As part of the redevelopment, two new sound stages were built to house Warner Bros. Studio Tour London, a permanent behind the scenes walking tour which features authentic sets, costumes and props from the Harry Potter film series. Hoare Lea & Partners contacted Comfort at the concept stages of the project to design and manufacture bespoke displacement terminals to suit the specific requirements needed to overcome the difficult task of conditioning the space without seeing the mechanical services. As with most of our bespoke terminals if you cant see them or don’t realise what they are, or do, we have succeeded, a paramount requirement on this particular project. There were almost 100 displacement terminals manufactured and installed throughout the exhibition, almost all have been built into the film sets or structures to provide an ideal internal environment even under maximum occupancy, but remaining invisible to the public. In 2010 Warner Bros. invested over £100 million into Leavesden Studios to create a permanent UK film production base for the company, becoming one of the largest studio production facilities in Europe. case study 01952 238250 | displacementsolutions.co.uk

Upload: others

Post on 25-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: case study · In 2010 Warner Bros. invested over £100 million into Leavesden Studios to create a permanent UK film production base for the company, becoming one of the largest studio

As part of the redevelopment, two new sound stages were built to houseWarner Bros. Studio Tour London, a permanent behind the scenes walkingtour which features authentic sets, costumes and props from the Harry Potterfilm series.

Hoare Lea & Partners contacted Comfort at the concept stages of the projectto design and manufacture bespoke displacement terminals to suit the specificrequirements needed to overcome the difficult task of conditioning the spacewithout seeing the mechanical services.

As with most of our bespoke terminals if you cant see them or don’t realisewhat they are, or do, we have succeeded, a paramount requirement on thisparticular project.

There were almost 100 displacement terminals manufactured and installedthroughout the exhibition, almost all have been built into the film sets orstructures to provide an ideal internal environment even under maximumoccupancy, but remaining invisible to the public.

In 2010 Warner Bros. invested over £100 million intoLeavesden Studios to create a permanent UK filmproduction base for the company, becoming one ofthe largest studio production facilities in Europe.

case study

01952 238250 | displacementsolutions.co.uk