINAGE AWAY FROM SPLASH
BLOCK AND BUILDING.
VERIFY MECHANICAL CURBS TO COMPLY WITH ROOF MEMBRANE WARRANTY
REQUIREMENTS AND ADJUST IF NECESSARY.
REMOVE AND REINSTALL ALL BUILDING MOUNTED SIGNS FOR COATING OF
EXTERIOR WALLS.
APPROPRIATE TRADES PERSON TO MODIFY OR EXTEND ANY MECHANICAL,
ELECTRICAL, PLUMBING, CCTV, TELEPHONE, ANTENNAE, SOUND, OR LIGHTING
FACILITIES, ETC. FOUND TO OBSTRUCT THE WORK OF THIS PROJECT.
THE PROJECT WILL TAKE PLACE DURING THE SCHOOL YEAR WHILE THE CAMPUS
IS OCCUPIED.
PROJECT ADDRESS:
JACK W. HARMON ELEMENTARY SCHOOL
39315 NORTH CORTONA DRIVE
SAN TAN VALLEY, ARIZONA 85140
APPLICABLE CODES:
ALL WORK OF THIS PROJECT SHALL BE
PERFORMED IN ACCORDANCE WTH THE 2012
INTERNATIONAL BUILDING CODE (IBC) AND THE
2012 INTERNATIONAL FIRE CODE (IFC).
DRAWING LIST:
A0 PROJECT INFORMATION
A1.1 BUILDING 100 - FLOOR PLAN
A1.2 BUILDINGS 100, 200 - ROOF PLANS
A1.3 BUILDING 100 - ELEVATIONS
A2.1 BUILDING 200 - FLOOR PLAN
A2.3 BUILDING 200 - ELEVATIONS
A3.1.1 BUILDING 300 - FLOOR PLAN
A3.1.2 BUILDING 300 - FLOOR PLAN
A3.2 BUILDING 300 - ROOF PLAN
A3.3 BUILDING 300 - ELEVATIONS
A10.4 BUILDING SECTIONS, DETAIL
NOTE:
ALL DIMENSIONS ARE APPROXIMATE. FIELD
VERIFY ALL QUANTITY TAKE-OFFS. DO NOT SCALE
DRAWINGS.
PROJECT TEAM
BUILDING OWNER:
J.O. COMBS UNIFIED SCHOOL DISTRICT
301 EAST COMBS ROAD
SAN TAN VALLEY, ARIZONA 85140
SCHOOL FACILITIES BOARD:
DAN DEMLAND, LIASON
CAPITOL WEST TOWER
1700 W. WASHINGTON ST SUITE 104
PHOENIX, AZ 85007
(602) 364-0538
ROOFING CONSULTANT
REDTREE CONSULTING
MIKE CROW
(602) 989-2433
ARCHITECT:
ROBERT POLCAR ARCHITECTS, INC.
KIRBY SPITLER, A.I.A.
(602) 317-7209
OCOTILLO ROAD
SC
HN
EP
F R
OA
D
GA
NT
ZE
L/ IR
ON
WO
OD
R
OA
D
COMBS ROAD
C
H
A
N
D
L
E
R
H
E
I
G
H
T
S
R
D
KE
NW
OR
TH
Y R
D
PROJECT
LOCATION
Q
U
E
E
N
C
R
E
E
K
CA
MB
RIA
D
R.
C
O
R
T
O
N
AD
R
.
A0
KS
BP
Project number
Date
Drawn by
Checked by
Revision Revision Date
ROBERT POLCAR ARCHITECTS, INC
(480) 675-9760 (602) 363-4096
SCOTTSDALE, ARIZONA
ARCH D 24"x36"Sheet Size
7845 E. REDFIELD RD STE 100
SCOTTSDALE, AZ 85260
(602) 989-2433
110344104-1002-019-BRG
CA
MP
US
R
OO
F R
ES
TO
RA
TIO
NS
A
ND
W
EA
TH
ER
IZ
AT
IO
NS
JA
CK
W
. H
AR
MO
N E
LE
ME
NT
AR
Y S
CH
OO
L
J.O
. C
OM
B U
NIF
IE
D S
CH
OO
L D
IS
TR
IC
T
39
31
5 N
OR
TH
C
OR
TO
NA
D
RIV
E
SA
N T
AN
V
AL
LE
Y, A
RIZ
ON
A 8
51
40
2/27/2018
N
J.O. COMBS UNIFIED SCHOOL DISTRICT
CAMPUS ROOF RESTORATIONS AND BUILDING WEATHERIZATIONS
JACK W. HARMON ELEMENTARY SCHOOL
39315 NORTH CORTONA DRIVE, SAN TAN VALLEY, ARIZONA 85140
FEBRUARY 27, 2018
BUILDING "100"
BUILDING "300"
BUILDING "200"
VICINITY MAP
N
CAMPUS PLAN
MADDISON STREET
C
O
R
T
O
N
A
D
R
I
V
E
A
N
A
S
T
A
S
IA
S
T
R
E
E
T
PROJECT
INFORMATION
NOTE: BUILDING NUMBERING IN THESE DRAWINGS IS CONSISTENT WITH THAT OF THE ORIGINAL
CONSTRUCTION DRAWING SET. THIS NUMBERING SYSTEM DIFFERS FROM THE BUILDING NUMBERS
POSTED ON THE ACTUAL BUILDINGS.
100
200
300
A1.1
KS
BP
Project number
Date
Drawn by
Checked by
Revision Revision Date
ROBERT POLCAR ARCHITECTS, INC
(480) 675-9760 (602) 363-4096
SCOTTSDALE, ARIZONA
ARCH D 24"x36"Sheet Size
7845 E. REDFIELD RD STE 100
SCOTTSDALE, AZ 85260
(602) 989-2433
110344104-1002-019-BRG
CA
MP
US
R
OO
F R
ES
TO
RA
TIO
NS
A
ND
W
EA
TH
ER
IZ
AT
IO
NS
JA
CK
W
. H
AR
MO
N E
LE
ME
NT
AR
Y S
CH
OO
L
J.O
. C
OM
B U
NIF
IE
D S
CH
OO
L D
IS
TR
IC
T
39
31
5 N
OR
TH
C
OR
TO
NA
D
RIV
E
SA
N T
AN
V
AL
LE
Y, A
RIZ
ON
A 8
51
40
2/27/2018
KEY PLAN
N
NO SCALE
BUILDING 100
KEYNOTES
1. CLEAN ALL EXTERIOR CONCRETE, MASONRY, STUCCO, GYPSUM BOARD
AND METAL FINISHES.
2. CLEAN ALL CRACKS OR HOLES IN MASONRY AND STUCCO. REMOVE
ANY EXISTING SEALANT AND PROPERLY PREPARE SURFACES FOR
REPAIR. REPAIR IN ACCORDANCE WITH THE SPECIFICATION PRIOR TO
COATING WALL SURFACE.
3. EXISTING MASONRY JOINT MATERIAL; REMOVE MATERIAL, CLEAN AND
PREP JOINT. INSTALL NEW BACKER ROD AND SEALANT AS SPECIFIED.
4. EXISTING GRADE AT BUILDING PERIMETER; EXCAVATE SOIL AWAY
FROM WALL DOWN TO 3” BELOW EXISTING GRADE. APPLY COATING TO
LEVEL OF EXCAVATION. RE-GRADE SOIL TO ORIGINAL GRADE,
PROVIDING POSITIVE DRAINAGE FROM BUILDING AT ALL LOCATIONS.
5. EXISTING CMU; CLEAN, REPAIR, PREP, BLOCKFILL AND COAT.
6. EXISTING STUCCO; CLEAN, REPAIR, PREP, BOCKFILL AND COAT.
7. EXISTING STUCCO WEEP SCREED; MASK WEEP HOLES FROM COATING
TO MAINTAIN DRAINAGE AT BASE OF STUCCO SYSTEM.
8. METAL WINDOW OR DOOR FRAME; REMOVE BUILDING SEALANTS,
CLEAN JOINT AND INSTALL NEW BACKER ROD AND SEALANT.
9. EXISTING CONDUCTOR HEAD AND DOWNSPOUT; CLEAN, PREP, PRIME
AND PAINT TO MATCH EXISTING COLOR.
10. PROVIDE NEW PRECAST CONCRETE SPLASH BLOCK AT DOWNSPOUT
DISCHARGE. RE-GRADE SOIL FOR POSITIVE DRAINAGE FROM SPLASH
BLOCK AND BUILDING.
11. METAL SURFACE; CLEAN, PREP, PRIME AND PAINT TO MATCH EXISTING
COLOR.
12. HOLLOW METAL DOOR AND FRAME; PROTECT HARDWARE, CLEAN,
PREP, PRIME AND PAINT EXTERIOR FACE AND EDGES.
13. HOLLOW FERROUS METAL WINDOW FRAMES; PROTECT GLAZING,
CLEAN, PREP, PRIME AND PAINT.
14. EXISTING SHEET METAL PARAPET COPING; REMOVE AND PROPERLY
DISPOSE/ RECYCLE. INSPECT EXISTING WOOD NAILER AND REPLACE IF
DAMAGED. INSTALL NEW PRE-FINISHED METAL COPING SYSTEM
INCLUDING CONTINUOUS SELF ADHERED BITUMINOUS FLASHING. SEE
SPECIFICATION. SEE DETAIL 1/ A10.4.
15. EXISTING BUILDING EXPANSION JOINT COVER; REMOVE SEALANTS,
CLEAN SEALANT JOINT AND INSTALL NEW BACKER ROD AND SEALANT.
CLEAN JOINT COVER, PREP, PRIME AND COAT WITH SEAMLESS ROOF
COATING.
16. EXISTING ROOF DRAINS; INSPECT AND PRESSURE TEST. REPAIR AS
NECESSARY. REPLACE MISSING OR DAMAGED DRAIN BASKETS.
17. EXISTING THROUGH WALL SCUPPER; TO REMAIN. PREP, PRIME AND
APPLY SEAMLESS ROOF COATING TO ALL SURFACES.
18. EXISTING LOW SLOPE ROOF SURFACE; CLEAN, REPAIR, PREP AND
PRIME. CUT OUT BLISTERS AND DAMAGED AREAS. TREAT SURFACE IN
ACCORDANCE WITH PULL TEST RESULTS. APPLY NEW SEAMLESS ROOF
COATING TO ENTIRE ROOF SURFACE.
19. EXISTING ROOF COATING ON WALL; CLEAN, REPAIR, PREP AND PRIME
ALL PREVIOUSLY COATED SURFACES. APPLY NEW SEAMLESS COATING
TO ALL PREVIOUSLY COATED SURFACES.
20. PROVIDE NEW TRAFFIC SURFACE FROM MECHANICAL UNIT
MAINTENANCE ACCESS POINT TO ROOF ACCESS. TYPICAL FOR ALL
UNITS ON ROOFS.
21. EXISTING EQUIPMENT REMAINS, ADJUST CURB HEIGHT AS REQUIRED
TO COMPLY WITH SEAMLESS ROOF COATING WARRANTY
REQUIREMENTS. REMOVE AND REPLACE EXISTING PITCH POCKETS,
COLLARS, ETC AS REQUIRED TO COMPLY WITH SEAMLESS ROOF
COATING MATERIAL MANUFACTURER'S WARRANTY REQUIREMENTS.
22. EXISTING EQUIPMENT CONNECTION; APPROPRIATE TRADES PERSON
TO INSPECT AND REPAIR, RELOCATE OR EXTEND AS NEEDED.
23. EXISTING BUILDING/ SIDEWALK JOINT MATERIAL; REMOVE, CLEAN AND
PREP JOINT. INSTALL NEW BACKER ROD AND SELF-LEVELING JOINT
MATERIAL AS SPECIFIED.
24. CLEAN, REPAIR, PREP, SPOT PRIME AND PAINT EXTERIOR STUCCO AND
GYPSUM BOARD SOFFITS AND CEILINGS.
25. METAL CANOPY; PREP, PRIME AND PAINT.
26. EXISTING BUILDING MOUNTED SIGN; REMOVE FOR COATING OF
EXTERIOR WALLS. CLEAN SIGN AND REINSTALL. TYPICAL FOR ALL
BUILDING MOUNTED SIGNS.
27. EXISTING ROOF HATCH; VERIFY PROPER OPERATION AND REPAIR AS
REQUIRED. CLEAN, PREP AND PAINT.
