Capital Metro Transit Development Plan:

Financial PlanFebruary 2017

Prepared by:

Page 2: Capital Metro Transit Development Plan: Financial Planconnections2025.org/wp-content/uploads/2017/03/... · Introduction Capital Metro’s Connections 2025 is a transit system study

Introduction

Capital Metro’s Connections 2025 is a transit system study that aims to rethink public mobility in Central

Texas. The study, conducted over a year by Transportation Management and Design (TMD) Inc., is the

latest in a series of reviews commissioned by Capital Metro every five years. With this study, the agency

wanted to address declining ridership, changing demographics, population growth and emerging new

development that has resulted in increasing roadway congestion. Connections 2025 seeks to address

both short-term (five years) and longer-term (10 years) public mobility needs and opportunities within a

sustainable financial plan based on current and potential increased funding.

This study reviewed the broader network structure and route-specific performance to provide Capital

Metro with a comprehensive understanding of its market conditions and service performance. The

findings led to the development of phased recommendations designed to build upon the network’s

market opportunities and performance strengths, maximize ridership, improve the overall rider

experience and ensure the system’s financial sustainability. The recommendations are based on board-

established goals, analysis of existing and future market conditions, service performance data and

feedback from Capital Metro riders and key stakeholders. Connections 2025 is intended to help guide

transit service development over the next decade.

Cost Information by Service Type and by RouteThe following tables and charts present some basic metrics for each service category and by route. Comparisons are made for annual hours, annual ridership, passengers per hour, annual cost and cost per rider. Metrics proposed for Year 10 include all recommendations implemented in the Transit Plan. However, the present cost value is used for both current and proposed categories to ensure a fair comparison.

Connections 2025 addresses regional mobility issues of both existing and potential riders. To that end,

the project accomplishes the following:

Improves transit network design to increase ridership and improve public mobility

Uses operating resources more effectively and efficiently

Builds advocacy and ownership within the community

Defines transit’s role in public mobility and economic development

Page 3: Capital Metro Transit Development Plan: Financial Planconnections2025.org/wp-content/uploads/2017/03/... · Introduction Capital Metro’s Connections 2025 is a transit system study

Service Types Bus Current 75.00$     cost per hour Rail 300.00$   cost per hourBus Proposed 75.00$     cost per hour (present value of cost for comparison purposes)

Local

Local

Compare Hours Ridership Passengers per Hour

Cost Cost/Pax

Current 936,938             23,546,860        25.1 70,270,337$              2.98$                

Proposed 924,697             21,828,510        23.6 69,352,269$              3.18$                

Variance (12,241) (1,718,350) (1.5) ($918,068) $0.19

Flyer

Flyer

Compare Hours Ridership Passengers per Hour

Cost Cost/Pax

Current 35,823               462,890             12.9 2,686,719$                 5.80$                

Proposed 3,060                 49,980               16.3 229,500$   4.59$                

Variance (32,763) (412,910) 3.4 ($2,457,219) ($1.21)

Express

Express

Compare Hours Ridership Passengers per Hour

Cost Cost/Pax

Current 40,324               643,136             15.9 3,024,300$                 4.70$                

Proposed 108,816             2,265,710          20.8 8,161,181$                 3.60$                

Variance 68,492 1,622,575 4.9 $5,136,881 ($1.10)

MetroRapid

MetroRapid

Compare Hours Ridership Passengers per Hour

Cost Cost/Pax

Current 152,200             3,069,755          20.2 11,415,006$              3.72$                

Proposed 393,070             13,691,940        34.8 29,480,250$              2.15$                

Variance 240,870 10,622,185 14.7 $18,065,244 ($1.57)

UT Shuttle

UT Shuttle

Compare Hours Ridership Passengers per Hour

Cost Cost/Pax

Current 102,257             4,107,473          40.2 7,669,241$                 1.87$                

Proposed 60,376               2,855,855          47.3 4,528,185$                 1.59$                

Variance (41,881) (1,251,618) 7.1 ($3,141,056) ($0.28)

MetroRail

MetroRail

Compare Hours Ridership Passengers per Hour

Cost Cost/Pax

Current 12,071               775,538             64.2 3,621,245$                 4.67$                

Proposed 28,385               1,444,645          50.9 8,515,500$                 5.89$                

Variance 16,314 669,107 (13.4) $4,894,255 $1.23

Full System

Full System

Compare Hours Ridership Passengers per Hour

Cost Cost/Pax

Current 1,279,612          32,605,651        25.5 98,686,849$              3.03$                

Proposed 1,518,403          42,136,640        28  120,266,885              3 

Variance 238,791 9,530,989 2.3 $21,580,037 ($0.17)

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours

Annual Ridership

Passengers / Hour

Annual Cost

Cost / Rider

Annual Hours

936,938  924,697 

CURRENT PROPOSED

23,546,860  21,828,510 

CURRENT PROPOSED

25.1  23.6 

CURRENT PROPOSED

$70,270,337  $69,352,269 

CURRENT PROPOSED

$2.98  $3.18 

CURRENT PROPOSED

60,756 

41,605 

CURRENT PROPOSED

2,064,210 

1,378,910 

CURRENT PROPOSED

34.0  33.1 

CURRENT PROPOSED

$4,556,675 

$3,120,375 

CURRENT PROPOSED

$2.21  $2.26 

CURRENT PROPOSED

35,823  3,060 

CURRENT PROPOSED

462,890  49,980 

CURRENT PROPOSED

12.9  16.3 

CURRENT PROPOSED

$2,686,719  $229,500 

CURRENT PROPOSED

$5.80 $4.59 

CURRENT PROPOSED

60,756 

41,605 

CURRENT PROPOSED

2,064,210 

1,378,910 

CURRENT PROPOSED

34.0  33.1 

CURRENT PROPOSED

$4,556,675 

$3,120,375 

CURRENT PROPOSED

$2.21  $2.26 

CURRENT PROPOSED

40,324  108,816 

CURRENT PROPOSED

643,136  2,265,710 

CURRENT PROPOSED

15.9  20.8 

CURRENT PROPOSED

$3,024,300  $8,161,181 

CURRENT PROPOSED

$4.70 $3.60 

CURRENT PROPOSED

152,200 393,070 

CURRENT PROPOSED

3,069,755 

13,691,940 

CURRENT PROPOSED

20.2 

34.8 

CURRENT PROPOSED

$11,415,006 $29,480,250 

CURRENT PROPOSED

$3.72  $2.15 

CURRENT PROPOSED

102,257  60,376 

CURRENT PROPOSED

4,107,473  2,855,855 

CURRENT PROPOSED

40.2 47.3 

CURRENT PROPOSED

$7,669,241  $4,528,185 

CURRENT PROPOSED

$1.87  $1.59 

CURRENT PROPOSED

60,756 

41,605 

CURRENT PROPOSED

2,064,210 

1,378,910 

CURRENT PROPOSED

34.0  33.1 

CURRENT PROPOSED

$4,556,675 

$3,120,375 

CURRENT PROPOSED

$2.21  $2.26 

CURRENT PROPOSED

12,071  28,385 

CURRENT PROPOSED

775,538  1,444,645 

CURRENT PROPOSED

64.2 50.9 

CURRENT PROPOSED

$3,621,245  $8,515,500 

CURRENT PROPOSED

$4.67 $5.89 

CURRENT PROPOSED

60,756 

41,605 

CURRENT PROPOSED

2,064,210 

1,378,910 

CURRENT PROPOSED

34.0  33.1 

CURRENT PROPOSED

$4,556,675 

$3,120,375 

CURRENT PROPOSED

$2.21  $2.26 

CURRENT PROPOSED

1,279,612 

1,518,403 

CURRENT PROPOSED

32,605,651 

42,136,640 

CURRENT PROPOSED

25.5  28 

CURRENT PROPOSED

$98,686,849 

120,266,885 

CURRENT PROPOSED

$3.03  3 

CURRENT PROPOSED

Page 4: Capital Metro Transit Development Plan: Financial Planconnections2025.org/wp-content/uploads/2017/03/... · Introduction Capital Metro’s Connections 2025 is a transit system study

By Route Current 75.00$         average cost per hour (all contractors)Proposed 75.00$         average cost per hour (all contractors) (present value of cost for comparison purposes)

1

Route             1-Metric/S. Congress

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 60,756         2,064,210           34.0             4,556,675$         2.21$           

Proposed 41,605         1,378,910           33.1             3,120,375$         2.26$           

Variance (19,151) (685,300) (0.8) ($1,436,300) $0.06

2

Route 2‐Rosewood

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 13,089         287,380              22.0             981,694$            3.42$           

Proposed 24,195         432,610              17.9             1,814,625$         4.19$           

Variance 11,106 145,230 (4.1) $832,931 $0.78

3

Route 3‐Burnet/Manchaca

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 48,368         1,393,260           28.8             3,627,588$         2.60$           

Proposed ‐               ‐  ‐$  

Variance (48,368) (1,393,260) (28.8) ($3,627,588) ($2.60)

4

Route 4‐Montopolis

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 19,312         446,775              23.1             1,448,381$         3.24$           

