Page 1: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Capability Systems Centre

capabilitysystems.unsw.adfa.edu.au

Designing Capability Through Research

Crafting and Implementing Project Execution Strategies is sponsored by Anywise Consulting and hosted by the Capability Systems Centre

Page 2: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Crafting and Implementing Project Execution Strategies for Complex

Projects

John Davies

Capability Systems Centre Seminar – 16 August 2017

Page 3: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

BackgroundDealing with complexity is a key challenge with system acquisition and sustainment becoming more interdependent with other capabilities (existing and emerging), rapid technological advancement, and greater emergence associated with end-user needs. This seminar explores the dimensions of complexity and offers guidance on how appropriate project execution strategies can best deal with this complexity.

Page 4: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Seminar Outline

0900-1200• Introduction (complexity and the failure of business as usual

approaches)• Risk Management• Selecting and Implementing Project Execution Strategies1300-1600• Governance• Risk Management in practice• Project Execution Strategies in Depth

Page 5: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

What is Complexity

‘Complex’ programs are not necessarily ‘complicated’.The United Kingdom National Audit Office (UK NAO) defines complexity as follows:• at the outset there is uncertainty over the route to delivering

the project outcome, or the project has aspects that have not previously been encountered; or

• there is a high level of change in the outcome required during the project’s lifetime

Keep in mind that ‘change’ could be simply a symptom of sloppy project management and systems engineering practices.

Page 6: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Dimensions of Complexity

Remington and Pollack

Page 7: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Assessment of ComplexityTreating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous proposition. Some elements of a program may be simple whilst others can be quite complex. Similarly, a project can start out complex and become simple (or vice versa).

Page 8: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Typical means of defining complexity

• The Kraljic matrix• Acquisition Category (ACAT)• ICCPM (Complexity Assessment Tool)• Helmsman (Project Complexity Framework)• Canadian Government http://www.tbs-sct.gc.ca/hgw-

cgf/oversight-surveillance/itpm-itgp/pm-gp/doc/pcra-ecrp-eng.asp

Page 9: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Helmsman complexity assessment -A ‘Comparison of Project Complexity between Defence and other Sectors’

Page 10: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

CASG Risk and Complexity

• Smart Buyer Framework– Core Acquisition and Core Sustainment Risks Drive

the Project Execution Strategy– No hard rules (unlike the previous Acquisition

Category (ACAT))

Page 11: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Smart Buyer – Detailed Design (2016)Core Acquisition Risk Categories Core Sustainment Risk Categories

Requirements In-Service Requirements

Technology Obsolescence

Schedule Commercial

Commercial Fundamental Inputs to Capability

Project Integration Financial

Defence Integration Strategic

Financial Operational

Strategic Industry

Industry

Page 12: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Problems with Complexity Assessment

• Uncertainty– Epistemic– Ontological

“We don’t know what we don’t know”

Presenter
Presentation Notes
Ontological risk – operating outside our experience base we cannot fathom risks (unknown unknowns) Epistemic risk – we can broadly identify the risk but may have no clue on likelihood
Page 13: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Further Problems with Complexity Assessments

• Temporal dimensions– Risks emerge and retire throughout the

acquisition and sustainment life cycle• Structural issues

– Applying a complexity ‘grade’ to the whole capability lifecycle and all sub-systems

Page 14: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Systems and Processes

• Many organisations seek to classify procurement into discrete categories.– Is this consistent with a ‘smart buyer’?– Do the cost savings associated with templates,

training and procedures outweigh the loss of flexibility and tailored approaches?

Page 15: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

The Coastline Paradox

Refer Andrew Pyke Presentation PCSG 2016

Source: hLps://41.media.tumblr.com/cdb7b518ed96f5d1ba3abace99077638/tumblr_n5s9nsUsw1sutkk1o1_500.png

Page 16: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Arnold Rimmer’s Study Plan“The first week of study, he would always devote to the construction of a revisiontimetable. Weeks of patient effort would be spent planning, designing and creating a revision schedule which, when finished, were minor works of art.