28. PROVIDE NEW 20 GUAGE GALVANIZED SHEET METAL SPLASH PAN AT
DOWNSPOUT DISCHARGE ON ROOF. ADHERE WITH ROOF SYSTEM
COMPATIBLE ADHESIVE.
29. EXISTING ROOFTOP COMMUNICATION EQUIPMENT; SCHOOL DISTRICT
TO RELOCATE FOR CONSTRUCTION AND THEN REINSTALL.
CONTRACTOR TO COORDINATE.
30. EXISTING TO REMAIN.
31. EXISTING CONCRETE WALL; CLEAN, PREP AND SEAL.
1
BUILDING 100 - FLOOR PLAN
N
3/32" = 1'-0"
NOTE: THE DRAWINGS INSIDE THE POLYGONS ARE REFERENCE
DRAWINGS AND ARE ORIGINAL CONSTRUCTION DOCUMENTS
PREPARED BY DLR GROUP INC., FOR THE EXISTING BUILDINGS.
THESE DRAWINGS ARE INCLUDED FOR REFERENCE ONLY TO
INDICATE LOCATIONS AND QUANTITIES OF ORIGINAL
CONSTRUCTION.
NEW WORK IS DESIGNATED BY THE KEYNOTES LOCATED
OUTSIDE OF THE POLYGONS.
8
6
TYP
2
1
6
2
1
1 2 68
TYP
8
TYP
8
TYP
8
TYP
1 2 6
6
2
1
8
8
1 2 68
TYP
6
TYP
2
1
6
TYP
2
1
6
2
1
13
TYP
13
TYP
12
TYP
100
200
300
A1.2
KS
BP
Project number
Date
Drawn by
Checked by
Revision Revision Date
ROBERT POLCAR ARCHITECTS, INC
(480) 675-9760 (602) 363-4096
SCOTTSDALE, ARIZONA
ARCH D 24"x36"Sheet Size
7845 E. REDFIELD RD STE 100
SCOTTSDALE, AZ 85260
(602) 989-2433
110344104-1002-019-BRG
CA
MP
US
R
OO
F R
ES
TO
RA
TIO
NS
A
ND
W
EA
TH
ER
IZ
AT
IO
NS
JA
CK
W
. H
AR
MO
N E
LE
ME
NT
AR
Y S
CH
OO
L
J.O
. C
OM
B U
NIF
IE
D S
CH
OO
L D
IS
TR
IC
T
39
31
5 N
OR
TH
C
OR
TO
NA
D
RIV
E
SA
N T
AN
V
AL
LE
Y, A
RIZ
ON
A 8
51
40
2/27/2018
KEY PLAN
N
NO SCALE
BUILDINGS 100 & 200
1
BUILDINGS 100 & 200 - ROOF PLAN
N
1/16" = 1'-0"
KEYNOTES
1. CLEAN ALL EXTERIOR CONCRETE, MASONRY, STUCCO, GYPSUM BOARD
AND METAL FINISHES.
2. CLEAN ALL CRACKS OR HOLES IN MASONRY AND STUCCO. REMOVE
ANY EXISTING SEALANT AND PROPERLY PREPARE SURFACES FOR
REPAIR. REPAIR IN ACCORDANCE WITH THE SPECIFICATION PRIOR TO
COATING WALL SURFACE.
3. EXISTING MASONRY JOINT MATERIAL; REMOVE MATERIAL, CLEAN AND
PREP JOINT. INSTALL NEW BACKER ROD AND SEALANT AS SPECIFIED.
4. EXISTING GRADE AT BUILDING PERIMETER; EXCAVATE SOIL AWAY
FROM WALL DOWN TO 3” BELOW EXISTING GRADE. APPLY COATING TO
LEVEL OF EXCAVATION. RE-GRADE SOIL TO ORIGINAL GRADE,
PROVIDING POSITIVE DRAINAGE FROM BUILDING AT ALL LOCATIONS.
5. EXISTING CMU; CLEAN, REPAIR, PREP, BLOCKFILL AND COAT.
6. EXISTING STUCCO; CLEAN, REPAIR, PREP, BOCKFILL AND COAT.
7. EXISTING STUCCO WEEP SCREED; MASK WEEP HOLES FROM COATING
TO MAINTAIN DRAINAGE AT BASE OF STUCCO SYSTEM.
8. METAL WINDOW OR DOOR FRAME; REMOVE BUILDING SEALANTS,
CLEAN JOINT AND INSTALL NEW BACKER ROD AND SEALANT.
9. EXISTING CONDUCTOR HEAD AND DOWNSPOUT; CLEAN, PREP, PRIME
AND PAINT TO MATCH EXISTING COLOR.
10. PROVIDE NEW PRECAST CONCRETE SPLASH BLOCK AT DOWNSPOUT
DISCHARGE. RE-GRADE SOIL FOR POSITIVE DRAINAGE FROM SPLASH
BLOCK AND BUILDING.
11. METAL SURFACE; CLEAN, PREP, PRIME AND PAINT TO MATCH EXISTING
COLOR.
12. HOLLOW METAL DOOR AND FRAME; PROTECT HARDWARE, CLEAN,
PREP, PRIME AND PAINT EXTERIOR FACE AND EDGES.
13. HOLLOW FERROUS METAL WINDOW FRAMES; PROTECT GLAZING,
CLEAN, PREP, PRIME AND PAINT.
14. EXISTING SHEET METAL PARAPET COPING; REMOVE AND PROPERLY
DISPOSE/ RECYCLE. INSPECT EXISTING WOOD NAILER AND REPLACE IF
DAMAGED. INSTALL NEW PRE-FINISHED METAL COPING SYSTEM
INCLUDING CONTINUOUS SELF ADHERED BITUMINOUS FLASHING. SEE
SPECIFICATION. SEE DETAIL 1/ A10.4.
15. EXISTING BUILDING EXPANSION JOINT COVER; REMOVE SEALANTS,
CLEAN SEALANT JOINT AND INSTALL NEW BACKER ROD AND SEALANT.
CLEAN JOINT COVER, PREP, PRIME AND COAT WITH SEAMLESS ROOF
COATING.
16. EXISTING ROOF DRAINS; INSPECT AND PRESSURE TEST. REPAIR AS
NECESSARY. REPLACE MISSING OR DAMAGED DRAIN BASKETS.
17. EXISTING THROUGH WALL SCUPPER; TO REMAIN. PREP, PRIME AND
APPLY SEAMLESS ROOF COATING TO ALL SURFACES.
18. EXISTING LOW SLOPE ROOF SURFACE; CLEAN, REPAIR, PREP AND
PRIME. CUT OUT BLISTERS AND DAMAGED AREAS. TREAT SURFACE IN
ACCORDANCE WITH PULL TEST RESULTS. APPLY NEW SEAMLESS ROOF
COATING TO ENTIRE ROOF SURFACE.
19. EXISTING ROOF COATING ON WALL; CLEAN, REPAIR, PREP AND PRIME
ALL PREVIOUSLY COATED SURFACES. APPLY NEW SEAMLESS COATING
TO ALL PREVIOUSLY COATED SURFACES.
20. PROVIDE NEW TRAFFIC SURFACE FROM MECHANICAL UNIT
MAINTENANCE ACCESS POINT TO ROOF ACCESS. TYPICAL FOR ALL
UNITS ON ROOFS.
21. EXISTING EQUIPMENT REMAINS, ADJUST CURB HEIGHT AS REQUIRED
TO COMPLY WITH SEAMLESS ROOF COATING WARRANTY
REQUIREMENTS. REMOVE AND REPLACE EXISTING PITCH POCKETS,
COLLARS, ETC AS REQUIRED TO COMPLY WITH SEAMLESS ROOF
COATING MATERIAL MANUFACTURER'S WARRANTY REQUIREMENTS.
22. EXISTING EQUIPMENT CONNECTION; APPROPRIATE TRADES PERSON
TO INSPECT AND REPAIR, RELOCATE OR EXTEND AS NEEDED.
23. EXISTING BUILDING/ SIDEWALK JOINT MATERIAL; REMOVE, CLEAN AND
PREP JOINT. INSTALL NEW BACKER ROD AND SELF-LEVELING JOINT
MATERIAL AS SPECIFIED.
24. CLEAN, REPAIR, PREP, SPOT PRIME AND PAINT EXTERIOR STUCCO AND
GYPSUM BOARD SOFFITS AND CEILINGS.
25. METAL CANOPY; PREP, PRIME AND PAINT.
26. EXISTING BUILDING MOUNTED SIGN; REMOVE FOR COATING OF
EXTERIOR WALLS. CLEAN SIGN AND REINSTALL. TYPICAL FOR ALL
BUILDING MOUNTED SIGNS.
27. EXISTING ROOF HATCH; VERIFY PROPER OPERATION AND REPAIR AS
REQUIRED. CLEAN, PREP AND PAINT.
28. PROVIDE NEW 20 GUAGE GALVANIZED SHEET METAL SPLASH PAN AT
DOWNSPOUT DISCHARGE ON ROOF. ADHERE WITH ROOF SYSTEM
COMPATIBLE ADHESIVE.
29. EXISTING ROOFTOP COMMUNICATION EQUIPMENT; SCHOOL DISTRICT
TO RELOCATE FOR CONSTRUCTION AND THEN REINSTALL.
CONTRACTOR TO COORDINATE.
30. EXISTING TO REMAIN.
31. EXISTING CONCRETE WALL; CLEAN, PREP AND SEAL.
NOTE: THE DRAWINGS INSIDE THE POLYGONS ARE REFERENCE
DRAWINGS AND ARE ORIGINAL CONSTRUCTION DOCUMENTS
PREPARED BY DLR GROUP INC., FOR THE EXISTING BUILDINGS.
THESE DRAWINGS ARE INCLUDED FOR REFERENCE ONLY TO
INDICATE LOCATIONS AND QUANTITIES OF ORIGINAL
CONSTRUCTION.
NEW WORK IS DESIGNATED BY THE KEYNOTES LOCATED
OUTSIDE OF THE POLYGONS.
7
6
98
11
4
BUILDING "100/ 200"
15
65
BUILDING "100"
2
BUILDING "100"
14
22
3
BUILDING "100"
BUILDING "100/ 200"
BUILDING "200"BUILDING "100" BUILDING "100"
19
14
TYP
TYP
14
16
17
TYP
18
TYP
18
TYP
18
18
TYP
18
TYP
18
14
TYP
17
TYP
TYP
18
17
TYP
18
14
TYP
18
18
14
14
21
TYP
25
TYP
25
TYP
27
20
27
20
TYP
2120
TYP
17
28
TYP
28
TYP
21
20
TYP
14
14
14
TYP
27
20
19
18
19
21
20
18
19
14
14
6
15
19
18
TYP
TYP
6
7
29
21
20
100
200
300
A1.3
KS
BP
Project number
Date
Drawn by
Checked by
Revision Revision Date
ROBERT POLCAR ARCHITECTS, INC
(480) 675-9760 (602) 363-4096
SCOTTSDALE, ARIZONA
ARCH D 24"x36"Sheet Size
7845 E. REDFIELD RD STE 100
SCOTTSDALE, AZ 85260
(602) 989-2433
110344104-1002-019-BRG
CA
MP
US
R
OO
F R
ES
TO
RA
TIO
NS
A
ND
W
EA
TH
ER
IZ
AT
IO
NS
JA
CK
W
. H
AR
MO
N E
LE
ME
NT
AR
Y S
CH
OO
L
J.O
. C
OM
B U
NIF
IE
D S
CH
OO
L D
IS
TR
IC
T
39
31
5 N
OR
TH
C
OR
TO
NA
D
RIV
E
SA
N T
AN
V
AL
LE
Y, A
RIZ
ON
A 8
51
40
2/27/2018
KEY PLAN
N
NO SCALE
BUILDING 100
5
BUILDING "100"
8
1
13
2
6
1
BUILDING 100 - EAST ELEVATION
3/32" = 1'-0"
2
BUILDING 100 - SOUTH ELEVATION
3/32" = 1'-0"
3
BUILDING 100 - WEST ELEVATION
3/32" = 1'-0"
4
BUILDING 100 - NORTH ELEVATION
3/32" = 1'-0"
9876
BUILDING "100" BUILDING "100" BUILDING "100"BUILDING "100"
14
10
2
6
8
23
24
25
4
TYP
KEYNOTES
1. CLEAN ALL EXTERIOR CONCRETE, MASONRY, STUCCO, GYPSUM BOARD
AND METAL FINISHES.
