Tube Armor Ceramic CoatingCASE STUDY

Page 2: CASE STUDY 2013 Tube Armor Ceramic Coatings.pptmesser-cs.com/southafrica_stick/s/Whertec-Tube-Armor-Cer… · Tube Armor Ceramic Coating was installed as two formulas altogether

PGE Boardman Coal Plant (Portland General Electric)

Page 3: CASE STUDY 2013 Tube Armor Ceramic Coatings.pptmesser-cs.com/southafrica_stick/s/Whertec-Tube-Armor-Cer… · Tube Armor Ceramic Coating was installed as two formulas altogether

610 MW Foster Wheeler Opposed Wall Fired Boiler (est. 1977)•The State of Oregon’s only coal fired boiler

•PRB Fuel

Page 4: CASE STUDY 2013 Tube Armor Ceramic Coatings.pptmesser-cs.com/southafrica_stick/s/Whertec-Tube-Armor-Cer… · Tube Armor Ceramic Coating was installed as two formulas altogether

The Problem…

“Severe Fouling”

Page 5: CASE STUDY 2013 Tube Armor Ceramic Coatings.pptmesser-cs.com/southafrica_stick/s/Whertec-Tube-Armor-Cer… · Tube Armor Ceramic Coating was installed as two formulas altogether

Boardman Unit 1 Boiler is a double back-pass design.

The Primary Superheats are located in the first backpass and the Re Heater is in the second.

Although both the Primaries and Re Heaters are affected by heavy slag and fouling, there was only enough time allocated during the scheduled outage to coat 47% of the Re Heater (24 out of 51 elements protected).

Future plans will be to coat the entire Re Heater, Primary Superheats, Division Walls, and Waterwalls.

Page 6: CASE STUDY 2013 Tube Armor Ceramic Coatings.pptmesser-cs.com/southafrica_stick/s/Whertec-Tube-Armor-Cer… · Tube Armor Ceramic Coating was installed as two formulas altogether

The 24 elements were coated starting at the bottom of the tube penetrations and then up to the boiler roof.

Each element had a surface area of 550 square feet (tube curvature accounted for). Total area coated is 13,200 sqft.

Page 7: CASE STUDY 2013 Tube Armor Ceramic Coatings.pptmesser-cs.com/southafrica_stick/s/Whertec-Tube-Armor-Cer… · Tube Armor Ceramic Coating was installed as two formulas altogether

Whertec prepared the boiler tubing by grit blasting the areas with Garnet blended with Al. Oxide.

White metal finish with a 2-3 mil profile. Overall Whertec completed the surface prep in 2.5 days utilizing only four blasting machines!

Page 8: CASE STUDY 2013 Tube Armor Ceramic Coatings.pptmesser-cs.com/southafrica_stick/s/Whertec-Tube-Armor-Cer… · Tube Armor Ceramic Coating was installed as two formulas altogether

After the tubes were blasted and before any coating was installed, care was taken to completely remove any dust on the tubes, to prevent contamination.

Page 9: CASE STUDY 2013 Tube Armor Ceramic Coatings.pptmesser-cs.com/southafrica_stick/s/Whertec-Tube-Armor-Cer… · Tube Armor Ceramic Coating was installed as two formulas altogether

Whertec utilized Airless Spray Coating Equipment for the Tube Armor Application.

The ceramic slurry is constantly agitated throughout the install, to keep the fine ingredients suspended in its aqueous solution.

Page 10: CASE STUDY 2013 Tube Armor Ceramic Coatings.pptmesser-cs.com/southafrica_stick/s/Whertec-Tube-Armor-Cer… · Tube Armor Ceramic Coating was installed as two formulas altogether

Tube Armor Ceramic Coating was installed as two formulas altogether.

TA- F61”E” installed as the base layer at 5 mils dry. The E has erosion resistance to soot blowers.

Page 11: CASE STUDY 2013 Tube Armor Ceramic Coatings.pptmesser-cs.com/southafrica_stick/s/Whertec-Tube-Armor-Cer… · Tube Armor Ceramic Coating was installed as two formulas altogether

TA- F61”S” is installed on top of the “E” layer at an average of 6 mils.

The “S” layer has very strong resistance to slag adhesion.

Page 12: CASE STUDY 2013 Tube Armor Ceramic Coatings.pptmesser-cs.com/southafrica_stick/s/Whertec-Tube-Armor-Cer… · Tube Armor Ceramic Coating was installed as two formulas altogether

.

Overall the Tube Armor System was installed at an average thickness of 13 mils.

Page 13: CASE STUDY 2013 Tube Armor Ceramic Coatings.pptmesser-cs.com/southafrica_stick/s/Whertec-Tube-Armor-Cer… · Tube Armor Ceramic Coating was installed as two formulas altogether

Primary ROI Results:

•Higher heat absorption in the coated areas of the Re Heater

•Reduced amount of sootblowing

•Significantly less time needed to clean the elements in order to gain entry of the boiler, especially during forced outage situations

Page 14: CASE STUDY 2013 Tube Armor Ceramic Coatings.pptmesser-cs.com/southafrica_stick/s/Whertec-Tube-Armor-Cer… · Tube Armor Ceramic Coating was installed as two formulas altogether

TubeArmor provides a wide range of benefits, including:

•Higher heat absorption in the coated areas of the entire boiler ($$$ in fuel, emissions, etc).

•Lower your FEGT (furnace exit gas temperature)

•Dramatically reduce Water Cannon usage or cancel plans to install them

•Reduce wear associated with soot blowing and fly ash erosion because you don’t have to run them as often or rarely at all

•Decrease the amount of money you spend at the begininning of each outage washing and dynamiting slag out of the boiler

•Save your lower slopes from taking a beating from dangerous clinker falls