Page 1: Huawei Data Center Facilities Solutions - ActForNet Data Center Facilities...Huawei Data Center Facilities Solutions. W ... low efficiency, ... • Component/device/system tri-level

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Energy Powering the Future

Huawei Data Center Facilities Solutions

Page 2: Huawei Data Center Facilities Solutions - ActForNet Data Center Facilities...Huawei Data Center Facilities Solutions. W ... low efficiency, ... • Component/device/system tri-level

W ith the rapid development of cloud computing

and mobile Internet businesses, the growth of IT

density and energy consumption are bringing a lot

of challenges to the traditional data center. Traditional data centers

are suffering from long construction periods, low efficiency, high

TCO and inefficient management.

Page 3: Huawei Data Center Facilities Solutions - ActForNet Data Center Facilities...Huawei Data Center Facilities Solutions. W ... low efficiency, ... • Component/device/system tri-level

T o comply with the requirements of cloud computing and virtualization

in future, as well as improving the efficiency of data centers and

reducing the TCO, HUAWEI has launched the data center facilities

solution. It is a new generation data center solution with complete integration

of rack cabinets, power supply and distribution systems, cooling systems, cabling

systems, management software, and much more. HUAWEI data center facilities

solution can help customers win in the “Cloud” era through fast deployment,

flexible expansion, high efficiency & reliablility and intelligent management.

Page 4: Huawei Data Center Facilities Solutions - ActForNet Data Center Facilities...Huawei Data Center Facilities Solutions. W ... low efficiency, ... • Component/device/system tri-level

ContentsContainer Data Center ........................................ 01

Modular Data Center .......................................... 05

Intelligent Management System ......................... 11

Global Applications ............................................. 13

IDS1000-A

IDS1000-C

IDS1000

Page 5: Huawei Data Center Facilities Solutions - ActForNet Data Center Facilities...Huawei Data Center Facilities Solutions. W ... low efficiency, ... • Component/device/system tri-level

IDS2000(Dual-Row)

IDS2000(Single-Row)

IDS2000

Page 6: Huawei Data Center Facilities Solutions - ActForNet Data Center Facilities...Huawei Data Center Facilities Solutions. W ... low efficiency, ... • Component/device/system tri-level

1

Container Data CenterIDS1000-A All-in-one container data center

IDS1000-AM

IDS1000-AS

The All-in-One container data center solution functions as a foundation

for cloud computing in enterprise data centers. It meets the requirements

of telecom operators and Internet service providers for environmental

protection, energy conservation, and fast deployment. In addition, it has

distinct advantages in scenarios such as disaster relief operations, military

operations, oil exploration, and enterprise data management.

Introduction

• IT load≤48kW per container

• Fast deployment and movable scenarios

Application Scenarios

Easy

• Prefabricated and pre-tested

• Highly integrated, one container is an entire data center

• Easy on-site work, saving 80% deployment time

Efficient

• High energy efficiency, PUE down to 1.5

• High efficiency O&M, saving 30% OPEX

Reliable

• High environment adaption helps business operate stably

• IP56 external protection level and 9 intensity anti-seismic level

Value & Features

Page 7: Huawei Data Center Facilities Solutions - ActForNet Data Center Facilities...Huawei Data Center Facilities Solutions. W ... low efficiency, ... • Component/device/system tri-level

2

* -40°C ~ -15°C conditions should use low temperature air conditioner, some parameters will change.

Sub Feature IDS1000-AM IDS1000-AS

Power

Input power Two mains or one main power plus one generator

Lightningproof level Class B, 60kA(PDB)

Power density per rack 6kW per rack

UPS mode HUAWEI UPS 2000G, 20kVA rack mounted UPS

UPS redundancy 3+1 redundancy 2+1 redundancy

BAT backup time 7~10 mins 10 mins

Cooling

Technology DX (Direct Expansion) type air-conditioner units

Containment Hot and cold aisle isolation

Cooling capacity 20kW per unit, 3+1 redundancy 20kW per unit, 2+1 redundancy

Refrigerant R410A

Humidity Build-in humidification function

Environmental requirements

Operation temperature -15°C ~ +52°C*

Operation humidity 5% to 100% relative humidity

Altitude <3000m

Fire control Type Automatic fire detection & suppression system c/w emergency release function