Every hour of every day was subdivided into different study periods, each labelled in his lovely, tiny copperplate hand; then painted over in watercolours, a different colour for each subject, the colours gradually becoming bolder and more urgent shades as the exam time approached. The effect was as if a myriad tiny rainbows had splintered and sprinkled across the poster-sized sheet of creamwove card.

The only problem was this: because the timetables often took seven or eight weeks, and sometimes more, to complete, by the time Rimmer had finished them the exam was almost on him. He'd then have to cram three months of astronavigation revision into a single week. Gripped by an almost deranging panic, he'd then decide to sacrifice the first two days of that final week to the making of another timetable. This time for someone who had to pack three months of revision into five days.” Grant Naylor, Red Dwarf – Infinity Welcomes Careful Drivers (1989)

Page 17: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Goldilocks Planning?• Not too much, not too little!• Ask yourself: what is the plan for?

– To Seek funding and create budgets– Identify resources– Achieve gate review milestones– Demonstrate confidence to stakeholders

Page 18: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Second Order Learning

“If the only change that can be contemplated takes place in the context of an existing mental model, then you are limited to bringing about first-order learning. If, however, the mental model itself can be changed, and purposes radically altered, then second-order change is possible.”

- M. Jackson, “Systems Thinking” (2003) p10.

Page 19: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Key Challenges

• Striking the balance between consistency and responsiveness– Resources– Repeatability– Centralised, Decentralised and Centre-led

approaches– Risk

Page 20: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Business as usual?

• Linearity (water fall development life cycle)• Too much planning (reductionist approaches)• Adoption of worst practice?

Page 21: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Key Success factors for Complex Projects

ICCPM ‘Contracting for Success in Complex Projects’ (2015)1. Clearly defined project goals and vision,2. Appropriate Relationship/behavioural management,3. Prudent risk management and equitable risk allocation,4. An acquisition and sustainment strategy suited to the project

at hand,5. Leadership and competencies of the team, and6. A robust project management and systems engineering

framework (hygiene factors)

Page 22: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Traditional Approach for Goal Alignment

The principal defines outcomes in precise terms (statements of requirement and statements of work) with a robust contractual framework that precisely allocates liability.

Defence Industry

Page 23: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

LinearityGate 0 –> Gate 1 –> Gate 2The Capability Lifecycle Manual now contemplates skipping Gate 1 for non-complex projects and direct source options and having multiple Gate 1 reviews for the most complex projects.

Page 24: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Gate Reviews“Gate 2 - Assure decision makers the proposal to commit public money is sound and should proceed with the acquisition”.

- The Capability Life Cycle Awareness Presentation (2016)

What does this mean? (acceptable risk, requirements stability?)

Page 25: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Post Gate 2

“In the event contractual terms within that envelope cannot be agreed, the Project will return to the Investment Committee with a recommendation on whether to terminate the Project or expand the performance/time/cost envelope.” Capability Life Cycle Manual (2016)

Page 26: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Traditional Approach to Managing Relationships

• A focus on liability assignment• liquidated damages• termination for convenience• no waiver clauses• onerous contract change proposal/variation

processes• Some attempts for Alternate Dispute Resolution

(ADR)

Page 27: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Traditional Approach for Risk Allocation

Abrahamson’s Principles of transferring the risk to the party best able to manage the risk if often ignored. Consider the following:• The principal assumes no responsibility for the reliability of

the tender documentation,• The tenderer must acquaint itself with all information, and• Information is provided for the convenience of tenders only

and this information is not guaranteed. J. Feehley ‘Tendering and Contract Documentation’ (1998)

Page 28: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

The Illusion of Risk Transfer

• Contracts cannot legislate for every permutation of risk

• Rarely will parties have ‘clean hands’• Risk take back is often the norm in complex

projects

Page 29: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Contracts – not a panacea• The role of the lawyer is to legislate for risk in

accordance with management’s instructions.• Problems

– GFE/GFI/GFD/GFF – baseline risks– Interdependencies with other projects or contracts– Uncertainty– Variations (there is rarely price competition with

variations)– Interpretation (fitness for purpose)– Insurance– Implied terms

Page 30: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Clean Hands and Risk Take Back

• IPT participation• Risks outside of the contractor’s control• Actions and behaviours modify the contract• Poor Contract Configuration Management

“A revised schedule is to business what a new season is to an athlete or a new canvas to an artist.”