Proposed ‐               ‐  ‐$  

Variance (19,312) (446,775) (23.1) ($1,448,381) ($3.24)

5

Route 5‐Woodrow/South 5th

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 38,902         815,140              21.0             2,917,675$         3.58$           

Proposed 24,820         424,735              17.1             1,861,500$         4.38$           

Variance (14,082) (390,405) (3.8) ($1,056,175) $0.80

6

Route 6‐East 12th

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 10,401         211,205              20.3             780,106$            3.69$           

Proposed 17,680         290,840              16.5             1,326,000$         4.56$           

Variance 7,279 79,635 (3.9) $545,894 $0.87

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

60,756 

41,605 

CURRENT PROPOSED

2,064,210 

1,378,910 

CURRENT PROPOSED

34.0  33.1 

CURRENT PROPOSED

$4,556,675 $3,120,375 

CURRENT PROPOSED

$2.21  $2.26 

CURRENT PROPOSED

13,089 

24,195 

CURRENT PROPOSED

287,380  432,610 

CURRENT PROPOSED

22.0 17.9 

CURRENT PROPOSED

$981,694  $1,814,625 

CURRENT PROPOSED

$3.42  $4.19 

CURRENT PROPOSED

48,368 

CURRENT PROPOSED

1,393,260 

CURRENT PROPOSED

28.8 

CURRENT PROPOSED

$3,627,588 $‐

CURRENT PROPOSED

$2.60 

CURRENT PROPOSED

19,312 

CURRENT PROPOSED

446,775  ‐

CURRENT PROPOSED

23.1 

CURRENT PROPOSED

$1,448,381  $‐

CURRENT PROPOSED

$3.24 

CURRENT PROPOSED

38,902 

24,820 

CURRENT PROPOSED

815,140  424,735 

CURRENT PROPOSED

21.0 17.1 

CURRENT PROPOSED

$2,917,675 $1,861,500 

CURRENT PROPOSED

$3.58  $4.38 

CURRENT PROPOSED

10,401 

17,680 

CURRENT PROPOSED

211,205  290,840 

CURRENT PROPOSED

20.3 16.5 

CURRENT PROPOSED

$780,106  $1,326,000 

CURRENT PROPOSED

$3.69 $4.56 

CURRENT PROPOSED

Page 5: Capital Metro Transit Development Plan: Financial Planconnections2025.org/wp-content/uploads/2017/03/... · Introduction Capital Metro’s Connections 2025 is a transit system study

7

Route 7‐Duval/Dove Springs

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 80,415         2,621,595           32.6             6,031,156$         2.30$           

Proposed 81,595         2,798,980           34.3             6,119,625$         2.19$           

Variance 1,180 177,385 1.7 $88,469 ($0.11)

10

Route 10‐South First/Red River

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 52,332         1,572,475           30.0             3,924,888$         2.50$           

Proposed 84,300         3,535,425           41.9             6,322,500$         1.79$           

Variance 31,968 1,962,950 11.9 $2,397,613 ($0.71)

17

Route 17‐Cesar Chavez

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 24,721         802,140              32.4             1,854,088$         2.31$           

Proposed 30,145         1,149,570           38.1             2,260,875$         1.97$           

Variance 5,424 347,430 5.7 $406,788 ($0.34)

18

Route 18‐MLK, Jr./Enfield

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 17,068         372,650              21.8             1,280,125$         3.44$           

Proposed 35,910         882,785              24.6             2,693,250$         3.05$           

Variance 18,842 510,135 2.8 $1,413,125 ($0.38)

19

Route 19‐Bull Creek

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 15,070         264,935              17.6             1,130,225$         4.27$           

Proposed ‐               ‐  ‐$  

Variance (15,070) (264,935) (17.6) ($1,130,225) ($4.27)

20

Route 20‐Manor/Riverside

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 46,898         1,398,505           29.8             3,517,369$         2.52$           

Proposed ‐               ‐  ‐$  

Variance (46,898) (1,398,505) (29.8) ($3,517,369) ($2.52)

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

80,415  81,595 

CURRENT PROPOSED

2,621,595  2,798,980 

CURRENT PROPOSED

32.6  34.3 

CURRENT PROPOSED

$6,031,156 

$6,119,625 

CURRENT PROPOSED

$2.30  $2.19 

CURRENT PROPOSED

52,332 

84,300 

CURRENT PROPOSED

1,572,475 

3,535,425 

CURRENT PROPOSED

30.0 

41.9 

CURRENT PROPOSED

$3,924,888 

$6,322,500 

CURRENT PROPOSED

$2.50  $1.79 

CURRENT PROPOSED

24,721 30,145 

CURRENT PROPOSED

802,140 1,149,570 

CURRENT PROPOSED

32.4 38.1 

CURRENT PROPOSED

$1,854,088  $2,260,875 

CURRENT PROPOSED

$2.31  $1.97 

CURRENT PROPOSED

17,068 

35,910 

CURRENT PROPOSED

372,650 882,785 

CURRENT PROPOSED

21.8  24.6 

CURRENT PROPOSED

$1,280,125  $2,693,250 

CURRENT PROPOSED

$3.44  $3.05 

CURRENT PROPOSED

15,070 

CURRENT PROPOSED

264,935  ‐

CURRENT PROPOSED

17.6 

CURRENT PROPOSED

$1,130,225  $‐

CURRENT PROPOSED

$4.27 

CURRENT PROPOSED

46,898 

CURRENT PROPOSED

1,398,505 ‐

CURRENT PROPOSED

29.8 

CURRENT PROPOSED

$3,517,369 $‐

CURRENT PROPOSED

$2.52 

CURRENT PROPOSED

Page 6: Capital Metro Transit Development Plan: Financial Planconnections2025.org/wp-content/uploads/2017/03/... · Introduction Capital Metro’s Connections 2025 is a transit system study

21

Route 21‐Exposition

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 12,424         193,215              15.6             931,775$            4.82$           

Proposed ‐               ‐  ‐$  

Variance (12,424) (193,215) (15.6) ($931,775) ($4.82)

22

Route 22‐Chicon

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 12,364         198,370              16.0             927,275$            4.67$           

Proposed 12,920         261,375              20.2             969,000$            3.71$           

Variance 556 63,005 4.2 $41,725 ($0.97)

30

Route 30‐Barton Creek 

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 20,996         388,405              18.5             1,574,675$         4.05$           

Proposed 12,410         190,425              15.3             930,750$            4.89$           

Variance (8,586) (197,980) (3.2) ($643,925) $0.83

37

Route 37‐Colony Park/Windsor Park

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 35,312         898,365              25.4             2,648,419$         2.95$           

Proposed 36,890         568,515              15.4             2,766,750$         4.87$           

Variance 1,578 (329,850) (10.0) $118,331 $1.92

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

12,424 

CURRENT PROPOSED

193,215  ‐

CURRENT PROPOSED

15.6 

CURRENT PROPOSED

$931,775  $‐

CURRENT PROPOSED

$4.82 

CURRENT PROPOSED

12,364  12,920 

CURRENT PROPOSED

198,370  261,375 

CURRENT PROPOSED

16.0 20.2 

CURRENT PROPOSED

$927,275  $969,000 

CURRENT PROPOSED

$4.67 $3.71 

CURRENT PROPOSED

20,996 

12,410 

CURRENT PROPOSED

388,405  190,425 

CURRENT PROPOSED

18.5  15.3 

CURRENT PROPOSED

$1,574,675  $930,750 

CURRENT PROPOSED

$4.05  $4.89 

CURRENT PROPOSED

35,312 36,890 

CURRENT PROPOSED

898,365 568,515 

CURRENT PROPOSED

25.4 

15.4 

CURRENT PROPOSED

$2,648,419  $2,766,750 

CURRENT PROPOSED

$2.95 $4.87 

CURRENT PROPOSED

Page 7: Capital Metro Transit Development Plan: Financial Planconnections2025.org/wp-content/uploads/2017/03/... · Introduction Capital Metro’s Connections 2025 is a transit system study

100

Route 100‐MetroAirport

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 21,262         306,065              14.4             1,594,681$         5.21$           

Proposed ‐               ‐  ‐$  

Variance (21,262) (306,065) (14.4) ($1,594,681) ($5.21)

103

Route 103‐Manchaca Flyer

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 2,304           30,600                 13.3             172,763$            5.65$           

Proposed ‐               ‐  ‐$  

Variance (2,304) (30,600) (13.3) ($172,763) ($5.65)

105

Route 105-South 5th

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current ‐               ‐  ‐$  

Proposed 3,060           49,980                 16.3             229,500$            4.59$           

Variance 3,060 49,980 16.3 $229,500 $4.59

110

Route 110‐South Central Flyer

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 973              17,085                 17.6             72,994$               4.27$           

Proposed ‐               ‐  ‐$  

Variance (973) (17,085) (17.6) ($72,994) ($4.27)

111

Route 111‐Escarpment Flyer

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 1,024           18,615                 18.2             76,819$               4.13$           

Proposed ‐               ‐  ‐$  

Variance (1,024) (18,615) (18.2) ($76,819) ($4.13)