Size

Dimensions (L x W x H) 12192mm x 2438mm x 2896mm 6058mm x 2438mm x 2896mm

Total IT load 48kW 24kW

Typical rack capacity 8 IT racks, 360U 4 IT racks, 180U

Specifications

Air ConditionerOutdoor Unit IT Rack

Battery Apartment

EmergencyLight

UPSRack

PDB

Air ConditionerIndoor Unit

IT Rack Gas Tank

Tools Rack

Air ConditionerIndoor Unit

IDS1000-AM IDS1000-AS

Air Conditioner Outdoot Unit PDB

Air ConditionerIndoor Unit

BatteryCabinet

Gas Tank

IT Cabinet

ToolsCabinet

UPSCabinet

Page 8: Huawei Data Center Facilities Solutions - ActForNet Data Center Facilities...Huawei Data Center Facilities Solutions. W ... low efficiency, ... • Component/device/system tri-level

3

Container Data CenterIDS1000-C cluster container data center

Traditional data centers suffer from long construction periods, high energy

consumption and high initial investment. To help resolve these issues,

HUAWEI has launched the IDS1000-C outdoor data center solution, which

has a highly integrated power system, environmental monitoring, cooling

systems, racks, cabling, fire control, security and other infrastructure facilities.

This solution complies with the diverse business needs of customers today.

Introduction

• IT load≤270kW

• Fast deployment, staged deployment scenario

Application Scenarios

Easy

• Prefabricated and pre-tested, ensure deploy time is one week

• Modular structure realizes fast & on-demand deployment

• Intelligent management makes unattended operation

Efficient

• High energy efficiency, PUE down to 1.2

• High density and saving 80% footprint

Reliable

• Component/device/system triple reliable design

• IP56 external protection level and 9 intensity anti-seismic level.

• Operate without interrupted from -40°C to +55°C

Value & Features

IDS1000-C

IDS1000-C

Page 9: Huawei Data Center Facilities Solutions - ActForNet Data Center Facilities...Huawei Data Center Facilities Solutions. W ... low efficiency, ... • Component/device/system tri-level

4

Component Features

Power

Input power Two mains or one main power plus one generator

Power density per rack 3kW~15kW

UPS capacity 40kVA~320kVA

UPS redundancy 2N or N+X

Battery backup time 10mins

Cooling-Chilled water

TechnologyOutdoor unit: Four 100kW chillers for 3+1 backup Indoor unit: twelve 30kW units for 9+3 backup

Containment Hot and cold aisle isolation

Total cooling capacity 300kW

Indoor unit capacity 30kW

Indoor unit size (H x W x D) 2100mm x 300mm x 1000mm

Refrigerant R410A or R134a

Fan type EC Fans

Compressor Scroll compressor

Humidity control 20%~80%

Design operation Parameters

Temperature -40°C ~ +55°C*

Relative humidity 10%~100%

Size

IT container (L x W x H) 12192mm x 2438mm x 2896mm

Cooling container (L x W x H) 12192mm x 2438mm x 2896mm

Power container (L x W x H) 6058mm x 2438mm x 2896mm

Rack 45U/rack, 18 IT racks

IT Equipment container

Cooling container

Power container (20ft)

Central control container

Specifications

* +45°C ~ +55°C tropical conditions should use high temperature air conditioner, -40°C ~ -15°C conditions should use low temperature air conditioner, some parameters will change.

Water Chiller Water Chiller Water Chiller Water Chiller PDFExpansion Tank

Cold Storage Tank

Fire Control Box

中控箱

ScreenSwitch

Access ControllerAC Entry Door

LCU LCU LCU LCU LCU LCU PDF

Fire Control Tank

Three-Cabinet Three-Cabinet

Fire Extinguisher

Fire ControlMonitoring Modules UPS5000-E

LCU Functional cabinet

UPS Cabinet

Power distribution box

BCB-BOXBattery

Hydrogen emission fan

Hydrogen sensor

FM200 Fire Extinguisher

Emergency lamp

VESDA

Audible and visual alarm

Hydrogen alarm controller

Access controllerAccess

controller

Page 10: Huawei Data Center Facilities Solutions - ActForNet Data Center Facilities...Huawei Data Center Facilities Solutions. W ... low efficiency, ... • Component/device/system tri-level

5

Modular Data CenterIDS2000 modular data center

HUAWEI IDS2000 is a new generation modular data center solution with

complete integration of cabinets, power supply and distribution systems,

cooling systems, cabling systems, management software, and much more.

