DESCRIPTION

With a goal to refurbish several of their toilet and shower areas, Cubicle Centre were contacted to carry out a site visit to help with design issues and take site measurements.

TRANSCRIPT

Page 1: Case Study - St. Peter's School, York

February 2012 - Issue 5

Location

Cubicle System

Manufacturer

Website

St. Peter’s School, York

Cairngorm Cubicles & Bench Seating

Cubicle Centre Ltd

www.washroomcubicles.co.uk

Page 2: Case Study - St. Peter's School, York

Situated on the banks of the Ouse within sight of the Minster, St. Peter’s York is a co-educational day and boarding school with around 550 pupils aged 13-18.

With a goal to refurbish several toilet and shower areas, Cubicle Centre Ltd were contacted to carry out a site visit to help with design issues and take measurements.

Manufactured from waterproof and vandal resistant Compact Grade Laminate, Cairngorm cubicles were put forward as the perfect product for the task at hand. The Cairngorm cubicle system is suited for areas of high volume usage and designed to stand the test of time.

Cubicle Centre Ltd manufactured the whole St. Peter’s School job within the standard 10 working days enabling deadlines to be met with time to spare.

Schools looking to refurbish washrooms during the busy school holiday period are advised to place their order several weeks beforehand as lead times may increase.

If your school is planning new washroom or changing room areas why not give Cubicle Centre Ltd a call for design advice at the start of the project.

Tel: 01924 457600Fax: 01924 437600Email: [email protected]

Video clip available on our NEW YouTube channel - youtube.com/cubiclecentre

Page 3: Case Study - St. Peter's School, York

Main image: One of the impressive St. Peter’s

School buildings seen from the roadside

This Page

Top Left: Interior view of shower cubicle with

integrated bench seat

Top Right: Toilet cubicle with wall panel system

Bottom Left: Bench seating with coat hooks

Above: Privacy screen inside the shower cubicle

Page 4: Case Study - St. Peter's School, York
Page 5: Case Study - St. Peter's School, York
Page 6: Case Study - St. Peter's School, York

Cairngorm

Manufacturer

Cubicle Centre Ltd, Unit 33 Caldervale Business Park, Ravensthorpe, West Yorkshire, WF13 3JLTel: (01924) 457600 Fax: (01924) 437600Email: [email protected]

Specification

Overall cubicle height: 1955mm including a 155mm floor clearance

Doors: 13mm Compact Grade Laminate (CGL) with black phenolic core (Water Proof)

Partitions: 13mm Compact Grade Laminate (CGL) with black phenolic core (Water Proof) - maximum depth varies depending on colour choice

Edging: Black - machine rounded profile

Fittings: Heavy duty SAA fittings - head-rail, wall and pilaster brackets, wide base cubicle legs, hidden safety hinges and robust ‘single action’ latches

Colour options

Speckled Grey, Speckled Blue, Speckled Anthracite, Plain Grey, Blue, Red and Yellow available from stock.Cairngorm is available in a wide range of colours, visit www.washroomcubicles.co.uk for full details

Standard Size Guide

Overall height: 1955mm

Partition height: 1800mm

Partition depth: 1500mm (standard)

Door width: 600mm

Door opening: 550mm

Start / End Fascia: 150mm

Middle Fascia: 300mm

Floor clearance: 155mm