Center for Innovative School Facilities. Commissioning Re-Commissioning Retro-Commissioning Mike DiPasquale. Introduction & Background. Commissioning. The Cx agent is the part of the QA/QC process Should be independent of the design and construction management - PowerPoint PPT PresentationTRANSCRIPT
Center for Innovative School FacilitiesCommissioningRe-CommissioningRetro-Commissioning
Mike DiPasquale
Introduction & Background
Commissioning The Cx agent is the part of the QA/QC
process Should be independent of the design
and construction management Client’s eyes and ears
Pre-Construction Activities Review Basis of Design (BOD) and Owner
Project Requirements (OPR)* Develop and incorporate commissioning (Cx)
requirements into the construction documents* Perform a Cx review of the design documents** * LEED Fundamental** LEED Enhanced
Construction Activities Develop and implement a Cx plan* Review contractor submittals applicable to
systems being Cx’d** Perform installation verification of the systems to
be Cx’d* (Pre-Functional) Accessibility for service and maintenance Meetings * LEED Fundamental** LEED Enhanced
Construction Activities Verify performance of the systems to be Cx’d* (Functional Tests)
HVAC systems and associated controls system Client standard sequence of operations, DDC graphics, equipment and point
naming standards. Lighting and Daylighting Controls Domestic Hot Water System Renewable Energy Systems (Photovoltaic, Solar Hot Water, etc.)
Other equipment/systems: Building Envelope, FSD’s, smoke evacuation, nurse call, security
Systems needing additional clarification: ‘Communication’, ‘IT/Data’ Systems that may be Cx’d but may not bring the most value to the
client (Fire Alarm, Elevators, Medical Gas)
* LEED Fundamental** LEED Enhanced
Post-Construction Activities Verify training requirements have been
met** Develop a systems manual** ‘It Doesn’t Work” stage Review operation of the building 8-10
months after substantial completion**
* LEED Fundamental** LEED Enhanced
Post-Construction Activities Final Report*
Executive summary Scope of Services OPR/BOD Review comments Cx plan Pre-Functional documents Equipment start up documents Functional tests Meeting minutes, field reports etc. Cx punchlist Systems manual
* LEED Fundamental** LEED Enhanced
Re-Commissioning
Re-Commissioning
Retro-Commissioning Energy Trust Existing Buildings Program
Retro-Commissioning
Retro-Commissioning VISN 20