It supports flexible deployment with single or dual row, cold or hot aisle

containment. The maximal IT power can be up to 21kW/rack.

Introduction

• Single module is applied to small or medium data center (total IT

load≤200kW, area≤100m2)

• Multiple modules can be used to construct a large data center to

meet large enterprise data center requirements, such as government,

education, healthcare, finance, telecom industries data center and etc.

Application Scenarios

Easy

• Standardized devices, modular architecture, on-demand deployment

• Intelligent module-level management , easy O&M

Efficient

• Closely coupled cooling, efficient power system, module-level PUE

down to 1.06

• Aisle containment, separated hot and cold air, eliminating hot spots

Reliable

• Component/device/system tri-level reliability design, ensuring 99.999%

availability

• Excellent environment adaptability, stable operations under extreme

conditions

Value & Features

IDS2000(Dual-Row)

IDS2000(Single-Row)

Page 11: Huawei Data Center Facilities Solutions - ActForNet Data Center Facilities...Huawei Data Center Facilities Solutions. W ... low efficiency, ... • Component/device/system tri-level

6

Item Specifications

System

Dimensions

Single-row with aisle containment: L x 2400mm x 2350mm, L≤14400mmDual-row with aisle containment: L x 3600mm x 2350mm, L≤14400mm

Cabinet number per module Single row: ≤ 24; dual row≤ 48

Input Power208V (3Ph, 60Hz)380V (3Ph, 50/60Hz)480V (3Ph, 60Hz)

IT power consumption per module208V: 1~100kW380V: 1~200kW480V: 1~200kW

Maximum power per rack 21kW

Operating condition T1 condition: –30ºC ~ +45ºC; T3 condition: –20ºC ~ +55ºC

Reliability level Tier II or Tier III (up to Tier IV)

Altitude 0~1000m (derating above 1000m)

Installation Installing on concrete floor or raised floor

Cabinet

Dimensions(H x W x D) 2000mm x 600mm x 1200mm , 2200mm x 600mm x 1200mm

Installation space 42U/47U

Protection level IP20

Air-cooled In-row Air Conditioner

Cooling capacity 20kW/25kW/35kW

Dimensions(H x W x D) 2000mm x 300mm x 1200mm, 2000mm x 600mm x 1200mm

Input power 380/400/415V (3Ph, 50/60Hz), 440/460/480V (3Ph, 60Hz)

Refrigerant R410A

Chilled water In-row Air Conditioner

Cooling capacity 30kW

Dimensions(H x W x D) 2000mm x 300mm x 1200mm

Input power 200 ~ 240V (1Ph, 50/60Hz)

Refrigerant Water / Ethylene Glycol

Rack-mounted UPSInput power 380V (3Ph, 50/60Hz)

Rated capacity 10/15/20kVA

Modular UPSInput power 380V (3Ph, 50/60Hz)

Rated capacity 40~800kVA

Specifications

Page 12: Huawei Data Center Facilities Solutions - ActForNet Data Center Facilities...Huawei Data Center Facilities Solutions. W ... low efficiency, ... • Component/device/system tri-level

7

Model M020-4D-4

UPS capacity 20kVA

Number of IT racks 4

Power density 4kW/R

Redundancy N+1

Backup time 30min

Dimensions 3.6m×3m

PDU 8000

End door End door

IT cabinet

IT cabinet IT cabinet IT cabinet

In-Row airconditioner

In-Row airconditioner

Storagebattery

Cable distribution frame

Storagebattery

Contained cold aisle

End doorEnd door

Cable distribution frame

Cable distribution frame

PDU 8000 IT cabinet

IT cabinet IT cabinet IT cabinet IT cabinet

In-Row airconditioner

In-Row airconditioner

Storagebattery

Storagebattery

Contained cold aisle

Cable distribution framePDU 8000 IT cabinet IT cabinet IT cabinet IT cabinet

In-Row airconditioner

In-Row airconditioner

Storagebattery

Storagebattery

Contained cold aisle

Cable distribution framePDU 8000 IT cabinet IT cabinet IT cabinet IT cabinet IT cabinet