N. Augustine ‘Augustine's Laws’ (1986)

Page 31: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Inappropriate Project Execution Strategies

One size will rarely fit all yet organisations love ‘boilerplate’ templates! Failure to vary the remuneration strategy as a function of lifecycle and risk.

Page 32: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Lack of Leadership

Leadership is a key component for supporting collaborative behaviours as observed by the UK NAO:“Every case study ranked leadership as the most important factor in developing collaborative relationships.”

UK NAO Good Governance ‘Measuring Success Through Collaborative Working Relationships’ (2006)

Page 33: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Worst Practice Leadership"Managing the NHS IT suppliers is like running a team of huskies. When one of the dogs goes lame, it is shot. It is then chopped up and fed to the other dogs. The survivors work harder, not only because they have had a meal, but also because they have seen what will happen should they themselves go lame." UK Parliament, Committee of Public Accounts (26 June 2006)

Page 34: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Don’t abandon the Hygiene factorsA final success factor for complex projects is to ensure all the procurement ‘hygiene’ factors are supported. Adopting all the other attributes will be meaningless if we do not have competencies in: • Project Management• Configuration Management• Quality Assurance• Systems Engineering• Commercial and Contracting Disciplines• Logistics

Page 35: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Risk Management and Complex Projects

• The acquisition and sustainment strategy is crafted to deal with known risks.

• Risks are typically high in complex projects• We also need to deal with uncertainty and

flexibility

Page 36: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Complex Project Risk management Challenges

• Very long implementation timeframes• Multiple Parties• Diverse stakeholders• Difficulty in assigning responsibility• First of type

Page 37: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Industry Risks

• Cash Flow• Demand/usage• Financing• Indices/fluctuations• Risk adjusted rates of return• Solvency• Insurance

Page 38: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Contract Risks

• Jurisdictional• Legislation change (Tax, R&D credits, Industrial

Relations, WH&S, Contract Administrative Law)

• Proportionate liability

Page 39: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

What are the processes for identifying risk

• Customer Drivers, Risks, Assumptions and Issues Log

• Liability Risk Assessments– Craft Project Execution Strategy to manage these

known risks• What are the problems with this approach?

Page 40: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

How do we traditionally deal with risk

• Accept the risk• Treat the risk• Avoid the risk• Transfer the risk (or partial transfer with risk

sharing)

Page 41: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

How does a contract deal with risk?

• Remuneration Strategy • Warranties• Limitation of liability• Indemnities• Liquidated damages• Consequential damages• Breach/remedies

Page 42: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Problems with risk management approaches in complex projects

• Clinical risk transfer is often not possible• Multi party involvement exacerbates problems

with allocation of risks• Failure to anticipate uncertainty• Failure to consider temporal dimensions of

risk (see example)

Page 43: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Time

Risk

Page 44: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Complex Project Risk Management Best Practice

• Early Industry Involvement • Offer Definition and Improvement Activities• Risk Sharing where appropriate• Joint Decision Making• Joint Risk management• Agile contracts

Page 45: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Early Industry Involvement

• The quality of risk identification and classification will improve with early industry involvement

• Probity Issues need to be carefully managed• The use of Early Contractor Involvement

Strategies improve the quality of the risk management function.

Page 46: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Risk Sharing

• Parties are more likely to be proactive in risk management if they have ‘skin in the game’.

• Options for risk sharing include– Remuneration (target cost, gainshare/painshare)– Achievement of Key Performance Indices– Shared costs (e.g. insurance)

Page 47: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Joint Decision Making

• Joint decision making does not mean that the customer’s decision making ability is fettered, rather joint decision making allows for:– Collaborative approaches to dealing with change– Support for agility– Dealing with emergence

Page 48: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Joint Risk Management

• Complex projects often fail because they do not take a holistic view of risk.

