Chaplin Station Preliminary DesignOnline Consultation
Apr 25, 2012 to May 9, 2012
Preliminary Design by:
![Page 2: Chaplin Station Preliminary Design Online ConsultationChaplin Station Design Schedule Open House #1 Apr 25, 2012 Online Consultation Apr 25 to May 9, 2012 Open House #2 Fall-Winter](https://reader035.vdocument.in/reader035/viewer/2022062506/5f08fc617e708231d424ae78/html5/thumbnails/2.jpg)
2
Chaplin Station Design Schedule
Open House #1 Apr 25, 2012
Online Consultation Apr 25 to May 9, 2012
Open House #2 Fall-Winter 2012
- Response to Open House #1 input
- Architectural treatments
- Final Station Design Open House
Open House #3 Early 2013 (TBD)
- Construction staging
- Ongoing Outreach on Construction
Tunnelling Construction Start Mid 2013 (TBD)
Chaplin Station Construction Start 2015 (TBD)
![Page 3: Chaplin Station Preliminary Design Online ConsultationChaplin Station Design Schedule Open House #1 Apr 25, 2012 Online Consultation Apr 25 to May 9, 2012 Open House #2 Fall-Winter](https://reader035.vdocument.in/reader035/viewer/2022062506/5f08fc617e708231d424ae78/html5/thumbnails/3.jpg)
3
Aerial View
Chaplin Station Preliminary Design
![Page 4: Chaplin Station Preliminary Design Online ConsultationChaplin Station Design Schedule Open House #1 Apr 25, 2012 Online Consultation Apr 25 to May 9, 2012 Open House #2 Fall-Winter](https://reader035.vdocument.in/reader035/viewer/2022062506/5f08fc617e708231d424ae78/html5/thumbnails/4.jpg)
4
Local Context
View East
Kay Gardner Beltline
View West Chaplin Cres. Parkette
• Eglinton Way BIA • Beltline Trail• Generally 26m ROW, but varies• 3 lanes of through traffic plus 2 HOV lanes, peak hours• On street parking, both sides - off hours• Turning lanes at Chaplin Crescent• Generous sidewalks - 4.75 to 5.0 wide• The Eglinton Way BIA– lighting, unit paving• Few street trees, in poor condition• Opportunity to improve public realm
![Page 5: Chaplin Station Preliminary Design Online ConsultationChaplin Station Design Schedule Open House #1 Apr 25, 2012 Online Consultation Apr 25 to May 9, 2012 Open House #2 Fall-Winter](https://reader035.vdocument.in/reader035/viewer/2022062506/5f08fc617e708231d424ae78/html5/thumbnails/5.jpg)
5
Area Within 10 Minute Walk (500m) of Future Chaplin Station
proposed station
500m walking radius
existing roads
existing railway
Eglinton Ave W
Avenue R
d
Roselawn Ave
Chaplin Station Preliminary Design
![Page 6: Chaplin Station Preliminary Design Online ConsultationChaplin Station Design Schedule Open House #1 Apr 25, 2012 Online Consultation Apr 25 to May 9, 2012 Open House #2 Fall-Winter](https://reader035.vdocument.in/reader035/viewer/2022062506/5f08fc617e708231d424ae78/html5/thumbnails/6.jpg)
6
Forest HillMemorial Arena
Multi-unit Residential
Eglinton Ave W
Avenue R
d
Roselawn Ave
C/R mixed use
Commercial
Institutional
Educational
Parks and Green Corridor
Recreational
Chaplin Station Preliminary Design
Land Use
![Page 7: Chaplin Station Preliminary Design Online ConsultationChaplin Station Design Schedule Open House #1 Apr 25, 2012 Online Consultation Apr 25 to May 9, 2012 Open House #2 Fall-Winter](https://reader035.vdocument.in/reader035/viewer/2022062506/5f08fc617e708231d424ae78/html5/thumbnails/7.jpg)
7
Public Transportation
Forest HillMemorial Arena
Eglinton Ave W
Avenue R
d
Roselawn Ave
7 – Bathurst Routes
33 – Forest Hill Routes
Bus Shelters/Stops
Proposed Station Area
Proposed LRT Line
142-Downtown/Avenue Express Rd. Routes61-Avenue Rd North
14-Glencairn Routes
32-Eglinton West Route
Chaplin Station Preliminary Design
