    North/South Bike LanePilot Project Proposal

    13 th Street and 10 th Street

  • 8/6/2019 Center City Bicycle Network Pilot Projects Final 1

    2/20

    Previous Experiences/Similar Projects

    Give Respect Get Respect Campaign

    Project Objectives

    Selection Criteria

    Project Details

    Timeline

    Q&A 20 minutes

    Review striping plans with City staff Center CityBicycleNetworkPilotProjectsAGENDA

  • 8/6/2019 Center City Bicycle Network Pilot Projects Final 1

    3/20

    Center CityBicycleNetworkPilotProjects

    REVIEW OF SPRUCE / PINE PROJECTS

    Converted One Travel Lane to Buffered Bike Lane

    Average Motor Vehicle Speed Remained Consistent

    Reduced Speed for Fastest, Most Aggressive Drivers

    More Orderly, Evenly Paced Traffic Flow

    Improved Safety for all road users:

    Serious crashes down 45% Fender-benders down 17%

  • 8/6/2019 Center City Bicycle Network Pilot Projects Final 1

    4/20

    FINDINGS FROM SPRUCE/PINE

    Two main responses:

    We need more bike lanes to go North and South

    We need cyclists to obey the law

    Center CityBicycleNetworkPilotProjects

  • 8/6/2019 Center City Bicycle Network Pilot Projects Final 1

    5/20

    DEMAND

    Center City hashighest share of bike to work tripsin Philadelphia

  • 8/6/2019 Center City Bicycle Network Pilot Projects Final 1

    6/20

  • 8/6/2019 Center City Bicycle Network Pilot Projects Final 1

    7/20

    Center CityBicycleNetworkPilotProjects

    Connect Center City employment hubs to Northand South Philadelphia residential areas

    Improve safety for bicyclists and pedestrians inCenter City

    Improve bicyclist behavior

    Organize traffic on streets frequently used bybicyclists

    Draw cyclists to preferred routesMake a data-based decision

    PILOT PROJECT OBJECTIVES

  • 8/6/2019 Center City Bicycle Network Pilot Projects Final 1

    8/20

    Center CityBicycle

    NetworkPilotProjects

    Existing vehicle volume can be carried with oneless lane

    Increase capacity of N/S bicycle network throughemployment and service hubs of Center City

    Minimize conflicts with buses

    Limit conflicts between parked cars and bicycles

    Provide safe riding surface for bicycles

    SELECTION CRITERIA

  • 8/6/2019 Center City Bicycle Network Pilot Projects Final 1

    9/20

    Add Capacity

    Safe Surface

    Bus Conflicts

    High Auto Volume

    Build N/S Networkto Employers &Businesses

    75 Miles of North/SouthTravel

    LanesAnalyzed:

    2.5 Miles of Pilot Bike Lanes

  • 8/6/2019 Center City Bicycle Network Pilot Projects Final 1

    10/20Center CityBicycleNetworkPilotProjects

    Pilot Buffered Lanes SharrowsTraditional Lanes

  • 8/6/2019 Center City Bicycle Network Pilot Projects Final 1

    11/20

    EVALUATION

    City will collect data onVehicle speedQueue lengths at intersectionsVehicle volumesBicycle volumes

    Behavior of bicyclists

    Data based decision to be made afterreview of this information andcomments from residents, businesses

    and users.

  • 8/6/2019 Center City Bicycle Network Pilot Projects Final 1

    12/20

    Buffered bike lane

    Shared turn lane

    SAMPLE LINE DIAGRAM10 th & LOCUST

  • 8/6/2019 Center City Bicycle Network Pilot Projects Final 1

    13/20

    Buffered bike lane

    Shared turn lane

    SAMPLE LINE DIAGRAM13 th & PINE

  • 8/6/2019 Center City Bicycle Network Pilot Projects Final 1

    14/20

    Shared Lane forturning traffic

    Buffered bike lanewide enough foremergency vehicles

    SAMPLE LINE DIMENSIONS10 th & CHESTNUT

  • 8/6/2019 Center City Bicycle Network Pilot Projects Final 1

    15/20

    Center CityBicycleNetworkPilot

    Projects

    PROJECT TIMELINE

    LateJune

    Linestriping PlansFinalized

    July-October

    Post DataCollection

    OngoingMonitoring

    LateFall Evaluate And Report

    Data

    Second CommunityMeeting

    Met With KeyStakeholders

    May10

    th CommunityMeeting

    Mid/Late May

    Follow Up WithStakeholders

    Pre Data Collection

    April

    Pilot LanesInstalled

  • 8/6/2019 Center City Bicycle Network Pilot Projects Final 1

    16/20

    VISUALIZING 10th @ Jefferson

  • 8/6/2019 Center City Bicycle Network Pilot Projects Final 1

    17/20

    VISUALIZING 10 th @ Chinatown

  • 8/6/2019 Center City Bicycle Network Pilot Projects Final 1

    18/20

    VISUALIZING 13 th and Sansom

  • 8/6/2019 Center City Bicycle Network Pilot Projects Final 1

    19/20

    VISUALIZING 13 th and Rodman

  • 8/6/2019 Center City Bicycle Network Pilot Projects Final 1

    20/20

    QUESTIONS?COMMENTS?

    Charles [email protected] [email protected]