2. CLEAN ALL CRACKS OR HOLES IN MASONRY AND STUCCO. REMOVE
ANY EXISTING SEALANT AND PROPERLY PREPARE SURFACES FOR
REPAIR. REPAIR IN ACCORDANCE WITH THE SPECIFICATION PRIOR TO
COATING WALL SURFACE.
3. EXISTING MASONRY JOINT MATERIAL; REMOVE MATERIAL, CLEAN AND
PREP JOINT. INSTALL NEW BACKER ROD AND SEALANT AS SPECIFIED.
4. EXISTING GRADE AT BUILDING PERIMETER; EXCAVATE SOIL AWAY
FROM WALL DOWN TO 3” BELOW EXISTING GRADE. APPLY COATING TO
LEVEL OF EXCAVATION. RE-GRADE SOIL TO ORIGINAL GRADE,
PROVIDING POSITIVE DRAINAGE FROM BUILDING AT ALL LOCATIONS.
5. EXISTING CMU; CLEAN, REPAIR, PREP, BLOCKFILL AND COAT.
6. EXISTING STUCCO; CLEAN, REPAIR, PREP, BOCKFILL AND COAT.
7. EXISTING STUCCO WEEP SCREED; MASK WEEP HOLES FROM COATING
TO MAINTAIN DRAINAGE AT BASE OF STUCCO SYSTEM.
8. METAL WINDOW OR DOOR FRAME; REMOVE BUILDING SEALANTS,
CLEAN JOINT AND INSTALL NEW BACKER ROD AND SEALANT.
9. EXISTING CONDUCTOR HEAD AND DOWNSPOUT; CLEAN, PREP, PRIME
AND PAINT TO MATCH EXISTING COLOR.
10. PROVIDE NEW PRECAST CONCRETE SPLASH BLOCK AT DOWNSPOUT
DISCHARGE. RE-GRADE SOIL FOR POSITIVE DRAINAGE FROM SPLASH
BLOCK AND BUILDING.
11. METAL SURFACE; CLEAN, PREP, PRIME AND PAINT TO MATCH EXISTING
COLOR.
12. HOLLOW METAL DOOR AND FRAME; PROTECT HARDWARE, CLEAN,
PREP, PRIME AND PAINT EXTERIOR FACE AND EDGES.
13. HOLLOW FERROUS METAL WINDOW FRAMES; PROTECT GLAZING,
CLEAN, PREP, PRIME AND PAINT.
14. EXISTING SHEET METAL PARAPET COPING; REMOVE AND PROPERLY
DISPOSE/ RECYCLE. INSPECT EXISTING WOOD NAILER AND REPLACE IF
DAMAGED. INSTALL NEW PRE-FINISHED METAL COPING SYSTEM
INCLUDING CONTINUOUS SELF ADHERED BITUMINOUS FLASHING. SEE
SPECIFICATION. SEE DETAIL 1/ A10.4.
15. EXISTING BUILDING EXPANSION JOINT COVER; REMOVE SEALANTS,
CLEAN SEALANT JOINT AND INSTALL NEW BACKER ROD AND SEALANT.
CLEAN JOINT COVER, PREP, PRIME AND COAT WITH SEAMLESS ROOF
COATING.
16. EXISTING ROOF DRAINS; INSPECT AND PRESSURE TEST. REPAIR AS
NECESSARY. REPLACE MISSING OR DAMAGED DRAIN BASKETS.
17. EXISTING THROUGH WALL SCUPPER; TO REMAIN. PREP, PRIME AND
APPLY SEAMLESS ROOF COATING TO ALL SURFACES.
18. EXISTING LOW SLOPE ROOF SURFACE; CLEAN, REPAIR, PREP AND
PRIME. CUT OUT BLISTERS AND DAMAGED AREAS. TREAT SURFACE IN
ACCORDANCE WITH PULL TEST RESULTS. APPLY NEW SEAMLESS ROOF
COATING TO ENTIRE ROOF SURFACE.
19. EXISTING ROOF COATING ON WALL; CLEAN, REPAIR, PREP AND PRIME
ALL PREVIOUSLY COATED SURFACES. APPLY NEW SEAMLESS COATING
TO ALL PREVIOUSLY COATED SURFACES.
20. PROVIDE NEW TRAFFIC SURFACE FROM MECHANICAL UNIT
MAINTENANCE ACCESS POINT TO ROOF ACCESS. TYPICAL FOR ALL
UNITS ON ROOFS.
21. EXISTING EQUIPMENT REMAINS, ADJUST CURB HEIGHT AS REQUIRED
TO COMPLY WITH SEAMLESS ROOF COATING WARRANTY
REQUIREMENTS. REMOVE AND REPLACE EXISTING PITCH POCKETS,
COLLARS, ETC AS REQUIRED TO COMPLY WITH SEAMLESS ROOF
COATING MATERIAL MANUFACTURER'S WARRANTY REQUIREMENTS.
22. EXISTING EQUIPMENT CONNECTION; APPROPRIATE TRADES PERSON
TO INSPECT AND REPAIR, RELOCATE OR EXTEND AS NEEDED.
23. EXISTING BUILDING/ SIDEWALK JOINT MATERIAL; REMOVE, CLEAN AND
PREP JOINT. INSTALL NEW BACKER ROD AND SELF-LEVELING JOINT
MATERIAL AS SPECIFIED.
24. CLEAN, REPAIR, PREP, SPOT PRIME AND PAINT EXTERIOR STUCCO AND
GYPSUM BOARD SOFFITS AND CEILINGS.
25. METAL CANOPY; PREP, PRIME AND PAINT.
26. EXISTING BUILDING MOUNTED SIGN; REMOVE FOR COATING OF
EXTERIOR WALLS. CLEAN SIGN AND REINSTALL. TYPICAL FOR ALL
BUILDING MOUNTED SIGNS.
27. EXISTING ROOF HATCH; VERIFY PROPER OPERATION AND REPAIR AS
REQUIRED. CLEAN, PREP AND PAINT.
28. PROVIDE NEW 20 GUAGE GALVANIZED SHEET METAL SPLASH PAN AT
DOWNSPOUT DISCHARGE ON ROOF. ADHERE WITH ROOF SYSTEM
COMPATIBLE ADHESIVE.
29. EXISTING ROOFTOP COMMUNICATION EQUIPMENT; SCHOOL DISTRICT
TO RELOCATE FOR CONSTRUCTION AND THEN REINSTALL.
CONTRACTOR TO COORDINATE.
30. EXISTING TO REMAIN.
31. EXISTING CONCRETE WALL; CLEAN, PREP AND SEAL.
NOTE: THE DRAWINGS INSIDE THE POLYGONS ARE REFERENCE
DRAWINGS AND ARE ORIGINAL CONSTRUCTION DOCUMENTS
PREPARED BY DLR GROUP INC., FOR THE EXISTING BUILDINGS.
THESE DRAWINGS ARE INCLUDED FOR REFERENCE ONLY TO
INDICATE LOCATIONS AND QUANTITIES OF ORIGINAL
CONSTRUCTION.
NEW WORK IS DESIGNATED BY THE KEYNOTES LOCATED
OUTSIDE OF THE POLYGONS.
30 1 9 2 6 30
TYP TYP
14
TYP
12 8
TYP
8
TYP
10 104
TYP
2 6
TYP
7
TYP
13
TYP
30 12 6 14
TYP
2 6
TYP
238 8
TYP
4
TYP
7
TYP
13
TYP TYP
2 6
TYP
4
TYP
13
12
8
TYP
1213 128
1 30
TYP
14
TYP
2 6
TYP
13
TYP
30
TYP
9 2 6
TYP
8 8 4
TYP
7
TYP
2 6
TYP
4
TYP
10 8
TYP
1213 8
8 8
TYP
4
TYP
7
TYP
4
TYP
8
TYP
1013 8
13
TYP
10
TYP
13
9
13 713
TYP
13
8
13
TYP
1
2 6
TYP
9
TYP
9
TYP
302 6 14 2 6 131230 1 2525
24
TYP
TYP
9
7
TYP
12
2
6
26
30
4
TYP
13
31
31
31
100
200
300
A2.1
KS
BP
Project number
Date
Drawn by
Checked by
Revision Revision Date
ROBERT POLCAR ARCHITECTS, INC
(480) 675-9760 (602) 363-4096
SCOTTSDALE, ARIZONA
ARCH D 24"x36"Sheet Size
7845 E. REDFIELD RD STE 100
SCOTTSDALE, AZ 85260
(602) 989-2433
110344104-1002-019-BRG
CA
MP
US
R
OO
F R
ES
TO
RA
TIO
NS
A
ND
W
EA
TH
ER
IZ
AT
IO
NS
JA
CK
W
. H
AR
MO
N E
LE
ME
NT
AR
Y S
CH
OO
L
J.O
. C
OM
B U
NIF
IE
D S
CH
OO
L D
IS
TR
IC
T
39
31
5 N
OR
TH
C
OR
TO
NA
D
RIV
E
SA
N T
AN
V
AL
LE
Y, A
RIZ
ON
A 8
51
40
2/27/2018
KEY PLAN
N
NO SCALE
BUILDING 200
KEYNOTES
1. CLEAN ALL EXTERIOR CONCRETE, MASONRY, STUCCO, GYPSUM BOARD
AND METAL FINISHES.
2. CLEAN ALL CRACKS OR HOLES IN MASONRY AND STUCCO. REMOVE
ANY EXISTING SEALANT AND PROPERLY PREPARE SURFACES FOR
REPAIR. REPAIR IN ACCORDANCE WITH THE SPECIFICATION PRIOR TO
COATING WALL SURFACE.
3. EXISTING MASONRY JOINT MATERIAL; REMOVE MATERIAL, CLEAN AND
PREP JOINT. INSTALL NEW BACKER ROD AND SEALANT AS SPECIFIED.
4. EXISTING GRADE AT BUILDING PERIMETER; EXCAVATE SOIL AWAY
FROM WALL DOWN TO 3” BELOW EXISTING GRADE. APPLY COATING TO
LEVEL OF EXCAVATION. RE-GRADE SOIL TO ORIGINAL GRADE,
PROVIDING POSITIVE DRAINAGE FROM BUILDING AT ALL LOCATIONS.
5. EXISTING CMU; CLEAN, REPAIR, PREP, BLOCKFILL AND COAT.
6. EXISTING STUCCO; CLEAN, REPAIR, PREP, BOCKFILL AND COAT.
7. EXISTING STUCCO WEEP SCREED; MASK WEEP HOLES FROM COATING
TO MAINTAIN DRAINAGE AT BASE OF STUCCO SYSTEM.
8. METAL WINDOW OR DOOR FRAME; REMOVE BUILDING SEALANTS,
CLEAN JOINT AND INSTALL NEW BACKER ROD AND SEALANT.
9. EXISTING CONDUCTOR HEAD AND DOWNSPOUT; CLEAN, PREP, PRIME
AND PAINT TO MATCH EXISTING COLOR.
10. PROVIDE NEW PRECAST CONCRETE SPLASH BLOCK AT DOWNSPOUT
DISCHARGE. RE-GRADE SOIL FOR POSITIVE DRAINAGE FROM SPLASH
BLOCK AND BUILDING.
11. METAL SURFACE; CLEAN, PREP, PRIME AND PAINT TO MATCH EXISTING
COLOR.
12. HOLLOW METAL DOOR AND FRAME; PROTECT HARDWARE, CLEAN,
PREP, PRIME AND PAINT EXTERIOR FACE AND EDGES.
13. HOLLOW FERROUS METAL WINDOW FRAMES; PROTECT GLAZING,
CLEAN, PREP, PRIME AND PAINT.
14. EXISTING SHEET METAL PARAPET COPING; REMOVE AND PROPERLY
DISPOSE/ RECYCLE. INSPECT EXISTING WOOD NAILER AND REPLACE IF
DAMAGED. INSTALL NEW PRE-FINISHED METAL COPING SYSTEM
INCLUDING CONTINUOUS SELF ADHERED BITUMINOUS FLASHING. SEE
SPECIFICATION. SEE DETAIL 1/ A10.4.