122

Route 122‐Four Points Limited

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 859              2,295                   2.7                64,388$               28.06$         

Proposed ‐               ‐  ‐$  

Variance (859) (2,295) (2.7) ($64,388) ($28.06)

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

21,262 

CURRENT PROPOSED

306,065  ‐

CURRENT PROPOSED

14.4 

CURRENT PROPOSED

$1,594,681 

$‐

CURRENT PROPOSED

$5.21 

CURRENT PROPOSED

2,304  ‐

CURRENT PROPOSED

30,600  ‐

CURRENT PROPOSED

13.3 

CURRENT PROPOSED

$172,763  $‐

CURRENT PROPOSED

$5.65 

CURRENT PROPOSED

973  ‐

CURRENT PROPOSED

17,085  ‐

CURRENT PROPOSED

17.6 

CURRENT PROPOSED

$72,994  $‐

CURRENT PROPOSED

$4.27 

CURRENT PROPOSED

1,024  ‐

CURRENT PROPOSED

18,615  ‐

CURRENT PROPOSED

18.2 

CURRENT PROPOSED

$76,819  $‐

CURRENT PROPOSED

$4.13 

CURRENT PROPOSED

859  ‐

CURRENT PROPOSED

2,295  ‐

CURRENT PROPOSED

2.7 

CURRENT PROPOSED

$64,388  $‐

CURRENT PROPOSED

$28.06 

CURRENT PROPOSED

‐ 3,060 

CURRENT PROPOSED

‐ 49,980 

CURRENT PROPOSED

16.3 

CURRENT PROPOSED

$‐ $229,500 

CURRENT PROPOSED

$4.59 

CURRENT PROPOSED

Page 8: Capital Metro Transit Development Plan: Financial Planconnections2025.org/wp-content/uploads/2017/03/... · Introduction Capital Metro’s Connections 2025 is a transit system study

127

Route 127‐Dove Springs Flyer

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 493              6,375                   12.9             36,975$               5.80$           

Proposed ‐               ‐  ‐$  

Variance (493) (6,375) (12.9) ($36,975) ($5.80)

135

Route 135‐Dell Limited

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 2,775           5,100                   1.8                208,144$            40.81$         

Proposed ‐               ‐  ‐$  

Variance (2,775) (5,100) (1.8) ($208,144) ($40.81)

142

Route 142‐Metric Flyer

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 2,414           24,735                 10.2             181,050$            7.32$           

Proposed ‐               ‐  ‐$  

Variance (2,414) (24,735) (10.2) ($181,050) ($7.32)

171

Route 171‐Oak Hill Flyer

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 3,719           52,020                 14.0             278,906$            5.36$           

Proposed ‐               ‐  ‐$  

Variance (3,719) (52,020) (14.0) ($278,906) ($5.36)

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

493  ‐

CURRENT PROPOSED

6,375  ‐

CURRENT PROPOSED

12.9 

CURRENT PROPOSED

$36,975  $‐

CURRENT PROPOSED

$5.80 

CURRENT PROPOSED

2,775  ‐

CURRENT PROPOSED

5,100  ‐

CURRENT PROPOSED

1.8 

CURRENT PROPOSED

$208,144  $‐

CURRENT PROPOSED

$40.81 

CURRENT PROPOSED

493  ‐

CURRENT PROPOSED

6,375  ‐

CURRENT PROPOSED

12.9 

CURRENT PROPOSED

$36,975  $‐

CURRENT PROPOSED

$5.80 

CURRENT PROPOSED

3,719  ‐

CURRENT PROPOSED

52,020  ‐

CURRENT PROPOSED

14.0 

CURRENT PROPOSED

$278,906  $‐

CURRENT PROPOSED

$5.36 

CURRENT PROPOSED

Page 9: Capital Metro Transit Development Plan: Financial Planconnections2025.org/wp-content/uploads/2017/03/... · Introduction Capital Metro’s Connections 2025 is a transit system study

201

Route 201‐Southpark Meadows

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 8,572           148,650              17.3             642,919$            4.33$           

Proposed ‐               ‐  ‐$  

Variance (8,572) (148,650) (17.3) ($642,919) ($4.33)

214

Route 214‐Northwest Feeder

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 7,650           27,030                 3.5                573,750$            21.23$         

Proposed 7,650           23,460                 3.1                573,750$            24.46$         

Variance 0 (3,570) (0.5) $0 $3.23

228

Route 228‐Burleson

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 8,513           131,835              15.5             638,456$            4.84$           

Proposed 6,120           130,815              21.4             459,000$            3.51$           

Variance (2,393) (1,020) 5.9 ($179,456) ($1.33)

237

Route 237‐Northeast Feeder

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 3,661           7,691                   2.1                274,600$            35.70$         

Proposed 4,368           42,920                 9.8                327,606$            7.63$           

Variance 707 35,229 7.7 $53,006 ($28.07)

238

Route 238‐Westgate

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 6,566           102,240              15.6             492,463$            4.82$           

Proposed 23,545         243,635              10.3             1,765,875$         7.25$           

Variance 16,979 141,395 (5.2) $1,273,413 $2.43

240

Route 240‐Rutland

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 12,605         255,690              20.3             945,363$            3.70$           

Proposed ‐               ‐  ‐$  

Variance (12,605) (255,690) (20.3) ($945,363) ($3.70)

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

8,572 

CURRENT PROPOSED

148,650  ‐

CURRENT PROPOSED

17.3 

CURRENT PROPOSED

$642,919 

$‐

CURRENT PROPOSED

$4.33 

CURRENT PROPOSED

7,650  7,650 

CURRENT PROPOSED

27,030  23,460 

CURRENT PROPOSED

3.5  3.1 

CURRENT PROPOSED

$573,750  $573,750 

CURRENT PROPOSED CURRENT PROPOSED

8,513 

6,120 

CURRENT PROPOSED

131,835  130,815 

CURRENT PROPOSED

15.5 21.4 

CURRENT PROPOSED

$638,456 

$459,000 

CURRENT PROPOSED

$4.84 $3.51 

CURRENT PROPOSED

3,661  4,368 

CURRENT PROPOSED

7,691  42,920 

CURRENT PROPOSED

2.1  9.8 

CURRENT PROPOSED

$274,600 

$327,606 

CURRENT PROPOSED

$7.63 

CURRENT PROPOSED

6,566 

23,545 

CURRENT PROPOSED

102,240  243,635 

CURRENT PROPOSED

15.6  10.3 

CURRENT PROPOSED

$492,463 

$1,765,875 

CURRENT PROPOSED

$4.82 

$7.25 

CURRENT PROPOSED

12,605 

CURRENT PROPOSED

255,690  ‐

CURRENT PROPOSED

20.3 

CURRENT PROPOSED

$945,363 

$‐

CURRENT PROPOSED

$3.70 

CURRENT PROPOSED

Page 10: Capital Metro Transit Development Plan: Financial Planconnections2025.org/wp-content/uploads/2017/03/... · Introduction Capital Metro’s Connections 2025 is a transit system study

243

Route 243‐Wells Branch

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 8,035           133,310              16.6             602,631$            4.52$           

Proposed 6,205           118,365              19.1             465,375$            3.93$           

Variance (1,830) (14,945) 2.5 ($137,256) ($0.59)

271

Route 271‐Del Valle Feeder

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 6,758           74,639                 11.0             506,813$            6.79$           

Proposed 11,630         91,570                 7.9                872,250$            9.53$           

Variance 4,873 16,932 (3.2) $365,438 $2.74

275

Route 275‐North Lamar Feeder

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 15,317         453,975              29.6             1,148,788$         2.53$           

Proposed ‐               ‐  ‐$  

Variance (15,317) (453,975) (29.6) ($1,148,788) ($2.53)

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

8,035 6,205 

CURRENT PROPOSED

133,310  118,365 

CURRENT PROPOSED

16.6  19.1 

CURRENT PROPOSED

$602,631 $465,375 

CURRENT PROPOSED

$4.52  $3.93 

CURRENT PROPOSED

6,758 

11,630 

CURRENT PROPOSED

74,639  91,570 

CURRENT PROPOSED

11.0  7.9 

CURRENT PROPOSED

$506,813 

$872,250 

CURRENT PROPOSED

$6.79 

$9.53 

CURRENT PROPOSED

15,317 

CURRENT PROPOSED

453,975 ‐

CURRENT PROPOSED

29.6 

CURRENT PROPOSED

$1,148,788 

$‐

CURRENT PROPOSED

$2.53 

CURRENT PROPOSED

Page 11: Capital Metro Transit Development Plan: Financial Planconnections2025.org/wp-content/uploads/2017/03/... · Introduction Capital Metro’s Connections 2025 is a transit system study

300

Route 300‐Govalle

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 64,028         2,068,105           32.3             4,802,094$         2.32$           

Proposed 74,115         3,192,660           43.1             5,558,625$         1.74$           

Variance 10,087 1,124,555 10.8 $756,531 ($0.58)

311

Route 311‐Stassney

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 14,912         452,575              30.3             1,118,394$         2.47$           

Proposed 36,675         847,220              23.1             2,750,625$         3.25$           

