Capacity Workshop

Introduction

Gas Regional Initiative – North West Region

London 14 November 2008

Chair: Dominique JAMME

Director of Gas Infrastructure and Networks

Commission de Régulation de l’Energie (CRE)

Page 2: Capacity Workshop Introduction Gas Regional Initiative – North West Region London 14 November 2008 Chair: Dominique JAMME Director of Gas Infrastructure

2 Capacity Work Stream SG meeting, London, 14 November 2008

Agenda

1. Capacity situation in the NW region

2. Overview of the capacity work stream and project plans

3. Organization of the capacity session

Page 3: Capacity Workshop Introduction Gas Regional Initiative – North West Region London 14 November 2008 Chair: Dominique JAMME Director of Gas Infrastructure

3 Capacity Work Stream SG meeting, London, 14 November 2008

Capacity situation in the NW region

Easy access to capacity for transport across the region seen as a priority area for action in the GRI NW

Substantial challenges confirmed by the Roadmap (April 2008)

“Capacity should be easily available and tradable”

“Capacity should be fungible, compatible with trade in the commodity and consistent across the region”

Since the Roadmap was presented in Amsterdam, progress has been made setting up the priority Projects for capacity issue

7 projects plans tackling various aspects of capacity issue in a coherent approach

But congestion situation still existing on the majority of IPs in the region

Page 4: Capacity Workshop Introduction Gas Regional Initiative – North West Region London 14 November 2008 Chair: Dominique JAMME Director of Gas Infrastructure

4 Capacity Work Stream SG meeting, London, 14 November 2008

Capacity situation in the NW region Percentage of firm available capacity compared to the total of technical capacity

Selected interconnection points (H gas):

• Blaregnies / Taisnières

• Eynatten

• Medelsheim / Obergailbach

• Bunde Oude / Statenzijl

Preliminary remarks on data:

• Time horizon: 2009 and 2010 (until may 2010) i.e. 18 months from Nov. 2008 (in accordance with Reg. n° 1775/2005 on publication of information at relevant points)

• Calculation based on TSOs’ data available for consultation on GTE+ Transparency Platform (www.gas-roads.eu). These data are also available on TSOs’ websites.

• On Fluxys side: conditional capacity considered as firm capacity

• On GTS side, some information are mentioned as confidential (C)

!

Blaregnies / Taisnières

Medelsheim / Obergailbach

Eynatten

BOS

Page 5: Capacity Workshop Introduction Gas Regional Initiative – North West Region London 14 November 2008 Chair: Dominique JAMME Director of Gas Infrastructure

5 Capacity Work Stream SG meeting, London, 14 November 2008

Capacity situation in the NW regionPercentage of firm available capacity compared to the total of technical capacity

C = confidential data

Page 6: Capacity Workshop Introduction Gas Regional Initiative – North West Region London 14 November 2008 Chair: Dominique JAMME Director of Gas Infrastructure

6 Capacity Work Stream SG meeting, London, 14 November 2008

Agenda

1. Capacity situation in the NW region

2. Overview of the capacity workstream and project plans

3. Organization of the capacity session

Page 7: Capacity Workshop Introduction Gas Regional Initiative – North West Region London 14 November 2008 Chair: Dominique JAMME Director of Gas Infrastructure

7 Capacity Work Stream SG meeting, London, 14 November 2008

Overview of the capacity workstream

OPTIMISING USE OF CAPACITY and CREATING CAPACITY

Facilitating access to capacity

= Project plan on Bundled Products

= Project plan on Capacity Service Evolution

Increasing available firm capacity

= Project plan on BOS

Maximising use of capacity

= Project plan on Short term capacity

= Project plan on Day-ahead platform at BOS

= Project plan on Fluxys interruptible services

Coordination of the investment project

=

Project plan on Open Season

Pilot project plan on the IPs of Blaregnies / Taisnières & Medelsheim / Obergailbach

Page 8: Capacity Workshop Introduction Gas Regional Initiative – North West Region London 14 November 2008 Chair: Dominique JAMME Director of Gas Infrastructure

8 Capacity Work Stream SG meeting, London, 14 November 2008

Overview of the project plans

Project plan on Fluxys

interruptible services

Objective

Improve the functioning of Belgian transit system

Scope

Examination of Fluxys’ new interruptible services (transit and existing entry capacity for domestic transport; overbooking situation and buy-back measures)

Deliverable

Description of services (Q4-08)

Assessing market value (Q1-09)

Next step

Identification and analysis of “other initiatives”

Page 9: Capacity Workshop Introduction Gas Regional Initiative – North West Region London 14 November 2008 Chair: Dominique JAMME Director of Gas Infrastructure