• Joint risk management may involve joint risk logs to avoid duplication and errors of omission.

Page 49: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Agile Contracts

• No contract can anticipate every outcome.• Agile contracts allow for off-ramps, rescoping,

and re-negotiation• We need to understand industry’s need for

certainty and ensure arrangements are both fair and contestable.

Page 50: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

No Such Thing as a Free Lunch

• Risk Sharing will attract new risks in itself• Costs of bespoke contracts• Behavioural alignment• Trust!

Page 51: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Risk Management Pitfalls

• Optimism Bias• Deviant Behaviours• Governance and Legislation

Page 52: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Megaprojects and Risk

• Rail – 45% cost overruns• Tunnels and bridges – 34% cost overruns• Roads – 20% cost overruns

Flyvbjerg et al (2003)

Weapon System Cost growth averages 46% RAND Corporation ‘Sources of Weapon System Cost growth’ (2008)

Page 53: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

RAND Corporation ‘Sources of Weapon System Cost growth’ (2008)

Page 54: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Optimism Bias - causes

• Strategic misrepresentation• Adversity to accept sunk costs• Cost Benefit Analysis shortcomings• Lack of commercial focus

Page 55: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Potential Deviant Behaviours

• Placing too much of your supplier’s profit at risk

• Inappropriate KPIs • Too many KPIs• Creating monopolies• Asymmetry of information (what is a smart

customer?)

Page 56: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

You get what you measure!

“In one (perhaps legendary) case, a key performance measure was the time taken to answer phone calls. The target was met by the contractor simply picking up the phone and hanging up again.”

ANAO ‘Developing and Managing Contracts - Better Practice guide’ (2012)

Page 57: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Contracting and Procurement Options

• What are business as usual approaches?• Why do they often fail in complex projects?• What can we do to improve upon the status

quo?

Page 58: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Background

The terms procurement option, procurement strategy, and acquisition and sustainment strategy are often used synonymously to describe:• Contract method• Market engagement method• Finance approach• Ownership strategyAcross the whole system lifecycle

Page 59: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Construction & Engineering ModelFocus on a two stage process:a. Designb. Constructione.g. AS 4300-1995 General Conditions of Contract for

Design and ConstructThis does not cater for other procurement options such as services contracts, R&D, spiral development, evolutionary acquisition, IT etc.

Page 60: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Procurement Option NomenclatureConventional Procurement Options• Traditional: Construct only contracts; and• Non-traditional:

i. Design and Construct (D&C) (or Design and Implement),ii. Design Construct and Maintain,iii. Managing Contractor/Contract Management,iv. Early Contractor Involvement, (ECI), and v. Spiral development or rapid prototypes (for software programs).

Non-Conventional Procurement Options• Alliance Contracts• Public-Private Partnerships

Presenter
Presentation Notes
This is based on the QLD government better procurement guide.
Page 61: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Traditional Contracts (Fixed Price Construct Only)Benefits

– Minimal Resources needed from the Buyer – Price competition demonstrates value for money (contra cost

reimbursement)– Quantitative emphasis on tender selections– Retention of legal remedies– Visibility of costs and schedule before contract signature– Adoption of Abrahamson’s principles of risk allocation – Mature insurance products– Arms length contract

Presenter
Presentation Notes
Best suited to the ‘black letter law’ approach Arguably greater certainty but this could be illusory
Page 62: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Traditional Contracts (continued)Costs

– Buyer liable for errors/omissions in the design– Greater likelihood of variations/contract change

proposals– Greater risk of no bids/inflated bids– Little or no scope for innovation – Greater likelihood of disputes

- Buyer must retain some design expertise

Presenter
Presentation Notes
Also look at waiver and carve outs demanded by the supplier Costs may be small for simple procurement Examples – building a house based on an architects design.
Page 63: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Design and Construct ContractsBenefits

– Same as traditional but buyer is no longer liable for design errors/omissions.

