Page 1: Transit Resource Allocation Plan Capital Projectiondrpt.virginia.gov/media/1954/drpt-capital-project-plan...2016/10/17  · Update 10-year projection of transit capital costs (FY18-27)

Transit Service Delivery

Advisory Committee

October 26, 2016

Virginia Department of Rail &

Public Transportation

Transit Resource

Allocation Plan

Capital Projection

Page 2: Transit Resource Allocation Plan Capital Projectiondrpt.virginia.gov/media/1954/drpt-capital-project-plan...2016/10/17  · Update 10-year projection of transit capital costs (FY18-27)

TABLE OF CONTENTS

2

Objective

Assumptions

Presentation of updated model results

Base Case

Scenarios

Conclusions

Page 3: Transit Resource Allocation Plan Capital Projectiondrpt.virginia.gov/media/1954/drpt-capital-project-plan...2016/10/17  · Update 10-year projection of transit capital costs (FY18-27)

OBJECTIVE

3

Update 10-year projection of transit capital costs (FY18-27)

Previous version (FY17-26) based on DRPT FY16 SYIP

Update analysis to reflect DRPT FY17 SYIP

Calibrate updated data based on:

- Recent TDPs

- Telephone interviews with largest 10 agencies

- WMATA FY17-22 CIP

Update 10-year projection of transit capital revenues

Perform gap analysis

Deficit/additional revenues needed

Change in state match rates due to lower revenues

Page 4: Transit Resource Allocation Plan Capital Projectiondrpt.virginia.gov/media/1954/drpt-capital-project-plan...2016/10/17  · Update 10-year projection of transit capital costs (FY18-27)

STATE TRANSIT CAPITAL FUNDING TIERS

Tier 1 Replacement and Expansion Vehicles

68% maximum state match

Tier 2 Infrastructure and Facilities

34% maximum state match

Tier 3 Other

17% maximum state match

4

Page 5: Transit Resource Allocation Plan Capital Projectiondrpt.virginia.gov/media/1954/drpt-capital-project-plan...2016/10/17  · Update 10-year projection of transit capital costs (FY18-27)

PROJECT CATEGORIES

5

State of Good Repair

Rehabilitation and replacement projects such as purchase of replacement vehicles; amenities

including shelters, fare payment, bike racks, signage; computers, communications and

technology; security; and track lease and debt service payments

VRE track lease payments

Expansion Projects

Expansion vehicles (bus, vans, and service vehicles)

Significant new facilities and upgrades such as construction of second elevators, station

entrances, and parking garages

Multi-year projects

- Virginia Beach Light Rail Transit (LRT) Extension

- Richmond Bus Rapid Transit (BRT)

- Norfolk Naval Station Transit Extension

Page 6: Transit Resource Allocation Plan Capital Projectiondrpt.virginia.gov/media/1954/drpt-capital-project-plan...2016/10/17  · Update 10-year projection of transit capital costs (FY18-27)

CAPITAL PROJECTION ASSUMPTIONS

6

WMATA Expenditures

FY18-22 based on WMATA FY17-22 CIP

Mix of PRIIA-funded projects by tier estimated based on FY18 mix

All Other Agencies’ Expenditures

FY18-21 based on FY17 SYIP, due to drop in expenditures last 2 years of SYIP

Projected expenditures FY22-27 based on average annual SYIP costs FY18-21

FY22-27 escalated by historical growth in RS Means Construction Cost Index

Federal Participation

FY18-21 based on FY2017 SYIP estimates by major agency/district by tier

FY22-27 based on average of FY18-FY21

Page 7: Transit Resource Allocation Plan Capital Projectiondrpt.virginia.gov/media/1954/drpt-capital-project-plan...2016/10/17  · Update 10-year projection of transit capital costs (FY18-27)

BASE CASE ASSUMPTIONS

7

Revenues

Revenues based on state projection

Elimination of transit bond funding in FY20

Elimination of PRIIA funding in FY21

Expenditures

Calculate resulting gap when state match by tier is maintained at 68%/34%/17%

(different from FY17 SYIP which assumes tiers varying each year)

In addition, examine cut in state match required to address funding gap

- Maintain tier 1 percentages to the extent possible

- Adjust tier 3 and 2 percentages, respectively

Page 8: Transit Resource Allocation Plan Capital Projectiondrpt.virginia.gov/media/1954/drpt-capital-project-plan...2016/10/17  · Update 10-year projection of transit capital costs (FY18-27)

