canadian solar installation manual ul 154727

Upload: luis-antonio-espinoza-ruiz

Post on 02-Jun-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/10/2019 Canadian Solar Installation Manual Ul 154727

    1/14

    Headquarters

    545 Speedvale Avenue West,Guelph,Ontario, Canada N1K 1E6Tel: +1-519-837-18 81 Fax: +1-519-837-2550Email: [email protected]

    Germany

    Landsberger Strasse 94, 80339 Munich, GermanyTel: +49 (0) 89-51 996 89-0Fax: +49 (0) 89-51 996 89-11Email: [email protected]

    Italy

    Via Antonio Salandra, 18, 00187 Roma, ItalyTel: +39 06 4227 2272 Fax: +39 06 4227 4000Email: [email protected]

    Spain

    c/ Josefa Valcarcel, 8. 2nd floor, E-28027 Madrid, SpainTel: +34 91 320 28 84Fax: +34 91 320 84 38Email: [email protected]

    Tel:[email protected]

    USA 2420 Camino Ramon, Suite 125 San Ramon, CA 94583-4385 USATel: +1-888-998-7739 Fax: +1-925-866-2704Email: [email protected]

    Japan

    Round-Cross Shinjuku 5-Chome 8F, 5-17-5 Shinjuku Shinjuku-ku,Tokyo Japan 160-0022Tel: 03-5291-8591 Fax: 03-5291-8596Email: [email protected]

    Korea201, SK HUB Officetel, 708-26, Yeoksam-Dong, Kangnam-gu,Seoul, KoreaTel: (02) 539-7541 Fax: (02) 539-7505Email: [email protected]

    Singapore

    101 Thomson Road, #15-03 United SquareSingapore 307591Tel: +65 65729050 Fax: +65 62594690Email: [email protected]

    South Africa

    4 Clearview Place, Bentwood Village, Dainfern, 219 1, South AfricaTel: +27-867-750-600 Fax: +27-726-385-885Email: [email protected]

    Middle East

    Mohammed Bin Zayed City, Injazat Building, Flat: 321P.O Box: 39190, Abu-Dhabi, U.A.EEmail: [email protected]

    China

    199 Lushan Road, Suzhou New District, Jiangsu, China, 215129Tel: +86 (512) 6690-8088Email: [email protected]

    India

    Email: [email protected]

    www.canadiansolar.com

    Australia

    Unit 3B, North Rydelink Business Park 277-283 Lane Cove RoadMacquarie Park, NSW 2113, Australia

    +61 (2) 9889 4395Email:

    Solar ModuleInstallation Manual (UL)

    www.canadiansolar.com

  • 8/10/2019 Canadian Solar Installation Manual Ul 154727

    2/14

  • 8/10/2019 Canadian Solar Installation Manual Ul 154727

    3/14

  • 8/10/2019 Canadian Solar Installation Manual Ul 154727

    4/14

  • 8/10/2019 Canadian Solar Installation Manual Ul 154727

    5/14

  • 8/10/2019 Canadian Solar Installation Manual Ul 154727

    6/14

  • 8/10/2019 Canadian Solar Installation Manual Ul 154727

    7/14

  • 8/10/2019 Canadian Solar Installation Manual Ul 154727

    8/14

  • 8/10/2019 Canadian Solar Installation Manual Ul 154727

    9/14

  • 8/10/2019 Canadian Solar Installation Manual Ul 154727

    10/14

  • 8/10/2019 Canadian Solar Installation Manual Ul 154727

    11/14

  • 8/10/2019 Canadian Solar Installation Manual Ul 154727

    12/14

  • 8/10/2019 Canadian Solar Installation Manual Ul 154727

    13/14

  • 8/10/2019 Canadian Solar Installation Manual Ul 154727

    14/14

    www.canadiansolar.com EN-Rev 2.5 Copyright Nov. 2013.Canadian Solar Inc. 24

    Thetopmoduleedgemustengagetheclampaminimumof3/8ofaninchonthetopclampedgeandthebottommodule

    edgemustengageaminimumof11/16ofaninchonthebottomclampedge. Ifthesedistancescannotbemeasured,a

    totalof0.062inchesofgapisallowedbetweenthemoduleandbothclamps.Thisgapcanbeoffsettoonesideorsplit

    betweentheclamps.

    Alltheclampassemblies,spacerplate,andhardwareshouldbetightenedtothetorquetubewithatorquesettingof13

    2ftlbs(183Nm),usingthelongboltsprovided(boltlengthisdependentonmodelused).

    RefertoArrayTechnology Inc. InstallationGuideformore informationandalwaysfollow latestsafetyprocedureswhen

    installing.FailuretofollowcorrespondingregulatoryinstructionswillvoidCanadianSolarInc.modulewarranty.

    TableC4:AuthorizedattachmentsforATIclamping

    CS6PSeries CS6XSeries

    12inchlength

    standardclamp

    Upliftload 1200Pa

    Downforceload1200Pa

    Upliftload 2400Pa

    Downforceload5400Pa

    12inchlength

    highclearance

    clamp

    Upliftload 1200Pa

    Downforceload3600Pa

    Upliftload 2400Pa

    Downforceload5400Pa

    ANNEXD:AMENDMENTEDITIONSANDDATES

    ThefirsteditionRev1.1isreleasedinJan,2009.

    Rev2.1isamendedandreleasedinJan,2011.

    Rev2.2isamendedandreleasedinApr,2012.

    Rev2.3isamendedandreleasedinSep,2012.

    Rev2.4isamendedandreleasedinMay,2013.