– Lower resources required from principal (no need to retain in house design expertise)

– Greater scope for innovationCosts

– Same as traditional but buyer loses control over the design- May introduce IP issues when contractor adopts proprietary design solutions.

Presenter
Presentation Notes
D&C are popular as principals often try to curtail design risks. Principals are often not ‘smart’ customers
Page 64: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Project ManagementDelegation of Project Management Responsibility (EPCM/PCM)• e.g. AS4916-2002 and AS4915-2002

There is a clear distinction between administrative versus contractual obligations

Defence examples – Integrated Support Contracts (above the line), Major Service Provider

Page 65: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

R.Quick “QLDs ECI Contract”(2007)

Page 66: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Benefits– Same as D&C– Less management resources needed from buyer

Costs– buyer loses control over management– Insurance becomes more complex

Page 67: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Managing Contractor

A form of outsourcing where the customer appoint a Managing Contractor (MC). The MC contracts directly with suppliers.The MC does not assume all risks associated with suppliers.

Page 68: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Benefits– Less resources required from Customer– MC incentivised to achieve superior outcomes

Costs– May be a limited pool of suppliers– Loss of Control

Page 69: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Early Contractor InvolvementFirst StageCost reimbursement for the initial design and risk reduction activities. Develop target cost and schedule for Stage 2.Second StageIncorporates Construction/Implementation (typically guaranteed maximum price)

Presenter
Presentation Notes
Where do we see ECI? Bridges Rail High risk roads
Page 70: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous
Page 71: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Benefits– Allows for early identification of risks.– Best suited for equitable risk allocation and the delivery of

value for money– Greater scope for innovation– Attractive to industry

Costs– Requires substantial buyer resources in the first stage– May be difficult to introduce price competition into tender

selection.– Not suitable where substantial risks exist in the construction

stage (stage 2)

Page 72: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Discussion

• How does the ECI process compare to Offer Definition and Improvement Activities?– Multi stage tender process– Early identification of potential suppliers– Less reliance on adversarial negotiations

Page 73: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Project Alliances• Risk Sharing• No disputes• No Blame• Open Book financial reporting• Best for Project Principles• Express Good Faith Provisions

Refer ‘National Alliance Contracting Policy and Guidelines’ (2014)

Presenter
Presentation Notes
Note that this guide is being replaced with less focus on pure alliances to more competitive TOC arrangements
Page 74: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Alliance Variations• Pure Alliance (no price competition)• Multiple TOC alliance (price competition)• Hybrid Alliance (carve out risk sharing/joint project teams)

Page 75: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Alliance Benefits• Creation of a commercial framework which aligns the

interests of all parties;• Improved risk management especially with uncertain

project requirements and environments;• Earlier involvement in preliminary design activities

providing greater visibility of project costs;• Reductions in resources needed to administer contracts,

especially contract change proposals;• Improved project performance and innovation;• Greater transparency in project prices; and• Attractive to industry (higher likelihood of bidding).

Page 76: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Alliance Costs- An absence of legal recourse should the project go awry,- Acceptance of risks that may be broader than the risks normally associated with a particular participant,- The absence of price competition in tender evaluations (for pure alliances),- The need for greater involvement of management resources in the alliance,- No cap on the project schedule or cost,- An increased risk of opportunistic behaviour from other parties to the alliance,- Prohibition on unilateral decision-making, and- Relatively high tendering costs.

Page 77: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Spiral Development/Evolutionary Acquisition(DPPM refers to incremental and spiral)Deviate from the stovepipe/waterfall development lifecycle by incrementally delivering capability. Avoids the big bang approach.Used in IT/systems engineering acquisition where end-user requirements are difficult to define.