SCENARIO ANALYSIS VARIABLES

8

PRIIA Funding

Assume PRIIA-authorized state/federal WMATA funding maintained beyond FY20

State Transit Capital Bonds

Assume new legislative action to continue bond funding beyond FY19

Projects Beyond FY17 SYIP

Assume additional projects reported by agencies for which constrained funding not currently identified

Contingency

Assume additional expenditures on projects statewide of approximately 5%

Project Mix

Assume state transit capital funds are only applied to SGR projects

Page 9: Transit Resource Allocation Plan Capital Projectiondrpt.virginia.gov/media/1954/drpt-capital-project-plan...2016/10/17  · Update 10-year projection of transit capital costs (FY18-27)

SCENARIOS

9

1 Base Case

PRIIA-authorized state/federal WMATA funding expires in FY20

State transit capital bonds sunset in FY19

2 PRIIA Funding Maintained

PRIIA funding maintained at current levels beyond FY20

State transit capital bonds sunset in FY19

3 Additional Revenues

PRIIA funding maintained at current levels beyond FY20

State transit capital bonds continue at current levels beyond FY19

4 Additional Revenues and Expenditures

State transit capital bonds and PRIIA Funding continue beyond FY19

Additional project spending as reported by agencies

Statewide contingency expenditures of 5%

5 SGR Only

Expansion projects not funded by state transit capital funds

Page 10: Transit Resource Allocation Plan Capital Projectiondrpt.virginia.gov/media/1954/drpt-capital-project-plan...2016/10/17  · Update 10-year projection of transit capital costs (FY18-27)

SCENARIOS

10

PRIIA Funding

Reauthorized

New State

Transit

Capital Bonds

Projects

Beyond FY17

SYIP

Contingency

SGR and

committed

expansion

projects only

1) Base Case X X X X X

2) PRIIA

Funding

Maintained X X X X

3) Additional

Revenues X X X

4) Additional

Revenues &

Expenditures X

5) SGR Only X X X X

X = NO

= YES

Page 11: Transit Resource Allocation Plan Capital Projectiondrpt.virginia.gov/media/1954/drpt-capital-project-plan...2016/10/17  · Update 10-year projection of transit capital costs (FY18-27)

SCENARIO 1

BASE CASE

Transit Resource Allocation Plan Capital Projection 1

Page 12: Transit Resource Allocation Plan Capital Projectiondrpt.virginia.gov/media/1954/drpt-capital-project-plan...2016/10/17  · Update 10-year projection of transit capital costs (FY18-27)

$6.5B PROJECTED TRANSIT CAPITAL INVESTMENTS

BY VIRGINIA TRANSIT AGENCIES (FY18-27)

12

1

70% SGR

30% Expansion

Page 13: Transit Resource Allocation Plan Capital Projectiondrpt.virginia.gov/media/1954/drpt-capital-project-plan...2016/10/17  · Update 10-year projection of transit capital costs (FY18-27)

$6.5B PROJECTED TRANSIT CAPITAL INVESTMENTS

TIER-WISE EXPENDITURES (FY18-27)

13

1

Page 14: Transit Resource Allocation Plan Capital Projectiondrpt.virginia.gov/media/1954/drpt-capital-project-plan...2016/10/17  · Update 10-year projection of transit capital costs (FY18-27)

$2.4B STATE TRANSIT CAPITAL FUNDING NEEDS

BY TIER (FY18-27)

14 Excludes share of transit capital costs funded by federal revenues

1

Page 15: Transit Resource Allocation Plan Capital Projectiondrpt.virginia.gov/media/1954/drpt-capital-project-plan...2016/10/17  · Update 10-year projection of transit capital costs (FY18-27)

$2.4B STATE TRANSIT CAPITAL FUNDING NEEDS

BY AGENCY (FY18-27)

15

1

Page 16: Transit Resource Allocation Plan Capital Projectiondrpt.virginia.gov/media/1954/drpt-capital-project-plan...2016/10/17  · Update 10-year projection of transit capital costs (FY18-27)

$1.3B PROJECTED STATE TRANSIT CAPITAL FUNDING

REVENUES BY TYPE (FY18-27)

16 Excludes federal funds disbursed by the State

Other Sources include VDOT TTF

1

Page 17: Transit Resource Allocation Plan Capital Projectiondrpt.virginia.gov/media/1954/drpt-capital-project-plan...2016/10/17  · Update 10-year projection of transit capital costs (FY18-27)

$2.4B STATE TRANSIT CAPITAL FUNDING NEEDS &

$1.3B PROJECTED REVENUES (FY18-27)