15. EXISTING BUILDING EXPANSION JOINT COVER; REMOVE SEALANTS,
CLEAN SEALANT JOINT AND INSTALL NEW BACKER ROD AND SEALANT.
CLEAN JOINT COVER, PREP, PRIME AND COAT WITH SEAMLESS ROOF
COATING.
16. EXISTING ROOF DRAINS; INSPECT AND PRESSURE TEST. REPAIR AS
NECESSARY. REPLACE MISSING OR DAMAGED DRAIN BASKETS.
17. EXISTING THROUGH WALL SCUPPER; TO REMAIN. PREP, PRIME AND
APPLY SEAMLESS ROOF COATING TO ALL SURFACES.
18. EXISTING LOW SLOPE ROOF SURFACE; CLEAN, REPAIR, PREP AND
PRIME. CUT OUT BLISTERS AND DAMAGED AREAS. TREAT SURFACE IN
ACCORDANCE WITH PULL TEST RESULTS. APPLY NEW SEAMLESS ROOF
COATING TO ENTIRE ROOF SURFACE.
19. EXISTING ROOF COATING ON WALL; CLEAN, REPAIR, PREP AND PRIME
ALL PREVIOUSLY COATED SURFACES. APPLY NEW SEAMLESS COATING
TO ALL PREVIOUSLY COATED SURFACES.
20. PROVIDE NEW TRAFFIC SURFACE FROM MECHANICAL UNIT
MAINTENANCE ACCESS POINT TO ROOF ACCESS. TYPICAL FOR ALL
UNITS ON ROOFS.
21. EXISTING EQUIPMENT REMAINS, ADJUST CURB HEIGHT AS REQUIRED
TO COMPLY WITH SEAMLESS ROOF COATING WARRANTY
REQUIREMENTS. REMOVE AND REPLACE EXISTING PITCH POCKETS,
COLLARS, ETC AS REQUIRED TO COMPLY WITH SEAMLESS ROOF
COATING MATERIAL MANUFACTURER'S WARRANTY REQUIREMENTS.
22. EXISTING EQUIPMENT CONNECTION; APPROPRIATE TRADES PERSON
TO INSPECT AND REPAIR, RELOCATE OR EXTEND AS NEEDED.
23. EXISTING BUILDING/ SIDEWALK JOINT MATERIAL; REMOVE, CLEAN AND
PREP JOINT. INSTALL NEW BACKER ROD AND SELF-LEVELING JOINT
MATERIAL AS SPECIFIED.
24. CLEAN, REPAIR, PREP, SPOT PRIME AND PAINT EXTERIOR STUCCO AND
GYPSUM BOARD SOFFITS AND CEILINGS.
25. METAL CANOPY; PREP, PRIME AND PAINT.
26. EXISTING BUILDING MOUNTED SIGN; REMOVE FOR COATING OF
EXTERIOR WALLS. CLEAN SIGN AND REINSTALL. TYPICAL FOR ALL
BUILDING MOUNTED SIGNS.
27. EXISTING ROOF HATCH; VERIFY PROPER OPERATION AND REPAIR AS
REQUIRED. CLEAN, PREP AND PAINT.
28. PROVIDE NEW 20 GUAGE GALVANIZED SHEET METAL SPLASH PAN AT
DOWNSPOUT DISCHARGE ON ROOF. ADHERE WITH ROOF SYSTEM
COMPATIBLE ADHESIVE.
29. EXISTING ROOFTOP COMMUNICATION EQUIPMENT; SCHOOL DISTRICT
TO RELOCATE FOR CONSTRUCTION AND THEN REINSTALL.
CONTRACTOR TO COORDINATE.
30. EXISTING TO REMAIN.
31. EXISTING CONCRETE WALL; CLEAN, PREP AND SEAL.
2
BUILDING "200"
18
6543
27
20
33
14
34
19
20
1
BUILDING 200 - FLOOR PLAN N
3/32" = 1'-0"
NOTE: THE DRAWINGS INSIDE THE POLYGONS ARE REFERENCE
DRAWINGS AND ARE ORIGINAL CONSTRUCTION DOCUMENTS
PREPARED BY DLR GROUP INC., FOR THE EXISTING BUILDINGS.
THESE DRAWINGS ARE INCLUDED FOR REFERENCE ONLY TO
INDICATE LOCATIONS AND QUANTITIES OF ORIGINAL
CONSTRUCTION.
NEW WORK IS DESIGNATED BY THE KEYNOTES LOCATED
OUTSIDE OF THE POLYGONS.
BUILDING "100/ 200" BUILDING "200" BUILDING "200" BUILDING "200"
6
TYP
2
1
6
TYP
2
1
8
8
TYP
TYP
6
TYP
2
1
8
TYP
8
TYP
6
TYP
2
1
1 2 68
TYP
1 2 68
TYP
12
TYP
13
TYP
17
19
15
18
19
21
22
TYP
TYP
TYP
TYP
6
TYP
2
19
18
14
100
200
300
A2.3
KS
BP
KEY PLAN
N
NO SCALE
BUILDING 200
5
BUILDING "200"
20
18
9876
BUILDING "200" BUILDING "100/ 200" BUILDING "200"BUILDING "100/ 200"
25
KEYNOTES
1. CLEAN ALL EXTERIOR CONCRETE, MASONRY, STUCCO, GYPSUM BOARD
AND METAL FINISHES.
2. CLEAN ALL CRACKS OR HOLES IN MASONRY AND STUCCO. REMOVE
ANY EXISTING SEALANT AND PROPERLY PREPARE SURFACES FOR
REPAIR. REPAIR IN ACCORDANCE WITH THE SPECIFICATION PRIOR TO
COATING WALL SURFACE.
3. EXISTING MASONRY JOINT MATERIAL; REMOVE MATERIAL, CLEAN AND
PREP JOINT. INSTALL NEW BACKER ROD AND SEALANT AS SPECIFIED.
4. EXISTING GRADE AT BUILDING PERIMETER; EXCAVATE SOIL AWAY
FROM WALL DOWN TO 3” BELOW EXISTING GRADE. APPLY COATING TO
LEVEL OF EXCAVATION. RE-GRADE SOIL TO ORIGINAL GRADE,
PROVIDING POSITIVE DRAINAGE FROM BUILDING AT ALL LOCATIONS.
5. EXISTING CMU; CLEAN, REPAIR, PREP, BLOCKFILL AND COAT.
6. EXISTING STUCCO; CLEAN, REPAIR, PREP, BOCKFILL AND COAT.
7. EXISTING STUCCO WEEP SCREED; MASK WEEP HOLES FROM COATING
TO MAINTAIN DRAINAGE AT BASE OF STUCCO SYSTEM.
8. METAL WINDOW OR DOOR FRAME; REMOVE BUILDING SEALANTS,
CLEAN JOINT AND INSTALL NEW BACKER ROD AND SEALANT.
9. EXISTING CONDUCTOR HEAD AND DOWNSPOUT; CLEAN, PREP, PRIME
AND PAINT TO MATCH EXISTING COLOR.
10. PROVIDE NEW PRECAST CONCRETE SPLASH BLOCK AT DOWNSPOUT
DISCHARGE. RE-GRADE SOIL FOR POSITIVE DRAINAGE FROM SPLASH
BLOCK AND BUILDING.
11. METAL SURFACE; CLEAN, PREP, PRIME AND PAINT TO MATCH EXISTING
COLOR.
12. HOLLOW METAL DOOR AND FRAME; PROTECT HARDWARE, CLEAN,
PREP, PRIME AND PAINT EXTERIOR FACE AND EDGES.
13. HOLLOW FERROUS METAL WINDOW FRAMES; PROTECT GLAZING,
CLEAN, PREP, PRIME AND PAINT.
14. EXISTING SHEET METAL PARAPET COPING; REMOVE AND PROPERLY
DISPOSE/ RECYCLE. INSPECT EXISTING WOOD NAILER AND REPLACE IF
DAMAGED. INSTALL NEW PRE-FINISHED METAL COPING SYSTEM
INCLUDING CONTINUOUS SELF ADHERED BITUMINOUS FLASHING. SEE
SPECIFICATION. SEE DETAIL 1/ A10.4.
15. EXISTING BUILDING EXPANSION JOINT COVER; REMOVE SEALANTS,
CLEAN SEALANT JOINT AND INSTALL NEW BACKER ROD AND SEALANT.
CLEAN JOINT COVER, PREP, PRIME AND COAT WITH SEAMLESS ROOF
COATING.
16. EXISTING ROOF DRAINS; INSPECT AND PRESSURE TEST. REPAIR AS
NECESSARY. REPLACE MISSING OR DAMAGED DRAIN BASKETS.
17. EXISTING THROUGH WALL SCUPPER; TO REMAIN. PREP, PRIME AND
APPLY SEAMLESS ROOF COATING TO ALL SURFACES.
18. EXISTING LOW SLOPE ROOF SURFACE; CLEAN, REPAIR, PREP AND
PRIME. CUT OUT BLISTERS AND DAMAGED AREAS. TREAT SURFACE IN
ACCORDANCE WITH PULL TEST RESULTS. APPLY NEW SEAMLESS ROOF
COATING TO ENTIRE ROOF SURFACE.
19. EXISTING ROOF COATING ON WALL; CLEAN, REPAIR, PREP AND PRIME
ALL PREVIOUSLY COATED SURFACES. APPLY NEW SEAMLESS COATING
TO ALL PREVIOUSLY COATED SURFACES.
20. PROVIDE NEW TRAFFIC SURFACE FROM MECHANICAL UNIT
MAINTENANCE ACCESS POINT TO ROOF ACCESS. TYPICAL FOR ALL
UNITS ON ROOFS.
21. EXISTING EQUIPMENT REMAINS, ADJUST CURB HEIGHT AS REQUIRED
TO COMPLY WITH SEAMLESS ROOF COATING WARRANTY
REQUIREMENTS. REMOVE AND REPLACE EXISTING PITCH POCKETS,
COLLARS, ETC AS REQUIRED TO COMPLY WITH SEAMLESS ROOF
COATING MATERIAL MANUFACTURER'S WARRANTY REQUIREMENTS.
22. EXISTING EQUIPMENT CONNECTION; APPROPRIATE TRADES PERSON
TO INSPECT AND REPAIR, RELOCATE OR EXTEND AS NEEDED.
23. EXISTING BUILDING/ SIDEWALK JOINT MATERIAL; REMOVE, CLEAN AND
PREP JOINT. INSTALL NEW BACKER ROD AND SELF-LEVELING JOINT
MATERIAL AS SPECIFIED.
24. CLEAN, REPAIR, PREP, SPOT PRIME AND PAINT EXTERIOR STUCCO AND
GYPSUM BOARD SOFFITS AND CEILINGS.
25. METAL CANOPY; PREP, PRIME AND PAINT.
26. EXISTING BUILDING MOUNTED SIGN; REMOVE FOR COATING OF
EXTERIOR WALLS. CLEAN SIGN AND REINSTALL. TYPICAL FOR ALL
BUILDING MOUNTED SIGNS.
27. EXISTING ROOF HATCH; VERIFY PROPER OPERATION AND REPAIR AS
REQUIRED. CLEAN, PREP AND PAINT.
28. PROVIDE NEW 20 GUAGE GALVANIZED SHEET METAL SPLASH PAN AT
DOWNSPOUT DISCHARGE ON ROOF. ADHERE WITH ROOF SYSTEM
COMPATIBLE ADHESIVE.
29. EXISTING ROOFTOP COMMUNICATION EQUIPMENT; SCHOOL DISTRICT
TO RELOCATE FOR CONSTRUCTION AND THEN REINSTALL.
CONTRACTOR TO COORDINATE.
30. EXISTING TO REMAIN.
31. EXISTING CONCRETE WALL; CLEAN, PREP AND SEAL.
1
BUILDING 200 - EAST ELEVATION
3/32" = 1'-0"
2
BUILDING 100/ 200 - SOUTH ELEVATION
3/32" = 1'-0"
3
BUILDING 200 - WEST ELEVATION
3/32" = 1'-0"
4
BUILDING 200 - NORTH ELEVATION
3/32" = 1'-0"
NOTE: THE DRAWINGS INSIDE THE POLYGONS ARE REFERENCE
DRAWINGS AND ARE ORIGINAL CONSTRUCTION DOCUMENTS
PREPARED BY DLR GROUP INC., FOR THE EXISTING BUILDINGS.