Page 78: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous
Page 79: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Spiral DevelopmentBenefits• Provides the principal with flexibility to change project

requirements at each prototype stage• Incorporates gateway reviews to allow termination or progression

of the acquisition• Provides suppliers with a means to increase or decrease project

costs/fees as risks eventuate or get retired

Costs• Principal is not provided with certainty (fixed cost or fixed

schedule)• Needs greater management resources to implement from both

principal and supplier• There is inherently rework built into this procurement method

Presenter
Presentation Notes
Legal issues: Contract needs ‘off ramps’, Demobilisation costs, Good faith, and Hard to specify fixed fees.
Page 80: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Other Options

• Rapid Prototypes – FIRE• Design Competitions/Incentive Prizes• Challenge Based Acquisition

US Government Innovative Contracting Case Studies (2014)

Page 81: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Service Contracts and Performance Based ContractsUsed for:• Maintenance• Cleaning• Catering• Engineering Services

Presenter
Presentation Notes
Refer again to Seddon pg 27. Qualitative measures can lead to disputes Risks of focus on the wrong behaviours eg sacrifice ‘commercial purpose’ to meet agreed benchmarks/KPIs
Page 82: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Service Contracts Example Clause (cl 27 of AS4920-2003)The Contractor shall give the Principal reasonable advance notice of when the Contractor needs information, materials, documents or instructions from the Principal.

The Principal shall not be obliged to give any information, materials, documents or instructions earlier than the Principal should reasonably have anticipated at the date of acceptance of tender.

The Principal may direct in what order and at what dates and times the various stages or portions of the Services shall be performed. If the Contractor can reasonably comply with the direction, the Contractor shall do so. If the Contractor cannot reasonably comply, the Contractor shall give the Principal written notice of the reasons.

A performance program is a written statement showing the times and frequency of each performance duration and performance period cycle during the total performance period. It shall be deemed a Contract document.

The Principal may direct the Contractor to give the Principal a performance program within the time and in the form directed.

Does this cater for emergence and complexity?

Presenter
Presentation Notes
Is the contract certain? How is reasonable defined? Does good faith come into play (prescriptive versus proscriptive duties)? How do variations get costed? Is there a blank cheque?
Page 83: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Leasing Options

Ownership may not be desirable for the following reasons• High upfront costs• Taxation• Loss of flexibility• Obsolescence• Introduction of non-core activities

Options – traditional lease, wet lease, dry lease, hybrids (damp lease)

Page 84: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Leasing Risks and Opportunities

Ownership may not be desirable for the following reasons• Loss of flexibility• ‘Quiet possession’• Potential higher through life costs• Renewal issues

Private sector option – Sale In Lease Out (SILO) with accelerated depreciation.

Page 85: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Public Private Partnerships

‘PPPs may be loosely defined as agreements between the public and the private sector for the purposes of ‘designing, planning, financing, constructing, and/or operating projects, normally regarded as falling within the remit of the public sector.’

Richard Webb and Bernard Pulle, ‘Public Private Partnerships: An Introduction’, Economics, Commerce and Industrial Relations Group, Research Paper 1, 2002/2003.

Page 86: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Public Private Partnerships

Page 87: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Public Private Partnerships - Benefits

• ‘Free’ infrastructure for the public• More efficient delivery• Better utilisation with commercial focus• Eliminate non-core functions

Page 88: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Public Private Partnerships - Costs

• High costs of borrowing• Non-compete clauses• Optimism bias (strategic misrepresentation)• User pays?

Page 89: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Public Private Partnerships - Evolution

Supported Debt Model – the state provides some fundingCredit Finance Guarantee – The state underwrites some of the risk

Page 90: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

One Size does not fit all

There is great danger in looking at just one procurement option alone. We need to understand likely contract interfaces, risks, and responsibilities.

- multiparty contracts- multiple contracts

Page 91: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Exercise

Explore the likely contracts required to deliver the Future Submarine Capability- Consider all FIC and inter-agency agreements- Who is the prime?

Page 92: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Implementation issues – Best Practice

• Goal Alignment• Positive Relationships• Prudent Risk Management and allocation• A well crafted acquisition and sustainment strategy• Leadership

must retain robust PM, systems engineering, ILS, and commercial discipline.