17

State Capital Contribution

Excludes share of transit capital costs funded by federal revenues

and by State Other Sources

1

Page 18: Transit Resource Allocation Plan Capital Projectiondrpt.virginia.gov/media/1954/drpt-capital-project-plan...2016/10/17  · Update 10-year projection of transit capital costs (FY18-27)

$1.1B STATE TRANSIT CAPITAL FUNDING DEFICIT

(FY18-27) – AVERAGE ANNUAL DEFICIT $107M

18

1

Current state match rates by Tier of 68/34/17% maintained

$M

illio

ns

Page 19: Transit Resource Allocation Plan Capital Projectiondrpt.virginia.gov/media/1954/drpt-capital-project-plan...2016/10/17  · Update 10-year projection of transit capital costs (FY18-27)

PROJECTED STATE TRANSIT CAPITAL MATCH BY

TIER TO ADDRESS DEFICIT (FY18-27)

19

1

Deficit eliminated by changing state match rates by Tier

Page 20: Transit Resource Allocation Plan Capital Projectiondrpt.virginia.gov/media/1954/drpt-capital-project-plan...2016/10/17  · Update 10-year projection of transit capital costs (FY18-27)

SCENARIO 2:

PRIIA FUNDING

MAINTAINED

Transit Resource Allocation Plan Capital Projection 2

Page 21: Transit Resource Allocation Plan Capital Projectiondrpt.virginia.gov/media/1954/drpt-capital-project-plan...2016/10/17  · Update 10-year projection of transit capital costs (FY18-27)

$6.5B PROJECTED TRANSIT CAPITAL INVESTMENTS

BY VIRGINIA TRANSIT AGENCIES (FY18-27)

21

2

70% SGR

30% Expansion

Page 22: Transit Resource Allocation Plan Capital Projectiondrpt.virginia.gov/media/1954/drpt-capital-project-plan...2016/10/17  · Update 10-year projection of transit capital costs (FY18-27)

$1.7B PROJECTED STATE TRANSIT CAPITAL FUNDING

REVENUES BY TYPE (FY18-27)

22

2

Excludes federal funds disbursed by the State

Other Sources include VDOT TTF

PRIIA Continues

Page 23: Transit Resource Allocation Plan Capital Projectiondrpt.virginia.gov/media/1954/drpt-capital-project-plan...2016/10/17  · Update 10-year projection of transit capital costs (FY18-27)

$2.4B STATE TRANSIT CAPITAL FUNDING NEEDS &

$1.7B PROJECTED REVENUES (FY18-27)

23

State Capital Contribution

2

Excludes share of transit capital costs funded by federal revenues

and by State Other Sources

Page 24: Transit Resource Allocation Plan Capital Projectiondrpt.virginia.gov/media/1954/drpt-capital-project-plan...2016/10/17  · Update 10-year projection of transit capital costs (FY18-27)

24

$715M STATE TRANSIT CAPITAL FUNDING DEFICIT

(FY18-27) – AVERAGE ANNUAL DEFICIT $72M 2

Current state match rates by Tier of 68/34/17% maintained

$M

illio

ns

Page 25: Transit Resource Allocation Plan Capital Projectiondrpt.virginia.gov/media/1954/drpt-capital-project-plan...2016/10/17  · Update 10-year projection of transit capital costs (FY18-27)

PROJECTED STATE TRANSIT CAPITAL MATCH BY TIER TO

ADDRESS DEFICIT (FY18-27)

25

2

Deficit eliminated by changing state match rates by Tier

Page 26: Transit Resource Allocation Plan Capital Projectiondrpt.virginia.gov/media/1954/drpt-capital-project-plan...2016/10/17  · Update 10-year projection of transit capital costs (FY18-27)

SCENARIO 3:

ADDITIONAL REVENUES

Transit Resource Allocation Plan Capital Projection 3

Page 27: Transit Resource Allocation Plan Capital Projectiondrpt.virginia.gov/media/1954/drpt-capital-project-plan...2016/10/17  · Update 10-year projection of transit capital costs (FY18-27)

$6.5B PROJECTED TRANSIT CAPITAL INVESTMENTS

BY VIRGINIA TRANSIT AGENCIES (FY18-27)

27

3

70% SGR

30% Expansion

Page 28: Transit Resource Allocation Plan Capital Projectiondrpt.virginia.gov/media/1954/drpt-capital-project-plan...2016/10/17  · Update 10-year projection of transit capital costs (FY18-27)

$2.2B PROJECTED STATE TRANSIT CAPITAL FUNDING

REVENUES BY TYPE (FY18-27)