THESE DRAWINGS ARE INCLUDED FOR REFERENCE ONLY TO
INDICATE LOCATIONS AND QUANTITIES OF ORIGINAL
CONSTRUCTION.
NEW WORK IS DESIGNATED BY THE KEYNOTES LOCATED
OUTSIDE OF THE POLYGONS.
8
TYP
4
TYP
7
TYP
2 6
TYP
8
TYP
1310 138
914 2 6 1330 1
8 8
TYP
4
TYP
7
TYP
2 6
TYP
4
TYP
13 8
TYP
1213 8
302 6 14 2 6 1313 301 24
30 2 69
TYP TYP
10
13
TYP
8
13 12
1 9
TYP TYP
14
1010
TYP TYP
13238
8 8
TYP
4
TYP
7
TYP
13 8
TYP
12 13 812
TYP
13238
302 6 14 2 61313 30 1 241
TYP
1425 12
23
25
23
1
302 6 141
TYP
9
8
TYP
4
TYP
7
TYP
13 10 8 13
9
10
21
22
TYP
2
6
18
15
1924
2
6
TYP
Project number
Date
Drawn by
Checked by
Revision Revision Date
ROBERT POLCAR ARCHITECTS, INC
(480) 675-9760 (602) 363-4096
SCOTTSDALE, ARIZONA
ARCH D 24"x36"Sheet Size
7845 E. REDFIELD RD STE 100
SCOTTSDALE, AZ 85260
(602) 989-2433
110344104-1002-019-BRG
CA
MP
US
R
OO
F R
ES
TO
RA
TIO
NS
A
ND
W
EA
TH
ER
IZ
AT
IO
NS
JA
CK
W
. H
AR
MO
N E
LE
ME
NT
AR
Y S
CH
OO
L
J.O
. C
OM
B U
NIF
IE
D S
CH
OO
L D
IS
TR
IC
T
39
31
5 N
OR
TH
C
OR
TO
NA
D
RIV
E
SA
N T
AN
V
AL
LE
Y, A
RIZ
ON
A 8
51
40
2/27/2018
31
100
200
300
A3.1.1
KS
BP
Project number
Date
Drawn by
Checked by
Revision Revision Date
ROBERT POLCAR ARCHITECTS, INC
(480) 675-9760 (602) 363-4096
SCOTTSDALE, ARIZONA
ARCH D 24"x36"Sheet Size
7845 E. REDFIELD RD STE 100
SCOTTSDALE, AZ 85260
(602) 989-2433
110344104-1002-019-BRG
CA
MP
US
R
OO
F R
ES
TO
RA
TIO
NS
A
ND
W
EA
TH
ER
IZ
AT
IO
NS
JA
CK
W
. H
AR
MO
N E
LE
ME
NT
AR
Y S
CH
OO
L
J.O
. C
OM
B U
NIF
IE
D S
CH
OO
L D
IS
TR
IC
T
39
31
5 N
OR
TH
C
OR
TO
NA
D
RIV
E
SA
N T
AN
V
AL
LE
Y, A
RIZ
ON
A 8
51
40
2/27/2018
KEY PLAN
N
NO SCALE
BUILDING 300
1
BUILDING 300 - PARTIAL FLOOR PLAN
N
1/8" = 1'-0"
KEYNOTES
1. CLEAN ALL EXTERIOR CONCRETE, MASONRY, STUCCO, GYPSUM BOARD
AND METAL FINISHES.
2. CLEAN ALL CRACKS OR HOLES IN MASONRY AND STUCCO. REMOVE
ANY EXISTING SEALANT AND PROPERLY PREPARE SURFACES FOR
REPAIR. REPAIR IN ACCORDANCE WITH THE SPECIFICATION PRIOR TO
COATING WALL SURFACE.
3. EXISTING MASONRY JOINT MATERIAL; REMOVE MATERIAL, CLEAN AND
PREP JOINT. INSTALL NEW BACKER ROD AND SEALANT AS SPECIFIED.
4. EXISTING GRADE AT BUILDING PERIMETER; EXCAVATE SOIL AWAY
FROM WALL DOWN TO 3” BELOW EXISTING GRADE. APPLY COATING TO
LEVEL OF EXCAVATION. RE-GRADE SOIL TO ORIGINAL GRADE,
PROVIDING POSITIVE DRAINAGE FROM BUILDING AT ALL LOCATIONS.
5. EXISTING CMU; CLEAN, REPAIR, PREP, BLOCKFILL AND COAT.
6. EXISTING STUCCO; CLEAN, REPAIR, PREP, BOCKFILL AND COAT.
7. EXISTING STUCCO WEEP SCREED; MASK WEEP HOLES FROM COATING
TO MAINTAIN DRAINAGE AT BASE OF STUCCO SYSTEM.
8. METAL WINDOW OR DOOR FRAME; REMOVE BUILDING SEALANTS,
CLEAN JOINT AND INSTALL NEW BACKER ROD AND SEALANT.
9. EXISTING CONDUCTOR HEAD AND DOWNSPOUT; CLEAN, PREP, PRIME
AND PAINT TO MATCH EXISTING COLOR.
10. PROVIDE NEW PRECAST CONCRETE SPLASH BLOCK AT DOWNSPOUT
DISCHARGE. RE-GRADE SOIL FOR POSITIVE DRAINAGE FROM SPLASH
BLOCK AND BUILDING.
11. METAL SURFACE; CLEAN, PREP, PRIME AND PAINT TO MATCH EXISTING
COLOR.
12. HOLLOW METAL DOOR AND FRAME; PROTECT HARDWARE, CLEAN,
PREP, PRIME AND PAINT EXTERIOR FACE AND EDGES.
13. HOLLOW FERROUS METAL WINDOW FRAMES; PROTECT GLAZING,
CLEAN, PREP, PRIME AND PAINT.
14. EXISTING SHEET METAL PARAPET COPING; REMOVE AND PROPERLY
DISPOSE/ RECYCLE. INSPECT EXISTING WOOD NAILER AND REPLACE IF
DAMAGED. INSTALL NEW PRE-FINISHED METAL COPING SYSTEM
INCLUDING CONTINUOUS SELF ADHERED BITUMINOUS FLASHING. SEE
SPECIFICATION. SEE DETAIL 1/ A10.4.
15. EXISTING BUILDING EXPANSION JOINT COVER; REMOVE SEALANTS,
CLEAN SEALANT JOINT AND INSTALL NEW BACKER ROD AND SEALANT.
CLEAN JOINT COVER, PREP, PRIME AND COAT WITH SEAMLESS ROOF
COATING.
16. EXISTING ROOF DRAINS; INSPECT AND PRESSURE TEST. REPAIR AS
NECESSARY. REPLACE MISSING OR DAMAGED DRAIN BASKETS.
17. EXISTING THROUGH WALL SCUPPER; TO REMAIN. PREP, PRIME AND
APPLY SEAMLESS ROOF COATING TO ALL SURFACES.
18. EXISTING LOW SLOPE ROOF SURFACE; CLEAN, REPAIR, PREP AND
PRIME. CUT OUT BLISTERS AND DAMAGED AREAS. TREAT SURFACE IN
ACCORDANCE WITH PULL TEST RESULTS. APPLY NEW SEAMLESS ROOF
COATING TO ENTIRE ROOF SURFACE.
19. EXISTING ROOF COATING ON WALL; CLEAN, REPAIR, PREP AND PRIME
ALL PREVIOUSLY COATED SURFACES. APPLY NEW SEAMLESS COATING
TO ALL PREVIOUSLY COATED SURFACES.
20. PROVIDE NEW TRAFFIC SURFACE FROM MECHANICAL UNIT
MAINTENANCE ACCESS POINT TO ROOF ACCESS. TYPICAL FOR ALL
UNITS ON ROOFS.
21. EXISTING EQUIPMENT REMAINS, ADJUST CURB HEIGHT AS REQUIRED
TO COMPLY WITH SEAMLESS ROOF COATING WARRANTY
REQUIREMENTS. REMOVE AND REPLACE EXISTING PITCH POCKETS,
COLLARS, ETC AS REQUIRED TO COMPLY WITH SEAMLESS ROOF
COATING MATERIAL MANUFACTURER'S WARRANTY REQUIREMENTS.
22. EXISTING EQUIPMENT CONNECTION; APPROPRIATE TRADES PERSON
TO INSPECT AND REPAIR, RELOCATE OR EXTEND AS NEEDED.
23. EXISTING BUILDING/ SIDEWALK JOINT MATERIAL; REMOVE, CLEAN AND
PREP JOINT. INSTALL NEW BACKER ROD AND SELF-LEVELING JOINT
MATERIAL AS SPECIFIED.
24. CLEAN, REPAIR, PREP, SPOT PRIME AND PAINT EXTERIOR STUCCO AND
GYPSUM BOARD SOFFITS AND CEILINGS.
25. METAL CANOPY; PREP, PRIME AND PAINT.
26. EXISTING BUILDING MOUNTED SIGN; REMOVE FOR COATING OF
EXTERIOR WALLS. CLEAN SIGN AND REINSTALL. TYPICAL FOR ALL
BUILDING MOUNTED SIGNS.
27. EXISTING ROOF HATCH; VERIFY PROPER OPERATION AND REPAIR AS
REQUIRED. CLEAN, PREP AND PAINT.
28. PROVIDE NEW 20 GUAGE GALVANIZED SHEET METAL SPLASH PAN AT
DOWNSPOUT DISCHARGE ON ROOF. ADHERE WITH ROOF SYSTEM
COMPATIBLE ADHESIVE.
29. EXISTING ROOFTOP COMMUNICATION EQUIPMENT; SCHOOL DISTRICT
TO RELOCATE FOR CONSTRUCTION AND THEN REINSTALL.
CONTRACTOR TO COORDINATE.
30. EXISTING TO REMAIN.
31. EXISTING CONCRETE WALL; CLEAN, PREP AND SEAL.
432
BUILDING "100" BUILDING "300"BUILDING "100"
NOTE: THE DRAWINGS INSIDE THE POLYGONS ARE REFERENCE
DRAWINGS AND ARE ORIGINAL CONSTRUCTION DOCUMENTS
PREPARED BY DLR GROUP INC., FOR THE EXISTING BUILDINGS.
THESE DRAWINGS ARE INCLUDED FOR REFERENCE ONLY TO
INDICATE LOCATIONS AND QUANTITIES OF ORIGINAL
CONSTRUCTION.
NEW WORK IS DESIGNATED BY THE KEYNOTES LOCATED
OUTSIDE OF THE POLYGONS.
1 2 68
TYP
6
TYP
2
1
30
12
TYP
13
TYP
8
6
TYP
2
1
13
8 12
1 2 6 1 2 6
6
TYP
2
1 TYP
8
TYP
31
TYP
4
TYP
7
TYP
2
TYP
6
10
9
7
TYP
4
2
TYP
6
30
TYP
6
TYP
2
1
8
12
TYP
100
200
300
A3.1.2
KS
BP
Project number
Date
Drawn by
Checked by
Revision Revision Date
ROBERT POLCAR ARCHITECTS, INC
(480) 675-9760 (602) 363-4096
SCOTTSDALE, ARIZONA
ARCH D 24"x36"Sheet Size
7845 E. REDFIELD RD STE 100
SCOTTSDALE, AZ 85260
(602) 989-2433
110344104-1002-019-BRG
CA
MP
US
R
OO
F R
ES
TO
RA
TIO
NS
A
ND
W
EA
TH
ER
IZ
AT
IO
NS
JA
CK
W
. H
AR
MO
N E
LE
ME
NT
AR
Y S
CH
OO
L
J.O
. C
OM
B U
NIF
IE
D S
CH
OO
L D
IS
TR
IC
T
39
31
5 N
OR
TH
C
OR
TO
NA
D
RIV
E
SA
N T
AN
V
AL
LE
Y, A
RIZ
ON
A 8
51
40
2/27/2018
KEY PLAN
N
NO SCALE
BUILDING 300
1
BUILDING 300 - PARTIAL FLOOR PLAN
N
1/8" = 1'-0"
KEYNOTES
1. CLEAN ALL EXTERIOR CONCRETE, MASONRY, STUCCO, GYPSUM BOARD
AND METAL FINISHES.