Page 93: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Best Practice Goal Alignment

• Gainshare/painshare remuneration arrangements,• Joint decision making,• A collaborative process for managing change,• Integrated product teams, • Partnering charters, and• No disputes/no blame frameworks.

Page 94: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Best Practice Relationship Management

• Best for project culture,• No blame culture,• No disputes,• Transparency and a culture of ‘no surprises’,• Integrated Project Teams, and• Joint decision making.

Page 95: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Best Practice Risk Management

• Early Industry Engagement,• Joint risk and opportunity identification workshops,• Participation by insurance brokers in risk workshops,• Multi stage projects whereby risk allocation varies as

a function of the procurement lifecycle, and• Sharing risks where appropriate.

Page 96: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Best Practice Project Execution Strategy Implementation

• Multi-disciplinary approach• Converge to a solution as more information becomes

available• Strategies are fixed but plans are fluid• Consistency with enterprise objectives

Page 97: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Best Practice Leadership

• Key management participation in the program (participation in monthly reviews)

• Rights of refusal for key positions• A common understanding of the capability

principles is established throughout the organisation (shared vision)

• Talk the talk and walk the walk

Page 98: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Cautionary issues

• Behavioural drivers (too much at risk)• Governance, Accountability, and Probity• Off Ramps (market confidence)

Page 99: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Conclusions and Take Aways• One size does not fit all in Complex Projects• Plans can be fluid – Strategy should not!• Continually review the Business Case and ensure

transparency• Adopt a holistic risk management approach• Craft the Project Execution Strategy to drive the right

behaviours• Foster collaboration• Embrace the chaos! Manage expectations.

Page 100: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Workshops

This afternoon we will conduct some workshops to explore best practice acquisition and sustainment strategies in detail. We will look at three key areas:• Governance• Risk management• Flexibility

Page 101: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Governance

• Tricker’s Model (Compliance and performance)

• Public versus Private Sector Frameworks• Self regulation• Joint Governance

Page 102: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Compliance versus performance

• Compliance – following the rules• Performance – maximising value

– How do we measure performance

Page 103: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Public versus Private sector views

• Compare the Public Governance Performance Accountability Act to the Corporations Act– How does the law treat each entity?

Page 104: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Self Regulation

• Should we rely on trust alone?– Reputation– Repeat business– Cash Flow– Insurance claims record – Preserve relationships

Page 105: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Joint Governance

• Joint decision making• Joint risk management

• Issues – fetter decision making, deadlocks, accountability, insurance, claims/clean hands.

Page 106: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Case Study – Djimindi Lightweight Torpedo

Page 107: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Background

• Project Alliance between Defence and Torpedo OEM

• Alliance selected• Weapon to be integrated onto five platforms

(FFH,FFG, SH-70B, SH-2G Super Seasprite , AP-3C Orion)

• Subject to two ANAO audit reports

Page 108: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Alliance Features

• No Blame/No liability• Joint decision making (capability board

separate)• Gainshare/painshare

Page 109: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

ANAO findings

• Poor initial costings• [the project] will not deliver the capability originally sought by

the ADF, with uncertainty surrounding what will be delivered; has not achieved schedule, with the successful completion of a range of ongoing activities essential to providing certainty regarding when the capability will be released into Navy service

• Sustainment costs much higher than expected (exercise torpedo firing)

Page 110: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

What went wrong?

• Explore– Source selection and tender evaluation process– Alliance governance– Conflicts of interest/duty– Motivations– Off-ramps

Page 111: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Risk Management

• Risk attitudes• Negotiated Risk Transfer• Risk and Remuneration

Page 112: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Risk Attitudes

• We need to consider our risk attitudes at the ‘enterprise level’

• What is your attitude to risk?– Risk Neutral (expected value)– Risk Averse – Pessimist (maximin)– Risk Taker - Optimist (maximax)

Page 113: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Customer and Supplier Perspectives

• The development of the acquisition and sustainment strategy should contemplate both the risk attitude of the customer and supplier– What if there is a mismatch?

