Case Study: Micropile pier bracket underpinning with mi-cropiles
Foundation Specialties, Inc. was retained to per‐form emergency remedial underpinning at the Fort Smith Pavilion. Several precast tilt‐up panels with integral columns placed on a spread footing with column pads had been damaged when the footings settled during construction.
Project Summary
Project: Fort Smith Pavilion Underpinning
Project Engineer: James L Burke, P.E.
Installing Contractor: Foundation Specialties Inc., FSI GEO-CON
Products Installed: Ischebeck 40/20 Titan hollow bar micropiles with ECP M-350-EP4 Under-footing Bracket
Number of Placements: 42 micropiles with brackets
Average Depth to Load Capacity 20 feet
Pile Ultimate Capacity: 40 kips
Pile Design Load: 20 kips
The solution proposed by Foundation Specialties and James L Burke, P.E. was the use of hollow bar mi‐cropiles drilled and grouted through the boulder fill ma‐terial and into bedrock to support the footing. ECP was contacted to provide under‐footing brackets that would connect the micropiles to the footing and transfer the loads to the micropiles..
-
The material under the footing consists of up to 20 feet of boulder back fill material with highly variable blow counts over hard shale. The underpinning of the two walls required a total of 42 40/20 Titan bar mi‐cropiles installed with a TEI MP250H drill. The drill was mounted on the ECP under‐footing brackets after the footing had been taken back inline with the wall panels. The footing was taken back to minimize eccen‐tricity of the bracket. After installation, the micropiles were cased with a 4’ ‐ 4”diameter inertia sleeve from ECP to lock into the bracket.
After the micropile grout achieved the design compres‐sive strength of 4000psi, the micropiles were loaded to 17 kips and locked off in the brackets. This transferred 90% of the wall load to the micropiles. The gap between the wall panels and the foot‐ing was filled with grout to completely transfer the load to the micropiles
/ColorImageDict > /JPEG2000ColorACSImageDict > /JPEG2000ColorImageDict > /AntiAliasGrayImages false /CropGrayImages true /GrayImageMinResolution 300 /GrayImageMinResolutionPolicy /OK /DownsampleGrayImages true /GrayImageDownsampleType /Bicubic /GrayImageResolution 300 /GrayImageDepth -1 /GrayImageMinDownsampleDepth 2 /GrayImageDownsampleThreshold 1.50000 /EncodeGrayImages true /GrayImageFilter /DCTEncode /AutoFilterGrayImages true /GrayImageAutoFilterStrategy /JPEG /GrayACSImageDict > /GrayImageDict > /JPEG2000GrayACSImageDict > /JPEG2000GrayImageDict > /AntiAliasMonoImages false /CropMonoImages true /MonoImageMinResolution 1200 /MonoImageMinResolutionPolicy /OK /DownsampleMonoImages true /MonoImageDownsampleType /Bicubic /MonoImageResolution 1200 /MonoImageDepth -1 /MonoImageDownsampleThreshold 1.50000 /EncodeMonoImages true /MonoImageFilter /CCITTFaxEncode /MonoImageDict > /AllowPSXObjects false /CheckCompliance [ /None ] /PDFX1aCheck false /PDFX3Check false /PDFXCompliantPDFOnly false /PDFXNoTrimBoxError true /PDFXTrimBoxToMediaBoxOffset [ 0.00000 0.00000 0.00000 0.00000 ] /PDFXSetBleedBoxToMediaBox true /PDFXBleedBoxToTrimBoxOffset [ 0.00000 0.00000 0.00000 0.00000 ] /PDFXOutputIntentProfile () /PDFXOutputConditionIdentifier () /PDFXOutputCondition () /PDFXRegistryName () /PDFXTrapped /False
/CreateJDFFile false /Description > /Namespace [ (Adobe) (Common) (1.0) ] /OtherNamespaces [ > /FormElements false /GenerateStructure false /IncludeBookmarks false /IncludeHyperlinks false /IncludeInteractive false /IncludeLayers false /IncludeProfiles false /MultimediaHandling /UseObjectSettings /Namespace [ (Adobe) (CreativeSuite) (2.0) ] /PDFXOutputIntentProfileSelector /DocumentCMYK /PreserveEditing true /UntaggedCMYKHandling /LeaveUntagged /UntaggedRGBHandling /UseDocumentProfile /UseDocumentBleed false >> ]>> setdistillerparams> setpagedevice