2. CLEAN ALL CRACKS OR HOLES IN MASONRY AND STUCCO. REMOVE
ANY EXISTING SEALANT AND PROPERLY PREPARE SURFACES FOR
REPAIR. REPAIR IN ACCORDANCE WITH THE SPECIFICATION PRIOR TO
COATING WALL SURFACE.
3. EXISTING MASONRY JOINT MATERIAL; REMOVE MATERIAL, CLEAN AND
PREP JOINT. INSTALL NEW BACKER ROD AND SEALANT AS SPECIFIED.
4. EXISTING GRADE AT BUILDING PERIMETER; EXCAVATE SOIL AWAY
FROM WALL DOWN TO 3” BELOW EXISTING GRADE. APPLY COATING TO
LEVEL OF EXCAVATION. RE-GRADE SOIL TO ORIGINAL GRADE,
PROVIDING POSITIVE DRAINAGE FROM BUILDING AT ALL LOCATIONS.
5. EXISTING CMU; CLEAN, REPAIR, PREP, BLOCKFILL AND COAT.
6. EXISTING STUCCO; CLEAN, REPAIR, PREP, BOCKFILL AND COAT.
7. EXISTING STUCCO WEEP SCREED; MASK WEEP HOLES FROM COATING
TO MAINTAIN DRAINAGE AT BASE OF STUCCO SYSTEM.
8. METAL WINDOW OR DOOR FRAME; REMOVE BUILDING SEALANTS,
CLEAN JOINT AND INSTALL NEW BACKER ROD AND SEALANT.
9. EXISTING CONDUCTOR HEAD AND DOWNSPOUT; CLEAN, PREP, PRIME
AND PAINT TO MATCH EXISTING COLOR.
10. PROVIDE NEW PRECAST CONCRETE SPLASH BLOCK AT DOWNSPOUT
DISCHARGE. RE-GRADE SOIL FOR POSITIVE DRAINAGE FROM SPLASH
BLOCK AND BUILDING.
11. METAL SURFACE; CLEAN, PREP, PRIME AND PAINT TO MATCH EXISTING
COLOR.
12. HOLLOW METAL DOOR AND FRAME; PROTECT HARDWARE, CLEAN,
PREP, PRIME AND PAINT EXTERIOR FACE AND EDGES.
13. HOLLOW FERROUS METAL WINDOW FRAMES; PROTECT GLAZING,
CLEAN, PREP, PRIME AND PAINT.
14. EXISTING SHEET METAL PARAPET COPING; REMOVE AND PROPERLY
DISPOSE/ RECYCLE. INSPECT EXISTING WOOD NAILER AND REPLACE IF
DAMAGED. INSTALL NEW PRE-FINISHED METAL COPING SYSTEM
INCLUDING CONTINUOUS SELF ADHERED BITUMINOUS FLASHING. SEE
SPECIFICATION. SEE DETAIL 1/ A10.4.
15. EXISTING BUILDING EXPANSION JOINT COVER; REMOVE SEALANTS,
CLEAN SEALANT JOINT AND INSTALL NEW BACKER ROD AND SEALANT.
CLEAN JOINT COVER, PREP, PRIME AND COAT WITH SEAMLESS ROOF
COATING.
16. EXISTING ROOF DRAINS; INSPECT AND PRESSURE TEST. REPAIR AS
NECESSARY. REPLACE MISSING OR DAMAGED DRAIN BASKETS.
17. EXISTING THROUGH WALL SCUPPER; TO REMAIN. PREP, PRIME AND
APPLY SEAMLESS ROOF COATING TO ALL SURFACES.
18. EXISTING LOW SLOPE ROOF SURFACE; CLEAN, REPAIR, PREP AND
PRIME. CUT OUT BLISTERS AND DAMAGED AREAS. TREAT SURFACE IN
ACCORDANCE WITH PULL TEST RESULTS. APPLY NEW SEAMLESS ROOF
COATING TO ENTIRE ROOF SURFACE.
19. EXISTING ROOF COATING ON WALL; CLEAN, REPAIR, PREP AND PRIME
ALL PREVIOUSLY COATED SURFACES. APPLY NEW SEAMLESS COATING
TO ALL PREVIOUSLY COATED SURFACES.
20. PROVIDE NEW TRAFFIC SURFACE FROM MECHANICAL UNIT
MAINTENANCE ACCESS POINT TO ROOF ACCESS. TYPICAL FOR ALL
UNITS ON ROOFS.
21. EXISTING EQUIPMENT REMAINS, ADJUST CURB HEIGHT AS REQUIRED
TO COMPLY WITH SEAMLESS ROOF COATING WARRANTY
REQUIREMENTS. REMOVE AND REPLACE EXISTING PITCH POCKETS,
COLLARS, ETC AS REQUIRED TO COMPLY WITH SEAMLESS ROOF
COATING MATERIAL MANUFACTURER'S WARRANTY REQUIREMENTS.
22. EXISTING EQUIPMENT CONNECTION; APPROPRIATE TRADES PERSON
TO INSPECT AND REPAIR, RELOCATE OR EXTEND AS NEEDED.
23. EXISTING BUILDING/ SIDEWALK JOINT MATERIAL; REMOVE, CLEAN AND
PREP JOINT. INSTALL NEW BACKER ROD AND SELF-LEVELING JOINT
MATERIAL AS SPECIFIED.
24. CLEAN, REPAIR, PREP, SPOT PRIME AND PAINT EXTERIOR STUCCO AND
GYPSUM BOARD SOFFITS AND CEILINGS.
25. METAL CANOPY; PREP, PRIME AND PAINT.
26. EXISTING BUILDING MOUNTED SIGN; REMOVE FOR COATING OF
EXTERIOR WALLS. CLEAN SIGN AND REINSTALL. TYPICAL FOR ALL
BUILDING MOUNTED SIGNS.
27. EXISTING ROOF HATCH; VERIFY PROPER OPERATION AND REPAIR AS
REQUIRED. CLEAN, PREP AND PAINT.
28. PROVIDE NEW 20 GUAGE GALVANIZED SHEET METAL SPLASH PAN AT
DOWNSPOUT DISCHARGE ON ROOF. ADHERE WITH ROOF SYSTEM
COMPATIBLE ADHESIVE.
29. EXISTING ROOFTOP COMMUNICATION EQUIPMENT; SCHOOL DISTRICT
TO RELOCATE FOR CONSTRUCTION AND THEN REINSTALL.
CONTRACTOR TO COORDINATE.
30. EXISTING TO REMAIN.
31. EXISTING CONCRETE WALL; CLEAN, PREP AND SEAL.
32
BUILDING "300" BUILDING "300"
14
29
30
14
NOTE: THE DRAWINGS INSIDE THE POLYGONS ARE REFERENCE
DRAWINGS AND ARE ORIGINAL CONSTRUCTION DOCUMENTS
PREPARED BY DLR GROUP INC., FOR THE EXISTING BUILDINGS.
THESE DRAWINGS ARE INCLUDED FOR REFERENCE ONLY TO
INDICATE LOCATIONS AND QUANTITIES OF ORIGINAL
CONSTRUCTION.
NEW WORK IS DESIGNATED BY THE KEYNOTES LOCATED
OUTSIDE OF THE POLYGONS.
1 2 5
8
12
TYP
1 2 5
1 2 5 8
TYP
13
TYP
1 2 5
5
2
1
30
8 12
8 12
5
2
1
1 2 5
TYP
9
18
19
28
TYP
30
1
5
2
1
3
5
2
1
7
100
200
300
A3.2
KS
BP
Project number
Date
Drawn by
Checked by
Revision Revision Date
ROBERT POLCAR ARCHITECTS, INC
(480) 675-9760 (602) 363-4096
SCOTTSDALE, ARIZONA
ARCH D 24"x36"Sheet Size
7845 E. REDFIELD RD STE 100
SCOTTSDALE, AZ 85260
(602) 989-2433
110344104-1002-019-BRG
CA
MP
US
R
OO
F R
ES
TO
RA
TIO
NS
A
ND
W
EA
TH
ER
IZ
AT
IO
NS
JA
CK
W
. H
AR
MO
N E
LE
ME
NT
AR
Y S
CH
OO
L
J.O
. C
OM
B U
NIF
IE
D S
CH
OO
L D
IS
TR
IC
T
39
31
5 N
OR
TH
C
OR
TO
NA
D
RIV
E
SA
N T
AN
V
AL
LE
Y, A
RIZ
ON
A 8
51
40
2/27/2018
KEY PLAN
N
NO SCALE
1
BUILDING 300 - ROOF PLAN
N
1/16" = 1'-0"
BUILDING 300
KEYNOTES
1. CLEAN ALL EXTERIOR CONCRETE, MASONRY, STUCCO, GYPSUM BOARD
AND METAL FINISHES.
2. CLEAN ALL CRACKS OR HOLES IN MASONRY AND STUCCO. REMOVE
ANY EXISTING SEALANT AND PROPERLY PREPARE SURFACES FOR
REPAIR. REPAIR IN ACCORDANCE WITH THE SPECIFICATION PRIOR TO
COATING WALL SURFACE.
3. EXISTING MASONRY JOINT MATERIAL; REMOVE MATERIAL, CLEAN AND
PREP JOINT. INSTALL NEW BACKER ROD AND SEALANT AS SPECIFIED.
4. EXISTING GRADE AT BUILDING PERIMETER; EXCAVATE SOIL AWAY
FROM WALL DOWN TO 3” BELOW EXISTING GRADE. APPLY COATING TO
LEVEL OF EXCAVATION. RE-GRADE SOIL TO ORIGINAL GRADE,
PROVIDING POSITIVE DRAINAGE FROM BUILDING AT ALL LOCATIONS.
5. EXISTING CMU; CLEAN, REPAIR, PREP, BLOCKFILL AND COAT.
6. EXISTING STUCCO; CLEAN, REPAIR, PREP, BOCKFILL AND COAT.
7. EXISTING STUCCO WEEP SCREED; MASK WEEP HOLES FROM COATING
TO MAINTAIN DRAINAGE AT BASE OF STUCCO SYSTEM.
8. METAL WINDOW OR DOOR FRAME; REMOVE BUILDING SEALANTS,
CLEAN JOINT AND INSTALL NEW BACKER ROD AND SEALANT.
9. EXISTING CONDUCTOR HEAD AND DOWNSPOUT; CLEAN, PREP, PRIME
AND PAINT TO MATCH EXISTING COLOR.
10. PROVIDE NEW PRECAST CONCRETE SPLASH BLOCK AT DOWNSPOUT
DISCHARGE. RE-GRADE SOIL FOR POSITIVE DRAINAGE FROM SPLASH
BLOCK AND BUILDING.
11. METAL SURFACE; CLEAN, PREP, PRIME AND PAINT TO MATCH EXISTING
COLOR.
12. HOLLOW METAL DOOR AND FRAME; PROTECT HARDWARE, CLEAN,
PREP, PRIME AND PAINT EXTERIOR FACE AND EDGES.
13. HOLLOW FERROUS METAL WINDOW FRAMES; PROTECT GLAZING,
CLEAN, PREP, PRIME AND PAINT.
14. EXISTING SHEET METAL PARAPET COPING; REMOVE AND PROPERLY
DISPOSE/ RECYCLE. INSPECT EXISTING WOOD NAILER AND REPLACE IF
DAMAGED. INSTALL NEW PRE-FINISHED METAL COPING SYSTEM
INCLUDING CONTINUOUS SELF ADHERED BITUMINOUS FLASHING. SEE
SPECIFICATION. SEE DETAIL 1/ A10.4.
15. EXISTING BUILDING EXPANSION JOINT COVER; REMOVE SEALANTS,
CLEAN SEALANT JOINT AND INSTALL NEW BACKER ROD AND SEALANT.
CLEAN JOINT COVER, PREP, PRIME AND COAT WITH SEAMLESS ROOF
COATING.
16. EXISTING ROOF DRAINS; INSPECT AND PRESSURE TEST. REPAIR AS
NECESSARY. REPLACE MISSING OR DAMAGED DRAIN BASKETS.
17. EXISTING THROUGH WALL SCUPPER; TO REMAIN. PREP, PRIME AND
APPLY SEAMLESS ROOF COATING TO ALL SURFACES.