![Page 8: Chaplin Station Preliminary Design Online ConsultationChaplin Station Design Schedule Open House #1 Apr 25, 2012 Online Consultation Apr 25 to May 9, 2012 Open House #2 Fall-Winter](https://reader035.vdocument.in/reader035/viewer/2022062506/5f08fc617e708231d424ae78/html5/thumbnails/8.jpg)
8
Pathway and Numbered Bikeways
Chaplin Station Preliminary Design
Numbered Bikeways
Belt Line
Eglinton Ave
![Page 9: Chaplin Station Preliminary Design Online ConsultationChaplin Station Design Schedule Open House #1 Apr 25, 2012 Online Consultation Apr 25 to May 9, 2012 Open House #2 Fall-Winter](https://reader035.vdocument.in/reader035/viewer/2022062506/5f08fc617e708231d424ae78/html5/thumbnails/9.jpg)
9
Project Environmental ReportEA Layout - 2010
Chaplin Station Preliminary Design
![Page 10: Chaplin Station Preliminary Design Online ConsultationChaplin Station Design Schedule Open House #1 Apr 25, 2012 Online Consultation Apr 25 to May 9, 2012 Open House #2 Fall-Winter](https://reader035.vdocument.in/reader035/viewer/2022062506/5f08fc617e708231d424ae78/html5/thumbnails/10.jpg)
10
2012 Consolidated LayoutStreet Level Plan
![Page 11: Chaplin Station Preliminary Design Online ConsultationChaplin Station Design Schedule Open House #1 Apr 25, 2012 Online Consultation Apr 25 to May 9, 2012 Open House #2 Fall-Winter](https://reader035.vdocument.in/reader035/viewer/2022062506/5f08fc617e708231d424ae78/html5/thumbnails/11.jpg)
11
• Streetscape reconstruction – building face to building face• Length of streetscape work – Russell Hill Road to the bridge (210 metres)• Significant potential to enhance the public realm as per ESC urban design guidelines• Streetscape elements include:
• New consistent line of street trees• New sidewalks pavements with articulated furnishing zones• New road and pedestrian lighting
2012 Preliminary Streetscape Plan
Secondary Entrance West Secondary Entrance EastMain Entrance
![Page 12: Chaplin Station Preliminary Design Online ConsultationChaplin Station Design Schedule Open House #1 Apr 25, 2012 Online Consultation Apr 25 to May 9, 2012 Open House #2 Fall-Winter](https://reader035.vdocument.in/reader035/viewer/2022062506/5f08fc617e708231d424ae78/html5/thumbnails/12.jpg)
12
New Preliminary Design ConceptLooking East
![Page 13: Chaplin Station Preliminary Design Online ConsultationChaplin Station Design Schedule Open House #1 Apr 25, 2012 Online Consultation Apr 25 to May 9, 2012 Open House #2 Fall-Winter](https://reader035.vdocument.in/reader035/viewer/2022062506/5f08fc617e708231d424ae78/html5/thumbnails/13.jpg)
13
New Preliminary Design ConceptLooking West
![Page 14: Chaplin Station Preliminary Design Online ConsultationChaplin Station Design Schedule Open House #1 Apr 25, 2012 Online Consultation Apr 25 to May 9, 2012 Open House #2 Fall-Winter](https://reader035.vdocument.in/reader035/viewer/2022062506/5f08fc617e708231d424ae78/html5/thumbnails/14.jpg)
14
Key Advantages of Consolidated Design• Improves look and feel for community
• Enhances access for communities to the west
• Enhances connectivity to Belt Line Trail
• Eliminates private property impact to Shoppers Drug Mart
• Preserves potential for future investment and development
• Shorter Station box reduces construction footprint, impact & costs
• Re-purposes Toronto Fire building for public use & preserves heritage(Toronto Fire is re-locating to a new facility)
Chaplin Station Preliminary Design
![Page 15: Chaplin Station Preliminary Design Online ConsultationChaplin Station Design Schedule Open House #1 Apr 25, 2012 Online Consultation Apr 25 to May 9, 2012 Open House #2 Fall-Winter](https://reader035.vdocument.in/reader035/viewer/2022062506/5f08fc617e708231d424ae78/html5/thumbnails/15.jpg)