In-Row airconditioner

In-Row airconditioner

Storagebattery

Storagebattery

Contained cold aisle

IDS2000 Typical Products —— 20kVA

Model M020-4S-4

UPS capacity 20kVA

Number of IT racks 4

Power density 4kW/R

Redundancy N+1

Backup time 30min

Dimensions 1.5m×6m

Model M020-5D-3

UPS capacity 20kVA

Number of IT racks 5

Power density 3kW/R

Redundancy N+1

Backup time 30min

Dimensions 3.6m×3.6m

Model M020-5S-3

UPS capacity 20kVA

Number of IT racks 5

Power density 3kW//R

Redundancy N+1

Backup time 30min

Dimensions 1.5m×6.6m

Specifications

Page 13: Huawei Data Center Facilities Solutions - ActForNet Data Center Facilities...Huawei Data Center Facilities Solutions. W ... low efficiency, ... • Component/device/system tri-level

8

Model M030-6D-4

UPS capacity 30kVA

Number of IT racks 6

Power density 4kW/R

Redundancy N+1

Backup time 40min

Dimensions 3.6m×3.6m

End doorEnd door

Cable distribution frame

PDU 8000 IT cabinet

IT cabinetIT cabinetIT cabinetIT cabinet

IT cabinetIn-Row airconditioner

In-Row airconditioner

Storagebattery

Storagebattery

Contained cold aisle

Cable distribution frame

PDU 8000 IT cabinet IT cabinet IT cabinet

IT cabinet IT cabinet IT cabinet

In-Row airconditioner

IT cabinet IT cabinetIn-Row airconditioner

Storagebattery

Storagebattery

End doorEnd door Contained cold aisle

Cable distribution framePDU 8000 IT cabinet IT cabinet IT cabinet IT cabinet IT cabinet IT cabinet

In-Row airconditioner

In-Row airconditioner

Storagebattery

Storagebattery

Contained cold aisle

Cable distribution framePDU 8000 IT cabinetIT cabinet IT cabinet IT cabinet IT cabinet IT cabinet IT cabinet IT cabinet

In-Row airconditioner

In-Row airconditioner

Storagebattery

Storagebattery

Contained cold aisle

IDS2000 Typical Products —— 30kVA

Model M030-6S-4

UPS capacity 30kVA

Number of IT racks 6

Power density 4kW/R

Redundancy N+1

Backup time 40min

Dimensions 1.5m×7.2m

Model M030-8D-3

UPS capacity 30kVA

Number of IT racks 8

Power density 3kW/R

Redundancy N+1

Backup time 40min

Dimensions 3.6m×4.2m

Model M030-8S-3

UPS capacity 30kVA

Number of IT racks 8

Power density 3kW/R

Redundancy N+1

Backup time 40min

Dimensions 1.5m×8.4m

Specifications

Page 14: Huawei Data Center Facilities Solutions - ActForNet Data Center Facilities...Huawei Data Center Facilities Solutions. W ... low efficiency, ... • Component/device/system tri-level

9

End door End door

Cable distribution frame

PDU 8000

IT cabinetIT cabinet IT cabinet

IT cabinet IT cabinetIn-Row airconditioner

In-Row airconditioner

In-Row airconditioner

Storagebattery

Storagebattery

Contained cold aisle

Cable distribution framePDU 8000 IT cabinet IT cabinet IT cabinet IT cabinetIT cabinet

