Production
Stage1 Stage 2 Contracted
Product Regular Subcontracted Overtime Regular Overtime Sales
Trowel 1691.95 0.00 10.05 100 0 100!oe 1"19.5# 0.00 0.#6 1#00 0 1#00
Ra$e 1600 0 0 1600 0 1600
S%ovel 9""."" 66.6& 0 11#6.6& 65"."" 100
Total cost' 5#&2.60
Production Costs:
Production
Stage1 Stage 2
Product Regular Subcontracted Overtime Regular Overtime
Trowel 6 &.2 6.2 " ".1
!oe 10 12 10.& 5 5.#Ra$e 9.6 .5 # #."
S%ovel 10 12 10.& 5 5.#
Sheet Steel (sq. ft.) Product Stage Flow
(vailable' 10000 Trowel 0
)sed' 10000 !oe 0
Ra$e 0
S%ovel 0
-
8/17/2019 Case4 Garden Tools
2/2
Stage 1 Regular Production:
Process Production (vailable !rs
Stam*ing 500 500
Products +rilling #00 #00
100 01#00 Stage 1 Overtime Production:
1600 Process Production (vailable !rs
100 Stam*ing 1 100
+rilling 16.6& 100
Stage 2 Regular Production:
Process Production (vailable !rs
(ssembl, 5"6.6& 600
-inis%ing 5"0.6& 550
Pac$aging 500 500
Stage 2 Overtime Production:
Process Production (vailable !rs
(ssembl, 65."" 100
-inis%ing 65."" 100
Pac$aging 9 100