28

3

Excludes federal funds disbursed by the State

Other Sources include VDOT TTF

PRIIA Continues

Bonds Renewed

Page 29: Transit Resource Allocation Plan Capital Projectiondrpt.virginia.gov/media/1954/drpt-capital-project-plan...2016/10/17  · Update 10-year projection of transit capital costs (FY18-27)

$2.4B STATE TRANSIT CAPITAL FUNDING NEEDS &

$2.2B PROJECTED REVENUES (FY18-27)

29

State Capital Contribution

3

Excludes share of transit capital costs funded by federal revenues

and by State Other Sources

Page 30: Transit Resource Allocation Plan Capital Projectiondrpt.virginia.gov/media/1954/drpt-capital-project-plan...2016/10/17  · Update 10-year projection of transit capital costs (FY18-27)

30

$203M STATE TRANSIT CAPITAL FUNDING DEFICIT

(FY18-27) – AVERAGE ANNUAL DEFICIT $20M 3

Current state match rates by Tier of 68/34/17% maintained

$M

illio

ns

Page 31: Transit Resource Allocation Plan Capital Projectiondrpt.virginia.gov/media/1954/drpt-capital-project-plan...2016/10/17  · Update 10-year projection of transit capital costs (FY18-27)

31

PROJECTED STATE MATCH BY TIER TO ADDRESS

DEFICIT (FY18-27): HIGHER TIER 2 MATCH THAN BASE

3

Deficit eliminated by changing state match rates by Tier

Page 32: Transit Resource Allocation Plan Capital Projectiondrpt.virginia.gov/media/1954/drpt-capital-project-plan...2016/10/17  · Update 10-year projection of transit capital costs (FY18-27)

SCENARIO 4:

ADDITIONAL REVENUES

AND EXPENDITURES

Transit Resource Allocation Plan Capital Projection 4

Page 33: Transit Resource Allocation Plan Capital Projectiondrpt.virginia.gov/media/1954/drpt-capital-project-plan...2016/10/17  · Update 10-year projection of transit capital costs (FY18-27)

$9.1B PROJECTED TRANSIT CAPITAL INVESTMENTS

BY VIRGINIA TRANSIT AGENCIES (FY18-27)

33

4

56% SGR

44% Expansion

Page 34: Transit Resource Allocation Plan Capital Projectiondrpt.virginia.gov/media/1954/drpt-capital-project-plan...2016/10/17  · Update 10-year projection of transit capital costs (FY18-27)

$2.2B PROJECTED STATE TRANSIT CAPITAL FUNDING

REVENUES BY TYPE (FY18-27)

34

4

Excludes federal funds disbursed by the State

Other Sources include VDOT TTF

PRIIA Continues

Bonds Renewed

Page 35: Transit Resource Allocation Plan Capital Projectiondrpt.virginia.gov/media/1954/drpt-capital-project-plan...2016/10/17  · Update 10-year projection of transit capital costs (FY18-27)

$3.5B STATE TRANSIT CAPITAL FUNDING NEEDS &

$2.2B PROJECTED REVENUES (FY18-27)

35

State Capital Contribution

4

Additional State Capital Contribution

Excludes share of transit capital costs funded by federal revenues

and by State Other Sources

Page 36: Transit Resource Allocation Plan Capital Projectiondrpt.virginia.gov/media/1954/drpt-capital-project-plan...2016/10/17  · Update 10-year projection of transit capital costs (FY18-27)

36

$1.3B STATE TRANSIT CAPITAL FUNDING DEFICIT

(FY18-27) – AVERAGE ANNUAL DEFICIT $129M

4

Current state match rates by Tier of 68/34/17% maintained

$M

illio

ns

Page 37: Transit Resource Allocation Plan Capital Projectiondrpt.virginia.gov/media/1954/drpt-capital-project-plan...2016/10/17  · Update 10-year projection of transit capital costs (FY18-27)

37

PROJECTED STATE MATCH BY TIER TO ADDRESS

DEFICIT (FY18-27): NO TIER 3, LESS TIER 2 FUNDING

4

Deficit eliminated by changing state match rates by Tier

Page 38: Transit Resource Allocation Plan Capital Projectiondrpt.virginia.gov/media/1954/drpt-capital-project-plan...2016/10/17  · Update 10-year projection of transit capital costs (FY18-27)

SCENARIO 5:

SGR ONLY

Transit Resource Allocation Plan Capital Projection 5

Page 39: Transit Resource Allocation Plan Capital Projectiondrpt.virginia.gov/media/1954/drpt-capital-project-plan...2016/10/17  · Update 10-year projection of transit capital costs (FY18-27)