In-Row airconditioner

In-Row airconditioner

In-Row airconditioner

Storagebattery

Storagebattery

Contained cold aisle

End doorEnd door

Cable distribution framePDU 8000 IT cabinetIT cabinet IT cabinet

In-Row airconditioner

Cable distribution frame

IT cabinetIT cabinet IT cabinet In-Row airconditioner

IT cabinet IT cabinet In-Row airconditioner

Storagebattery

Storagebattery

Contained cold aisle

End doorEnd door

Cable distribution framePDU 8000 IT cabinetIT cabinet IT cabinet

In-Row airconditioner

Cable distribution frame

IT cabinet IT cabinet IT cabinet IT cabinetIn-Row airconditioner

IT cabinet IT cabinet In-Row airconditioner

Storagebattery

Storagebattery

Storagebattery

Contained cold aisle

IDS2000 Typical Products —— 40kVA and 60kVA

Model M040-5D-5

UPS capacity 40kVA

Number of IT racks 5

Power density 5kW/R

Redundancy N+1

Backup time 30min

Dimensions 3.6m×3.6m

Model M040-5S-5

UPS capacity 40kVA

Number of IT racks 5

Power density 5kW/R

Redundancy N+1

Backup time 30min

Dimensions 1.5m×7.2m

Model M040-8D-4

UPS capacity 40kVA

Number of IT racks 8

Power density 4kW/R

Redundancy N+1

Backup time 30min

Dimensions 3.6m×4.8m

Model M060-8D-5

UPS capacity 60kVA

Number of IT racks 8

Power density 5kW/R

Redundancy N+1

Backup time 30min

Dimensions 3.6m×5.4m

Specifications

Page 15: Huawei Data Center Facilities Solutions - ActForNet Data Center Facilities...Huawei Data Center Facilities Solutions. W ... low efficiency, ... • Component/device/system tri-level

10

End doorEnd door

Cable distribution framePDU 8000 IT cabinetIT cabinet IT cabinet

In-Row airconditioner

IT cabinetIT cabinetIT cabinet IT cabinet IT cabinetIn-Row airconditioner

IT cabinet IT cabinet IT cabinetIn-Row airconditioner

IT cabinetIT cabinetStoragebattery

Storagebattery

Contained cold aisle

End door End door

Cable distribution frame

PDU 8000 IT cabinetIT cabinet IT cabinetIn-Row airconditioner

IT cabinet IT cabinetIn-Row airconditioner

IT cabinetIT cabinet IT cabinetIn-Row airconditioner

In-Row airconditioner

Storagebattery

Storagebattery

Contained cold aisle

End door End door

Cable distribution frame

Cable distribution framePDU 8000

PD

U 8

000

UP

S

IT cabinetIT cabinet IT cabinetIn-Row airconditioner

In-Row airconditioner

IT cabinet IT cabinetIT cabinetIT cabinet IT cabinetIn-Row airconditioner

In-Row airconditioner

In-Row airconditioner

Storagebattery

Bat

tery

Bat

tery

Storagebattery

Contained hot aisle

End doorEnd door

Cable distribution frame

Cable distribution frame

PD

U 8

000

UP

SB

atte

ryB

atte

ry

PDU 8000 IT cabinet IT cabinetIT cabinetIT cabinet IT cabinet IT cabinetIn-Row airconditioner

In-Row airconditioner

IT cabinet IT cabinet IT cabinetIT cabinetIT cabinet

IT cabinet

IT cabinetIT cabinet IT cabinet

IT cabinet

IT cabinet In-Row airconditioner

In-Row airconditioner

Contained hot aisle

Note: The dimensions do not include external power area

IDS2000 Typical Products —— 80kVA and 120kVA

Model M080-11D-5

UPS capacity 80kVA

Number of IT racks 11

Power density 5kW/R

Redundancy N+1

Backup time 15min

Dimensions 3.6m×6m

Model M080-7D-9

UPS capacity 80kVA

Number of IT racks 7

Power density 9kW/R

Redundancy N+1

Backup time 15min

Dimensions 3.6m×4.8m

Model M120-10D-9

UPS capacity 120kVA

Number of IT racks 10

Power density 9kW/R

Redundancy N+1

Backup time 30min

Dimensions 3.6m×5.4m

Model M120-17D-5

UPS capacity 120kVA

Number of IT racks 17

Power density 5kW/R

Redundancy N+1

Backup time 30min

Dimensions 3.6m×7.2mNote: The dimensions do not include external power area

Specifications

Page 16: Huawei Data Center Facilities Solutions - ActForNet Data Center Facilities...Huawei Data Center Facilities Solutions. W ... low efficiency, ... • Component/device/system tri-level

11

Intelligent Management SystemNetEco6000

NetEco is a new generation data center management system launched

by HUAWEI. It manages the real-time data and status of data center

infrastructures, including power, environment, video, and door status and

generates alarms if any fault occurs.

NetEco displays data center layouts and data reports for customers to easily

query equipment status, and provides a standard platform to apply to all

data center solutions due to its flexible configuration, smooth capacity

expansion, and hierarchical management.