Variance 21,763 394,645 (7.2) $1,632,231 $0.78

320

Route 320‐St. Johns

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 33,742         850,540              25.2             2,530,613$         2.98$           

Proposed ‐               ‐  ‐$  

Variance (33,742) (850,540) (25.2) ($2,530,613) ($2.98)

323

Route 323‐Anderson

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 19,451         367,250              18.9             1,458,856$         3.97$           

Proposed 12,410         146,940              11.8             930,750$            6.33$           

Variance (7,041) (220,310) (7.0) ($528,106) $2.36

325

Route 325‐Ohlen

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 32,602         758,930              23.3             2,445,163$         3.22$           

Proposed 24,820         558,790              22.5             1,861,500$         3.33$           

Variance (7,782) (200,140) (0.8) ($583,663) $0.11

331

Route 331‐Oltorf

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 33,603         972,090              28.9             2,520,256$         2.59$           

Proposed ‐               ‐  ‐$  

Variance (33,603) (972,090) (28.9) ($2,520,256) ($2.59)

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

64,028 

74,115 

CURRENT PROPOSED

2,068,105 

3,192,660 

CURRENT PROPOSED

32.3 

43.1 

CURRENT PROPOSED

$4,802,094 

$5,558,625 

CURRENT PROPOSED

$2.32  $1.74 

CURRENT PROPOSED

14,912 

36,675 

CURRENT PROPOSED

452,575  847,220 

CURRENT PROPOSED

30.3 23.1 

CURRENT PROPOSED

$1,118,394 

$2,750,625 

CURRENT PROPOSED

$2.47  $3.25 

CURRENT PROPOSED

33,742 

CURRENT PROPOSED

850,540  ‐

CURRENT PROPOSED

25.2 

CURRENT PROPOSED

$2,530,613 

$‐

CURRENT PROPOSED

$2.98 

CURRENT PROPOSED

19,451 

12,410 

CURRENT PROPOSED

367,250  146,940 

CURRENT PROPOSED

18.9 11.8 

CURRENT PROPOSED

$1,458,856 

$930,750 

CURRENT PROPOSED

$3.97 

$6.33 

CURRENT PROPOSED

32,602 24,820 

CURRENT PROPOSED

758,930  558,790 

CURRENT PROPOSED

23.3  22.5 

CURRENT PROPOSED

$2,445,163 

$1,861,500 

CURRENT PROPOSED

$3.22  $3.33 

CURRENT PROPOSED

33,603 

CURRENT PROPOSED

972,090  ‐

CURRENT PROPOSED

28.9 

CURRENT PROPOSED

$2,520,256 

$‐

CURRENT PROPOSED

$2.59 

CURRENT PROPOSED

Page 12: Capital Metro Transit Development Plan: Financial Planconnections2025.org/wp-content/uploads/2017/03/... · Introduction Capital Metro’s Connections 2025 is a transit system study

333

Route 333‐William Cannon

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 25,031         466,595              18.6             1,877,325$         4.02$           

Proposed 30,145         703,140              23.3             2,260,875$         3.22$           

Variance 5,114 236,545 4.7 $383,550 ($0.81)

338

Route 338‐Lamar/45th ‐> 335-38th

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 16,652         285,070              17.1             1,248,863$         4.38$           

Proposed 23,430         336,095              14.3             1,757,250$         5.23$           

Variance 6,779 51,025 (2.8) $508,388 $0.85

350

Route 350‐Airport Blvd.

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 30,189         725,805              24.0             2,264,175$         3.12$           

Proposed 18,615         658,520              35.4             1,396,125$         2.12$           

Variance (11,574) (67,285) 11.3 ($868,050) ($1.00)

383

Route 383‐Research

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 26,830         515,040              19.2             2,012,256$         3.91$           

Proposed 35,955         872,190              24.3             2,696,625$         3.09$           

Variance 9,125 357,150 5.1 $684,369 ($0.82)

392

Route 392‐Braker

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 12,214         186,415              15.3             916,050$            4.91$           

Proposed ‐               ‐  ‐$  

Variance (12,214) (186,415) (15.3) (916,050)$           ($4.91)

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

25,031 30,145 

CURRENT PROPOSED

466,595  703,140 

CURRENT PROPOSED

18.6 23.3 

CURRENT PROPOSED

$1,877,325 $2,260,875 

CURRENT PROPOSED

$4.02  $3.22 

CURRENT PROPOSED

16,652 

23,430 

CURRENT PROPOSED

285,070  336,095 

CURRENT PROPOSED

17.1  14.3 

CURRENT PROPOSED

$1,248,863 

$1,757,250 

CURRENT PROPOSED

$4.38  $5.23 

CURRENT PROPOSED

30,189 

18,615 

CURRENT PROPOSED

725,805  658,520 

CURRENT PROPOSED

24.0 

35.4 

CURRENT PROPOSED

$2,264,175 

$1,396,125 

CURRENT PROPOSED

$3.12  $2.12 

CURRENT PROPOSED

26,830 

35,955 

CURRENT PROPOSED

515,040  872,190 

CURRENT PROPOSED

19.2 24.3 

CURRENT PROPOSED

$2,012,256 

$2,696,625 

CURRENT PROPOSED

$3.91  $3.09 

CURRENT PROPOSED

4,061 1,860 

CURRENT PROPOSED

186,415  ‐

CURRENT PROPOSED

15.3 

CURRENT PROPOSED

$916,050  $‐

CURRENT PROPOSED

$4.91 

CURRENT PROPOSED

Page 13: Capital Metro Transit Development Plan: Financial Planconnections2025.org/wp-content/uploads/2017/03/... · Introduction Capital Metro’s Connections 2025 is a transit system study

410

Route 410‐E‐Bus/West Campus 

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 5,270           187,985              35.7             395,250$            2.10$           

Proposed 930              56,160                 60.4             69,750$               1.24$           

Variance (4,340) (131,825) 24.7 ($325,500) ($0.86)

411

Route 411‐E‐Bus/Riverside

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 4,061           38,825                 9.6                304,575$            7.84$           

Proposed 1,860           40,735                 21.9             139,500$            3.42$           

Variance (2,201) 1,910 12.3 ($165,075) ($4.42)

412

Route 412‐E‐Bus/Main Campus

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 3,358           51,000                 15.2             251,875$            4.94$           

Proposed 930              50,685                 54.5             69,750$               1.38$           

Variance (2,428) (315) 39.3 ($182,125) ($3.56)

464

Route 464‐MLK, Jr./Capitol

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 1,568           22,950                 14.6             117,619$            5.13$           

Proposed ‐               ‐  ‐$  

Variance (1,568) (22,950) (14.6) ($117,619) ($5.13)

465

Route 465‐MLK, Jr./University of Texas

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 3,018           69,870                 23.2             226,313$            3.24$           

Proposed ‐               ‐  ‐$  

Variance (3,018) (69,870) (23.2) ($226,313) ($3.24)

466

Route 466‐Kramer/Domain

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 3,727           26,265                 7.0                279,544$            10.64$         

Proposed ‐               ‐  ‐$  

Variance (3,727) (26,265) (7.0) ($279,544) ($10.64)

Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost

5,270 

930 

CURRENT PROPOSED

187,985  56,160 

CURRENT PROPOSED

35.7 

60.4 

CURRENT PROPOSED

$395,250 

$69,750 

CURRENT PROPOSED

$2.10  $1.24 

CURRENT PROPOSED

12,214 

CURRENT PROPOSED

38,825  40,735 

CURRENT PROPOSED

9.6 21.9 

CURRENT PROPOSED

$304,575 $139,500 

CURRENT PROPOSED

$7.84 

$3.42 

CURRENT PROPOSED

3,358  930 

CURRENT PROPOSED

51,000  50,685 

CURRENT PROPOSED

15.2 

54.5 

CURRENT PROPOSED

$251,875  $69,750 

CURRENT PROPOSED

$4.94 $1.38 

CURRENT PROPOSED

1,568  ‐

CURRENT PROPOSED

22,950  ‐

CURRENT PROPOSED

14.6 

CURRENT PROPOSED

$117,619  $‐

CURRENT PROPOSED

$5.13 

CURRENT PROPOSED

26,830 

35,955 

CURRENT PROPOSED

515,040  872,190 

CURRENT PROPOSED

19.2 24.3 

CURRENT PROPOSED

$2,012,256 

$2,696,625 

CURRENT PROPOSED

$3.91  $3.09 

CURRENT PROPOSED

3,018  ‐

CURRENT PROPOSED

69,870  ‐

CURRENT PROPOSED

23.2 

CURRENT PROPOSED

$226,313  $‐

CURRENT PROPOSED

$3.24 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544 $‐

CURRENT PROPOSED

$10.64 

CURRENT PROPOSED

Page 14: Capital Metro Transit Development Plan: Financial Planconnections2025.org/wp-content/uploads/2017/03/... · Introduction Capital Metro’s Connections 2025 is a transit system study

470

Route 470‐Manor Circulator

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current ‐               ‐  ‐$  

Proposed 3,060           1,020                   0.3                229,500$            225.00$      