18. EXISTING LOW SLOPE ROOF SURFACE; CLEAN, REPAIR, PREP AND
PRIME. CUT OUT BLISTERS AND DAMAGED AREAS. TREAT SURFACE IN
ACCORDANCE WITH PULL TEST RESULTS. APPLY NEW SEAMLESS ROOF
COATING TO ENTIRE ROOF SURFACE.
19. EXISTING ROOF COATING ON WALL; CLEAN, REPAIR, PREP AND PRIME
ALL PREVIOUSLY COATED SURFACES. APPLY NEW SEAMLESS COATING
TO ALL PREVIOUSLY COATED SURFACES.
20. PROVIDE NEW TRAFFIC SURFACE FROM MECHANICAL UNIT
MAINTENANCE ACCESS POINT TO ROOF ACCESS. TYPICAL FOR ALL
UNITS ON ROOFS.
21. EXISTING EQUIPMENT REMAINS, ADJUST CURB HEIGHT AS REQUIRED
TO COMPLY WITH SEAMLESS ROOF COATING WARRANTY
REQUIREMENTS. REMOVE AND REPLACE EXISTING PITCH POCKETS,
COLLARS, ETC AS REQUIRED TO COMPLY WITH SEAMLESS ROOF
COATING MATERIAL MANUFACTURER'S WARRANTY REQUIREMENTS.
22. EXISTING EQUIPMENT CONNECTION; APPROPRIATE TRADES PERSON
TO INSPECT AND REPAIR, RELOCATE OR EXTEND AS NEEDED.
23. EXISTING BUILDING/ SIDEWALK JOINT MATERIAL; REMOVE, CLEAN AND
PREP JOINT. INSTALL NEW BACKER ROD AND SELF-LEVELING JOINT
MATERIAL AS SPECIFIED.
24. CLEAN, REPAIR, PREP, SPOT PRIME AND PAINT EXTERIOR STUCCO AND
GYPSUM BOARD SOFFITS AND CEILINGS.
25. METAL CANOPY; PREP, PRIME AND PAINT.
26. EXISTING BUILDING MOUNTED SIGN; REMOVE FOR COATING OF
EXTERIOR WALLS. CLEAN SIGN AND REINSTALL. TYPICAL FOR ALL
BUILDING MOUNTED SIGNS.
27. EXISTING ROOF HATCH; VERIFY PROPER OPERATION AND REPAIR AS
REQUIRED. CLEAN, PREP AND PAINT.
28. PROVIDE NEW 20 GUAGE GALVANIZED SHEET METAL SPLASH PAN AT
DOWNSPOUT DISCHARGE ON ROOF. ADHERE WITH ROOF SYSTEM
COMPATIBLE ADHESIVE.
29. EXISTING ROOFTOP COMMUNICATION EQUIPMENT; SCHOOL DISTRICT
TO RELOCATE FOR CONSTRUCTION AND THEN REINSTALL.
CONTRACTOR TO COORDINATE.
30. EXISTING TO REMAIN.
31. EXISTING CONCRETE WALL; CLEAN, PREP AND SEAL.
6
29
1098
7
31
19
14
18
20
21
28
11
29
TYP
NOTE: THE DRAWINGS INSIDE THE POLYGONS ARE REFERENCE
DRAWINGS AND ARE ORIGINAL CONSTRUCTION DOCUMENTS
PREPARED BY DLR GROUP INC., FOR THE EXISTING BUILDINGS.
THESE DRAWINGS ARE INCLUDED FOR REFERENCE ONLY TO
INDICATE LOCATIONS AND QUANTITIES OF ORIGINAL
CONSTRUCTION.
NEW WORK IS DESIGNATED BY THE KEYNOTES LOCATED
OUTSIDE OF THE POLYGONS.
2
BUILDING "300"
18
3
BUILDING "300"
4
BUILDING "300"
14
18
19
5
BUILDING "300"
14
21
19
20
BUILDING "300"BUILDING "300" BUILDING "300" BUILDING "300" BUILDING "300"
14
TYP
TYP
18
TYP
2120
TYP
17
TYP
17
TYP
16
17
28
TYP
15
TO
HERE
18
TYP
18
TYP
14
25
14
14
TYP
14
TYP
TYP
18
TYP
2120
TYP
2720
TYP
2720
15
TO
HERE
14
18
14
14
25
18
14
TYP
17
18
19
15
TO
HERE
15
17
6
19
TYP
TYP
TYP
14
18
19
20
21
9
6
19
14
18
9
6
11
TYP
16
14
11
TYP
18
TYP
100
200
300
A3.3
KS
BP
Project number
Date
Drawn by
Checked by
Revision Revision Date
ROBERT POLCAR ARCHITECTS, INC
(480) 675-9760 (602) 363-4096
SCOTTSDALE, ARIZONA
ARCH D 24"x36"Sheet Size
7845 E. REDFIELD RD STE 100
SCOTTSDALE, AZ 85260
(602) 989-2433
110344104-1002-019-BRG
CA
MP
US
R
OO
F R
ES
TO
RA
TIO
NS
A
ND
W
EA
TH
ER
IZ
AT
IO
NS
JA
CK
W
. H
AR
MO
N E
LE
ME
NT
AR
Y S
CH
OO
L
J.O
. C
OM
B U
NIF
IE
D S
CH
OO
L D
IS
TR
IC
T
39
31
5 N
OR
TH
C
OR
TO
NA
D
RIV
E
SA
N T
AN
V
AL
LE
Y, A
RIZ
ON
A 8
51
40
2/27/2018
KEY PLAN
N
NO SCALE
BUILDING 300
1
BUILDING 300 - PARTIAL SOUTH ELEVATION
3/32" = 1'-0"
2
BUILDING 300 - PARTIAL SOUTH ELEVATION
3/32" = 1'-0"
3
BUILDING 300 - EAST ELEVATION
3/32" = 1'-0"
4
BUILDING 300 - PARTIAL NORTH ELEVATION
3/32" = 1'-0"
5
BUILDING 300 - PARTIAL NORTH ELEVATION
3/32" = 1'-0"
6
BUILDING 300 - WEST ELEVATION
3/32" = 1'-0"
KEYNOTES
1. CLEAN ALL EXTERIOR CONCRETE, MASONRY, STUCCO, GYPSUM BOARD
AND METAL FINISHES.
2. CLEAN ALL CRACKS OR HOLES IN MASONRY AND STUCCO. REMOVE
ANY EXISTING SEALANT AND PROPERLY PREPARE SURFACES FOR
REPAIR. REPAIR IN ACCORDANCE WITH THE SPECIFICATION PRIOR TO
COATING WALL SURFACE.
3. EXISTING MASONRY JOINT MATERIAL; REMOVE MATERIAL, CLEAN AND
PREP JOINT. INSTALL NEW BACKER ROD AND SEALANT AS SPECIFIED.
4. EXISTING GRADE AT BUILDING PERIMETER; EXCAVATE SOIL AWAY
FROM WALL DOWN TO 3” BELOW EXISTING GRADE. APPLY COATING TO
LEVEL OF EXCAVATION. RE-GRADE SOIL TO ORIGINAL GRADE,
PROVIDING POSITIVE DRAINAGE FROM BUILDING AT ALL LOCATIONS.
5. EXISTING CMU; CLEAN, REPAIR, PREP, BLOCKFILL AND COAT.
6. EXISTING STUCCO; CLEAN, REPAIR, PREP, BOCKFILL AND COAT.
7. EXISTING STUCCO WEEP SCREED; MASK WEEP HOLES FROM COATING
TO MAINTAIN DRAINAGE AT BASE OF STUCCO SYSTEM.
8. METAL WINDOW OR DOOR FRAME; REMOVE BUILDING SEALANTS,
CLEAN JOINT AND INSTALL NEW BACKER ROD AND SEALANT.
9. EXISTING CONDUCTOR HEAD AND DOWNSPOUT; CLEAN, PREP, PRIME
AND PAINT TO MATCH EXISTING COLOR.
10. PROVIDE NEW PRECAST CONCRETE SPLASH BLOCK AT DOWNSPOUT
DISCHARGE. RE-GRADE SOIL FOR POSITIVE DRAINAGE FROM SPLASH
BLOCK AND BUILDING.
11. METAL SURFACE; CLEAN, PREP, PRIME AND PAINT TO MATCH EXISTING
COLOR.
12. HOLLOW METAL DOOR AND FRAME; PROTECT HARDWARE, CLEAN,
PREP, PRIME AND PAINT EXTERIOR FACE AND EDGES.
13. HOLLOW FERROUS METAL WINDOW FRAMES; PROTECT GLAZING,
CLEAN, PREP, PRIME AND PAINT.
14. EXISTING SHEET METAL PARAPET COPING; REMOVE AND PROPERLY
DISPOSE/ RECYCLE. INSPECT EXISTING WOOD NAILER AND REPLACE IF
DAMAGED. INSTALL NEW PRE-FINISHED METAL COPING SYSTEM
INCLUDING CONTINUOUS SELF ADHERED BITUMINOUS FLASHING. SEE
SPECIFICATION. SEE DETAIL 1/ A10.4.
15. EXISTING BUILDING EXPANSION JOINT COVER; REMOVE SEALANTS,
CLEAN SEALANT JOINT AND INSTALL NEW BACKER ROD AND SEALANT.
CLEAN JOINT COVER, PREP, PRIME AND COAT WITH SEAMLESS ROOF
COATING.
16. EXISTING ROOF DRAINS; INSPECT AND PRESSURE TEST. REPAIR AS
NECESSARY. REPLACE MISSING OR DAMAGED DRAIN BASKETS.
17. EXISTING THROUGH WALL SCUPPER; TO REMAIN. PREP, PRIME AND
APPLY SEAMLESS ROOF COATING TO ALL SURFACES.
18. EXISTING LOW SLOPE ROOF SURFACE; CLEAN, REPAIR, PREP AND
PRIME. CUT OUT BLISTERS AND DAMAGED AREAS. TREAT SURFACE IN
ACCORDANCE WITH PULL TEST RESULTS. APPLY NEW SEAMLESS ROOF
COATING TO ENTIRE ROOF SURFACE.
19. EXISTING ROOF COATING ON WALL; CLEAN, REPAIR, PREP AND PRIME
ALL PREVIOUSLY COATED SURFACES. APPLY NEW SEAMLESS COATING
TO ALL PREVIOUSLY COATED SURFACES.
20. PROVIDE NEW TRAFFIC SURFACE FROM MECHANICAL UNIT
MAINTENANCE ACCESS POINT TO ROOF ACCESS. TYPICAL FOR ALL
UNITS ON ROOFS.
21. EXISTING EQUIPMENT REMAINS, ADJUST CURB HEIGHT AS REQUIRED
TO COMPLY WITH SEAMLESS ROOF COATING WARRANTY
REQUIREMENTS. REMOVE AND REPLACE EXISTING PITCH POCKETS,
COLLARS, ETC AS REQUIRED TO COMPLY WITH SEAMLESS ROOF
COATING MATERIAL MANUFACTURER'S WARRANTY REQUIREMENTS.
22. EXISTING EQUIPMENT CONNECTION; APPROPRIATE TRADES PERSON
TO INSPECT AND REPAIR, RELOCATE OR EXTEND AS NEEDED.
23. EXISTING BUILDING/ SIDEWALK JOINT MATERIAL; REMOVE, CLEAN AND
PREP JOINT. INSTALL NEW BACKER ROD AND SELF-LEVELING JOINT
MATERIAL AS SPECIFIED.
24. CLEAN, REPAIR, PREP, SPOT PRIME AND PAINT EXTERIOR STUCCO AND
GYPSUM BOARD SOFFITS AND CEILINGS.
25. METAL CANOPY; PREP, PRIME AND PAINT.
26. EXISTING BUILDING MOUNTED SIGN; REMOVE FOR COATING OF
EXTERIOR WALLS. CLEAN SIGN AND REINSTALL. TYPICAL FOR ALL
BUILDING MOUNTED SIGNS.
27. EXISTING ROOF HATCH; VERIFY PROPER OPERATION AND REPAIR AS
REQUIRED. CLEAN, PREP AND PAINT.
28. PROVIDE NEW 20 GUAGE GALVANIZED SHEET METAL SPLASH PAN AT
DOWNSPOUT DISCHARGE ON ROOF. ADHERE WITH ROOF SYSTEM
COMPATIBLE ADHESIVE.
29. EXISTING ROOFTOP COMMUNICATION EQUIPMENT; SCHOOL DISTRICT
TO RELOCATE FOR CONSTRUCTION AND THEN REINSTALL.
