Page 1: Case study 1 – S&T Location Boxes

Case study 1 – S&T Location Boxes

WHERE CABLES ARE PRONE TO

DAMAGE , BECAUSE OF

SEVERE ABRASION AND MECHANICAL

ABUSE.

REPAIR OF JACKET WITH VINYL TAPES

IS NOT DURABLE.

3M PROVIDES EASY TO APPLY AND DURABLE

SOLUTION WITH SCOTCH

31 MINING TAPE.

Page 2: Case study 1 – S&T Location Boxes

PROBLEMS FACED:CONSTANT VIBRATION.RODENTS.WATER INGRESS.MOISTURE INGRESS.SOLUTION:3M SCOTCH31 MINING TAPE WITH WATER PROOF MASTIC AND HIGH MECHANICAL STRENGTH HYPALON .

WATER PROOFING OF GLAND AREA IN POINT MACHINE.