15
Main Entrance – North EastLooking East
Existing Future
Chaplin Station Preliminary Design
![Page 16: Chaplin Station Preliminary Design Online ConsultationChaplin Station Design Schedule Open House #1 Apr 25, 2012 Online Consultation Apr 25 to May 9, 2012 Open House #2 Fall-Winter](https://reader035.vdocument.in/reader035/viewer/2022062506/5f08fc617e708231d424ae78/html5/thumbnails/16.jpg)
16
Main Entrance – North East
Existing
Future
![Page 17: Chaplin Station Preliminary Design Online ConsultationChaplin Station Design Schedule Open House #1 Apr 25, 2012 Online Consultation Apr 25 to May 9, 2012 Open House #2 Fall-Winter](https://reader035.vdocument.in/reader035/viewer/2022062506/5f08fc617e708231d424ae78/html5/thumbnails/17.jpg)
17Secondary Entrance – South EastBefore & After
Chaplin Station Preliminary Design
Existing
Future
![Page 18: Chaplin Station Preliminary Design Online ConsultationChaplin Station Design Schedule Open House #1 Apr 25, 2012 Online Consultation Apr 25 to May 9, 2012 Open House #2 Fall-Winter](https://reader035.vdocument.in/reader035/viewer/2022062506/5f08fc617e708231d424ae78/html5/thumbnails/18.jpg)
18
Secondary Entrance – South EastRe-purpose Toronto Fire Station & Maintain Heritage
Door Treatment Under Review
Chaplin Station Preliminary Design
![Page 19: Chaplin Station Preliminary Design Online ConsultationChaplin Station Design Schedule Open House #1 Apr 25, 2012 Online Consultation Apr 25 to May 9, 2012 Open House #2 Fall-Winter](https://reader035.vdocument.in/reader035/viewer/2022062506/5f08fc617e708231d424ae78/html5/thumbnails/19.jpg)
19
Secondary Entrance – South WestLooking South
Today Future
Chaplin Station Preliminary Design
![Page 20: Chaplin Station Preliminary Design Online ConsultationChaplin Station Design Schedule Open House #1 Apr 25, 2012 Online Consultation Apr 25 to May 9, 2012 Open House #2 Fall-Winter](https://reader035.vdocument.in/reader035/viewer/2022062506/5f08fc617e708231d424ae78/html5/thumbnails/20.jpg)
20
Secondary Entrance – South WestLooking West
Existing Future
Chaplin Station Preliminary Design
![Page 21: Chaplin Station Preliminary Design Online ConsultationChaplin Station Design Schedule Open House #1 Apr 25, 2012 Online Consultation Apr 25 to May 9, 2012 Open House #2 Fall-Winter](https://reader035.vdocument.in/reader035/viewer/2022062506/5f08fc617e708231d424ae78/html5/thumbnails/21.jpg)
21
Station Box Massing South East Entrance
South West Entrance
MainEntrance
![Page 22: Chaplin Station Preliminary Design Online ConsultationChaplin Station Design Schedule Open House #1 Apr 25, 2012 Online Consultation Apr 25 to May 9, 2012 Open House #2 Fall-Winter](https://reader035.vdocument.in/reader035/viewer/2022062506/5f08fc617e708231d424ae78/html5/thumbnails/22.jpg)
22
Longitudinal Section
Fire Ventilation ShaftPublic
MechanicalElectrical
Staff Areas
Chaplin Station Preliminary Design
![Page 23: Chaplin Station Preliminary Design Online ConsultationChaplin Station Design Schedule Open House #1 Apr 25, 2012 Online Consultation Apr 25 to May 9, 2012 Open House #2 Fall-Winter](https://reader035.vdocument.in/reader035/viewer/2022062506/5f08fc617e708231d424ae78/html5/thumbnails/23.jpg)
23
Chaplin Station Preliminary Design
Pedestrian Circulation
![Page 24: Chaplin Station Preliminary Design Online ConsultationChaplin Station Design Schedule Open House #1 Apr 25, 2012 Online Consultation Apr 25 to May 9, 2012 Open House #2 Fall-Winter](https://reader035.vdocument.in/reader035/viewer/2022062506/5f08fc617e708231d424ae78/html5/thumbnails/24.jpg)
24
Streetscape Section