Variance 3,060 1,020 0.3 $229,500 $225.00

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

‐ 3,060 

CURRENT PROPOSED

‐ 1,020 

CURRENT PROPOSED

0.3 

CURRENT PROPOSED

$‐ $229,500 

CURRENT PROPOSED

$225.00 

CURRENT PROPOSED

Page 15: Capital Metro Transit Development Plan: Financial Planconnections2025.org/wp-content/uploads/2017/03/... · Introduction Capital Metro’s Connections 2025 is a transit system study

481

Route 481‐Night Owl North Lamar

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 3,075           66,275                 21.6             230,644$            3.48$           

Proposed ‐               ‐  ‐$  

Variance (3,075) (66,275) (21.6) ($230,644) ($3.48)

483

Route 483‐Night Owl Riverside

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 953              38,785                 40.7             71,469$               1.84$           

Proposed ‐               ‐  ‐$  

Variance (953) (38,785) (40.7) ($71,469) ($1.84)

484

Route 484‐Night Owl South Lamar

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 953              14,265                 15.0             71,469$               5.01$           

Proposed ‐               ‐  ‐$  

Variance (953) (14,265) (15.0) ($71,469) ($5.01)

485

Route 485‐Night Owl Cameron

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 2,154           28,580                 13.3             161,513$            5.65$           

Proposed ‐               ‐  ‐$  

Variance (2,154) (28,580) (13.3) ($161,513) ($5.65)

486

Route 486‐Night Owl South Congress

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 2,152           39,570                 18.4             161,375$            4.08$           

Proposed ‐               ‐  ‐$  

Variance (2,152) (39,570) (18.4) ($161,375) ($4.08)

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

3,075  ‐

CURRENT PROPOSED

66,275  ‐

CURRENT PROPOSED

21.6 

CURRENT PROPOSED

$230,644  $‐

CURRENT PROPOSED

$3.48 

CURRENT PROPOSED

953  ‐

CURRENT PROPOSED

38,785  ‐

CURRENT PROPOSED

40.7 

CURRENT PROPOSED

$71,469  $‐

CURRENT PROPOSED

$1.84 

CURRENT PROPOSED

953  ‐

CURRENT PROPOSED

14,265  ‐

CURRENT PROPOSED

15.0 

CURRENT PROPOSED

$71,469  $‐

CURRENT PROPOSED

$5.01 

CURRENT PROPOSED

2,154  ‐

CURRENT PROPOSED

28,580  ‐

CURRENT PROPOSED

13.3 

CURRENT PROPOSED

$161,513  $‐

CURRENT PROPOSED

$5.65 

CURRENT PROPOSED

2,152  ‐

CURRENT PROPOSED

39,570  ‐

CURRENT PROPOSED

18.4 

CURRENT PROPOSED

$161,375  $‐

CURRENT PROPOSED

$4.08 

CURRENT PROPOSED

Page 16: Capital Metro Transit Development Plan: Financial Planconnections2025.org/wp-content/uploads/2017/03/... · Introduction Capital Metro’s Connections 2025 is a transit system study

490

Route 490‐HEB Shuttle

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 629              10,455                 16.6             47,175$               4.51$           

Proposed ‐               ‐  ‐$  

Variance (629) (10,455) (16.6) ($47,175) ($4.51)

491

Route 491‐Allandale

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 4,180           5,510                   1.3                313,488$            56.89$         

Proposed ‐               ‐  ‐$  

Variance (4,180) (5,510) (1.3) ($313,488) ($56.89)

492

Route 492‐Delwood

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 3,421           34,425                 10.1             256,594$            7.45$           

Proposed ‐               ‐  ‐$  

Variance (3,421) (34,425) (10.1) ($256,594) ($7.45)

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

629  ‐

CURRENT PROPOSED

10,455  ‐

CURRENT PROPOSED

16.6 

CURRENT PROPOSED

$47,175  $‐

CURRENT PROPOSED

$4.51 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

4,180 ‐

CURRENT PROPOSED

5,510  ‐

CURRENT PROPOSED

1.3 

CURRENT PROPOSED

$313,488  $‐

CURRENT PROPOSED

$56.89 

CURRENT PROPOSED

3,421  ‐

CURRENT PROPOSED

34,425  ‐

CURRENT PROPOSED

10.1 

CURRENT PROPOSED

$256,594  $‐

CURRENT PROPOSED

$7.45 

CURRENT PROPOSED

Page 17: Capital Metro Transit Development Plan: Financial Planconnections2025.org/wp-content/uploads/2017/03/... · Introduction Capital Metro’s Connections 2025 is a transit system study

640

Route 640‐FA Forty Acres

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 6,575           666,135              101.3           493,115$            0.74$           

Proposed 6,373           361,440              56.7             477,990$            1.32$           

Variance (202) (304,695) (44.6) ($15,125) $0.58

641

Route 641‐EC East Campus

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 4,891           208,035              42.5             366,813$            1.76$           

Proposed 5,120           224,515              43.9             384,000$            1.71$           

Variance 229 16,480 1.3 $17,188 ($0.05)

642

Route 642‐WC West Campus/UT

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 8,472           773,518              91.3             635,425$            0.82$           

Proposed 8,058           477,360              59.2             604,350$            1.27$           

Variance (414) (296,158) (32.1) ($31,075) $0.44

653

Route 653‐RR Red River/UT

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 7,760           317,335              40.9             581,963$            1.83$           

Proposed ‐               ‐  ‐$  

Variance (7,760) (317,335) (40.9) ($581,963) ($1.83)

656

Route 656‐IF Intramural Fields/UT

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 12,837         479,160              37.3             962,775$            2.01$           

Proposed 8,640           432,360              50.0             648,000$            1.50$           

Variance (4,197) (46,800) 12.7 ($314,775) ($0.51)

661

Route 661‐FW Far West/UT

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 18,378         456,120              24.8             1,378,350$         3.02$           

Proposed 11,160         395,280              35.4             837,000$            2.12$           

Variance (7,218) (60,840) 10.6 ($541,350) ($0.90)

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

6,575  6,373 

CURRENT PROPOSED

666,135 

361,440 

CURRENT PROPOSED

56.7 

CURRENT PROPOSED

$493,115  $477,990 

CURRENT PROPOSED

$0.74  $1.32 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

4,891  5,120 

CURRENT PROPOSED

208,035  224,515 

CURRENT PROPOSED

42.5  43.9 

CURRENT PROPOSED

$366,813  $384,000 

CURRENT PROPOSED

$1.76  $1.71 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

8,472  8,058 

CURRENT PROPOSED

773,518 

477,360 

CURRENT PROPOSED

59.2 

CURRENT PROPOSED

$635,425  $604,350 

CURRENT PROPOSED

$0.82  $1.27 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

7,760 

CURRENT PROPOSED

666,135 

361,440 

CURRENT PROPOSED

56.7 

CURRENT PROPOSED

$493,115  $477,990 

CURRENT PROPOSED

$0.74  $1.32 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

7,760 

CURRENT PROPOSED

317,335  ‐

CURRENT PROPOSED

40.9 

CURRENT PROPOSED

$581,963 

$‐

CURRENT PROPOSED

$1.83 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

7,760 

CURRENT PROPOSED

666,135 

361,440 

CURRENT PROPOSED

56.7 

CURRENT PROPOSED

$493,115  $477,990 

CURRENT PROPOSED

$0.74  $1.32 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

12,837 8,640 

CURRENT PROPOSED

479,160  432,360 

CURRENT PROPOSED

37.3 50.0 

CURRENT PROPOSED

$962,775 $648,000 

CURRENT PROPOSED

$2.01  $1.50 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

7,760 

CURRENT PROPOSED

666,135 

361,440 

CURRENT PROPOSED

56.7 

CURRENT PROPOSED

$493,115  $477,990 

CURRENT PROPOSED

$0.74  $1.32 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

18,378 

11,160 

CURRENT PROPOSED

456,120  395,280 

CURRENT PROPOSED

24.8  35.4 

CURRENT PROPOSED

$1,378,350 

$837,000 

CURRENT PROPOSED

$3.02  $2.12 

CURRENT PROPOSED

Page 18: Capital Metro Transit Development Plan: Financial Planconnections2025.org/wp-content/uploads/2017/03/... · Introduction Capital Metro’s Connections 2025 is a transit system study

663

Route 663‐LA Lake Austin/UT Converts to Local 663L

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 8,563           212,545              24.8             642,231$            3.02$           

Proposed 11,550         237,235              20.5             866,250$            3.65$            "<<Formula (unique)"

Variance 2,987 24,690 (4.3) $224,019 $0.63

670

Route 670‐CP Crossing Place

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 15,241         495,645              32.5             1,143,100$         2.31$           

Proposed 10,260         493,740              48.1             769,500$            1.56$           

Variance (4,981) (1,905) 15.6 ($373,600) ($0.75)

671

Route 671‐NR North Riverside

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 11,085         310,320              28.0             831,375$            2.68$           

Proposed 10,321         464,890              45.0             774,056$            1.67$           

Variance (764) 154,570 17.0 ($57,319) ($1.01)

672

Route 672‐LS Lakeshore Replaced by Route 671

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 6,396           122,400              19.1             479,700$            3.92$           

