UN Climate Change Secretariat
CDM Project Cycle calibration
1st Sustainable Development Mechanisms Joint Coordination Workshop
Bonn, Germany, 24-25 March 2012
Ariesta Ningrum
![Page 2: UN Climate Change Secretariat CDM Project Cycle calibration 1 st Sustainable Development Mechanisms Joint Coordination Workshop Bonn, Germany, 24-25 March](https://reader035.vdocument.in/reader035/viewer/2022081512/55153cfe550346a87d8b5d9e/html5/thumbnails/2.jpg)
Scope
• Excludes direct communication aspects – a dedicated session on Day 2
• Main focus on post-registration changes
• Implementation timeline – what happens between now, 1 May, and 1 October?
• Practical tips
![Page 3: UN Climate Change Secretariat CDM Project Cycle calibration 1 st Sustainable Development Mechanisms Joint Coordination Workshop Bonn, Germany, 24-25 March](https://reader035.vdocument.in/reader035/viewer/2022081512/55153cfe550346a87d8b5d9e/html5/thumbnails/3.jpg)
Post-registration changes: structure
a) Temporary deviation from monitoring plan or monitoring methodology
b) Permanent changes:
i. Corrections
ii. Start date of crediting period
iii. Monitoring plan or monitoring methodology
iv. Project/programme design
![Page 4: UN Climate Change Secretariat CDM Project Cycle calibration 1 st Sustainable Development Mechanisms Joint Coordination Workshop Bonn, Germany, 24-25 March](https://reader035.vdocument.in/reader035/viewer/2022081512/55153cfe550346a87d8b5d9e/html5/thumbnails/4.jpg)
Post-registration changes: process - two tracks
Change?
PP updates PDD
Submit revised PDDto DOE beforeverification?
(a) PP to inform changeto DOE at verification
(b) PP to engage a DOEto validate change before
verification
No Yes
Change requiresprior approval?
Yes No
Yes
Prior approval
Combine withissuance request
Prior approval
![Page 5: UN Climate Change Secretariat CDM Project Cycle calibration 1 st Sustainable Development Mechanisms Joint Coordination Workshop Bonn, Germany, 24-25 March](https://reader035.vdocument.in/reader035/viewer/2022081512/55153cfe550346a87d8b5d9e/html5/thumbnails/5.jpg)
Post-registration changes: criteria
Changes that do NOT require prior approval by the Board (PS, Appendix 1)
1. Corrections (e.g. typo, location, name)
2. Temporary deviations from monitoring plan or applied methodology:
‒ PPs have not temporarily monitored parameters for baseline emissions, or are unable to produce evidence of such monitoring
Report the parameters as zero.
‒ PPs have not temporarily monitored parameters for project emissions or are unable to produce evidence of such monitoring
Assume the source of emissions operated at maximum capacity for the full period of the missing data. (for consumption of electricity, add 10% to the estimate to account for transmission and distribution losses)
3. Permanent changes from monitoring plan or applied methodology limiting to:
‒ Monitoring equipment installed has a lower accuracy level than stipulated in the methodology but the equipment is under control
‒ Calibration frequency, accuracy/type/model of meter(s)
‒ Location of meter(s)
![Page 6: UN Climate Change Secretariat CDM Project Cycle calibration 1 st Sustainable Development Mechanisms Joint Coordination Workshop Bonn, Germany, 24-25 March](https://reader035.vdocument.in/reader035/viewer/2022081512/55153cfe550346a87d8b5d9e/html5/thumbnails/6.jpg)
Post-registration change process: criteria (cont.)
