case study: remote access to hilltop ...maxitrack.online/wp-content/uploads/2017/08/maxitrack...case...

1
The Outcome: The customer was really impressed with the speed and efficiency of the MaxiTrack system. The on-site team now had a safe, convenient area to park their vehicles and equipment without fear of slips, trips and accidents. Work on the transmission lines was now able to proceed. CASE STUDY: REMOTE ACCESS TO HILLTOP TRANSMISSIONS The Requirement: Maintenance work to transmission lines, at a remote hilltop field near Halifax, required a heavy duty temporary vehicle park as a base for mobile teams. The solution needed to be safe, fit-for-purpose and easy to install. The Solution: To enable easy, convenient on-site access for the maintenance teams without the fear of vehicles getting stuck in mud or sensitive ground underneath being disturbed, Ground- Guards recommended MaxiTrack. A large pad area, complete with a ground protection sheet underneath, was quickly constructed using a small team of workers, instantly transforming the muddy field into a high performance, high traction car park. The Customer: Amec Foster Wheeler

Upload: dophuc

Post on 19-May-2018

216 views

Category:

Documents


3 download

TRANSCRIPT

The Outcome:

The customer was really impressed with the speed and efficiency of the MaxiTrack system.

The on-site team now had a safe, convenient area to park their vehicles and equipment

without fear of slips, trips and accidents. Work on the transmission lines was now able to

proceed.

CASE STUDY: REMOTE ACCESS TO HILLTOP TRANSMISSIONS

The Requirement:

Maintenance work to transmission lines, at a

remote hilltop field near Halifax, required a

heavy duty temporary vehicle park as a base for

mobile teams.

The solution needed to be safe, fit-for-purpose

and easy to install.

The Solution:

To enable easy, convenient on-site access for

the maintenance teams without the fear of

vehicles getting stuck in mud or sensitive

ground underneath being disturbed, Ground-

Guards recommended MaxiTrack.

A large pad area, complete with a ground

protection sheet underneath, was quickly

constructed using a small team of workers,

instantly transforming the muddy field into a

high performance, high traction car park.

The Customer:

Amec Foster Wheeler