Proposed ‐               ‐  ‐$  

Variance (6,396) (122,400) (19.1) ($479,700) ($3.92)

680

Route 680‐NR/LS North Riverside/Lake Replaced by Route 671

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 1,615           60,375                 37.4             121,106$            2.01$           

Proposed ‐               ‐  ‐$  

Variance (1,615) (60,375) (37.4) ($121,106) ($2.01)

681

Route 681‐IF/FW Intramural/Far West Evening Service

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 444              5,885                   13.3             33,289$               5.66$           

Proposed 444              6,270                   14.1             33,289$               5.31$           

Variance 0 385 0.9 $0 ($0.35)

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

7,760 

CURRENT PROPOSED

666,135 

361,440 

CURRENT PROPOSED

56.7 

CURRENT PROPOSED

$493,115  $477,990 

CURRENT PROPOSED

$0.74  $1.32 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

8,563 11,550 

CURRENT PROPOSED

212,545  237,235 

CURRENT PROPOSED

24.8  20.5 

CURRENT PROPOSED

$642,231 $866,250 

CURRENT PROPOSED

$3.02  $3.65 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

7,760 

CURRENT PROPOSED

666,135 

361,440 

CURRENT PROPOSED

56.7 

CURRENT PROPOSED

$493,115  $477,990 

CURRENT PROPOSED

$0.74  $1.32 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

15,241 10,260 

CURRENT PROPOSED

495,645  493,740 

CURRENT PROPOSED

32.5 48.1 

CURRENT PROPOSED

$1,143,100 $769,500 

CURRENT PROPOSED

$2.31  $1.56 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

7,760 

CURRENT PROPOSED

666,135 

361,440 

CURRENT PROPOSED

56.7 

CURRENT PROPOSED

$493,115  $477,990 

CURRENT PROPOSED

$0.74  $1.32 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

11,085  10,321 

CURRENT PROPOSED

310,320 464,890 

CURRENT PROPOSED

28.0 45.0 

CURRENT PROPOSED

$831,375  $774,056 

CURRENT PROPOSED

$2.68  $1.67 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

7,760 

CURRENT PROPOSED

666,135 

361,440 

CURRENT PROPOSED

56.7 

CURRENT PROPOSED

$493,115  $477,990 

CURRENT PROPOSED

$0.74  $1.32 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

6,396  ‐

CURRENT PROPOSED

122,400  ‐

CURRENT PROPOSED

19.1 

CURRENT PROPOSED

$479,700  $‐

CURRENT PROPOSED

$3.92 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

7,760 

CURRENT PROPOSED

666,135 

361,440 

CURRENT PROPOSED

56.7 

CURRENT PROPOSED

$493,115  $477,990 

CURRENT PROPOSED

$0.74  $1.32 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

1,615  ‐

CURRENT PROPOSED

60,375  ‐

CURRENT PROPOSED

37.4 

CURRENT PROPOSED

$121,106  $‐

CURRENT PROPOSED

$2.01 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

7,760 

CURRENT PROPOSED

666,135 

361,440 

CURRENT PROPOSED

56.7 

CURRENT PROPOSED

$493,115  $477,990 

CURRENT PROPOSED

$0.74  $1.32 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

444  444 

CURRENT PROPOSED

5,885  6,270 

CURRENT PROPOSED

13.3  14.1 

CURRENT PROPOSED

$33,289  $33,289 

CURRENT PROPOSED

$5.66  $5.31 

CURRENT PROPOSED

Page 19: Capital Metro Transit Development Plan: Financial Planconnections2025.org/wp-content/uploads/2017/03/... · Introduction Capital Metro’s Connections 2025 is a transit system study

801

Route 801‐N. Lamar/S. Congress 7‐Min Freq

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 85,654         1,955,800           22.8             6,424,050$         3.28$           

Proposed 148,840      6,625,075           44.5             11,163,000$       1.68$           

Variance 63,186 4,669,275 21.7 $4,738,950 ($1.60)

803

Route 803‐Burnet/S. Lamar Expanded Freq/Coverage

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 66,546         1,113,955           16.7             4,990,956$         4.48$           

Proposed 128,710      3,878,645           30.1             9,653,250$         2.49$           

Variance 62,164 2,764,690 13.4 $4,662,294 ($1.99)

804

Route 804‐Montopolis New

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current ‐               ‐  ‐$                    

Proposed 37,640         540,005              14.3             2,823,000$         5.23$           

Variance 37,640 540,005 14.3 $2,823,000 $5.23

820

Route 820‐Manor Rd/Riverside New

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current ‐               ‐  ‐$                    

Proposed 77,880         2,648,215           34.0             5,841,000$         2.21$           

Variance 77,880 2,648,215 34.0 $5,841,000 $2.21

500

Route 500-I‐35 BRT New

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current ‐               ‐  ‐$                    

Proposed 53,145         1,382,390           26.0             3,985,875$         2.88$           

Variance 53,145 1,382,390 26.0 $3,985,875 $2.88

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

7,760 

CURRENT PROPOSED

666,135 

361,440 

CURRENT PROPOSED

56.7 

CURRENT PROPOSED

$493,115  $477,990 

CURRENT PROPOSED

$0.74  $1.32 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSEDCURRENT PROPOSED

5,885  6,270  ‐

 500,000

 1,000,000

Current Proposed

13.3  14.1 

CURRENT PROPOSED

$33,289  $33,289 

CURRENT PROPOSED

$5.66  $5.31 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

7,760 

CURRENT PROPOSED

666,135 

361,440 

CURRENT PROPOSED

56.7 

CURRENT PROPOSED

$493,115  $477,990 

CURRENT PROPOSED

$0.74  $1.32 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

85,654 

148,840 

CURRENT PROPOSED

1,955,800 

6,625,075 

CURRENT PROPOSED

22.8 44.5 

CURRENT PROPOSED

$6,424,050 

$11,163,000 

CURRENT PROPOSED

$3.28  $1.68 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

7,760 

CURRENT PROPOSED

666,135 

361,440 

CURRENT PROPOSED

56.7 

CURRENT PROPOSED

$493,115  $477,990 

CURRENT PROPOSED

$0.74  $1.32 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSEDCURRENT PROPOSED

5,885  6,270  ‐

 500,000

 1,000,000

Current Proposed

13.3  14.1 

CURRENT PROPOSED

$33,289  $33,289 

CURRENT PROPOSED

$5.66  $5.31 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

7,760 

CURRENT PROPOSED

666,135 

361,440 

CURRENT PROPOSED

56.7 

CURRENT PROPOSED

$493,115  $477,990 

CURRENT PROPOSED

$0.74  $1.32 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

66,546 

128,710 

CURRENT PROPOSED

1,113,955 

3,878,645 

CURRENT PROPOSED

16.7  30.1 

CURRENT PROPOSED

$4,990,956 

$9,653,250 

CURRENT PROPOSED

$4.48 $2.49 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

7,760 

CURRENT PROPOSED

666,135 

361,440 

CURRENT PROPOSED

56.7 

CURRENT PROPOSED

$493,115  $477,990 

CURRENT PROPOSED

$0.74  $1.32 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

5,614  ‐

CURRENT PROPOSED

90,015  ‐

CURRENT PROPOSED

16.0 

CURRENT PROPOSED

$421,069  $‐

CURRENT PROPOSED

$4.68 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

7,760 

CURRENT PROPOSED

666,135 

361,440 

CURRENT PROPOSED

56.7 

CURRENT PROPOSED

$493,115  $477,990 

CURRENT PROPOSED

$0.74  $1.32 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

53,145 

CURRENT PROPOSED

1,382,390 

CURRENT PROPOSED

26.0 

CURRENT PROPOSED

$‐

$3,985,875 

CURRENT PROPOSED

$2.88 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

7,760 

CURRENT PROPOSED

666,135 

361,440 

CURRENT PROPOSED

56.7 

CURRENT PROPOSED

$493,115  $477,990 

CURRENT PROPOSED

$0.74  $1.32 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSEDCURRENT PROPOSED

5,885  6,270  ‐

 500,000

 1,000,000

Current Proposed

13.3  14.1 

CURRENT PROPOSED

$33,289  $33,289 

CURRENT PROPOSED

$5.66  $5.31 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

7,760 

CURRENT PROPOSED

666,135 

361,440 

CURRENT PROPOSED

56.7 

CURRENT PROPOSED

$493,115  $477,990 

CURRENT PROPOSED

$0.74  $1.32 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

‐ 53,145 

CURRENT PROPOSED

‐ 1,382,390 

CURRENT PROPOSED

26.0 

CURRENT PROPOSED

$‐ $3,985,875 

CURRENT PROPOSED

$2.88 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

7,760 

CURRENT PROPOSED

666,135 

361,440 

CURRENT PROPOSED

56.7 

CURRENT PROPOSED

$493,115  $477,990 

CURRENT PROPOSED

$0.74  $1.32 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSEDCURRENT PROPOSED