CONTRACTOR TO COORDINATE.
30. EXISTING TO REMAIN.
31. EXISTING CONCRETE WALL; CLEAN, PREP AND SEAL.
14
19
111098
23
8
TYP
30
14
30
4
NOTE: THE DRAWINGS INSIDE THE POLYGONS ARE REFERENCE
DRAWINGS AND ARE ORIGINAL CONSTRUCTION DOCUMENTS
PREPARED BY DLR GROUP INC., FOR THE EXISTING BUILDINGS.
THESE DRAWINGS ARE INCLUDED FOR REFERENCE ONLY TO
INDICATE LOCATIONS AND QUANTITIES OF ORIGINAL
CONSTRUCTION.
NEW WORK IS DESIGNATED BY THE KEYNOTES LOCATED
OUTSIDE OF THE POLYGONS.
BUILDING "300" BUILDING "300" BUILDING "300" BUILDING "300"
14 2 5 111 30 2 5
TYP
13
3
TYP
4
TYP
2 5
TYP
8
TYP
13 128
2 5 2 5 14
3
TYP
3
TYP
3
TYP
31
84
TYP
7
TYP
8
302 6
12
1
TYP
23
TYP
13
24 13
2
6
14
26
8
TYP
TYP
1411
302 5 31
TYP
25 9 123
8 12234 8
TYP TYP
2 5
TYP
8
TYP
3
2
5
914
TYP
1411
302 5 31
TYP
123 14
TYP
30 2 59
TYP
12 23
24
8 13 2412 128
TYP TYP TYP
138
TYP TYP
3 23 3 3
TYP
1
TYP
8
TYP
13
23
234
302 6 1
TYP
1489
TYP TYP
24 9 10
TYP
2 6
12238 138
TYP TYP
13 1313 12
11
302 5 31
TYP
3 14
TYP
142 6
128
TYP
2530
251213
8
TYP
TYP
18
5
2
5
2
24
12
26
TYP
31
TYP
5
2
TYP
11
18
20
7
BUILDING "300"
9
TYP
100
200
300
SPECIFIED
PRE-MANUFACTURED
METAL COPING.
INSIDE CONTINUOUS
HOLD DOWN CLEAT
EXTEND
MEMBRANE PAST
JOINT
20 GA. GALV.
ANCHOR CLIP, 12"
WIDE, AT 4'-0" O.C.
SPLICE PLATE,
MATCH COPING.
WOOD NAILER
STAINLESS
FASTENERS, TYP.
EXIST'G PARAPET
EXTERIOR SIDEROOF SIDE
CONTINOUS
SELF-ADHERED
MEMBRANE
PARAPET COPING
-
NEOPRENE
SEALANT STRIP,
FACTORY APPLIED
OUTSIDE
CONTINUOUS HOLD
DOWN CLEAT.
NOTE: USE ONLY SPECIFIED PARAPET
COPING. SPECIFICATION SECTION 07 62 00
A10.4
KS
BP
Project number
Date
Drawn by
Checked by
Revision Revision Date
ROBERT POLCAR ARCHITECTS, INC
(480) 675-9760 (602) 363-4096
SCOTTSDALE, ARIZONA
ARCH D 24"x36"Sheet Size
7845 E. REDFIELD RD STE 100
SCOTTSDALE, AZ 85260
(602) 989-2433
110344104-1002-019-BRG
CA
MP
US
R
OO
F R
ES
TO
RA
TIO
NS
A
ND
W
EA
TH
ER
IZ
AT
IO
NS
JA
CK
W
. H
AR
MO
N E
LE
ME
NT
AR
Y S
CH
OO
L
J.O
. C
OM
B U
NIF
IE
D S
CH
OO
L D
IS
TR
IC
T
39
31
5 N
OR
TH
C
OR
TO
NA
D
RIV
E
SA
N T
AN
V
AL
LE
Y, A
RIZ
ON
A 8
51
40
2/27/2018
KEY PLAN
N
NO SCALE
BUILDINGS 100,
200 & 300
KEYNOTES
1. CLEAN ALL EXTERIOR CONCRETE, MASONRY, STUCCO, GYPSUM BOARD
AND METAL FINISHES.
2. CLEAN ALL CRACKS OR HOLES IN MASONRY AND STUCCO. REMOVE
ANY EXISTING SEALANT AND PROPERLY PREPARE SURFACES FOR
REPAIR. REPAIR IN ACCORDANCE WITH THE SPECIFICATION PRIOR TO
COATING WALL SURFACE.
3. EXISTING MASONRY JOINT MATERIAL; REMOVE MATERIAL, CLEAN AND
PREP JOINT. INSTALL NEW BACKER ROD AND SEALANT AS SPECIFIED.
4. EXISTING GRADE AT BUILDING PERIMETER; EXCAVATE SOIL AWAY
FROM WALL DOWN TO 3” BELOW EXISTING GRADE. APPLY COATING TO
LEVEL OF EXCAVATION. RE-GRADE SOIL TO ORIGINAL GRADE,
PROVIDING POSITIVE DRAINAGE FROM BUILDING AT ALL LOCATIONS.
5. EXISTING CMU; CLEAN, REPAIR, PREP, BLOCKFILL AND COAT.
6. EXISTING STUCCO; CLEAN, REPAIR, PREP, BOCKFILL AND COAT.
7. EXISTING STUCCO WEEP SCREED; MASK WEEP HOLES FROM COATING
TO MAINTAIN DRAINAGE AT BASE OF STUCCO SYSTEM.
8. METAL WINDOW OR DOOR FRAME; REMOVE BUILDING SEALANTS,
CLEAN JOINT AND INSTALL NEW BACKER ROD AND SEALANT.
9. EXISTING CONDUCTOR HEAD AND DOWNSPOUT; CLEAN, PREP, PRIME
AND PAINT TO MATCH EXISTING COLOR.
10. PROVIDE NEW PRECAST CONCRETE SPLASH BLOCK AT DOWNSPOUT
DISCHARGE. RE-GRADE SOIL FOR POSITIVE DRAINAGE FROM SPLASH
BLOCK AND BUILDING.
11. METAL SURFACE; CLEAN, PREP, PRIME AND PAINT TO MATCH EXISTING
COLOR.
12. HOLLOW METAL DOOR AND FRAME; PROTECT HARDWARE, CLEAN,
PREP, PRIME AND PAINT EXTERIOR FACE AND EDGES.
13. HOLLOW FERROUS METAL WINDOW FRAMES; PROTECT GLAZING,
CLEAN, PREP, PRIME AND PAINT.
14. EXISTING SHEET METAL PARAPET COPING; REMOVE AND PROPERLY
DISPOSE/ RECYCLE. INSPECT EXISTING WOOD NAILER AND REPLACE IF
DAMAGED. INSTALL NEW PRE-FINISHED METAL COPING SYSTEM
INCLUDING CONTINUOUS SELF ADHERED BITUMINOUS FLASHING. SEE
SPECIFICATION. SEE DETAIL 1/ A10.4.
15. EXISTING BUILDING EXPANSION JOINT COVER; REMOVE SEALANTS,
CLEAN SEALANT JOINT AND INSTALL NEW BACKER ROD AND SEALANT.
CLEAN JOINT COVER, PREP, PRIME AND COAT WITH SEAMLESS ROOF
COATING.
16. EXISTING ROOF DRAINS; INSPECT AND PRESSURE TEST. REPAIR AS
NECESSARY. REPLACE MISSING OR DAMAGED DRAIN BASKETS.
17. EXISTING THROUGH WALL SCUPPER; TO REMAIN. PREP, PRIME AND
APPLY SEAMLESS ROOF COATING TO ALL SURFACES.
18. EXISTING LOW SLOPE ROOF SURFACE; CLEAN, REPAIR, PREP AND
PRIME. CUT OUT BLISTERS AND DAMAGED AREAS. TREAT SURFACE IN
ACCORDANCE WITH PULL TEST RESULTS. APPLY NEW SEAMLESS ROOF
COATING TO ENTIRE ROOF SURFACE.
19. EXISTING ROOF COATING ON WALL; CLEAN, REPAIR, PREP AND PRIME
ALL PREVIOUSLY COATED SURFACES. APPLY NEW SEAMLESS COATING
TO ALL PREVIOUSLY COATED SURFACES.
20. PROVIDE NEW TRAFFIC SURFACE FROM MECHANICAL UNIT
MAINTENANCE ACCESS POINT TO ROOF ACCESS. TYPICAL FOR ALL
UNITS ON ROOFS.
21. EXISTING EQUIPMENT REMAINS, ADJUST CURB HEIGHT AS REQUIRED
TO COMPLY WITH SEAMLESS ROOF COATING WARRANTY
REQUIREMENTS. REMOVE AND REPLACE EXISTING PITCH POCKETS,
COLLARS, ETC AS REQUIRED TO COMPLY WITH SEAMLESS ROOF
COATING MATERIAL MANUFACTURER'S WARRANTY REQUIREMENTS.
22. EXISTING EQUIPMENT CONNECTION; APPROPRIATE TRADES PERSON
TO INSPECT AND REPAIR, RELOCATE OR EXTEND AS NEEDED.
23. EXISTING BUILDING/ SIDEWALK JOINT MATERIAL; REMOVE, CLEAN AND
PREP JOINT. INSTALL NEW BACKER ROD AND SELF-LEVELING JOINT
MATERIAL AS SPECIFIED.
24. CLEAN, REPAIR, PREP, SPOT PRIME AND PAINT EXTERIOR STUCCO AND
GYPSUM BOARD SOFFITS AND CEILINGS.
25. METAL CANOPY; PREP, PRIME AND PAINT.
26. EXISTING BUILDING MOUNTED SIGN; REMOVE FOR COATING OF
EXTERIOR WALLS. CLEAN SIGN AND REINSTALL. TYPICAL FOR ALL
BUILDING MOUNTED SIGNS.
27. EXISTING ROOF HATCH; VERIFY PROPER OPERATION AND REPAIR AS
REQUIRED. CLEAN, PREP AND PAINT.
28. PROVIDE NEW 20 GUAGE GALVANIZED SHEET METAL SPLASH PAN AT
DOWNSPOUT DISCHARGE ON ROOF. ADHERE WITH ROOF SYSTEM
COMPATIBLE ADHESIVE.
29. EXISTING ROOFTOP COMMUNICATION EQUIPMENT; SCHOOL DISTRICT
TO RELOCATE FOR CONSTRUCTION AND THEN REINSTALL.
CONTRACTOR TO COORDINATE.
30. EXISTING TO REMAIN.
31. EXISTING CONCRETE WALL; CLEAN, PREP AND SEAL.
6
BUILDING "100"
10987
BUILDING "100" BUILDING "100" BUILDING "100"BUILDING "100"
6
2
4
TYP
2
BUILDING 300 - SECTION
3/32" = 1'-0"
3
BUILDING 300 - SECTION
3/32" = 1'-0"
4
BUILDINGS 100 & 200 - SECTION
3/32" = 1'-0"
5
BUILDING 300 - SECTION
3/32" = 1'-0"
NOTE: THE DRAWINGS INSIDE THE POLYGONS ARE REFERENCE
DRAWINGS AND ARE ORIGINAL CONSTRUCTION DOCUMENTS
PREPARED BY DLR GROUP INC., FOR THE EXISTING BUILDINGS.
THESE DRAWINGS ARE INCLUDED FOR REFERENCE ONLY TO
INDICATE LOCATIONS AND QUANTITIES OF ORIGINAL
CONSTRUCTION.
NEW WORK IS DESIGNATED BY THE KEYNOTES LOCATED
OUTSIDE OF THE POLYGONS.
23 8
2 6 14 2 61217
11
1
1
15 15
2 5 14 2 519
2
5
25
2
5
14 9
TYP
11
18 19
TYP
23
TYP TYP TYP
2
5
141914 18
TYP TYP TYP
15202122 19 18
TYP TYP
202122
31
TYP
2
6
8
13
TYP
2
6
7
4
18 18
1914 18
TYP TYP
15202122
2
6
14
4
1918
TYP TYP
1918
TYP TYP
2
5
23
14
6
4
TYP
7
TYP
2
TYP
7
TYP
6
2
24
8
TYP
12
13
11
TYP
11
TYP
11
TYP
1