• Proposed street section consistent with ESC urban design guidelines and the Eglington Way BIA details
• Sidewalks - 2.5m• Furnishing zone - 1.8m• Street trees - 10m on centre, flush with pavement
![Page 25: Chaplin Station Preliminary Design Online ConsultationChaplin Station Design Schedule Open House #1 Apr 25, 2012 Online Consultation Apr 25 to May 9, 2012 Open House #2 Fall-Winter](https://reader035.vdocument.in/reader035/viewer/2022062506/5f08fc617e708231d424ae78/html5/thumbnails/25.jpg)
25
•New park design•Retained large trees on north edge•Generous paved areas are provided•New grove of large caliper trees•New bus layby on Chaplin with
new transit shelter•Potential pick-up area/taxi stand
on Gilgorm Road •New shortcut sidewalk on the north edge
Main Entrance Landscaping
![Page 26: Chaplin Station Preliminary Design Online ConsultationChaplin Station Design Schedule Open House #1 Apr 25, 2012 Online Consultation Apr 25 to May 9, 2012 Open House #2 Fall-Winter](https://reader035.vdocument.in/reader035/viewer/2022062506/5f08fc617e708231d424ae78/html5/thumbnails/26.jpg)
26
Secondary Entrance West Landscape Concept (Ravine)
• New staircase with bike wheel ramp to access Beltline Trail
• Enhance the existing embankments with native plantings
• Provide a privacy fence at the end unit
![Page 27: Chaplin Station Preliminary Design Online ConsultationChaplin Station Design Schedule Open House #1 Apr 25, 2012 Online Consultation Apr 25 to May 9, 2012 Open House #2 Fall-Winter](https://reader035.vdocument.in/reader035/viewer/2022062506/5f08fc617e708231d424ae78/html5/thumbnails/27.jpg)
27
East Secondary EntranceLandscape Concept (Fire Station)
• Public space in front of entrance including seating and bike rings• Security fencing on east property line
Chaplin Station Preliminary Design
![Page 28: Chaplin Station Preliminary Design Online ConsultationChaplin Station Design Schedule Open House #1 Apr 25, 2012 Online Consultation Apr 25 to May 9, 2012 Open House #2 Fall-Winter](https://reader035.vdocument.in/reader035/viewer/2022062506/5f08fc617e708231d424ae78/html5/thumbnails/28.jpg)
Chaplin Station Community Outreach for Construction
28
Chaplin Station Preliminary Design
• At this early design stage, construction staging is not yet developed
• Comprehensive Construction Management Plan & individual construction plans for each station will be developed with local consultation well before construction
• Please contact us any time with questions you may have about construction
![Page 29: Chaplin Station Preliminary Design Online ConsultationChaplin Station Design Schedule Open House #1 Apr 25, 2012 Online Consultation Apr 25 to May 9, 2012 Open House #2 Fall-Winter](https://reader035.vdocument.in/reader035/viewer/2022062506/5f08fc617e708231d424ae78/html5/thumbnails/29.jpg)
29
The Crosstown TeamPlease Get in Touch with Us!
Community Office Hours — 2012
Monday, Wednesday, Friday: 9:00 a.m. – 5:00 p.m. Tuesday & ThursdayPlease make an appointmentEvening hours and presentation available
Devin Horne, Franca Di Giovanni,Denise Jayawardene
E-mail: [email protected] Online: www.thecrosstown.caTel: 416-338-6310Fax: 416-397-8193TTY: 416-481-2523
Visit our West Community Office at1848 Eglinton Avenue West (at Dufferin)
facebook.com/thecrosstowntwitter.com/crosstownTO
![Page 30: Chaplin Station Preliminary Design Online ConsultationChaplin Station Design Schedule Open House #1 Apr 25, 2012 Online Consultation Apr 25 to May 9, 2012 Open House #2 Fall-Winter](https://reader035.vdocument.in/reader035/viewer/2022062506/5f08fc617e708231d424ae78/html5/thumbnails/30.jpg)
Thank You
Chaplin Station Preliminary Design