Page 1: CDM Accreditation Procedure: A Broad Overview John Kilani Chair CDM-AP Joint Workshop for EB and its Panels 21-22 March 2003, Bonn, Germany

CDM Accreditation Procedure: A Broad Overview

John KilaniChair CDM-AP

Joint Workshop for EB and its Panels

21-22 March 2003, Bonn, Germany

Page 2: CDM Accreditation Procedure: A Broad Overview John Kilani Chair CDM-AP Joint Workshop for EB and its Panels 21-22 March 2003, Bonn, Germany

3

Page 3: CDM Accreditation Procedure: A Broad Overview John Kilani Chair CDM-AP Joint Workshop for EB and its Panels 21-22 March 2003, Bonn, Germany

4

Designation of an operational entity

Ex/AEx

EB COP/MOP

OEx

2) Checks AE‘s competence through desk review, on-site assessment and witnessing

1) Submits request for accreditation

Accreditation

Recommends

Review of accreditation every 3 years

Designates

Spot-checks

DesignatedOE1OE2…

OEn

VALIDATESCDM proj. activities

VERIFIES & CERTIFIES CERs

Publicly available list

Page 4: CDM Accreditation Procedure: A Broad Overview John Kilani Chair CDM-AP Joint Workshop for EB and its Panels 21-22 March 2003, Bonn, Germany

Applicant Entity Applies

Submit duly completed application form

(F-CDM-A).

Submit all the documentation specified in D.1.

Pay the required application fee.

Existing sectoral scopes or proposed new scopes.

Page 5: CDM Accreditation Procedure: A Broad Overview John Kilani Chair CDM-AP Joint Workshop for EB and its Panels 21-22 March 2003, Bonn, Germany

Consideration by CDM-APProcessing of application by the Secretariat

– Check completeness of documents

– Preparation of an application file.

Consideration of any proposed new sectoral scope(s)

Selection of the members of the CDM-AT

– AE has 6 working days to object to members of the AT

Prepare work plan for the CDM –AT

Consideration of reports from the CDM-AT and recommendation to the EB.

Page 6: CDM Accreditation Procedure: A Broad Overview John Kilani Chair CDM-AP Joint Workshop for EB and its Panels 21-22 March 2003, Bonn, Germany

Assessment by the CDM-AT

Desk review of documentation.

On-site assessment.

Witnessing of performance of tasks within scope.

Page 7: CDM Accreditation Procedure: A Broad Overview John Kilani Chair CDM-AP Joint Workshop for EB and its Panels 21-22 March 2003, Bonn, Germany

Desk Review

Prepare desk review report.

AT, through the Sec, informs AE of any

inadequacy of the documentation.

Identify the tasks requiring witnessing

activities.

Page 8: CDM Accreditation Procedure: A Broad Overview John Kilani Chair CDM-AP Joint Workshop for EB and its Panels 21-22 March 2003, Bonn, Germany

On-site assessment

Final work plan submitted to the AE.

Opening meeting.

Assessment of the operational capability of the AE.

A closing meeting.

Page 9: CDM Accreditation Procedure: A Broad Overview John Kilani Chair CDM-AP Joint Workshop for EB and its Panels 21-22 March 2003, Bonn, Germany

Witnessing of performance of tasks

Minimization of costs

AE has 6 working days (from receipt of work plan) to identify opportunities for witnessing.

A delay of 3 months will be granted on request by the AE.

Minimum of 2 members of the CDM-AT shall witness in person the AE performing the functions.

Page 10: CDM Accreditation Procedure: A Broad Overview John Kilani Chair CDM-AP Joint Workshop for EB and its Panels 21-22 March 2003, Bonn, Germany

Reporting by the CDM-ATPreliminary report to be finalized within 6 weeks after the last witnessing activity.

Preliminary report made available to the AE.

AE has 30 days to identify corrective actions to resolve non-conformities.

All identified corrective actions to be completed within 6 months.

Preparation and submission of final report to

CDM-AP.– AE has 6 working days to comment on the draft final report.

Page 11: CDM Accreditation Procedure: A Broad Overview John Kilani Chair CDM-AP Joint Workshop for EB and its Panels 21-22 March 2003, Bonn, Germany

CDM-AP Submission to EB

Consider final report by the CDM-AT and submit recommendation to EB.

AE has 6 working days to appeal against CDM-AP recommendation.

EB considers submission by the CDM-AP and decide whether to accredit the AE and recommend to COP/MOP for designation.

Page 12: CDM Accreditation Procedure: A Broad Overview John Kilani Chair CDM-AP Joint Workshop for EB and its Panels 21-22 March 2003, Bonn, Germany

Other Aspects of Accreditation Process

Unscheduled surveillance (spot-check).

Re-accreditation