5,885  6,270  ‐

 500,000

 1,000,000

Current Proposed

13.3  14.1 

CURRENT PROPOSED

$33,289  $33,289 

CURRENT PROPOSED

$5.66  $5.31 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

7,760 

CURRENT PROPOSED

666,135 

361,440 

CURRENT PROPOSED

56.7 

CURRENT PROPOSED

$493,115  $477,990 

CURRENT PROPOSED

$0.74  $1.32 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

‐ 37,640 

CURRENT PROPOSED

‐ 540,005 

CURRENT PROPOSED

14.3 

CURRENT PROPOSED

$‐ $2,823,000 

CURRENT PROPOSED

$5.23 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

7,760 

CURRENT PROPOSED

666,135 

361,440 

CURRENT PROPOSED

56.7 

CURRENT PROPOSED

$493,115  $477,990 

CURRENT PROPOSED

$0.74  $1.32 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSEDCURRENT PROPOSED

5,885  6,270  ‐

 500,000

 1,000,000

Current Proposed

13.3  14.1 

CURRENT PROPOSED

$33,289  $33,289 

CURRENT PROPOSED

$5.66  $5.31 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

7,760 

CURRENT PROPOSED

666,135 

361,440 

CURRENT PROPOSED

56.7 

CURRENT PROPOSED

$493,115  $477,990 

CURRENT PROPOSED

$0.74  $1.32 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

‐77,880 

CURRENT PROPOSED

‐ 2,648,215 

CURRENT PROPOSED

34.0 

CURRENT PROPOSED

$‐$5,841,000 

CURRENT PROPOSED

$2.21 

CURRENT PROPOSED

Page 20: Capital Metro Transit Development Plan: Financial Planconnections2025.org/wp-content/uploads/2017/03/... · Introduction Capital Metro’s Connections 2025 is a transit system study

935

Route 935‐Tech Ridge Express

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 5,614           90,015                 16.0             421,069$            4.68$           

Proposed ‐               ‐  ‐$  

Variance (5,614) (90,015) (16.0) ($421,069) ($4.68)

970

Route 970‐Lantana Express

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 961              2,550                   2.7                72,038$               28.25$         

Proposed ‐               ‐  ‐$  

Variance (961) (2,550) (2.7) ($72,038) ($28.25)

971

Route 971‐Oak Hill Express Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current ‐               ‐  ‐$  

Proposed 2,805           51,255                 18.3             210,375$            4.10$           

Variance 2,805 51,255 18.3 $210,375 $4.10

972

Route 972‐South MoPac Express Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current ‐               ‐  ‐$  

Proposed 2,550           41,820                 16.4             191,250$            4.57$           

Variance 2,550 41,820 16.4 $191,250 $4.57

981

Route 981 Howard Direct

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current ‐               ‐  ‐$  

Proposed 1,530           28,050                 18.3             114,750$            4.09$           

Variance 1,530 28,050 18.3 $114,750 $4.09

982

Route 982‐Pavilion Express

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 11,518         245,055              21.3             863,813$            3.52$           

Proposed 11,220         310,590              27.7             841,500$            2.71$           

Variance (298) 65,535 6.4 ($22,313) ($0.82)

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

7,760 

CURRENT PROPOSED

666,135 

361,440 

CURRENT PROPOSED

56.7 

CURRENT PROPOSED

$493,115  $477,990 

CURRENT PROPOSED

$0.74  $1.32 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

5,614  ‐

CURRENT PROPOSED

90,015  ‐

CURRENT PROPOSED

16.0 

CURRENT PROPOSED

$421,069  $‐

CURRENT PROPOSED

$4.68 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

7,760 

CURRENT PROPOSED

666,135 

361,440 

CURRENT PROPOSED

56.7 

CURRENT PROPOSED

$493,115  $477,990 

CURRENT PROPOSED

$0.74  $1.32 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

961  ‐

CURRENT PROPOSED

2,550  ‐

CURRENT PROPOSED

2.7 

CURRENT PROPOSED

$72,038  $‐

CURRENT PROPOSED

$28.25 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

7,760 

CURRENT PROPOSED

666,135 

361,440 

CURRENT PROPOSED

56.7 

CURRENT PROPOSED

$493,115  $477,990 

CURRENT PROPOSED

$0.74  $1.32 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

11,518  11,220 

CURRENT PROPOSED

245,055  310,590 

CURRENT PROPOSED

21.3 27.7 

CURRENT PROPOSED

$863,813  $841,500 

CURRENT PROPOSED

$3.52  $2.71 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

7,760 

CURRENT PROPOSED

666,135 

361,440 

CURRENT PROPOSED

56.7 

CURRENT PROPOSED

$493,115  $477,990 

CURRENT PROPOSED

$0.74  $1.32 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

‐ 1,530 

CURRENT PROPOSED

‐ 28,050 

CURRENT PROPOSED

18.3 

CURRENT PROPOSED

$‐ $114,750 

CURRENT PROPOSED

$4.09 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

7,760 

CURRENT PROPOSED

666,135 

361,440 

CURRENT PROPOSED

56.7 

CURRENT PROPOSED

$493,115  $477,990 

CURRENT PROPOSED

$0.74  $1.32 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

‐ 2,805 

CURRENT PROPOSED

‐ 51,255 

CURRENT PROPOSED

18.3 

CURRENT PROPOSED

$‐ $210,375 

CURRENT PROPOSED

$4.10 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

7,760 

CURRENT PROPOSED

666,135 

361,440 

CURRENT PROPOSED

56.7 

CURRENT PROPOSED

$493,115  $477,990 

CURRENT PROPOSED

$0.74  $1.32 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

‐ 2,805 

CURRENT PROPOSED

‐ 51,255 

CURRENT PROPOSED

18.3 

CURRENT PROPOSED

$‐ $210,375 

CURRENT PROPOSED

$4.10 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

7,760 

CURRENT PROPOSED

666,135 

361,440 

CURRENT PROPOSED

56.7 

CURRENT PROPOSED

$493,115  $477,990 

CURRENT PROPOSED

$0.74  $1.32 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

‐ 2,805 

CURRENT PROPOSED

‐ 51,255 

CURRENT PROPOSED

18.3 

CURRENT PROPOSED

$‐ $210,375 

CURRENT PROPOSED

$4.10 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

7,760 

CURRENT PROPOSED

666,135 

361,440 

CURRENT PROPOSED

56.7 

CURRENT PROPOSED

$493,115  $477,990 

CURRENT PROPOSED

$0.74  $1.32 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

‐ 2,550 

CURRENT PROPOSED

‐ 41,820 

CURRENT PROPOSED

16.4 

CURRENT PROPOSED

$‐ $191,250 

CURRENT PROPOSED

$4.57 

CURRENT PROPOSED

Page 21: Capital Metro Transit Development Plan: Financial Planconnections2025.org/wp-content/uploads/2017/03/... · Introduction Capital Metro’s Connections 2025 is a transit system study

983

Route 983‐N. U.S. 183 Express ‐> 980-Howard

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 12,572         150,960              12.0             942,863$            6.25$           

Proposed 5,610           111,435              19.9             420,750$            3.78$           

Variance (6,962) (39,525) 7.9 ($522,113) ($2.47)

985

Route 985‐Leander/Lakeline Direct

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 2,006           39,780                 19.8             150,450$            3.78$           

Proposed 20,910         209,355              10.0             1,568,250$         7.49$           

Variance 18,904 169,575 (9.8) $1,417,800 $3.71

987

Route 987‐Leander/Lakeline Express

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 5,789           89,250                 15.4             434,138$            4.86$           

Proposed 9,180           104,295              11.4             688,500$            6.60$           

Variance 3,392 15,045 (4.1) $254,363 $1.74

990

Route 990‐Manor/Elgin Express

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current 1,866           25,526                 13.7             139,931$            5.48$           

Proposed 1,866           26,520                 14.2             139,931$            5.28$           

Variance 0 995 0.5 $0 ($0.21)

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

7,760 

CURRENT PROPOSED

666,135 

361,440 

CURRENT PROPOSED

56.7 

CURRENT PROPOSED

$493,115  $477,990 

CURRENT PROPOSED

$0.74  $1.32 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

12,572 

5,610 

CURRENT PROPOSED

150,960  111,435 

CURRENT PROPOSED

12.0 19.9 

CURRENT PROPOSED

$942,863 

$420,750 

CURRENT PROPOSED

$6.25 

$3.78 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

7,760 

CURRENT PROPOSED

666,135 

361,440 

CURRENT PROPOSED

56.7 

CURRENT PROPOSED

$493,115  $477,990 

CURRENT PROPOSED

$0.74  $1.32 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

2,006 

20,910 

CURRENT PROPOSED

39,780  209,355 

CURRENT PROPOSED

19.8 10.0 

CURRENT PROPOSED

$150,450 

$1,568,250 

CURRENT PROPOSED

$3.78  $7.49 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

7,760 

CURRENT PROPOSED

666,135 

361,440 

CURRENT PROPOSED

56.7 

CURRENT PROPOSED

$493,115  $477,990 

CURRENT PROPOSED

$0.74  $1.32 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

5,789 9,180 

CURRENT PROPOSED

89,250  104,295 

CURRENT PROPOSED

15.4  11.4 

CURRENT PROPOSED

$434,138 $688,500 

CURRENT PROPOSED

$4.86 $6.60 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

7,760 

CURRENT PROPOSED

666,135 

361,440 

CURRENT PROPOSED

56.7 

CURRENT PROPOSED

$493,115  $477,990 

CURRENT PROPOSED

$0.74  $1.32 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

1,866  1,866 

CURRENT PROPOSED

25,526  26,520 

CURRENT PROPOSED

13.7  14.2 

CURRENT PROPOSED

$139,931  $139,931 

CURRENT PROPOSED

$5.48  $5.28 

CURRENT PROPOSED

Page 22: Capital Metro Transit Development Plan: Financial Planconnections2025.org/wp-content/uploads/2017/03/... · Introduction Capital Metro’s Connections 2025 is a transit system study