Page 114: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Case Study

• What delivers ‘best value’– Firm fixed price contract,– Cost reimbursement (with or without a not to

exceed), or– Cost sharing approach

Page 115: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

It Depends!

• Cost assurance/cost certainty versus cost control and cost minimisation– Are these mutually exclusive?

We can also apply the same logic to schedule and performance

Page 116: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Cultural issues

• A large organisation should normally adopt expected value decision making but how does this affect individual project managers?

• What can we do to foster a consistent, enterprise wide risk management framework?

Page 117: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Audit Perspectives

• The ANAO is very good at exploring compliance aspects but not performance

“Auditors are the troops who watch a battle from the safety of a hillside and, when the battle is over, come down to count the dead and bayonet the wounded.” - anon

Page 118: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Risk and Remuneration

• Revision– Firm fixed price– Cost reimbursement– Target Cost/Incentive– Cost plus fixed fee

• How does this affect risk?

Page 119: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Case Study – Performance Based Contract

• Fleet of Special Purpose Aircraft• Damp lease• Pay by the hour• Contracted minimum usage level• Surge capacity

Page 120: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Risks

• KPI gaming• Relationships• Safety• Other non-price elements

Page 121: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Solutions to Complex Risks

• Early industry involvement• 2-stage approaches• Joint risk identification• Offer Definition and Improvement Activities

– What are the risks of risk mitigation?

Page 122: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Strategic Supplier Selection

“It's unwise to pay too much, but it's worse to pay too little. When you pay too much, you lose a little money - that's all. When you pay too little, you sometimes lose everything, because the thing you bought was incapable of doing the thing it was bought to do. “ John Ruskin

“A man who knows the price of everything, and the value of nothing.” Oscar Wilde

Page 123: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Key stages

• Approach to market (intelligence)• Selection criteria (link to enterprise objectives)• When does competition end?

Page 124: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Issues

• Asymmetry of information• Bid the A-team, substitute the B-team• Misrepresentation• Mistake• Decoupling Acquisition and Sustainment

Page 125: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Traditional approaches

• Clearly defined specification and statement of work

• Selection based on capability and price

Problems – Tendered prices far exceed initial cost estimates. What of we do not know what we want. What if we over estimate industry capabilities. Loss of innovation

Page 126: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Gate reviews

• Must continually review business case“The business case is continually maintained throughout the life of a project, being formally verified by the board at each key decision point…” Managing Successful Projects with PRINCE 2 (2009) P 22.

Page 127: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Cost as an Independent Variable

• Maximise trade space• Case Study – AIM 9X

– Cost was on equal footing with performance– Established a cost performance IPT– Cost and Operational Effectiveness Analysis

Revealed that little performance gains would be achieved with a new rocket motor and warhead

Page 128: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

The problems with templates

• One size does not fit all• Battle between responsiveness and

consistency (smart buyer)• Laziness (emphasis on compliance)• Select the wrong supplier• Sabotage negotiations?

Page 129: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Relational Contracting

• Universal acceptance that collaboration leads to better outcomes– Partnering charters– Gainshare– No disputes– Transparency– Joint risk management

Page 130: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Disputes and Issues resolution

• Resolve at the lowest level possible• Rapid escalation• Alternate resolution (mediation, expert

determination)• Healthy relationship between Sponsors/SROs

Page 131: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Cobb’s Paradox

We know why projects fail, we know how to prevent their failure – why the do they continue to fail?”

Page 132: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

What can we do to break the cycle?

• Lessons learned• Culture• Training, education and experience• Expectation management

Presenter
Presentation Notes
Break into groups and explore what we can do to deviate from business as usual. Make sure we understand what new risks and issues are introduced
Page 133: Capability Systems Centre · best deal with this complexity. Seminar Outline. 0900-1200 ... Treating programs as a binary construct of either ‘complex’ or ‘simple’ is a dangerous

Conclusions

• Linear problem solving does not always solve non-linear problems

• Focus on enterprise objectives• Do not paint yourself into a corner• Change is inevitable – embrace it!