Changes that do NOT require prior approval by the Board (PS, Appendix 1)
3. Permanent changes from monitoring plan or applied methodology limiting to:
• Monitoring equipment installed has a lower accuracy level than stipulated in the methodology but the equipment is under control
• Calibration frequency, accuracy/type/model of meter(s)
• Location of meter(s)
4. Changes to project design that do not adversely impact:
• additionality,
• applicability/application methodology under which project was registered,
• project scale
5. Changes specific to A/R projects (listed in the “Guidelines on accounting of specified types of changes in A/R CDM project activities from the description in registered project design document
Changes to start-date of CP less than 1 year (2 yrs for LDCs) do NOT require prior approval (PS, para 213)
All other changes require prior approval by the Board
![Page 7: UN Climate Change Secretariat CDM Project Cycle calibration 1 st Sustainable Development Mechanisms Joint Coordination Workshop Bonn, Germany, 24-25 March](https://reader035.vdocument.in/reader035/viewer/2022081512/55153cfe550346a87d8b5d9e/html5/thumbnails/7.jpg)
Implementation Timeline
![Page 8: UN Climate Change Secretariat CDM Project Cycle calibration 1 st Sustainable Development Mechanisms Joint Coordination Workshop Bonn, Germany, 24-25 March](https://reader035.vdocument.in/reader035/viewer/2022081512/55153cfe550346a87d8b5d9e/html5/thumbnails/8.jpg)
Principles of Implementation
• Consistency in applying old/new rules:
PDDs/MRs submitted under old rules shall be validated/verified and requests for registration/issuance shall be made under old rules
PDDs/MRs submitted under new rules shall be validated/verified and requests for registration/issuance shall be made under new rules
• If requests with PDDs/MRs published under old rules cannot be submitted by 30 Sep 2012, they have to be modified to comply with new rules
re-publication of PDDs/MRs is NOT needed, but
modified PDDs/MRs have to be attached to validation/verification reports
• PPs/DOEs may voluntarily shift to new rules for PDDs/MRs published under the old rules, even before 1 October 2012
re-publication of PDDs/MRs is NOT needed, but
modified PDDs/MRs have to be attached to validation/verification reports
![Page 9: UN Climate Change Secretariat CDM Project Cycle calibration 1 st Sustainable Development Mechanisms Joint Coordination Workshop Bonn, Germany, 24-25 March](https://reader035.vdocument.in/reader035/viewer/2022081512/55153cfe550346a87d8b5d9e/html5/thumbnails/9.jpg)
Principles of Implementation – cont’d
• Any requests made under old rules continue to be processed by the Board/secretariat under old rules
• Any requests submitted before 1 Oct 2012 but “kicked-out” from the process resulting from completeness check or information & reporting check, would have to be modified to comply with new rules, if the re-submission is made after 30 Sep 2012
![Page 10: UN Climate Change Secretariat CDM Project Cycle calibration 1 st Sustainable Development Mechanisms Joint Coordination Workshop Bonn, Germany, 24-25 March](https://reader035.vdocument.in/reader035/viewer/2022081512/55153cfe550346a87d8b5d9e/html5/thumbnails/10.jpg)
Principles of implementation – post registration changes
• 30 April 2012 : last day to submit any requests for Revision of Monitoring Plan, Changes from PDD, Deviation under old rules
• Any requests made under old rules continue to be processed by the Board/secretariat under old rules
• If changes are only identified only after 1 May, the new rules shall be applied
Changes within Appendix 1 – shall be submitted with request for issuance
Changes requiring prior approval shall be submitted before submitting request for issuance
re-publication of PDDs/MRs with new form is NOT needed, but
modified PDDs/MRs have to be attached to validation/verification reports
![Page 11: UN Climate Change Secretariat CDM Project Cycle calibration 1 st Sustainable Development Mechanisms Joint Coordination Workshop Bonn, Germany, 24-25 March](https://reader035.vdocument.in/reader035/viewer/2022081512/55153cfe550346a87d8b5d9e/html5/thumbnails/11.jpg)
Practical tips
• For PPs:
Identify changes early in the process and determine if they can be addressed by approaches in PS (Appendix 1 & para 213 for start-date of CP)
Consider timing of submission and appropriate process track – selecting DOEs
• For DOEs:
Ensure types of changes are fully described in the form (both in Issuance track as well as in Prior Approval track)
Provide assessment opinion on each type of changes
Ensure supporting documentation relevant to each type of changes is provided
![Page 12: UN Climate Change Secretariat CDM Project Cycle calibration 1 st Sustainable Development Mechanisms Joint Coordination Workshop Bonn, Germany, 24-25 March](https://reader035.vdocument.in/reader035/viewer/2022081512/55153cfe550346a87d8b5d9e/html5/thumbnails/12.jpg)
More information ..
![Page 13: UN Climate Change Secretariat CDM Project Cycle calibration 1 st Sustainable Development Mechanisms Joint Coordination Workshop Bonn, Germany, 24-25 March](https://reader035.vdocument.in/reader035/viewer/2022081512/55153cfe550346a87d8b5d9e/html5/thumbnails/13.jpg)
Thank you for your attention!