$6.5B PROJECTED TRANSIT CAPITAL INVESTMENTS

BY VIRGINIA TRANSIT AGENCIES (FY18-27)

39

5

70% SGR

30% Expansion (Not Funded by

State Transit

Capital Funding)

Page 40: Transit Resource Allocation Plan Capital Projectiondrpt.virginia.gov/media/1954/drpt-capital-project-plan...2016/10/17  · Update 10-year projection of transit capital costs (FY18-27)

$1.3B PROJECTED STATE TRANSIT CAPITAL FUNDING

REVENUES BY TYPE (FY18-27)

40

Excludes federal funds disbursed by the State

Other sources include VDOT TTF

5

Page 41: Transit Resource Allocation Plan Capital Projectiondrpt.virginia.gov/media/1954/drpt-capital-project-plan...2016/10/17  · Update 10-year projection of transit capital costs (FY18-27)

$1.8B STATE TRANSIT CAPITAL FUNDING NEEDS &

$1.3B PROJECTED REVENUES (FY18-27)

41

State Capital Contribution

5

Excludes share of transit capital costs funded by federal revenues

and by State Other Sources

Page 42: Transit Resource Allocation Plan Capital Projectiondrpt.virginia.gov/media/1954/drpt-capital-project-plan...2016/10/17  · Update 10-year projection of transit capital costs (FY18-27)

42

$475M STATE TRANSIT CAPITAL FUNDING DEFICIT

(FY18-27) – AVERAGE ANNUAL DEFICIT $47.5M

5

Current state match rates by Tier of 68/34/17% maintained

$M

illio

ns

Page 43: Transit Resource Allocation Plan Capital Projectiondrpt.virginia.gov/media/1954/drpt-capital-project-plan...2016/10/17  · Update 10-year projection of transit capital costs (FY18-27)

43

PROJECTED STATE MATCH BY TIER TO ADDRESS

DEFICIT (FY18-27): LOWER STATE MATCH OVER TIME 5

Deficit eliminated by changing state match rates by Tier

Page 44: Transit Resource Allocation Plan Capital Projectiondrpt.virginia.gov/media/1954/drpt-capital-project-plan...2016/10/17  · Update 10-year projection of transit capital costs (FY18-27)

CONCLUSIONS

Transit Resource Allocation Plan Capital Projection

Page 45: Transit Resource Allocation Plan Capital Projectiondrpt.virginia.gov/media/1954/drpt-capital-project-plan...2016/10/17  · Update 10-year projection of transit capital costs (FY18-27)

STATE TRANSIT CAPITAL FUNDING AVERAGE ANNUAL

PROJECTED DEFICIT BY SCENARIO

45

$M

illio

ns

Page 46: Transit Resource Allocation Plan Capital Projectiondrpt.virginia.gov/media/1954/drpt-capital-project-plan...2016/10/17  · Update 10-year projection of transit capital costs (FY18-27)

KEY FINDINGS

46

Base Case scenario is a conservative estimate of transit capital spending, does not

fund significant expansion

Average annual deficit is $107 million FY18-27

Commonwealth will not be able to maintain existing state transit capital program

participation rates by tier beginning in FY18

Lower state participation will require greater local funding or cuts in capital spending

Insufficient committed funding to cover cost of SGR, even without funding expansion

projects, beyond FY20

To provide stability to transit funding statewide, WMATA PRIIA funding must be

reauthorized at existing state and federal levels beyond FY20

Even with WMATA PRIIA funding, maintaining the state match for local agencies’ SGR

projects would be challenging beyond FY22

Page 47: Transit Resource Allocation Plan Capital Projectiondrpt.virginia.gov/media/1954/drpt-capital-project-plan...2016/10/17  · Update 10-year projection of transit capital costs (FY18-27)

NEXT STEPS

47

Investigate revenue options

Model impact of prioritization options on transit funds allocation

Page 48: Transit Resource Allocation Plan Capital Projectiondrpt.virginia.gov/media/1954/drpt-capital-project-plan...2016/10/17  · Update 10-year projection of transit capital costs (FY18-27)

CONTACTS

48

Consultant Team

Nathan Macek

Director of Project Development & Finance

WSP | Parsons Brinckerhoff

202-365-2927 (direct/mobile)

202-370-2912 (office)

[email protected]

Miriam Zaki

Associate Consultant

WSP | Parsons Brinckerhoff

202-569-2874 (direct/mobile)

202-661-5315 (office)

[email protected]

Simon Mosbah

Consultant

WSP | Parsons Brinckerhoff

202-370-2934 (office)

[email protected]