Introduction

• Apply to IDS1000 and IDS2000 data center solutions

Application Scenarios

High availability, warning and troubleshooting

• Foresight warning of faults and risks improves IDC availability

• Quickly faults location, virtual inspection

Smart interaction, energy saving

• Dynamic PUE management

• Optimizing important power and cooling services

Rapid deployment, one -button launching

• Pre-configured software and parameters, one-button launching

• Parameters of AC and UPS loading, testing time saving

Easy visualization maintenance in 3D view

• The 3D design tool realizes 3D visual maintenance

• Dynamic 3D display of site temperature, eliminating hot spots

Value & Features

IPInternetNetEco

SystemMornitoringSystem

PDF

Page 17: Huawei Data Center Facilities Solutions - ActForNet Data Center Facilities...Huawei Data Center Facilities Solutions. W ... low efficiency, ... • Component/device/system tri-level

12

Monitoring Systems

Bottom-layer equipments can be easily connected to NetEco over Modbus, Simple Network Management Protocol (SNMP), and

intelligent equipment communication protocol. Customers can customize NetEco for the support of non-standard protocols. Bottom-

layer devices monitored by the NetEco are classified into the power system, environment system, video system, and access system.

Functions

NetEco provides comprehensive functions for managing data center infrastructures.

Technical Specification

Power System

Precision air conditioner,

UPS, PDU, UPS input cabinet,

UPS output cabinet, Precise

PDF, AC PDF

Environment System

Temperature and humidity

sensor, smoke sensor,

water sensor

Video System

Camera, NVR (Optional)

Access System

Door access controller

Analysis

Level

Management

Level

Monitoring

Level

Power Analysis

ResourceManagement

ViewManagement

PerformanceManagement

ReportManagement

FaultManagement

Work-OrderManagement

System (Safety)Management

CapacityManagement

Page 18: Huawei Data Center Facilities Solutions - ActForNet Data Center Facilities...Huawei Data Center Facilities Solutions. W ... low efficiency, ... • Component/device/system tri-level

13

Global Applications

Netherlands/BOCbranch data centers

Brazil/Petrobras

Mexico/IPCYT

Guyana/E-Gov

Togo/Lome university

Ghana/E-Gov

Ethiopia /METEC data center

Iraq /Video Surveillance Data Center

England/channel

The offerings in the Huawei data center facilities solutions have been successfully

applied in China Mobile Southern Base, China Telecom, Phoenix TV, India NxtGen,

Maldives smart- government, Venezuela CanTV, etc.

Venezuela/CANTV

Brazil/Mackenzie university

Chile/Codelco

Page 19: Huawei Data Center Facilities Solutions - ActForNet Data Center Facilities...Huawei Data Center Facilities Solutions. W ... low efficiency, ... • Component/device/system tri-level

14

China Mobile/North China Logistics IDC

Russia/MasterTelNetherlands/BOCbranch data centers

Saudi/MOI

India/NxtGen data center

Huawei desktop cloud container DC

Maldives smart/government IDC

China Mobile/Southern base IDC

China Unicom (Beijing) IDC

Tencent (Tianjin) IDC

China Telecom (Shanghai) IDC

More than 10-year data center service experiences, more than 480 data centers (

including 160 'Cloud' data centers ) all around the world.

Samoa/National broadband

Page 20: Huawei Data Center Facilities Solutions - ActForNet Data Center Facilities...Huawei Data Center Facilities Solutions. W ... low efficiency, ... • Component/device/system tri-level

Copyright © Huawei Technologies Co., Ltd. 2015. All rights reserved.

No part of this document may be reproduced or transmitted in any form or by any means without prior written consent of Huawei Technologies Co., Ltd.

General Disclaimer

The information in this document may contain predictive statements including,

without limitation, statements regarding the future financial and operating results,

future product portfolio, new technology, etc. There are a number of factors

that could cause actual results and developments to differ materially from those

expressed or implied in the predictive statements. Therefore, such information

is provided for reference purpose only and constitutes neither an offer nor an

acceptance. Huawei may change the information at any time without notice.

Trademark Notice

, HUAWEI, and are trademarks or registered trademarks of Huawei Technologies Co., Ltd.

Other trademarks, product, service and company names mentioned are the property of their respective owners.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Industrial Base

Bantian Longgang

Shenzhen 518129, P.R. China

Tel: +86-755-28780808

Version No.: M3-022333-20131226-C-1.0

www.huawei.com