310

Route 310-Wickersham

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current ‐               ‐  ‐$                    

Proposed 17,340         237,245              13.7             1,300,500$         5.48$           

Variance 17,340 237,245 13.7 $1,300,500 $5.48

315

Route 315-Ben White

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current ‐               ‐  ‐$                    

Proposed 22,610         243,420              10.8             1,695,750$         6.97$           

Variance 22,610 243,420 10.8 $1,695,750 $6.97

345

Route 345-45th Street

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current ‐               ‐  ‐$  

Proposed 11,715         163,025              13.9             878,625$            5.39$           

Variance 11,715 163,025 13.9 $878,625 $5.39

421

Route 421‐Domain Circulator

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current ‐               ‐  ‐$                    

Proposed 23,280         242,360              10.4             1,746,000$         7.20$           

Variance 23,280 242,360 10.4 $1,746,000 $7.20

450

Route 450‐Congress Circulator

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current ‐               ‐  ‐$                    

Proposed 27,300         284,150              10.4             2,047,500$         7.21$           

Variance 27,300 284,150 10.4 $2,047,500 $7.21

451

Route 451‐Downtown Circulator

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current ‐               ‐  ‐$                    

Proposed 20,475         212,980              10.4             1,535,625$         7.21$           

Variance 20,475 212,980 10.4 $1,535,625 $7.21

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

7,760 

CURRENT PROPOSED

666,135 

361,440 

CURRENT PROPOSED

56.7 

CURRENT PROPOSED

$493,115  $477,990 

CURRENT PROPOSED

$0.74  $1.32 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

5,614  ‐

CURRENT PROPOSED

90,015  ‐

CURRENT PROPOSED

16.0 

CURRENT PROPOSED

$421,069  $‐

CURRENT PROPOSED

$4.68 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

7,760 

CURRENT PROPOSED

666,135 

361,440 

CURRENT PROPOSED

56.7 

CURRENT PROPOSED

$493,115  $477,990 

CURRENT PROPOSED

$0.74  $1.32 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

‐ 17,340 

CURRENT PROPOSED

‐ 237,245 

CURRENT PROPOSED

13.7 

CURRENT PROPOSED

$‐ $1,300,500 

CURRENT PROPOSED

$5.48 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

7,760 

CURRENT PROPOSED

666,135 

361,440 

CURRENT PROPOSED

56.7 

CURRENT PROPOSED

$493,115  $477,990 

CURRENT PROPOSED

$0.74  $1.32 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

5,614  ‐

CURRENT PROPOSED

90,015  ‐

CURRENT PROPOSED

16.0 

CURRENT PROPOSED

$421,069  $‐

CURRENT PROPOSED

$4.68 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

7,760 

CURRENT PROPOSED

666,135 

361,440 

CURRENT PROPOSED

56.7 

CURRENT PROPOSED

$493,115  $477,990 

CURRENT PROPOSED

$0.74  $1.32 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

‐22,610 

CURRENT PROPOSED

‐ 243,420 

CURRENT PROPOSED

10.8 

CURRENT PROPOSED

$‐$1,695,750 

CURRENT PROPOSED

$6.97 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

7,760 

CURRENT PROPOSED

666,135 

361,440 

CURRENT PROPOSED

56.7 

CURRENT PROPOSED

$493,115  $477,990 

CURRENT PROPOSED

$0.74  $1.32 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

5,614  ‐

CURRENT PROPOSED

90,015  ‐

CURRENT PROPOSED

16.0 

CURRENT PROPOSED

$421,069  $‐

CURRENT PROPOSED

$4.68 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

7,760 

CURRENT PROPOSED

666,135 

361,440 

CURRENT PROPOSED

56.7 

CURRENT PROPOSED

$493,115  $477,990 

CURRENT PROPOSED

$0.74  $1.32 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

‐ 11,715 

CURRENT PROPOSED

‐ 163,025 

CURRENT PROPOSED

13.9 

CURRENT PROPOSED

$‐ $878,625 

CURRENT PROPOSED

$5.39 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

7,760 

CURRENT PROPOSED

666,135 

361,440 

CURRENT PROPOSED

56.7 

CURRENT PROPOSED

$493,115  $477,990 

CURRENT PROPOSED

$0.74  $1.32 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

5,614  ‐

CURRENT PROPOSED

90,015  ‐

CURRENT PROPOSED

16.0 

CURRENT PROPOSED

$421,069  $‐

CURRENT PROPOSED

$4.68 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

7,760 

CURRENT PROPOSED

666,135 

361,440 

CURRENT PROPOSED

56.7 

CURRENT PROPOSED

$493,115  $477,990 

CURRENT PROPOSED

$0.74  $1.32 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

‐23,280 

CURRENT PROPOSED

‐ 242,360 

CURRENT PROPOSED

10.4 

CURRENT PROPOSED

$‐$1,746,000 

CURRENT PROPOSED

$7.20 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

7,760 

CURRENT PROPOSED

666,135 

361,440 

CURRENT PROPOSED

56.7 

CURRENT PROPOSED

$493,115  $477,990 

CURRENT PROPOSED

$0.74  $1.32 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

5,614  ‐

CURRENT PROPOSED

90,015  ‐

CURRENT PROPOSED

16.0 

CURRENT PROPOSED

$421,069  $‐

CURRENT PROPOSED

$4.68 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

7,760 

CURRENT PROPOSED

666,135 

361,440 

CURRENT PROPOSED

56.7 

CURRENT PROPOSED

$493,115  $477,990 

CURRENT PROPOSED

$0.74  $1.32 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

27,300 

CURRENT PROPOSED

‐ 284,150 

CURRENT PROPOSED

10.4 

CURRENT PROPOSED

$‐$2,047,500 

CURRENT PROPOSED

$7.21 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

7,760 

CURRENT PROPOSED

666,135 

361,440 

CURRENT PROPOSED

56.7 

CURRENT PROPOSED

$493,115  $477,990 

CURRENT PROPOSED

$0.74  $1.32 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

5,614  ‐

CURRENT PROPOSED

90,015  ‐

CURRENT PROPOSED

16.0 

CURRENT PROPOSED

$421,069  $‐

CURRENT PROPOSED

$4.68 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

7,760 

CURRENT PROPOSED

666,135 

361,440 

CURRENT PROPOSED

56.7 

CURRENT PROPOSED

$493,115  $477,990 

CURRENT PROPOSED

$0.74  $1.32 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

‐20,475 

CURRENT PROPOSED

‐ 212,980 

CURRENT PROPOSED

10.4 

CURRENT PROPOSED

$‐ $1,535,625 

CURRENT PROPOSED

$7.21 

CURRENT PROPOSED

Page 23: Capital Metro Transit Development Plan: Financial Planconnections2025.org/wp-content/uploads/2017/03/... · Introduction Capital Metro’s Connections 2025 is a transit system study

452

Route 452‐Medical Center

Compare Hours Ridership Passengers per Hour Cost Cost/Pax

Current ‐               ‐  ‐$  

Proposed 9,945           103,530              10.4             745,875$            7.20$           

Variance 9,945 103,530 10.4 $745,875 $7.20

Annual Hours Annual Ridership Passengers / Hour Annual Cost Cost / Rider

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

7,760 

CURRENT PROPOSED

666,135 

361,440 

CURRENT PROPOSED

56.7 

CURRENT PROPOSED

$493,115  $477,990 

CURRENT PROPOSED

$0.74  $1.32 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

5,614  ‐

CURRENT PROPOSED

90,015  ‐

CURRENT PROPOSED

16.0 

CURRENT PROPOSED

$421,069  $‐

CURRENT PROPOSED

$4.68 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

7,760 

CURRENT PROPOSED

666,135 

361,440 

CURRENT PROPOSED

56.7 

CURRENT PROPOSED

$493,115  $477,990 

CURRENT PROPOSED

$0.74  $1.32 

CURRENT PROPOSED

3,727  ‐

CURRENT PROPOSED

26,265  ‐

CURRENT PROPOSED

7.0 

CURRENT PROPOSED

$279,544  $‐

CURRENT PROPOSED CURRENT PROPOSED

‐ 9,945 

CURRENT PROPOSED

‐ 103,530 

CURRENT PROPOSED

10.4 

CURRENT PROPOSED

$‐ $745,875 

CURRENT PROPOSED

$7.20 

CURRENT PROPOSED