9 Capacity Work Stream SG meeting, London, 14 November 2008

Overview of the project plans

Project plan on pilot IPs of B / T

and M / O

Objective: improve functioning and capacity access at two pilot interconnection points

• Possibility to get access to equal capacity on each side of the IPs • Improvement of the interoperability of adjacent networks and improvement of the gas transit

Context

First set of concrete proposals from TSOs in Feb. 08 on capacity products and service offered, capacity increase (O.S.), procedures (booking notice…) and transparency (publication of data…)

Deliverable

Follow-up of implementation of commitments (Q4-08)

Next step

Further improvements and roll-out to others IPs (Q2-09)

Page 10: Capacity Workshop Introduction Gas Regional Initiative – North West Region London 14 November 2008 Chair: Dominique JAMME Director of Gas Infrastructure

10 Capacity Work Stream SG meeting, London, 14 November 2008

Overview of the project plans

Project plan at BOS (1)

“DACA”

Objective

Better use of existing capacity, improve liquidity and introduce market based trading of capacity (auctioning)

Sale of primary interruptible capacity + secondary firm capacity

Sale via online trading platforms (Trac-X and APX)

Status of implementation

Pilot started on May 08. but success of the project highly conditioned to the liquidity of the market (few transactions took place)

Some arrangements to be introduced on Jan. 09. to improve secondary trading

Next step

Initial evaluation of modified arrangements before going further. Possible request to extend the duration of the pilot

Page 11: Capacity Workshop Introduction Gas Regional Initiative – North West Region London 14 November 2008 Chair: Dominique JAMME Director of Gas Infrastructure

11 Capacity Work Stream SG meeting, London, 14 November 2008

Overview of the project plans

Project plan at BOS (2)

“Flow Commitments”

Objective

Increase available firm capacity for the short term at Bunde/Oude Statenzjil through implementation of flow commitments (FCs)

Key milestones

• Develop concept of FC

• Examination of FC impact on (commodity) markets in NL and D and relation of FC to swaps

• Evaluate regulatory framework and legal feasibility

Next step

Publication of a working paper on flow commitment concept (Q4-08) and solve resource issue with TSOs and stakeholders

Page 12: Capacity Workshop Introduction Gas Regional Initiative – North West Region London 14 November 2008 Chair: Dominique JAMME Director of Gas Infrastructure

12 Capacity Work Stream SG meeting, London, 14 November 2008

Agenda

1. Capacity situation in the NW region

2. Overview of the capacity workstream and project plans

3. Organization of the capacity session

Page 13: Capacity Workshop Introduction Gas Regional Initiative – North West Region London 14 November 2008 Chair: Dominique JAMME Director of Gas Infrastructure

13 Capacity Work Stream SG meeting, London, 14 November 2008

Organization of capacity session

Four projects selected for immediate attention

OPTIMISING THE USE OF

EXISTING CAPACITY

Short term capacity project planExamination of how unused capacity could be released day-ahead and investigating into whether renomination rules have to be reformed

Bundled products Overview of different platforms offering bundled products and analysis of how combined day-ahead primary capacity can be made available on the market

Capacity service evolution Increase the compatibility of capacity services and marketing procedures

CREATING CAPACITY

Coordination of open seasonAddressing difficulties encountered in coordination of O. S. ; defining effective and operational coordinated O.S. mechanisms

Interactive debate on few concrete questions to get tangible propositions

Page 14: Capacity Workshop Introduction Gas Regional Initiative – North West Region London 14 November 2008 Chair: Dominique JAMME Director of Gas Infrastructure

14 Capacity Work Stream SG meeting, London, 14 November 2008

Organization of capacity session

TIME AGENDA TOPICS CONTRIBUTOR

10:50 1. Opening and welcome

11:00

2. Overview and update on capacity in the North West region

- Inventory of capacity situation and progress

- Overview of the capacity work stream

Dominique Jamme

11:20

3. Optimising the use of existing capacity (presentation and debate)

- Short term capacity

- Bundled products and capacity service evolution

BNetzA

& Ontras

12:30 Lunch -

14:004. Creating capacities: Open season coordination (presentation and debate)

CRE

14:45 5. ConclusionsLed by

Dominique Jamme

15:00 Workshop ends -

Timing

Page 15: Capacity Workshop Introduction Gas Regional Initiative – North West Region London 14 November 2008 Chair: Dominique JAMME Director of Gas Infrastructure

15 Capacity Work Stream SG meeting, London, 14 November 2008

Thank you for your attention!

* * *

[email protected]