General Information
Type of building:Laboratory (hall) and office building
Structural System:Suspended CLT-elements, ripped CLT-plates,walls with boxed cross sections
Owner:Federal Building Agency (BIG), Vienna / Austria
Location:Graz / Austria
Erection date:1999 (begin) - 2001 (1st erection step finished)
Architectural design:Arch. Nussmüller / , Graz / AustriaArch. Kampits & Gamerith, Graz / Austria
Structural & constructional design, Building physics:Institutes of the Faculty for Civil Engineering,Graz University of Technology
Manufacturer of timber structure:Stingl GesmbH, Trofaiach / Austria
Offices
Plans (Erection step 1)
Plan(withdimensions)
Laboratory hall
Cross section
Laboratory hall
Office
Walls
→ Boxed cross-section utilising cross-laminated
element (CLT) rigidly glued with glulam rips
Roof above laboratory hall
→ 5-layered CLT-plate (120 mm) suspendedby steel trestles (tubes) andsteel rods; span: 19,48 m
Roof above offices
→ 5-layered CLT-element screw-pressed glued with glulam rips (GL32h, 140/280 mm, every 600 mm)
→ Width per element 2400 mm
→ Span: 14,0 m
Detail: Walls
Sp
ecia
l fas
ten
er s
yste
m (
stee
l rin
g a
nd
g
lued
-in
ro
ds)
at
the
lon
git
ud
inal
ed
ges
of
the
pre
fab
rica
ted
ele
men
ts
Sim
ple
co
nn
ecti
on
of
the
pre
fab
rica
ted
el
emen
ts w
ith
ste
el a
ng
les
at t
he
bo
tto
m
and
th
e fi
rst
flo
or
on
th
e re
info
rced
co
ncr
ete
stru
ctu
re
Detail: Roof above laboratory hall
Steel part for load introductionof steel rods into the CLT- plate
Joint of the CLT- plate (necessarydue to limited production length)
Detail of the steel trestles: drilledholes for the anchoring of thesuspension rods
Steel trestles (tubes) for thesuspending system of the CLT-elements
Detail: Roof above offices
Joint rips – wall: by means ofslotted- in steel plate with dowels
Joint deck (CLT) – wall:by means of bearing of on the CLT-element of the wall and selftapping screws
Bearing area of the roof above offices:bearing on reinforced concrete walls by means of slotted-in steel plates and special elastomeric layers
Assembling / Erection Offices
→ High level of pre-fabrication for wall and roof elements
→ Lifting by means of auto-cranes
→ Short erection time
Assembling / Erection Lab Hall
Impressions
Impressions
Laboratory hall Office
Thank you for your attention!