canada ftdt (npa) module 4 v1.0

9
Canada FTDT (NPA) A Generic Interpretation Understanding Canada FTDT (NPA) Flight and Duty Time Limitations and Rest Requirements. Version 1.0 Copyright © 2014 Understanding Canada FTDT (NPA) – A Generic Interpretation All rights reserved.

Upload: garret-healy

Post on 13-Apr-2017

212 views

Category:

Education


1 download

TRANSCRIPT

Page 1: Canada ftdt (npa)  module 4  v1.0

Canada FTDT (NPA)A Generic Interpretation

Understanding Canada FTDT (NPA)

Flight and Duty Time Limitations and Rest Requirements.

Version 1.0

Copyright © 2014 Understanding Canada FTDT (NPA) – A Generic Interpretation All rights reserved.

Page 2: Canada ftdt (npa)  module 4  v1.0

Disclaimer

The documentation is provided “AS IS” and is solely intended to provide a general understanding of the author’s interpretation of the Proposed Canada FTDT as amended on 15-September-2014.

The author makes no representations and disclaims any and all responsibility for the completeness or accuracy of the documentation.

The author reserves the right, at his discretion, to change or modify the documentation as deemed appropriate.

Copyright © 2014, Understanding Canada FTDT (NPA) – A Generic Interpretation. All rights reserved.

Copyright © 2014 Understanding Canada FTDT (NPA) – A Generic Interpretation All rights reserved.

Page 3: Canada ftdt (npa)  module 4  v1.0

Module 4:

Application of Regulations:In-Progress Limitations

Copyright © 2014 Understanding Canada FTDT (NPA) – A Generic Interpretation All rights reserved.

Page 4: Canada ftdt (npa)  module 4  v1.0

Permitted Extension above the Scheduled FDP Limitation is dependent upon:Permitted Extension above the Scheduled FDP Limitation is dependent upon:• Time of FDP Start,

700.25 Unforeseen Operational

Circumstances — PIC’s Discretion

Copyright © 2014 Understanding Canada FTDT (NPA) – A Generic Interpretation All rights reserved.

Permitted Extension above the Scheduled FDP Limitation is dependent upon:• Time of FDP Start,• Number of Pilots,

• Number of Sectors, and• Number of Sectors, and• Class of Inflight Rest Facility

Page 5: Canada ftdt (npa)  module 4  v1.0

700.25 Unforeseen Operational

Circumstances — PIC’s Discretion

Copyright © 2014 Understanding Canada FTDT (NPA) – A Generic Interpretation All rights reserved.

• 2 Pilots, 09:00 FDP Start, 4 Sectors14:30

• 3 Pilots, 15:30 FDP start, 3 Sectors, Class 2 Rest Facility16:30• 4 Pilots, 14:30 FDP Start, 1 Sector, Class 1 Rest Facility 21:00

Page 6: Canada ftdt (npa)  module 4  v1.0

700.25 Unforeseen Operational

Circumstances — PIC’s Discretion

Copyright © 2014 Understanding Canada FTDT (NPA) – A Generic Interpretation All rights reserved.

Rest period following must be increased by the amount of the extension above the Scheduled FDP limit:

Example:• 2 Pilots, 09:00 FDP Start, 4 Sectors 12:30 FDP

Limit• Minimum Rest Away from Base 10:00

• FDP extended to 13:15 0:45 Extension• Required Rest must now be 10:45

Minimum Required rests are defined in:• 700.22, 700.34, 700.37

Page 7: Canada ftdt (npa)  module 4  v1.0

700.26 Unforeseen Operational Circumstances

Short Term Re-Planning — PIC’s Discretion

Split-Duty may be applied to extend a FDP above the scheduled limit under the following conditions:

• The first 0:45 of the break provided is not counted towards the extension. (700.31 (1)(e))

• The break given will only count at 50% towards the extension. (700.31 (1)(d)(iii))

Copyright © 2014 Understanding Canada FTDT (NPA) – A Generic Interpretation All rights reserved.

Page 8: Canada ftdt (npa)  module 4  v1.0

700.27 Delayed Reporting TimeRevised FDP Start Time

Original FDP Start Time Amount of Delay

Copyright © 2014 Understanding Canada FTDT (NPA) – A Generic Interpretation All rights reserved.

Amount of Delay FDP Limit Based Upon FDP start time

>= 10:00 Actual FDP Start time Actual FDP Start time

>= 4:00 and < 10:00

More Limiting of the Actual FDP start time or

the Original FDP start timeOriginal FDP

start time + 4:00

< 4:00More Limiting of the

Actual FDP start time or the Original FDP start time

Actual FDP Start time

Page 9: Canada ftdt (npa)  module 4  v1.0

Canada FTDT (NPA)A Generic Interpretation

Understanding Canada FTDT (NPA)

Flight and Duty Time Limitations and Rest Requirements.

Version 1.0

Copyright © 2014 Understanding Canada FTDT (NPA) – A Generic Interpretation All rights reserved.